Vous êtes sur la page 1sur 4

DONI AFENDI ST.

Jln. Ki. Muh. Idris, Sumuranja Rt 10/05,


Kec. Pulo Ampel, Serang – Banten
Mobile No. +6287771816338
E-mail : Donisum.25@gmail.com

CURICULUM VITAE

I. PERSONAL DATA

Name : DONI AFENDI, ST.

Place, date of Birth : SERANG, FEBRUARI 11TH 1980

Gender : Male

Heigh/Weight : 170cm / 71 kg

Nationality : Indonesia

Relegion : Moslem

Marital status : Married

Home address : Jln. Ki. Muh. Idris, Sumuranja Rt 10/05,


Kec. Pulo Ampel, Serang – Banten, 42455

II. EDUCATION
Elementary School : 1994, SDN Sumuranja II Graduated.
Junior High School : 1997, MTsN Bojonegara Graduated.
Senior High School : 2000, SMAN Kramat Watu Graduated.
Colleege : 2007, Universitas Langlangbuana, (S1) Faculty of Technique
Industry. Graduated.
GPA : 2, 81

III. COURSE & TRAINING

Non Formal Education :

2012 : Training Assocciate Welding Engineering (Las Muda), JAPAN


Standard In Van Ovan – Pondok Cilegon Indah (C ilegon)-Banten

2008 : Development Computer AutoCAD Training

Conducted by The Computer Granada Institute, Cilegon – Banten

2006 : Career Development Program Training in Langlangbuana


University

Career Development and Neuro Linguistic Program (NLP) Training in


Pendidikan Indonesia University (UPI)

2002 : Computer Training

Conducted by The Computer Laboratory of Technique Faculty,


Langlangbuana University

1998 : Basic Computer Microsoft Office Training

Conducted by The Computer LPK Mustika Sari, Serang – Banten

1
DONI AFENDI ST.
Jln. Ki. Muh. Idris, Sumuranja Rt 10/05,
Kec. Pulo Ampel, Serang – Banten
Mobile No. +6287771816338
E-mail : Donisum.25@gmail.com

Computer Skill Fluent : MS. Office (Word, Excel, Power Point, Publisher, Visio),

Autocad, zwCAD or CAD model, Corel DRAW, Adobe Photoshop,


Adobe PDF, SPSS (Statistic), & Installation Software and Hardware
Computer, LAN/ Network, Internet, etc.

Summary of Qualification
Strength point : Dynamic person who are eager to learn. Potential and having
strong analysis capability. Excellent ability to communicate effectly.
Able to work on own initiative or as part of a team.
Able to work within under situation.
Dicipline, loyal and trustworthy.

Skills : Input data Painting (Coating), Piping and Structural for hydrotest Inspection Fit-
Up, Visual, NDT and Dimensional, also Computer literate.

Drawing Structure (Design 2 & 3 Dimensioning), Planning & Organizing.

IV. WORK EXPERIENCE

1. Period : May 11 th, 2013- July 20 th, 2014


Company : PT. BAKRIE CONSTRUCTION

Departement : Quality Control

Reason of leaving : Job Completed

Position : QC Officer

- Project STC-0761-EPCI UL FIELD Development-Pt. Pertamina


PHE ONWJ-Job 417

- Project BANYU URIP - MOORING TOWER EPC3 PROJECT -


PT. Mobil Cepu Ltd.- Job 416

- Project EPCI-ASTI&MILA-A Platforms And Pipeline.-PT. CNOOC


SES LTD. Job 418

o Input Painting Inspection Report (Coating for Daily Blasting & Painting Inspection
Report) to match with painting procedure from client.

o Input and Review Welding Treacibility Record

o Input Data NDT Plan Register and connect item for joint welding from Weld Map &
Shop Drawing.
o Input data Visual, Fit up, Non Destructive Test (Ultrasonict Test, Magnetic Test,
Radiographi Test and Penetran Test).

2. Period : May 10th , 2012 – May 20 th, 2013

Company : PT. BAKRIE CONSTRUCTION

2
DONI AFENDI ST.
Jln. Ki. Muh. Idris, Sumuranja Rt 10/05,
Kec. Pulo Ampel, Serang – Banten
Mobile No. +6287771816338
E-mail : Donisum.25@gmail.com

Departement : Quality Control

Reason of leaving : Job Completed

Position : QC Officer

Responsibility :

o Working Painting Document ( Input Coating, to Daily Blasting & Painting Inspection
Report)

o Input Data Fit-UP


o Update Drawing Register Welding Traceability Record.
o Dossier Structural and Piping ( Compail and Review Document Fit-up, Visual
Inspection, Welding Traceability Record, NDT Report and attachment for Completed )
o Document to Sign Client. )
- Client / Project :
- PT. Pertamina Hulu Energy – PHE WMO
Onshore Fabrication & Construction Service For KE-38B, KE-39 & KE-
54 Platform Project.

3. Period service : May,05 th – December, 20 th 2011


Company : PT. Bakrie Construction
Departement : Quality Control, Section Documentation
Position : QC. Dossier

Responsibility : - Prepare Summary Material Treacilibility Report


- Prepare Fit-up Inspection Report
- Prepare Visual Inspection Report
- Prepare Summary Welding Traceability Report
- Prepare Document for Dossier, include ITP, Procedure, NDT
Report, and attachment for Completed Document to Sign Client.

Client / Project :
o PT. Pertamina Hulu Energy – PHE ONWJ
3 New NUI Platforms & Pipeline of APN - E/F
New Field Development Project

o PT. Hess ( Indonesia – Pangkah ) Limited


Ujung Pangkah Offshore, WHP-B EPCC Platform and Jacket
Project
Ujung Pangkah Development Offshore Phase II, AUP & CPP
EPCC Jacket project

o PT. Timas Suplindo


Terang Surasun Batur ( TSB ) Development Project
Subsea Manifold, Kangean Energy Indonesia

o PT. LGL, Lihir Gold Limited

3
DONI AFENDI ST.
Jln. Ki. Muh. Idris, Sumuranja Rt 10/05,
Kec. Pulo Ampel, Serang – Banten
Mobile No. +6287771816338
E-mail : Donisum.25@gmail.com

Fabrication and Supply of Steel Structure for New Creast Mining


Project – Papua New Geuini

o PT. Mitsu’i Co. Ltd


Paiton Expantion Project, Fabrication of Circulation Water ( CW )
Piping & Related Appurtenance, Surabaya – West Java, Indonesia

4. Period service : October, 06th 2010 up to Maret 31th 2011

Company : PT. Gunanusa Utama Fabricators


Project Location : ONGC – ICP-R Platform INDIA – Grenyang Yard
Classification : As Dossier Structural (sertified)
Reason of leaving : Job Completed

5. Period service : January, 26th 2010 up to April, 23th 2010

Company : PT. Wearwel International


Product Location : Garment - Tanjung Priok - Jakarta
Classification : Industrial Engineering (sertified)
Reason of leaving : Job Completed

6. Period service : August, 20th 2008 up to August, 19th 2009

Company : CV. Bina Ikhsan Nusantara


Product Location : PT. Gunanusa Utama Fabricators
Classification : Staff Administrasi (sertified)
Reason of leaving : Contract Completation

7. Period service : Maret 04th 2008 up to Juni, 04th 2008

Company : PT. Asia Electric Industries


Product Location : Washing Machine – Tangerang
Classification : Electrical Engineering (sertified)
Reason of leaving : Contract Completation

The above information was made by me with full honesty

Your Faithfully

DONI AFENDI, ST.

Vous aimerez peut-être aussi