Vous êtes sur la page 1sur 21

COLD WATERLINE 80 elbow 45° 2"

40 elbow 45° 4"


47 Elbow 90° 20mm 13 elbow 90° 2"
10 Elbow 90° 25mm 8 p-trap 2"
14 Elbow 90° 32mm 1 p-trap 3"
1 End Cap 32mm 1 reducing tee 3" x 2"
19 Female Thread Elbow 20mmx1/2" 2 reducing tee 4" x 2"
2 Female Thread Elbow 25mmx3/4" 16 tapped tee 2" x 1/2"
4 Female Thread Tee 20mmx1/2" 16 tapped tee 2" x 1/4"
2 Reducing Tee 25x20x25 25x20x25 28 tee 2"
4 Reducing Tee 32x20x32 32x20x32 1 tee 3"
2 Reducing Tee 32x25x32 32x25x32 2 wye 2"
4 shut-off valve lower part 20mmx3/4" 2 wye 3"
4 shut-off valve upper part Concealed 14 wye 4"
7 Socket Reducer 32/20mm 3 wye reducer 3" x 2"
2 Socket Reducer 32/25mm 14 wye reducer 4" x 2"
8 Tee 20mm 41 tee 4"
10 Tee 32mm 15 elbow 45° 3"
2 Valve (complete set) 20mm 15 cleanout 4"
6 Valve (complete set) 32mm
INTERIOR CEILING
Material Allowance Floor Area Qty/sq m QTY UNIT FIX QTY.
Wall Angle 1.4 114.598 0.40 64.17 pc 64.17
C-Furring 1.4 114.598 1.20 192.52 pc 192.52
Carrying Channel 1.4 114.598 0.25 40.11 pc 40.11
Furring Clip 1.4 114.598 2.50 401.09 pc 401.09
Ficem Board 4mm 1.4 114.598 0.45 72.20 pc 72.20
Hardiflex screw 1.4 114.598 30.00 4,813.12 pc 4,813.12
Blind rivets 1.4 114.598 0.05 8.02 box 8.02
Tie Wire # 18 300 ties/kilo
Tie Wire # 16 150 ties/kilo
CWN # 1 1700 pcs/kilo
CWN # 2 425 pcs/kilo
CWN # 3 120 pcs/kilo
CWN # 4 55 pcs/kilo

POLYURETHANE per 15 sets of steps (Thread) PER THREAD


Sanding sealer 3 lit 0.20000
Polyurethane top coat 1 gal 0.06667
Polyurethane reducer 2 lit 0.13333
Sand paper 3M # 36 3 ft 0.20000
Sand paper 3M # 60 3 ft 0.20000
Sand paper 3M # 100 3 ft 0.20000
Sand paper 3M # 120 10 ft 0.66667
Paint brush 2" 2 pc 0.13333
Rugs 1 kl 0.06667
Septic Tank:
Wall Dimension
TYPE/LOCATION Height Length Opening 1-Face Area
2-Face AreaCHB # 4 CHB # 6
Septic Tank:
Front 2.10 3.70 0.00 7.77 15.54 97.13
Leaching Chamber 2.10 1.60 0.00 3.36 6.72 42.00
Digestive Chamber 2.10 1.60 0.00 3.36 6.72 42.00
Sides 2.10 3.20 0.00 6.72 13.44 84.00
Rear 2.10 3.70 0.00 7.77 15.54 97.13
TOTAL: 0.00 28.98 57.96 0.00 362.25
Area: 0.00 28.98

CONCRETE SLAB

Location Qty Depth Width Length Bedding Gravel Sand

Slab (Top) 1 0.130 3.700 1.600 0.77 0.58


Slab (Bottom) 1 0.100 3.700 1.600 0.59 0.59 0.44
0 0.100 0.000 0.000 0.00 0.00
0 0.00 0.00
0.59 1.36 1.02
Slab Formworks (Plywood) 2.672
Slab Formworks (Coco-lmber 2"x3"x12') 35.520
CWN # 4 3.229
CWN # 2 0.807
CWN # 1 0.161

QTY UNIT DESCRIPTION UNIT PRICE MATERIALS LABOR Cont.


I. Site & Temporary Works
11 cu. m. Excavation 180.00 1,935.00 96.75
0.00 1,935.00 96.75
II. Concrete & Masonry Works
0.59 cu.m. Ordinary gravel for bedding 700.00 414.40 165.76 29.01
1.36 cu.m. gravel G-3/4 910.00 1,239.06 495.62 86.73
5.19 cu.m. Sand 500.00 2,593.54 1,037.42 181.55
74.74 bags Cement 220.00 16,443.36 6,577.34 1,151.03
362.25 pcs CHB 5" 12.00 4,347.00 1,738.80 304.29
1.48 kl # 16 Tie Wire 60.00 88.96 35.58 6.23
32.01 pcs RSB 12mmØ x 6m 165.00 5,280.87 2,112.35 369.66
7.31 pcs RSB 10mmØ x 6m 115.00 840.49 336.20 58.83
3 pcs Construction pail 100.00 300.00 120.00 21.00
31,547.68 12,619.07 2,208.34
III. Form Works
2.67 pc 1/4 thk Marine Plywood 380.00 1,015.44 406.18 71.08
35.52 pc 2 x 3 x 12 Coco Lumber 84.00 2,983.68 1,193.47 208.86
3.23 kl CWN # 4 50.00 161.45 64.58 11.30
0.81 kl CWN # 2 52.00 41.98 16.79 2.94
0.16 kl CWN # 1 57.00 9.20 3.68 0.64
4,211.76 1,684.70 294.82
TOTALS
Sand Cement 12mm Ø RSB Tie Wire
for CHB #4for CHB #6for CHB #4 for CHB #6 for CHB #4 for CHB #6 for CHB #4 for CHB #6

0.00 1.12 0.00 16.75 0.00 4.66 0.00 0.10


0.00 0.48 0.00 7.25 0.00 2.02 0.00 0.04
0.00 0.48 0.00 7.25 0.00 2.02 0.00 0.04
0.00 0.97 0.00 14.49 0.00 4.03 0.00 0.09
0.00 1.12 0.00 16.75 0.00 4.66 0.00 0.10
0.00 4.17 0.00 62.49 0.00 17.39 0.00 0.39

SLAB
12mmØ X 6.0 RSB / 10mmØ X 6.0 RSB
V Long #16 TIE
Cement # of Bars # of Pcs # of Bars # of Pcs WIRE AREA PERI

6.93 10.66667 7.31 25 7.31 0.88 5.92 10.600


5.33 5.333333 3.65 12 3.65 0.22 5.92 10.600
0.00 0 0.00 0 0.00 0.00 0.00 0.000
0.00 0 0.00 0 0.00 0.00 0.00 0.000
12.25 1.10 11.84 21.200

TOTAL SUMMARY:
DESCRIPTION QTY
Excavation 10.75
2,031.75 Backfill 0.00
2,031.75 Bedding 0.59
Gravel 1.36
Sand 5.19
Cement 74.74
12mm RSB 32.01
10mm RSB 7.31
tie wire 1.48

46,375.08
48,406.83

6,191.29
54,598.12
11.84
MASONRY:
Wall Dimension
TYPE/LOCATION Height Length Opening 1-Face Area 2-Face Area CHB # 4
Ground Floor
Rear-Fence 3.34 5.00 0.00 16.70 33.40
Front-Fence 1.20 3.29 0.00 3.95 7.90

REINFORCED COLUMN
CONCRETE
Type Qty Depth Base Length Gravel Sand
C3 3 0.300 0.300 4.14 1.12 0.84
0 0.000 0.000 0.00 0.00 0.00
3 TOTALS: 4.140 1.12 0.84

REINFORCED COLUMN
CONCRETE
Type Qty Depth Base Length Gravel Sand
C3 16 0.250 0.250 3.20 3.20 2.40
0 0.000 0.000 0.00 0.00 0.00
16 TOTALS: 3.200 3.20 2.40

REINFORCED COLUMN
CONCRETE
Type Qty Depth Base Length Gravel Sand
0 0.000 0.000 0.00 0.00 0.00
0 TOTALS: 0.000 0.00 0.00

COLUMN FOOTING:

CONCRETE
Type Qty Thick Width Length Bedding Gravel
F3 16 0.250 0.800 0.800 1.02 2.56
16 TOTALS: 1.02 2.56

WALL FOOTING
CONCRETE
Type Qty Depth Base Length Bedding Gravel
WF-1 1 0.200 0.400 53.530 2.141 4.28
WF-2 1 0.250 0.350 10.700 0.375 0.94
1 TOTALS: 2.52 5.22

BEAM/S

CONCRETE
Type Qty Depth Base Length Gravel Sand

Beam 1 0.450 0.250 6.460 0.73 0.55


0 0.000 0.000 0.000 0.00 0.00
0 0.000 0.000 0.000 0.00 0.00
TOTALS: 6.460 0.73 0.55
PAINTING: Area Primer Top Coat Top Coat Clear
Exterior Wall: 41.30 1.65 4.96 1.38

Column Formworks (Plywood) 17.672


Beam Formworks (Plywood) 1.346
Formworks (Coco-lmber 2"x3"x12') 114.108
CWN # 4 10.373
CWN # 2 2.593
CWN # 1 0.519

SUMMARY: OTHERS
DESCRIPTION QTY sand paper 41.30
Excavation 27.38 paint brush 0.83
Backfill 0.00 roller brush 0.83
Bedding 3.54 baby roller 0.41
Gravel 12.82
Sand 15.60
Cement 208.78
16mm RSB 24.58
12mm RSB 61.63
10mm RSB 215.05
9mm RSB 15.53
tie wire 45.68
CHB 5" 258.10
Sand Cement 10mm Ø RSB Tie Wire
CHB # 6 for CHB #4 for CHB #6 for CHB #4 for CHB #6 for CHB #4 for CHB #6 for CHB #4

208.75 2.40 36.01 10.02


49.35 0.57 8.51 2.37
258.10 2.97 44.52 12.39

REINFORCED COLUMN
16mm x 6.0m RSB 10mmØ X 6.0 Stirrups #16 TIE Plaster
Cement # of Bars # of Pcs # of Ties # of Pcs WIRE Area Sand
10.06 6 13.80 41 34.50 8.28 14.90 0.75
0.00 0 0.00 0 0.00 0.00 0.00 0.00
10.06 13.80 34.50 8.28 14.90 0.75

REINFORCED COLUMN
12mm x 6.0m RSB 10mmØ X 6.0 Stirrups #16 TIE Plaster
Cement # of Bars # of Pcs # of Ties # of Pcs WIRE Area Sand
28.80 4 37.93 32 118.52 27.31 51.20 2.56
0.00 0 0.00 0 0.00 0.00 0.00 0.00
28.80 37.93 118.52 27.31 51.20 2.56

REINFORCED COLUMN
10mm x 6.0m RSB 9mmØ X 6.0 Stirrups #16 TIE Plaster
Cement # of Bars # of Pcs # of Ties # of Pcs WIRE Area Sand
0.00 0 0.00 0 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00

COLUMN FOOTING:
12mmØ X 6.0 RSB Grade 60 #16 Excavation
LONG CROSS TIE
Sand Cement # of Bars # of Pcs # of Bars # of Pcs WIRE Depth
1.92 23.04 5 11.85 5 11.85 2.67 1.200
1.92 23.04 11.85 11.85 2.67 1.200
23.70

LL FOOTING Excavation
10mmØ x 6.0m RSB 9mmØ X 6.0 Stirrups #16 TIE
Depth
Sand Cement # of Bars # of Pcs # of Ties # of Pcs WIRE
3.21 38.54 3 29.74 178 13.22 3.57 0.600
0.70 8.43 3 5.94 36 2.31 0.71 0.600
3.91 46.97 35.68 15.53 4.28

BEAM/S
16mmØ X 6.0 RSB 10mmØ X 6.0 Ties #16 TIE
Cont. Top Bottom No. of No. of No. Of
Cement Bars Bars Bars Pcs. Stirrups Pcs. WIRE

6.54 6 2 2 10.78 54 13.96 2.87


0.00 0 0 0 0.00 0 0.00 0.00
0.00 0 0 0 0.00 0 0.00 0.00
6.54 10.78 13.96 2.87
Filler Putty Neutralizer Joint tape Thinner Filler Sand paper Roller
0.41 5.16 1.03 5.88 0.55 41.30 1
Tie Wire
for CHB #6

0.22
0.05
0.28

Plaster
Cement
9.69 12.42
0.00 0
9.69

Plaster
Cement
33.28 51.2
0.00 0
33.28

Plaster
Cement
0.00 0
0.00

Excavation

Volume
12.29
12.29

Volume
12.85
2.25
15.09

Plaster
Area Sand Cement

9.04 0.45 5.88 6.46


0.00 0.00 0.00 0
0.00 0.00 0.00 0
0.45 5.88 6.46
Brush
1
PROJECT NAME: Proposed Two-Storey Residential Building
LOCATION: Lot 18, Block 1, Renaissance Subdivision, Washington Drive, Legazpi City
OWNER: Sps. Alexis & Zenaida Rellama
SUBJECT: Bill of Materials & Cost Estimates (Steel Gate & Fence)

QTY UNIT DESCRIPTION UNIT PRICE MATERIALS LABOR Cont. TOTAL


I. Site & Temporary Works
1 lot Mobilization 2,000.00 2,000.00 100.00
1 lot Demobilization and Project Close Out 2,000.00 2,000.00 100.00
27.38 cu. m. Foundation Excavation 180.00 4,928.80 246.44
0.00 8,928.80 446.44 9,375.24
II. Concrete & Masonry Works 9,375.24
3.54 cu.m. Ordinary gravel for bedding 700.00 2,477.79 991.12 173.45
12.82 cu.m. gravel G-3/4 910.00 11,669.11 4,667.64 816.84
15.60 cu.m. Sand 500.00 7,798.88 3,119.55 545.92
208.78 bags Cement 220.00 45,931.00 18,372.40 3,215.17
258.10 pcs CHB 5" 12.00 3,097.20 1,238.88 216.80
45.68 kl # 16 Tie Wire 60.00 2,740.91 1,096.36 191.86
24.58 pcs RSB 16mmØ x 6m 285.00 7,003.95 2,801.58 490.28
61.63 pcs RSB 12mmØ x 6m 165.00 10,168.89 4,067.56 711.82
215.05 pcs RSB 10mmØ x 6m 115.00 24,730.46 9,892.18 1,731.13
15.53 pcs RSB 9mmØ x 6m 85.00 1,319.97 527.99 92.40
5.00 pcs Construction pail 100.00 500.00 200.00 35.00
117,438.14 46,975.26 8,220.67 172,634.07
III. Form Works 182,009.31
19.02 pc 1/4 thk Marine Plywood 380.00 7,226.86 2,890.74 505.88
114.11 pc 2 x 3 x 12 Coco Lumber (Forms) 84.00 9,585.10 3,834.04 670.96
10.37 kl CWN # 4 50.00 518.67 207.47 36.31
2.59 kl CWN # 2 52.00 134.86 53.94 9.44
0.52 kl CWN # 1 57.00 29.56 11.83 2.07
17,495.06 6,998.02 1,224.65 25,717.73
IV. Exterior Painting (CHB Wall): 207,727.04
1.03 gal Davies Concrete Neutralizer 411.00 424.32 169.73 29.70
5.16 gal Liquid Tile Putty 620.00 3,200.44 1,280.18 224.03
0.41 gal Davies Liquid Tile Cast (5-900) 460.00 189.96 75.98 13.30
1.65 gal Liquid Tile Primer and Sealer 765.00 1,263.66 505.46 88.46
4.96 gal Liquid Tile Top Coat 857.00 4,246.88 1,698.75 297.28
1.38 gal Liquid Tile Hypergloss 515.00 708.91 283.57 49.62
6.78 gal Davies Liquid Tile Reducer (5-70) 410.00 2,779.56 1,111.83 194.57
8 can Davies Acry Color 143.00 1,144.00 457.60 80.08
13,957.74 5,583.09 977.04 20,517.87
V. Gate/ Fence: 228,244.91
A. Front Fence & Gate (Along Divine World Coll. Road)
1. Bi-Folding Gate:
6 pc Channel Bar 2"x 4"x 6m LD (Gate Frame) 2,086.00 12,516.00 5,006.40 876.12
6 pc Flat Bar 3/16" x 3" (Cap) 842.00 5,052.00 2,020.80 353.64
4 pc Angle Bar 1/4x1 3/4 x1 3/4 (Gate Frame) 1,059.00 4,236.00 1,694.40 296.52
10 pc Square Bar 20mm 787.00 7,870.00 3,148.00 550.90
4 pc Square Tube 1" x 1" 320.00 1,280.00 512.00 89.60
4 pc Plain G.I Sheet GA #16 1,152.00 4,608.00 1,843.20 322.56
1 pc Standard Heavy Duty Steel Gate Track 2,000.00 2,000.00 800.00 140.00
6 pc Heavy Duty Gate Hinges 560.00 3,360.00 1,344.00 235.20
6 pc Cylindrical Hinges 1" 108.00 648.00 259.20 45.36
2 set Wall Lamp 2,500.00 5,000.00 2,000.00 350.00
2. Concrete Fence:
3 sq.m Pre-Cast Concrete Corduroy (Cladding) 1,200.00 3,600.00 1,440.00 252.00
1 pc Aluminum Channel Bar 1/2"x 2" 375.00 375.00 150.00 26.25
1 set Wall Lamp 2,500.00 2,500.00 1,000.00 175.00
B. Front Fence & Gate (Along Renaissance Subd.)
5 pc Channel Bar 2"x 3"x 6m LD (Gate Frame) 1,497.00 7,485.00 2,994.00 523.95
5 pc Flat Bar 3/16" x 3" (Cap) 842.00 4,210.00 1,684.00 294.70
6 pc Angle Bar 1/4x1 3/4 x1 3/4 (Gate Frame) 1,059.00 6,354.00 2,541.60 444.78
16 pc Angle Bar 1/4x1" x1" (Fence Grills) 495.00 7,920.00 3,168.00 554.40
2 pc Plain G.I Sheet GA #16 1,152.00 2,304.00 921.60 161.28
4 pc Square Bar 20mm 787.00 3,148.00 1,259.20 220.36
1 pc Square Bar 25mm 1,267.00 1,267.00 506.80 88.69
2 sq.m Pre-Cast Concrete Corduroy (Cladding) 1,200.00 2,400.00 960.00 168.00
6 pc Heavy Duty Gate Hinges 560.00 3,360.00 1,344.00 235.20
3 set Wall Lamp 2,500.00 7,500.00 3,000.00 525.00
98,993.00 39,597.20 6,929.51 145,519.71
C. Metal Painting: 373,764.62
2 gal Boysen Quick Drying Enamel 617.00 1,234.00 493.60 86.38
2 gal Metal Primer 377.00 754.00 301.60 52.78
5 lit body filler 190.00 950.00 380.00 66.50
2 gal Paint thinner 245.00 490.00 196.00 34.30
D. Others:
41 pc sand paper 15.00 619.44 247.78 43.36
2 pc paint brush 110.00 220.00 88.00 15.40
2 pc roller brush 75.00 150.00 60.00 10.50
2 pc baby roller 60.00 120.00 48.00 8.40
4,537.44 1,814.98 317.62 6,670.04
VI. Consumables: 380,434.65
1 box Welding rod 1,880.00 1,880.00 752.00 131.60
10 pc Grinding pad 32.00 320.00 128.00 22.40
5 pc Cut-off blade 14" 235.00 1,175.00 470.00 82.25
1 gal Rust converter (Turco) 744.00 744.00 297.60 52.08
4,119.00 1,647.60 288.33 6,054.93
Total 386,489.58
MASONRY:
Wall Dimension Sand Cement 10mm Ø DSB Tie Wire
TYPE/LOCATION Height Length Opening 1-Face Area 2-Face Area CHB # 4 CHB # 6 for CHB #4 for CHB #6 for CHB #4 for CHB #6 for CHB #4 for CHB #6 for CHB #4 for CHB #6
Ground Floor:
LS - Living Area 3.80 4.00 5.04 10.16 20.32 127.00 0.00 1.46 0.00 21.91 0.00 6.10 0.00 0.14
Front - Living Area 3.80 4.05 4.45 10.94 21.88 136.75 0.00 1.57 0.00 23.59 0.00 6.56 0.00 0.15
RS - Living Area 3.80 4.00 1.80 13.40 26.80 167.50 0.00 1.93 0.00 28.89 0.00 8.04 0.00 0.18
LS - Dining Area 3.80 3.50 5.04 8.26 16.52 103.25 0.00 1.19 0.00 17.81 0.00 4.96 0.00 0.11
Front - Dining Area 3.80 0.84 3.19 6.38 39.90 0.00 0.46 0.00 6.88 0.00 1.92 0.00 0.04
LS - Kitchen 3.80 2.50 1.89 7.61 15.22 95.13 0.00 1.09 0.00 16.41 0.00 4.57 0.00 0.10
Rear - Kitchen 3.80 3.30 0.32 12.22 24.44 152.75 0.00 1.76 0.00 26.35 0.00 7.33 0.00 0.16
Rear - Maid's Room 3.80 3.00 1.44 9.96 19.92 124.50 0.00 1.43 0.00 21.48 0.00 5.98 0.00 0.13
RS - Maid's Room 3.80 2.50 9.50 19.00 118.75 0.00 1.37 0.00 20.48 0.00 5.70 0.00 0.13
RS - Storage / T&B 3.80 3.50 0.36 12.94 25.88 161.75 0.00 1.86 0.00 27.90 0.00 7.76 0.00 0.17
Front - Storage 3.20 1.85 5.92 11.84 74.00 0.00 0.85 0.00 12.77 0.00 3.55 0.00 0.08
3.80 1.15 4.37 8.74 54.63 0.00 0.63 0.00 9.42 0.00 2.62 0.00 0.06
Kitchen - Maid's Room 3.20 2.50 8.00 16.00 100.00 0.80 0.00 12.00 0.00 4.80 0.00 0.11 0.00
Storage - T&B 3.20 3.00 9.60 19.20 120.00 0.96 0.00 14.40 0.00 5.76 0.00 0.13 0.00
T&B - Maid's Room 3.20 3.00 1.89 7.71 15.42 96.38 0.77 0.00 11.57 0.00 4.63 0.00 0.10 0.00
LS - T&B 3.20 1.30 1.26 2.90 5.80 36.25 0.29 0.00 4.35 0.00 1.74 0.00 0.04 0.00
Storage Rm Wall 3.20 3.20 1.26 8.98 17.96 112.25 0.90 0.00 13.47 0.00 5.39 0.00 0.12 0.00
Second Floor:
Front - Master's Bedroom 3.55 3.40 2.56 9.51 19.02 118.88 0.00 1.37 0.00 20.51 0.00 5.71 0.00 0.13
LS - Master's Bedroom 3.55 4.80 4.20 12.84 25.68 160.50 0.00 1.85 0.00 27.69 0.00 7.70 0.00 0.17
LS - T&B 3.55 1.50 5.33 10.65 66.56 0.00 0.77 0.00 11.48 0.00 3.20 0.00 0.07
Front - T&B 3.55 2.20 0.87 6.94 13.88 86.75 0.00 1.00 0.00 14.96 0.00 4.16 0.00 0.09
RS - MBRM WIC & T&B 3.55 4.00 14.20 28.40 177.50 0.00 2.04 0.00 30.62 0.00 8.52 0.00 0.19
Front - Stair 3.55 3.40 0.96 11.11 22.22 138.88 0.00 1.60 0.00 23.96 0.00 6.67 0.00 0.15
LS - Bedroom 2 / 2F T&B / Stair 3.55 6.30 2.28 20.09 40.17 251.06 0.00 2.89 0.00 43.31 0.00 12.05 0.00 0.27
Rear - Bedroom 1 / 2 3.55 6.80 3.84 20.30 40.60 253.75 0.00 2.92 0.00 43.77 0.00 12.18 0.00 0.27
LS - Bedroom 1 3.55 3.99 1.89 12.27 24.55 153.43 0.00 1.76 0.00 26.47 0.00 7.36 0.00 0.16
BR1 / MBR - BR2 / 2F T&B / Stair 3.55 6.30 3.78 18.59 37.17 232.31 1.86 0.00 27.88 0.00 11.15 0.00 0.25 0.00
Master's Bedroom - Bedroom 1 3.55 3.40 12.07 24.14 150.88 1.21 0.00 18.11 0.00 7.24 0.00 0.16 0.00
Master's Bedroom - MBR WIC 3.55 1.50 5.33 10.65 66.56 0.53 0.00 7.99 0.00 3.20 0.00 0.07 0.00
Front - Bedroom 2 3.55 3.40 1.89 10.18 20.36 127.25 1.02 0.00 15.27 0.00 6.11 0.00 0.14 0.00
Front - 2F T&B 3.55 2.20 7.81 15.62 97.63 0.78 0.00 11.72 0.00 4.69 0.00 0.10 0.00
LS - 2F T&B 3.55 1.30 1.26 3.36 6.71 41.94 0.34 0.00 5.03 0.00 2.01 0.00 0.04 0.00
T&B - Walk-In Closet 3.55 4.50 1.26 14.72 29.43 183.94 1.47 0.00 22.07 0.00 8.83 0.00 0.20 0.00
Balcony 1.00 4.50 4.50 9.00 56.25 0.45 0.00 6.75 0.00 2.70 0.00 0.06 0.00
Parapet Wall:
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL: 49.54 334.79 669.57 1,421.63 2,763.21 11.37 31.78 170.60 476.65 68.24 132.63 1.52 2.95
Area: 113.73 221.06

PAINTING WATERPROOFING: 0.00


Exterior Wall: 221.06
Interior Wall: 448.52

PAINTING: Area Primer Top Coat Top Coat Clear Filler Putty Neutralizer Joint tape Thinner Filler Sand paper Roller Brush
Exterior Wall: 221.06 8.84 26.53 7.37 2.21 27.63 5.53 31.50 2.95 221.06 4 4
Interior Wall: 448.52 17.94 53.82 14.95 4.49 56.06 11.21 63.91 5.98 448.52 9 9
Interior Ceiling: 114.60 4.58 13.75 3.82 3.82 14.32 3.27 16.33 1.53 114.60 2 2
Totals: 31.37 94.10 26.14 10.52 98.02 16.74 3.27 111.74 10.46 784.17 16 16

OPENINGS: WIDTH HEIGHT AREA SUMMARY:


Door-1 0.90 2.10 1.89
Door-2 2.40 2.10 5.04 CHB LAYING EXTERIOR WALL INTERIOR WALL
Door-3 0.90 2.10 1.89 CHB # 6 2,763.21 Concrete Neutralizer 5.53 Concrete Neutralizer 11.21
Door-4 0.60 2.10 1.26 CHB # 4 1,421.63 Sun & Rain Elastromeric putty 27.63 Concrete primer & sealer 17.94
Door-5 2.00 2.10 4.20 Sand 43.15 Davies Liquid Tile Cast (5-900) 2.21 Megacryl Semi-gloss 53.82
Window-1 1.60 1.60 2.56 Cement 647.25 Davies concrete primer & sealer 8.84 Concrete putty 56.06
Window-2 1.20 1.60 1.92 RSB 10mm 200.87 Sun & Rain top coat 26.53 Liquid Tile Cast 4.49
Window-2 1.20 1.20 1.44 Tie Wire 4.46 Sun & Rain hypergloss 7.37 Liquid Tile Reducer 2.24
Window-3 0.80 0.40 0.32 Davies Liquid Tile Reducer (5-70) 36.29 Acry Color 22.43
Window-4 0.60 1.50 0.90 Davies Acry Color 22.11
Window-5 0.60 0.60 0.36 OTHERS INTERIOR CEILING
Window-6 0.60 1.60 0.96 sand paper 784.17 Water Proofing 0.00 2" joint tape 3.27
Window-7 1.20 1.60 1.92 paint brush 15.68 Boysen Plexibond 0.00 Boysen Acrytex Cast 3.82
Window-8 1.20 1.60 1.92 roller brush 15.68 Portland Cement 0.00 Boysen Flat Latex 18.34
Window-9 0.40 1.60 0.64 baby roller 7.84 Gypsum Putty 14.32
Window-10 1.45 0.60 0.87 body filler 3.82
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

DUCCO FINISH: Putty Lacquer White Lacquer Thinner


Water Lacquer White
Lacquer Flo Sand Paper Sand Paper Black Solignum Stikwel Roller Paint
Marine Primer Polituff
Location Plywood gal gal gal gal lit #240 #120 Screw gal lit Brush Brush
3/4" thk. gal gal 8.000 16.000 32.000 8.000 2 160 80 1800 10.000 2.400 2.304 2.304
Walk-in Closet of MBR 40 8.000 16.000 0.000 0.000 0.000 0.000 0 0 0 0 0.000 0.000 0 0
0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0.000 0.000 0 0
0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0.000 0.000 0 0
0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0.000 0.000 0 0
0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0.000 0.000 0 0
0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0.000 0.000 0 0
0.000 0.000

Polyurethane Sand Paper Sand Paper Sand Paper Sand Paper Paint Rugs PANEL DOOR/FLUSH DOOR 9 set
Quantity Sanding Polyurethane Reducer 3M # 120 3M # 100 3M # 60 3M # 36 Brush 2" White Body Filler 9 lit
Location Sealer Top Coat lit ft ft ft ft pc kl Oil wood stain 9 lit
(THREAD) lit gal 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Lacquer sanding sealer 27 lit
Ground Floor to 2nd Floor 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Clear gloss lacquer 36 lit
2nd Floor to 3rd Floor 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Auto Lacquer Thinner 18 gal
3rd Floor to 4th Floor 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Auto lacquer Flo 9 lit
TOTALS: 0.000 0.000 Sand paper # 120 90 pc
Sand paper # 240 135 pc
Paint brush 1.8 pc
Concrete

COLUMN FOOTING:
Type Qty CONCRETE

Thick Width Length Bedding Gravel


F1 16 0.300 1.200 1.200 2.304 2.16
0 0
0 0
0 0
16 TOTALS: 2.304 2.16

COLUMN FOOTING:
Type Qty CONCRETE

Thick Width Length Bedding Gravel


F-2 1 0.300 1.000 1.000 0.1 0.3
F-3 3 0.250 0.600 0.600 0.108 0.27
0 0
0 0.000 0.000 0.000 0 0
4 TOTALS: 0.208 0.57

REINFORCED COLUMN
Type Qty CONCRETE
Depth Base Length Gravel Sand
Footing to 2nd Floor: (1st Flr to LENGTH
2nd Flr) +=(1st Flr to Nat. Ground) + Excav Depth
C1 16 0.350 0.200 6.000 6.72 5.04
C3 1 0.250 0.250 6.000 0.375 0.28125
C4 3 0.250 0.250 6.000 1.125 0.84375
0 0.000 0.000 0.000 0 0
2nd Floor to Roof Beam: LENGTH 2nd
= Floor to Roof Beam
C1 16 0.350 0.200 2.800 3.136 2.352
0 0.000 0.000 0.000 0 0
0 0.000 0.000 0.000 0 0
0 0.000 0.000 0.000 0 0
36 TOTALS: 20.800 11.356 8.517

REINFORCED COLUMN
Type Qty CONCRETE
Depth Base Length Gravel Sand
C4 3 0.250 0.250 4.800 0.9 0.675
0 0.000 0.000 0.000 0 0
0 0.000 0.000 0.000 0 0
0 0.000 0.000 0.000 0 0
0 0.000 0.000 0.000 0 0
3 TOTALS: 4.800 0.9 0.675

Page 16
Concrete

WALL FOOTING
Type Qty CONCRETE
Depth Base Length Bedding Gravel
WF-1 1 0.250 0.400 15.800 0.632 1.58
WF-2 1 0.250 0.400 15.000 0.6 1.5
0 0.000 0.000 0.000 0 0
2 TOTALS: 1.232 3.08

BEAMS
Type Qty CONCRETE

Depth Base Length Gravel Sand


ECOND FLOOR FRAME & ROOF FRAME:
GB-1 1 0.400 0.200 10.500 0.84 0.63
0 0.000 0.000 0.000 0 0
0 0.000 0.000 0.000 0 0
0 0.000 0.000 0.000 0 0
TOTALS: 10.500 0.84 0.63

BEAMS
Type Qty CONCRETE

Depth Base Length Gravel Sand


GROUND FLOOR FRAME:
FTB-1 1 0.350 0.200 58.550 4.0985 3.073875
0 0.000 0.000 0.000 0 0
0 0.000 0.000 0.000 0 0
SECOND FLOOR FRAME:
2B-1 1 0.300 0.200 48.350 2.901 2.17575
2B-2 1 0.300 0.200 10.700 0.642 0.4815
CB-1 1 0.350 0.200 21.300 1.491 1.11825
CB-2 1 0.350 0.150 2.400 0.126 0.0945
ROOF BEAM:
RB-1 1 0.350 0.200 29.000 2.03 1.5225
RB-2 1 0.400 0.200 2.000 0.16 0.12
RB-3 1 0.350 0.200 17.650 1.2355 0.926625
CB-1 2 0.350 0.200 0.650 0.091 0.06825
CB-2 2 0.350 0.150 1.200 0.126 0.0945
SPECIAL STRUCTURE::
Lintel Beam 1 0.200 0.150 25.350 0.7605 0.570375
0 0.350 0.200 0.000 0 0
TOTALS: 217.150 13.6615 10.246125

Page 17
Concrete

16mmØ X 6.0 RSB Grade 60 #16


LONG CROSS TIE
Sand Cement # of Bars # of Pcs # of Bars # of Pcs WIRE
1.62 19.44 3 10.66666667 3 10.66666667 0.96
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1.62 19.44 10.66666667 10.66666667 0.96
21.33333333

12mmØ X 6.0 RSB Grade 60 #16


LONG CROSS TIE
Sand Cement # of Bars # of Pcs # of Bars # of Pcs WIRE
0.225 2.7 2.5 0.462962963 2.5 2.31 0.041666667
0.2025 2.43 1.5 0.5 1.5 0.5 0.045
0 0 0 0 0
0 0 0 0 0 0 0
0.4275 5.13 0.962962963 2.81 0.086666667
3.772962963

16mm x 6.0m RSB 10mmØ X 6.0 Stirrups #16 TIE Plaster


Cement # of Bars # of Pcs # of Ties # of Pcs WIRE Area

60.48 15 266.6666667 60 231.1111111 121.6 105.6


3.375 15 16.66666667 60 11.11111111 7.6 6
10.125 15 50 60 61.33333333 22.8 18
0 0 0 0 0 0 0

28.224 7 58.07407407 28 107.8518519 32.85333333 49.28


0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
102.204 391.4074074 411.4074074 184.8533333 178.88

12mm x 6.0m RSB 10mmØ X 6.0 Stirrups #16 TIE Plaster


Cement # of Bars # of Pcs # of Ties # of Pcs WIRE Area
8.1 1.92 5.12 48 45.5228475 5.6832 14.4
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
8.1 5.12 45.5228475 5.6832 14.4

Page 18
Concrete

Excavation
10mmØ x 6.0m RSB 10mmØ X 6.0 Stirrups #16 TIE
Sand Cement # of Bars # of Pcs # of Ties # of Pcs WIRE
1.185 14.22 39.5 115.5740741 52.66666667 3.901234568 13.86888889
1.125 13.5 37.5 104.1666667 50 3.703703704 12.5
0 0 0 0 0 0 0
2.31 27.72 219.7407407 7.604938272 26.36888889

20mmØ X 6.0 RSB 10mmØ X 6.0 Stirrups


Cont. Top Bottom No. of No. of No. Of
Cement Bars Bars Bars Pcs. Bars Pcs.

7.56 4 2 2 13.314 87.5 19.44444444


0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
7.56 13.314 19.44444444

16mmØ X 6.0 RSB 10mmØ X 6.0 Ties


Cont. Top Bottom No. of No. of No. Of
Cement Bars Bars Bars Pcs. Stirrups Pcs.

36.8865 4 2 2 74.2414 487.9166667 99.3904321


0 0 0 0 0 0
0 0 0 0 0 0 0

26.109 4 2 2 61.3078 402.9166667 74.61419753


5.778 4 2 2 13.5676 89.16666667 16.51234568
13.419 4 2 2 17.04 177.5 36.15740741
1.134 4 2 2 1.92 20 3.703703704

18.27 4 2 2 36.772 241.6666667 49.22839506


1.44 4 2 2 2.536 16.66666667 3.703703704
11.1195 4 2 2 22.3802 147.0833333 29.96141975
0.819 4 2 2 1.04 5.416666667 2.206790123
1.134 0 0 0 0 10 3.703703704

6.8445 2 0 0 10.14 211.25 27.38425926


0 2 0 0 0 0 0
122.9535 240.945

Page 19
Concrete

Excavation
Depth Volume

1.8 41.472
0 0
0 0
0 0
1.8 41.472

Excavation
Depth Volume

2.4 2.4
0 0
0 0
0 0
2.4 2.4

Sand Cement

5.28 68.64 96
0.3 3.9 6
0.9 11.7 18
0 0 0

2.464 32.032 44.8


0 0 0
0 0 0
0 0 0
8.944 116.272 164.8

Sand Cement
0.72 9.36 14.4
0 0 0
0 0 0
0 0 0
0 0 0
0.72 9.36 14.4

Page 20
Concrete

Depth Volume

0.6 3.792
0.6 3.6
0 0
7.392

#16 TIE
Plaster
WIRE Area Sand Cement

3.5 12.6 0.63 8.19 10.5


0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3.5 0.63 8.19 10.5

#16 TIE
Plaster
WIRE Area Sand Cement

19.51666667 64.405 3.22025 41.86325 58.55


0 0 0 0 0
0 0 0 0 0
0
16.11666667 48.35 2.4175 31.4275 48.35
3.566666667 10.7 0.535 6.955 10.7
7.1 23.43 1.1715 15.2295 21.3
0.8 2.4 0.12 1.56 2.4
0
9.666666667 31.9 1.595 20.735 29
0.666666667 2.4 0.12 1.56 2
5.883333333 19.415 0.97075 12.61975 17.65
0.433333333 1.43 0.0715 0.9295 1.3
0 2.4 0.12 1.56 2.4
0
2.816666667 17.745 0.88725 11.53425 25.35
0 0 0 0 0

Page 21

Vous aimerez peut-être aussi