EDT Descripción Partida Costo

1 PAVIMENTO FLEXIBLE S/. 346,161.16

1.01 TRABAJOS PRELIMINARES S/. 18,034.13

01.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO S/. 380.00

01.01.02 TRAZO Y REPLANTEO S/. 12,670.49

01.01.03 ALMACEN Y CASETA DE GUARDIANIA S/. 3,600.00

01.01.04 CARTEL DE IDENTIFICACION DE OBRA S/. 1,383.64

1.02 MOVIMIENTO DE TIERRAS S/. 62,426.75

01.02.01 EXCAVACION EN MATERIAL SUELTO (NIVEL DE SUBRASANTE) S/. 7,484.69

01.02.02 EXCAVACION NO CLASIFICADA (MANUAL) PARA BADEN S/. 581.54

01.02.03 ACARREO INTERNO DE MATERIAL DE CUNETAS Y BADEN S/. 2,352.05

01.02.04 ELIMINACION DE MATERIAL EXCEDENTE S/. 19,568.90

01.02.05 PERFILADO Y COMPACTADO EN ZONAS DE CORTE S/. 32,439.58

1.03 BASE GRANULAR E=0.15 m. S/. 59,293.10

01.03.01 EXTRACCION Y APILAMIENTO DE MATERIAL EN CANTERA S/. 8,536.15


01.03.02 SELECCIÓN DE MATERIAL EN CANTERA S/. 9,537.03

01.03.03 CARGUIO (AGREGADOS DE CANTERA) S/. 5,399.08

01.03.04 TRANSPORTE A LA OBRA (AGREGADOS DE CANTERA) S/. 5,467.87

01.03.05 EXTENDIDO RIEGO Y COMPAC.DE SUB-BASE S/. 30,352.98

1.04 BASE GRANULAR e=0.20 m S/. 63,362.84

01.04.01 EXTRACCION Y APILAMIENTO DE MATERIAL EN CANTERA S/. 9,736.55

01.04.02 SELECCIÓN DE MATERIAL EN CANTERA S/. 10,878.18

01.04.03 CARGUIO (AGREGADOS DE CANTERA) S/. 6,158.34

01.04.04 TRANSPORTE A LA OBRA (AGREGADOS DE CANTERA) S/. 6,236.79

01.04.05 EXT. RIEGO Y COMPAC. DE BASE e=0.20 m S/. 30,352.98

1.05 RECUBRIMIENTO ASFALTICO S/. 143,044.33

01.05.01 RIEGO DE LIGA S/. 41,322.08

01.05.02 PAVIMENTO CON EMULSION ASFALTICVA (SLURRY SEAL 12 mm) S/. 101,722.25

2 PAVIMENTO RIGIDO S/. 32,590.08

2.01 TRABAJOS PRELIMINARES S/. 335.24

02.01.01 TRAZO Y REPLANTEO S/. 335.24

2.02 MOVIMIENTO DE TIERRAS S/. 180.03

02.02.01 EXCAVACION EN MATERIAL SUELTO (NIVEL DE SUBRASANTE) S/. 62.41

02.02.02 ELIMINACION DE MATERIAL EXCEDENTE S/. 117.62

2.03 BASE GRANULAR E=0.15 m. S/. 2,501.48

02.03.01 EXTRACCION Y APILAMIENTO DE MATERIAL EN CANTERA S/. 331.47

02.03.02 SELECCIÓN DE MATERIAL EN CANTERA S/. 370.33

02.03.03 CARGUIO (AGREGADOS DE CANTERA) S/. 209.65

02.03.04 TRANSPORTE A LA OBRA (AGREGADOS DE CANTERA) S/. 212.32

02.03.05 EXTENDIDO RIEGO Y COMPAC.DE BASE S/. 1,377.71

2.04 PAVIMENTO DE CONCRETO HIDRAULICO e=0.15 S/. 29,573.33

02.04.01 ENCOFRADO Y DESENCOFRADO - PAVIMENTOS S/. 2,326.86

02.04.02 CONCRETO f'c=210 kg/cm2 - PAVIMENTO S/. 23,217.40

02.04.03 REGLADO DE LOSA - PAVIMENTO S/. 2,701.00

02.04.04 RELLENO DE JUNTAS CON ASFALTO - PAVIMENTO S/. 1,328.07


3 SARDINEL, VEREDAS Y AREAS VERDES S/. 476,235.58

3.01 TRABAJOS PRELIMINARES S/. 2,549.16

03.01.01 TRAZO Y REPLANTEO (VEREDAS, MARTILLOS Y AREAS VERDES) S/. 2,549.16

3.02 MOVIMIENTO DE TIERRAS S/. 42,392.08

03.02.01 EXCAVACION DE TERRENO MANUAL EN VEREDAS S/. 11,551.80

03.02.02 EXCAVACION MANUAL EN SARDINEL S/. 9,731.70

03.02.03 EXCAVACION DE RAMPAS S/. 187.46

03.02.04 ELIMINACION DE MATERIAL EXCEDENTE S/. 4,131.97

03.02.05 COMPACTACION DE SUB RASANTE EN VEREDAS S/. 16,789.15

3.03 SARDINEL S/. 299,077.23

03.03.01 ENCOFRADO Y DESENCOFRADO EN SARDINEL S/. 224,483.62

03.03.02 CONCRETO F"C=175KG/CM2 - SARDINEL S/. 72,938.91

03.03.03 RELLENO DE JUNTAS CON ASFALTO S/. 1,654.70

3.04 VEREDAS S/. 120,799.62

03.04.01 ENCOFRADO Y DESENCOFRADO TRANSVERSAL VEREDA S/. 5,106.45


03.04.02 CONCRETO F"C=175KG/CM2 PARA VERDAS S/. 104,203.63

03.04.03 CONCRETO F"C=175KG/CM2 PARA RAMPAS S/. 726.71

03.04.04 RELLENO DE JUNTAS CON ASFALTO S/. 10,762.83

3.05 AREAS VERDES S/. 11,417.50

03.05.01 SUMINISTRO DE TIERRA AGRICOLA S/. 5,604.41

03.05.02 SEMBRADO DE GRASS S/. 5,145.17

03.05.03 ARBORIZACION CON PLANTONES S/. 667.92

4 MURO PERIMETRICO TIPO PANTALLA S/. 11,981.27

4.01 OBRAS PRELIMINARES S/. 105.78

04.01.01 TRAZO Y REPLANTEO S/. 105.78

4.02 MURO PANTALLA S/. 4,713.37

04.02.01 ENCOF./DESENCOF. MURO DE PANTALLA S/. 3,025.57

04.02.02 CONCRETO F"C=140 KG/CM2 S/. 1,687.80

4.03 COLOCACION DE CUARTONES DE EUCALIPTO 3" S/. 7,162.12

04.03.01 COLOCACION DE CUARTONES LONGITUDINALES S/. 851.78

04.03.02 COLOCACION DE CUAERTONES VERTICALES S/. 1,742.59

04.03.03 COLOCACION DE CUARTONES DIAGONALES S/. 4,567.75

5 OBRAS DE DRENAJE S/. 126,866.05

5.01 DRENAJE - CUNETAS S/. 78,021.97

05.01.01 ENCOF./DESENCOF. DE CUNETAS S/. 37,440.79

05.01.02 CUNETA CONCRETO F"C=210KG/CM2 S/. 38,113.31

05.01.03 RELLENO DE JUNTAS CON ASFALTO S/. 2,467.87

5.02 DRENAJE - BADEN S/. 7,997.37

05.02.01 ENCOF./DESENCOF. DE BADEN S/. 3,571.42

05.02.02 BADEN CONCRETO F"C=210KG/CM2 S/. 4,425.95

5.03 DRENAJE CANAL PLUVIAL S/. 40,846.70

05.03.01 TRAZO Y REPLANTEO S/. 62.40

05.03.02 EXCAVACION MANUAL DE TERRENO NATURAL S/. 2,600.42

05.03.03 PERFILADO Y COMPACTADO DE LINEA DE DRENAJE PLUVIAL S/. 885.34

05.03.04 ELIMINACION DE MATERIAL EXCEDENTE S/. 751.92


05.03.05 CONCRETO S/. 12,971.66

05.03.05.01 SOLADO CONCRETO 1:10 S/. 2,434.08


05.03.05.02 CONCRETO EN LA BASE F'C = 175 KG/CM2 S/. 6,186.50
05.03.05.03 CONCRETO EN LOSA F'C = 210 KG/CM2 S/. 4,351.09

05.03.06 ACERO CORRUGADO GRADO 60 S/. 13,248.77

05.03.06.01 ACERO CORRUGADO GRADO 60 EN CANAL DE DRENAJE PLUVIAL S/. 13,248.77

05.03.07 ENCOFRADO Y DESENCOFRADO S/. 10,326.19

05.03.07.01 ENCOFRADO Y DESENCOFRADO EN CANAL DE DRENAJE PLUVIAL S/. 10,326.19

6 SUMIDEROS S/. 9,750.19

6.01 TRABAJOS PRELIMINARES S/. 580.58

06.01.01 TRAZO Y REPLANTEO S/. 8.52

06.01.02 EXCAVACION MANUAL DE TERRENO NATURAL S/. 443.80

06.01.03 ELIMINACION DE MATERIAL EXCEDENTE S/. 128.27

6.02 CONCRETO S/. 1,863.16

06.02.01 SOLADO CONCRETO 1:10 S/. 36.91

06.02.02 CONCRETO EN BASE Y PAREDES DE CANAL F'C = 175 K/CM2 S/. 1,826.25

6.03 ACERO CORRUGADO GRADO 60 S/. 2,421.16

06.03.01 ACERO CORRUGADO GRADO 60 EN ESTRUCTURAS DE SUMIDERO S/. 2,421.16

6.04 ENCOFRADO Y DESENCOFRADO S/. 1,495.28

06.04.01 ENCOFRADO Y DESENCOFRADO EN ESTRUCTURAS DE SUMIDERO S/. 1,495.28

6.05 ACERO LISO S/. 3,390.01

06.05.01 ACERO LISO EN REJILLA DE SUMIDERO S/. 3,390.01

7 CANAL EMBOQUILLADO DE PIEDRA S/. 3,613.34

7.01 TRABAJOS PRELIMINARES S/. 46.62

07.01.01 TRAZO Y REPLANTEO S/. 46.62

7.02 MOVIMIENTO DE TIERRAS S/. 364.33

07.02.01 EXCAVACION MANUAL S/. 364.33

7.03 ELIMINACION DE MATERIAL EXEDENTE S/. 105.39

07.03.01 ELIMINACION DE MATERIAL EXCEDENTE S/. 105.39

7.04 MATERIAL DE CANTERA PARA EMPEDRADO S/. 192.10

07.04.01 EXTRACCION Y APILAMIENTO DE PIEDRA DE 8-10" S/. 52.78

07.04.02 SELECCIÓN DE MATERIAL EN CANTERA S/. 72.00

07.04.03 CARGUIO (AGREGADOS DE CANTERA) S/. 29.15

07.04.04 TRANSPORTE A LA OBRA (AGREGADOS DE CANTERA) S/. 38.17

7.05 CONCRETO SIMPLE + 30 %PG 8 -10" PARA EMPEDRADO S/. 2,904.90

07.05.01 ENCOF./DESENCOF. S/. 918.34

07.05.02 CONCRETO F"C=140KG/CM2 + 30% PG 8-10" S/. 1,986.55

8 SEÑALIZACION VERTICAL S/. 1,500.00

8.01 SEÑAL IMFORMATIVA S/. 1,500.00

9 CONTROL DE CALIDAD S/. 23,476.60

9.01 PRUEBA DE DENSIDAD INSITU S/. 1,188.86

9.02 PRUEBA DE COMPACTACION PROCTOR S/. 242.64

9.03 PRUEBA DE COMPRESION DE CONCRETO S/. 468.21

9.04 PRUEBA DE ENASAYO MARSHALL S/. 1,429.40

9.05 DISEÑO DE MEZCLA DE CONCRETO S/. 1,622.16


9.06 LIMPIEZA FINAL DE OBRA S/. 18,525.33

10 MITIGACION AMBIENTAL S/. 47,414.43

10.01 PROGRAMA DE MITIGACION, PREVENCION Y CORRECCION S/. 1,540.00

10.01.01 SUB PROGRAMA DE MANEJO DE RESIDUOS Y EFLUENTES S/. 1,540.00

10.01.01.01 CONTENEDORES DE RESIDUO SOLIDOS S/. 240.00

10.01.01.02 SUB PROGRAMA DE CONTROL DE RUIDOS S/. 500.00

10.01.01.03 SUB PROGRAMA DE SEÑALIZACION S/. 800.00

10.02 PROGRAMA DE MONITOREO AMBIENTAL S/. 18,600.00

10.02.01 MONITOREO DE LA CALIDAD DEL AGUA S/. 4,600.00

10.02.02 MONITOREO DE LA CALIDAD DE AIRE S/. 4,000.00

10.02.03 MONITOREO DE LA CALIDAD EL SUELO S/. 5,000.00

10.02.04 MONITOREO DE RUIDOS S/. 5,000.00

10.03 PROGRAMA DE CAPACITACION Y EDUCACION AMBIENTAL S/. 12,000.00

10.03.01 A LA POBLACION LOCAL S/. 6,000.00

10.03.02 AL PERSONAL PROFESIONAL Y TECNICO S/. 6,000.00


10.04 PROGRAMA DE PREVENCION DE PERDIDAS Y RESPUESTA A EMERGENCI S/. 1,500.00

10.04.01 SUB PROGRAMA DE PREVENCION Y CONTROL DE RIESGOS LABORALES S/. 500.00

10.04.02 SUB PROGRAMA DE PREVENCION DE CONTINGENCIAS Y RESPUESTA S/. 1,000.00

10.05 PROGRAMA DE ASUNTOS SOCIALES S/. 12,400.00

10.05.01 MECANISMOS DE COMUNICACIÓN E INFORMACION ENTRE POBLADO S/. 10,300.00

10.05.02 MECANISMOS DE PREVENCION Y RESOLUCION DE CONFLICTOS S/. 2,100.00

10.06 PROGRAMA DE CIERRE O ABANDONO S/. 1,374.43

10.06.01 TRATAMIENTO DME S/. 1,374.43

S/. 1,079,588.70
presupuesto S/. 1,091,568.31
S/. 347,528.45
S/. 18,368.73
380 S/. 0.00 S/. 380.00
13001.41 S/. 330.92 S/. 13,001.41
3600 S/. 0.00 S/. 3,600.00
1387.32 S/. 3.68 S/. 1,387.32
S/. 62,805.37
7517.41 S/. 32.72 S/. 7,517.41
598.91 S/. 17.37 S/. 598.91
2424.42 S/. 72.37 S/. 2,424.42
19599.08 S/. 30.18 S/. 19,599.08
32665.55 S/. 225.97 S/. 32,665.55
S/. 59,546.24
8558.37 S/. 22.22 S/. 8,558.37
9584.71 S/. 47.68 S/. 9,584.71
5429.68 S/. 30.60 S/. 5,429.68
5479.34 S/. 11.47 S/. 5,479.34
30494.14 S/. 141.16 S/. 30,494.14
S/. 63,631.70
9761.89 S/. 25.34 S/. 9,761.89
10932.56 S/. 54.38 S/. 10,932.56
6193.23 S/. 34.89 S/. 6,193.23
6249.88 S/. 13.09 S/. 6,249.88
30494.14 S/. 141.16 S/. 30,494.14
S/. 143,176.41
41315.88 S/. -6.20 S/. 41,315.88
101860.53 S/. 138.28 S/. 101,860.53
S/. 32,903.35
S/. 338.53
338.53 S/. 3.29 S/. 338.53
S/. 180.47
62.67 S/. 0.26 S/. 62.67
117.8 S/. 0.18 S/. 117.80
S/. 2,512.24
332.33 S/. 0.86 S/. 332.33
372.18 S/. 1.85 S/. 372.18
210.84 S/. 1.19 S/. 210.84
212.77 S/. 0.45 S/. 212.77
1384.12 S/. 6.41 S/. 1,384.12
S/. 29,872.11
2369.4 S/. 42.54 S/. 2,369.40
23388.92 S/. 171.52 S/. 23,388.92
2768.24 S/. 67.24 S/. 2,768.24
1345.55 S/. 17.48 S/. 1,345.55
S/. 483,992.45
S/. 2,574.19
2574.19 S/. 25.03 S/. 2,574.19
S/. 43,453.17
11886.74 S/. 334.94 S/. 11,886.74
10022.44 S/. 290.74 S/. 10,022.44
193.06 S/. 5.60 S/. 193.06
4138.34 S/. 6.37 S/. 4,138.34
17212.59 S/. 423.44 S/. 17,212.59
S/. 304,760.36
229577.83 S/. 5,094.21 S/. 229,577.83
73506.05 S/. 567.14 S/. 73,506.05
1676.48 S/. 21.78 S/. 1,676.48
S/. 121,697.84
5222.07 S/. 115.62 S/. 5,222.07
104840.12 S/. 636.49 S/. 104,840.12
731.15 S/. 4.44 S/. 731.15
10904.5 S/. 141.67 S/. 10,904.50
S/. 11,506.89
5669.53 S/. 65.12 S/. 5,669.53
5158.36 S/. 13.19 S/. 5,158.36
679 S/. 11.08 S/. 679.00
S/. 12,159.04
S/. 107.80
107.8 S/. 2.02 S/. 107.80
S/. 4,783.18
3080.88 S/. 55.31 S/. 3,080.88
1702.3 S/. 14.50 S/. 1,702.30
S/. 7,268.06
864.86 S/. 13.08 S/. 864.86
1766.4 S/. 23.81 S/. 1,766.40
4636.8 S/. 69.05 S/. 4,636.80
S/. 128,553.16
S/. 79,091.67
38132.87 S/. 692.08 S/. 38,132.87
38458.45 S/. 345.14 S/. 38,458.45
2500.35 S/. 32.48 S/. 2,500.35
S/. 8,106.03
3644.84 S/. 73.42 S/. 3,644.84
4461.19 S/. 35.24 S/. 4,461.19
S/. 41,355.46
63.01 S/. 0.61 S/. 63.01
2678.11 S/. 77.69 S/. 2,678.11
907.67 S/. 22.33 S/. 907.67
753.08 S/. 1.16 S/. 753.08
S/. 13,088.94
2474.16 S/. 40.08 S/. 2,474.16
6224.29 S/. 37.79 S/. 6,224.29
4390.49 S/. 39.40 S/. 4,390.49
S/. 13,337.90
13337.9 S/. 89.13 S/. 13,337.90
S/. 10,526.75
10526.75 S/. 200.56 S/. 10,526.75
S/. 9,810.43
S/. 594.12
8.6 S/. 0.08 S/. 8.60
457.05 S/. 13.25 S/. 457.06
128.47 S/. 0.20 S/. 128.47
S/. 1,874.93
37.53 S/. 0.62 S/. 37.53
1837.4 S/. 11.15 S/. 1,837.40
S/. 2,435.54
2435.54 S/. 14.38 S/. 2,435.54
S/. 1,515.06
1515.06 S/. 19.78 S/. 1,515.06
S/. 3,390.78
3390.78 S/. 0.77 S/. 3,390.78
S/. 3,665.07
S/. 47.08
47.08 S/. 0.46 S/. 47.08
S/. 375.21
375.21 S/. 10.88 S/. 375.21
S/. 105.54
105.54 S/. 0.15 S/. 105.54
S/. 192.73
52.92 S/. 0.14 S/. 52.92
72.32 S/. 0.32 S/. 72.32
29.32 S/. 0.17 S/. 29.32
38.17 S/. 0.00 S/. 38.17
S/. 2,944.51
937.03 S/. 18.69 S/. 937.03
2007.48 S/. 20.93 S/. 2,007.48
S/. 1,500.00
1500 S/. 0.00 S/. 1,500.00
S/. 24,032.36
1199.28 S/. 10.42 S/. 1,199.28
242.64 S/. 0.00 S/. 242.64
468.24 S/. 0.03 S/. 468.24
1429.4 S/. 0.00 S/. 1,429.40
1622.16 S/. 0.00 S/. 1,622.16
19070.64 S/. 545.31 S/. 19,070.64
S/. 47,424.00
S/. 1,540.00
S/. 1,540.00
240 S/. 0.00 S/. 240.00
500 S/. 0.00 S/. 500.00
800 S/. 0.00 S/. 800.00
S/. 18,600.00
4600 S/. 0.00 S/. 4,600.00
4000 S/. 0.00 S/. 4,000.00
5000 S/. 0.00 S/. 5,000.00
5000 S/. 0.00 S/. 5,000.00
S/. 12,000.00
6000 S/. 0.00 S/. 6,000.00
6000 S/. 0.00 S/. 6,000.00
S/. 1,500.00
500 S/. 0.00 S/. 500.00
1000 S/. 0.00 S/. 1,000.00
S/. 12,400.00
10300 S/. 0.00 S/. 10,300.00
2100 S/. 0.00 S/. 2,100.00
S/. 1,384.00
1384 S/. 9.57 S/. 1,384.00
S/. 1,091,568.31 S/. 11,979.59 S/. 1,384.00
RESUMEN DE HOJA DE METRADOS
ITEM DENOMINACION UNIDAD METRADO
01 00 00 00 PAVIMENTO FLEXIBLE
01 01 00 00 TRABAJOS PRELIMINARES
01 01 01 00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00
01 01 02 00 TRAZO Y REPLANTEO GENERAL M2 9559.86
01 01 03 00 ALMACEN Y CASETA DE GUARDIANIA DIA 120.00
01 01 04 00 CARTEL DE IDENTIFICACION DE OBRA UND 1.00
01 02 00 00 MOVIMIENTO DE TIERRAS
01 02 01 00 EXCAVACION EN MATERIAL SUELTO (NIVEL DE SUBRASANTE) M3 1197.04
01 02 02 00 EXCAVACION NO CLASIFICADA (MANUAL) PARA BADEN M3 14.27
01 02 03 00 ACARREO INTERNO DE MATERIAL DE CUNETAS Y BADEN M3 247.39
01 02 04 00 ELIMINACION DE MATERIAL EXCEDENTE M3 1743.69
01 02 05 00 PERFILADO Y COMPACTADO EN ZONAS DE CORTE M2 9440.91
01 03 00 00 SUB BASE GRANULAR e=0.15 m
01 03 01 00 EXTRACCION Y APILAMIENTO DE MATERIAL EN CANTERA M3 1655.39
01 03 02 00 SELECCIÓN DE MATERIAL EN CANTERA M3 1655.39
01 03 03 00 CARGUIO (AGREGADOS DE CANTERA) M3 1655.39
01 03 04 00 TRANSPORTE A LA OBRA (AGREGADOS DE CANTERA) M3 1655.39
01 03 05 00 EXTENDIDO RIEGO Y COMPAC.DE SUB-BASE M2 9440.91
01 04 00 00 BASE GRANULAR e=0.20 m
01 04 01 00 ESTRACCION Y APILAMIENTO DE MATERIAL EN CANTERA M3 1888.18
01 04 02 00 SELECCIÓN DE MATERIAL EN CANTERA M3 1888.18
01 04 03 00 CARGUIO (AGREGADOS DE CANTERA) M3 1888.18
01 04 04 00 TRANSPORTE A LA OBRA (AGREGADOS DE CANTERA) M3 1888.18
01 04 05 00 EXT. RIEGO Y COMPAC. DE BASE e=0.20 m M2 9440.91
01 05 00 00 RECUBRIMIENTO ASFALTICO
01 05 01 00 RIEGO DE LIGA M2 8661.61
01 05 02 00 PAVIMENTO CON EMULSION ASFALTICVA (SLURRY SEAL 12 mm) M2 8661.61
02 00 00 00 PAVIMENTO RIGIDO
02 01 00 00 TRABAJOS PRELIMINARES
02 01 01 00 TRAZO Y REPLANTEO M2 428.52
02 02 00 00 MOVIMIENTO DE TIERRAS
02 02 01 00 EXCAVACION EN MATERIAL SUELTO (NIVEL DE SUBRASANTE) M3 9.98
02 02 02 00 ELIMINACION DE MATERIAL EXCEDENTE M3 10.48
02 03 00 00 BASE GRANULAR e=0.15 m
02 03 01 00 EXTRACCION Y APILAMIENTO - MATERIAL DE CANTERA M3 64.28
02 03 02 00 SELECCIÓN DE MATERIAL DE CANTERA - P/ BASE M3 64.28
02 03 03 00 CARGUIO DE MATERIAL DE CANTERA - P/ BASE M3 64.28
02 03 04 00 TRANSPORTE DE MAT. DE CANTERA A LA OBRA - P/BASE M3 64.28
02 03 05 00 EXTENDIDO RIEGO Y COMPAC.DE BASE M2 428.52
02 04 00 00 PAVIMENTO DE CONCRETO HIDRAULICO e=0.15
02 04 01 00 ENCOFRADO Y DESENCOFRADO - PAVIMENTOS M2 60.91
02 04 02 00 CONCRETO f'c=210 kg/cm2 - PAVIMENTO M3 64.28
02 04 03 00 REGLADO DE LOSA - PAVIMENTO M2 428.52
02 04 04 00 RELLENO DE JUNTAS CON ASFALTO - PAVIMENTO M 142.84
03 00 00 00 SARDINEL, VEREDAS Y AREAS VERDES
03 01 00 00 TRABAJOS PRELIMINARES
03 01 01 00 TRAZO Y REPLANTEO (VEREDAS, MARTILLOS Y AREAS VERDES) M2 3258.47
03 02 00 00 MOVIMIENTO DE TIERRAS
03 02 01 00 EXCAVACION DE TERRENO MANUAL EN VEREDAS M3 283.22
RESUMEN DE HOJA DE METRADOS
03 02 02 00 EXCAVACION MANUAL EN SARDINEL M3 238.80
03 02 03 00 EXCAVACION DE RAMPAS M3 4.60
03 02 04 00 ELIMINACION DE MATERIAL EXCEDENTE M3 368.18
03 02 05 00 COMPACTACION DE SUB RASANTE EN VEREDAS M2 3025.06
03 03 00 00 SARDINEL
03 03 01 01 ENCOFRADO Y DESENCOFRADO EN SARDINEL M2 4761.05
03 03 02 02 CONCRETO F"C=175KG/CM2 - SARDINEL M3 211.20
03 03 03 03 RELLENO DE JUNTAS CON ASFALTO ML 177.97
03 04 00 00 VEREDAS
03 04 01 01 ENCOFRADO Y DESENCOFRADO TRANSVERSAL VEREDA M2 116.59
03 04 02 02 CONCRETO F"C=175KG/CM2 PARA VERDAS M3 329.80
03 04 03 03 CONCRETO F"C=175KG/CM2 PARA RAMPAS M3 2.30
03 04 04 04 RELLENO DE JUNTAS CON ASFALTO ML 1157.59
03 05 00 00 AREAS VERDES
03 05 01 00 SUMINISTRO DE TIERRA AGRICOLA M2 233.41
03 05 02 00 SEMBRADO DE GRAS M2 233.41
03 05 03 00 ARBORIZACION CON PLANTONES UND 20.00
04 00 00 00 MURO PERIMETRICO TIPO PANTALLA
04 01 00 00 OBRAS PRELIMINARES
04 01 01 00 TRAZO Y REPLANTEO ML 220.00
04 02 00 00 MURO PANTALLA
04 02 01 00 ENCOF./DESENCOF. MURO DE PANTALLA M2 79.20
04 02 02 00 CONCRETO F"C=140 KG/CM2 M3 5.40
04 03 00 00 COLOCACION DE CUARTONES DE EUCALIPTO 3"
04 03 01 00 COLOCACION DE CUARTONES LONGITUDINALES ML 52.80
04 03 02 00 COLOCACION DE CUAERTONES VERTICALES ML 120.00
04 03 03 00 COLOCACION DE CUARTONES DIAGONALES ML 288.00
05 00 00 00 OBRAS DE DRENAJE
05 01 00 00 DRENAJE - CUNETAS
05 01 01 00 ENCOF./DESENCOF. DE CUNETAS M2 721.94
05 01 02 00 CUNETA CONCRETO F"C=210KG/CM2 M3 96.88
05 01 03 00 RELLENO DE JUNTAS CON ASFALTO EN CUNETAS ML 265.43
05 02 00 00 DRENAJE - BADEN
05 02 01 00 ENCOF./DESENCOF. DE BADEN M2 65.04
05 02 02 00 BADEN CONCRETO F"C=210KG/CM2 M3 11.90
05 03 00 00 DRENAJE CANAL PLUVIAL
05 03 01 00 TRAZO Y REPLANTEO M2 79.76
05 03 02 00 EXCAVACION MANUAL DE TERRENO NATURAL M3 63.81
05 03 03 00 PERFILADO Y COMPACTADO DE LINEA DE DRENAJE PLUVIAL M2 159.52
05 03 04 00 ELIMINACION DE MATERIAL EXCEDENTE m3 67.00
05 03 05 00 CONCRETO
05 03 05 01 Solado de Concreto 1:10 M2 79.76
05 03 05 02 CONCRETO EN LA BASE F'C = 175 KG/CM2 M3 19.58
05 03 05 03 CONCRETO EN LOSA F'C = 210 KG/CM2 M3 11.06
05 03 06 00 ACERO CORRUGADO GRADO 60
05 03 06 01 ACERO CORRUGADO GRADO 60 EN CANAL DE DRENAJE PLUVIAL KG 2837.85
05 03 07 00 ENCOFRADO Y DESENCOFRADO
05 03 07 01 ENCOFRADO Y DESENCOFRADO EN CANAL DE DRENAJE PLUVIAL M2 247.63
06 00 00 00 SUMIDEROS
06 01 00 00 TRABAJOS PRELIMINARES
06 01 01 00 TRAZO Y REPLANTEO M2 10.89
RESUMEN DE HOJA DE METRADOS
06 01 02 00 EXCAVACION MANUAL DE TERRENO NATURAL M3 10.89
06 01 03 00 Elminacion de Material excedente M3 11.43
06 02 00 00 CONCRETO
06 02 01 00 Solado de Concreto 1:10 M2 1.21
06 02 02 00 CONCRETO EN BASE Y PAREDES DE CANAL F'C = 175 K/CM2 - M3 5.78
06 03 00 00 ACERO CORRUGADO GRADO 60
06 03 01 00 ACERO CORRUGADO GRADO 60 EN ESTRUCTURAS DE SUMIDERO KG 517.10
06 04 00 00 ENCOFRADO Y DESENCOFRADO
06 04 01 00 ENCOFRADO Y DESENCOFRADO EN ESTRUCTURAS DE SUMIDERO M2 35.64
06 05 00 00 ACERO LISO
06 05 01 00 ACERO LISO EN REJILLA DE SUMIDERO KG 31.37
07 00 00 00 CANAL EMBOQUILLADO DE PIEDRA
07 01 00 00 OBRAS PRELIMINARES
07 01 01 00 TRAZO Y REPLANTEO M2 59.60
07 02 00 00 MOVIMIENTO DE TIERRAS
07 02 01 00 EXCAVACION MANUAL M3 8.94
07 03 00 00 ELIMINACION DE MATERIAL EXCEDENTE
07 03 01 00 ELIMINACION DE MATERIAL EXCEDENTE M3 9.39
07 04 00 00 MATERIAL DE CANTERA PARA EMPEDRADO
07 04 01 00 EXTRACCION Y APILAMIENTO DE PIEDRA DE 8-10" M3 8.94
07 04 02 00 SELECCIÓN DE MATERIAL EN CANTERA M3 8.94
07 04 03 00 CARGUIO (AGREGADOS DE CANTERA) M3 8.94
07 04 04 00 TRANSPORTE A LA OBRA (AGREGADOS DE CANTERA) M3 8.94
07 05 00 00 CONCRETO SIMPLE + 30 %PG 8 -10" PARA EMPEDRADO
07 05 01 00 ENCOF./DESENCOF. M2 15.89
07 05 02 00 CONCRETO F"C=140KG/CM2 + 30% PG 8-10" M3 8.94
08 00 00 00 SEÑALIZACION VERTICAL
08 01 00 00 SEÑALIZACION INFORMATIVA UND 15.00
09 00 00 00 CONTROL DE CALIDAD
09 01 00 00 Prueba de Densidad INSITU UND 24.00
09 02 00 00 Prueba de Compactacion PROCTOR UND 3.00
09 03 00 00 Prueba de Compresion de Concreto UND 24.00
09 04 00 00 Prueba Marshall para Asfalto UND 2.00
09 05 00 00 Diseño de Mezcla de Concreto UND 3.00
09 06 00 00 LIMPIEZA FINAL DE OBRA M2 9440.91
10 00 00 00 MITIGACION AMBIENTAL
10 01 00 00 PROGRAMA DE MITIGACION, PREVENCION Y CORRECCION
10 01 01 00 SUB PROGRAMA DE MANEJO DE RESIDUOS Y EFLUENTES
10 01 01 01 CONTENEDORES DE RESIDUO SOLIDOS UND 4
10 03 01 02 SUB PROGRAMA DE CONTROL DE RUIDOS pto 2
10 03 01 03 SUB PROGRAMA DE SEÑALIZACION pto 4
10 02 00 00 PROGRAMA DE MONITOREO AMBIENTAL
10 02 01 00 MONITOREO DE LA CALIDAD DEL AGUA pto 2
10 02 02 00 MONITOREO DE LA CALIDAD DE AIRE pto 2
10 02 03 00 MONITOREO DE LA CALIDAD EL SUELO pto 2
10 02 04 00 MONITOREO DE RUIDOS pto 2
10 03 00 00 PROGRAMA DE CAPACITACION Y EDUCACION AMBIENTAL
10 03 01 00 A LA POBLACION LOCAL Glb 2
10 03 02 00 AL PERSONAL PROFESIONAL Y TECNICO Glb 2
RESUMEN DE HOJA DE METRADOS
10 04 00 00 PROGRAMA DE PREVENCION DE PERDIDAS Y RESPUESTA A EMERGENCIAS
10 04 01 00 SUB PROGRAMA DE PREVENCION Y CONTROL DE RIESGOS LABORALES glb 1
10 04 02 00 SUB PROGRAMA DE PREVENCION DE CONTINGENCIAS Y RESPUESTA A EMERGENCIAS glb 1
10 05 00 00 PROGRAMA DE ASUNTOS SOCIALES
10 05 01 00 MECANISMOS DE COMUNICACIÓN E INFORMACION ENTRE POBLADORES Y EMPRESA Glb 1
10 05 02 00 MECANISMOS DE PREVENCION Y RESOLUCION DE CONFLICTOS Glb 1
10 06 00 00 PROGRAMA DE CIERRE O ABANDONO
10 06 01 00 TRATAMIENTO DME M2 400
PRECIO PARCIAL
PLAN DE SENCIBILIZACION
Programa de Mitigacion, Prevencion y Correcion 13,800
Sub-Programa de Manejo de Residuos y Efluentes
Contenedores de Residuos Solidos u 30 60 1,800Incluido en G. Generale
Transporte Especializado de Residuos Peligrosos ( Viaje 2 6,000 12,000
Sub-Programa de Control de Erosion y Sedimentos pto 5 - - No sujeto a pago directo
Sub-Programa de Control de Ruidos pto 2 - - No sujeto a pago directo
Sub-Programa de Señalizacion pto 4 - -Incluido en la partida 103
Programa de Monitoreo Ambiental 198,500
Monitoreo de la Calidad del Agua pto 30 2,500 75,000
Monitoreo de la Calidad del Aire pto 25 3,500 87,500
Monitoreo de la calidad del suelo
Monitoreo de Ruidos pto 30 1,200 36,000
Programa de Capacitacion y Educacion Ambiental 12,000
A la Poblacion Local Glb 4 3,000 12,000
Control Medico (Cada 6 meses) u 600 50 30,000
Fumigacion u 3 2,000 6,000
Sub-Programa de Prevencion y Control de Riesgos Labor - - - -
Sub-Programa de Prevencion de Contingencias y respuesta a emergencias
Pograma de Asuntos Sociales 12,400
Mecanismos de Comunicación e Informacion entre p Glb 1 10,300 10,300
Mecanismos de Prevencion y Resolucion de conflicto Glb 1 2,100 2,100
Sub-Programa de Contratacion de Mano de Obra Local - - - - No sujeto a pago directo
Sub-Programa de Compras Locales - - - - No sujeto a pago directo
Programa de Cierre o Abandono

TOTAL #REF! SOLES


ago directo
ago directo
artida 103.A
ago directo
ago directo