CONCRETE SLAB
SLAB
12mmØ X 6.0 RSB / 10mmØ X 6.0 RSB
V Long #16 TIE
Cement # of Bars # of Pcs # of Bars # of Pcs WIRE AREA PERI
TOTAL SUMMARY:
DESCRIPTION QTY
Excavation 10.75
2,031.75 Backfill 0.00
2,031.75 Bedding 0.59
Gravel 1.36
Sand 5.19
Cement 74.74
12mm RSB 32.01
10mm RSB 7.31
tie wire 1.48
46,375.08
48,406.83
6,191.29
54,598.12
11.84
MASONRY:
Wall Dimension
TYPE/LOCATION Height Length Opening 1-Face Area 2-Face Area CHB # 4
Ground Floor
Rear-Fence 3.34 5.00 0.00 16.70 33.40
Front-Fence 1.20 3.29 0.00 3.95 7.90
REINFORCED COLUMN
CONCRETE
Type Qty Depth Base Length Gravel Sand
C3 3 0.300 0.300 4.14 1.12 0.84
0 0.000 0.000 0.00 0.00 0.00
3 TOTALS: 4.140 1.12 0.84
REINFORCED COLUMN
CONCRETE
Type Qty Depth Base Length Gravel Sand
C3 16 0.250 0.250 3.20 3.20 2.40
0 0.000 0.000 0.00 0.00 0.00
16 TOTALS: 3.200 3.20 2.40
REINFORCED COLUMN
CONCRETE
Type Qty Depth Base Length Gravel Sand
0 0.000 0.000 0.00 0.00 0.00
0 TOTALS: 0.000 0.00 0.00
COLUMN FOOTING:
CONCRETE
Type Qty Thick Width Length Bedding Gravel
F3 16 0.250 0.800 0.800 1.02 2.56
16 TOTALS: 1.02 2.56
WALL FOOTING
CONCRETE
Type Qty Depth Base Length Bedding Gravel
WF-1 1 0.200 0.400 53.530 2.141 4.28
WF-2 1 0.250 0.350 10.700 0.375 0.94
1 TOTALS: 2.52 5.22
BEAM/S
CONCRETE
Type Qty Depth Base Length Gravel Sand
SUMMARY: OTHERS
DESCRIPTION QTY sand paper 41.30
Excavation 27.38 paint brush 0.83
Backfill 0.00 roller brush 0.83
Bedding 3.54 baby roller 0.41
Gravel 12.82
Sand 15.60
Cement 208.78
16mm RSB 24.58
12mm RSB 61.63
10mm RSB 215.05
9mm RSB 15.53
tie wire 45.68
CHB 5" 258.10
Sand Cement 10mm Ø RSB Tie Wire
CHB # 6 for CHB #4 for CHB #6 for CHB #4 for CHB #6 for CHB #4 for CHB #6 for CHB #4
REINFORCED COLUMN
16mm x 6.0m RSB 10mmØ X 6.0 Stirrups #16 TIE Plaster
Cement # of Bars # of Pcs # of Ties # of Pcs WIRE Area Sand
10.06 6 13.80 41 34.50 8.28 14.90 0.75
0.00 0 0.00 0 0.00 0.00 0.00 0.00
10.06 13.80 34.50 8.28 14.90 0.75
REINFORCED COLUMN
12mm x 6.0m RSB 10mmØ X 6.0 Stirrups #16 TIE Plaster
Cement # of Bars # of Pcs # of Ties # of Pcs WIRE Area Sand
28.80 4 37.93 32 118.52 27.31 51.20 2.56
0.00 0 0.00 0 0.00 0.00 0.00 0.00
28.80 37.93 118.52 27.31 51.20 2.56
REINFORCED COLUMN
10mm x 6.0m RSB 9mmØ X 6.0 Stirrups #16 TIE Plaster
Cement # of Bars # of Pcs # of Ties # of Pcs WIRE Area Sand
0.00 0 0.00 0 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
COLUMN FOOTING:
12mmØ X 6.0 RSB Grade 60 #16 Excavation
LONG CROSS TIE
Sand Cement # of Bars # of Pcs # of Bars # of Pcs WIRE Depth
1.92 23.04 5 11.85 5 11.85 2.67 1.200
1.92 23.04 11.85 11.85 2.67 1.200
23.70
LL FOOTING Excavation
10mmØ x 6.0m RSB 9mmØ X 6.0 Stirrups #16 TIE
Depth
Sand Cement # of Bars # of Pcs # of Ties # of Pcs WIRE
3.21 38.54 3 29.74 178 13.22 3.57 0.600
0.70 8.43 3 5.94 36 2.31 0.71 0.600
3.91 46.97 35.68 15.53 4.28
BEAM/S
16mmØ X 6.0 RSB 10mmØ X 6.0 Ties #16 TIE
Cont. Top Bottom No. of No. of No. Of
Cement Bars Bars Bars Pcs. Stirrups Pcs. WIRE
0.22
0.05
0.28
Plaster
Cement
9.69 12.42
0.00 0
9.69
Plaster
Cement
33.28 51.2
0.00 0
33.28
Plaster
Cement
0.00 0
0.00
Excavation
Volume
12.29
12.29
Volume
12.85
2.25
15.09
Plaster
Area Sand Cement
PAINTING: Area Primer Top Coat Top Coat Clear Filler Putty Neutralizer Joint tape Thinner Filler Sand paper Roller Brush
Exterior Wall: 221.06 8.84 26.53 7.37 2.21 27.63 5.53 31.50 2.95 221.06 4 4
Interior Wall: 448.52 17.94 53.82 14.95 4.49 56.06 11.21 63.91 5.98 448.52 9 9
Interior Ceiling: 114.60 4.58 13.75 3.82 3.82 14.32 3.27 16.33 1.53 114.60 2 2
Totals: 31.37 94.10 26.14 10.52 98.02 16.74 3.27 111.74 10.46 784.17 16 16
Polyurethane Sand Paper Sand Paper Sand Paper Sand Paper Paint Rugs PANEL DOOR/FLUSH DOOR 9 set
Quantity Sanding Polyurethane Reducer 3M # 120 3M # 100 3M # 60 3M # 36 Brush 2" White Body Filler 9 lit
Location Sealer Top Coat lit ft ft ft ft pc kl Oil wood stain 9 lit
(THREAD) lit gal 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Lacquer sanding sealer 27 lit
Ground Floor to 2nd Floor 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Clear gloss lacquer 36 lit
2nd Floor to 3rd Floor 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Auto Lacquer Thinner 18 gal
3rd Floor to 4th Floor 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Auto lacquer Flo 9 lit
TOTALS: 0.000 0.000 Sand paper # 120 90 pc
Sand paper # 240 135 pc
Paint brush 1.8 pc
Concrete
COLUMN FOOTING:
Type Qty CONCRETE
COLUMN FOOTING:
Type Qty CONCRETE
REINFORCED COLUMN
Type Qty CONCRETE
Depth Base Length Gravel Sand
Footing to 2nd Floor: (1st Flr to LENGTH
2nd Flr) +=(1st Flr to Nat. Ground) + Excav Depth
C1 16 0.350 0.200 6.000 6.72 5.04
C3 1 0.250 0.250 6.000 0.375 0.28125
C4 3 0.250 0.250 6.000 1.125 0.84375
0 0.000 0.000 0.000 0 0
2nd Floor to Roof Beam: LENGTH 2nd
= Floor to Roof Beam
C1 16 0.350 0.200 2.800 3.136 2.352
0 0.000 0.000 0.000 0 0
0 0.000 0.000 0.000 0 0
0 0.000 0.000 0.000 0 0
36 TOTALS: 20.800 11.356 8.517
REINFORCED COLUMN
Type Qty CONCRETE
Depth Base Length Gravel Sand
C4 3 0.250 0.250 4.800 0.9 0.675
0 0.000 0.000 0.000 0 0
0 0.000 0.000 0.000 0 0
0 0.000 0.000 0.000 0 0
0 0.000 0.000 0.000 0 0
3 TOTALS: 4.800 0.9 0.675
Page 16
Concrete
WALL FOOTING
Type Qty CONCRETE
Depth Base Length Bedding Gravel
WF-1 1 0.250 0.400 15.800 0.632 1.58
WF-2 1 0.250 0.400 15.000 0.6 1.5
0 0.000 0.000 0.000 0 0
2 TOTALS: 1.232 3.08
BEAMS
Type Qty CONCRETE
BEAMS
Type Qty CONCRETE
Page 17
Concrete
Page 18
Concrete
Excavation
10mmØ x 6.0m RSB 10mmØ X 6.0 Stirrups #16 TIE
Sand Cement # of Bars # of Pcs # of Ties # of Pcs WIRE
1.185 14.22 39.5 115.5740741 52.66666667 3.901234568 13.86888889
1.125 13.5 37.5 104.1666667 50 3.703703704 12.5
0 0 0 0 0 0 0
2.31 27.72 219.7407407 7.604938272 26.36888889
Page 19
Concrete
Excavation
Depth Volume
1.8 41.472
0 0
0 0
0 0
1.8 41.472
Excavation
Depth Volume
2.4 2.4
0 0
0 0
0 0
2.4 2.4
Sand Cement
5.28 68.64 96
0.3 3.9 6
0.9 11.7 18
0 0 0
Sand Cement
0.72 9.36 14.4
0 0 0
0 0 0
0 0 0
0 0 0
0.72 9.36 14.4
Page 20
Concrete
Depth Volume
0.6 3.792
0.6 3.6
0 0
7.392
#16 TIE
Plaster
WIRE Area Sand Cement
#16 TIE
Plaster
WIRE Area Sand Cement
Page 21