Vous êtes sur la page 1sur 16

SMARTFREN LTE ROLLOUT PROJECT

SmartfrenLTE Rollout Project


Single Site Verification Report

City : Jakarta

SITE NAME : Pegangsaan-004

SF SITE ID : ZJKT_4503

Technology :TDD

Smartfren Radio Network Optimization Team ZTE NPO Team

REVIEW/ACCEPT BY: REVIEW/ACCEPT BY:

NAME:______________________________ NAME:________________________________

SIGNATURE:__________________________ SIGNATURE:___________________________

DATE:________________________________ DATE:_________________________________
Site ID:ZJKT_4503

Site Optimization Report

City:

Jakarta

ZTE SITE ID:

ZJKT_4503

SITE NAME:

Pegangsaan-004

Test Engineer: Prima

Test date:2018-06-07

Date
Single Site Verification Phase4A_V.21 2018/06/29 1 (8)
Site ID:ZJKT_4503

1. Site Location Information

Site Information
Antenna Azimuth Azimuth Tilt
Site ID eNB ID Cell Name PCI TAC Lat Long
Height (Actual) (Planed) M/E

ZJKT_4503 157503 ZJKTDM4503-11 299 1526 17 30 30 0/8 -6.205653 106.8516

ZJKT_4503 157503 ZJKTDM4503-12 298 1526 17 140 140 0/8 -6.205653 106.8516

ZJKT_4503 157503 ZJKTDM4503-13 297 1526 17 290 290 0/8 -6.205653 106.8516

Site Address

Site Address ZJKT_4503 : JL. Matraman Dalam 3, Jakarta Pusat

Date
Single Site Verification Phase4A_V.21 2018/06/29 2 (8)
Site ID:ZJKT_4503

Route

RET

Date
Single Site Verification Phase4A_V.21 2018/06/29 3 (8)
Site ID:ZJKT_4503

2. KPI Summary
Summary
Source

SN Test Target Achieved Pass/Fail

>3Mbps (FDD)
1 OOKLAspeedtest 8.2/6.13/7.27 Mbps Pass DT Static
> 5Mbps (TDD)

>3Mbps (FDD)
2 Nperfspeedtest 22.65/7.98/12.46 Mbps Pass DT Static
> 5Mbps (TDD)

>3Mbps (FDD)
3 Opensignalspeedtest 12.41/8.27/16.33 Mbps Pass DT Static
> 5Mbps (TDD)

4 RRC Connection Success Rate > 99% 100% Pass DT Mobile

5 ERAB Drop Rate < 1% 0.00% Pass DT Mobile

6 Handover Succes Rate > 99% 100% Pass DT Mobile

TDD 30M>110 Mbps

7 Peak Value (Single Sample) FDD10M>50 Mbps 95.53 Mbps *Pass DT Mobile

FDD5M>27 Mbps

8 DL THP > 5 Mbps (%) N/A 75.36% N/A DT Mobile

9 RSRP > -105 (%) N/A 80.61% N/A DT Mobile

10 SINR > 3 (%) N/A 70.33% N/A DT Mobile

11 VoLTE Setup Success Rate > 99% 100% Pass DT Mobile

12 VoLTE ERAB Drop Rate < 1% 0.00% Pass DT Mobile

13 Cross Feeder No Cross Feeder No Pass DT Mobile

14 OverShooting No Overshooting No/No/No Pass OSS Data

*REMARK
 Peak Value
Test Date : 07 June 2018
We take KPI 5 sites surrounding ZJKT_4503 where these sites affected when team
perform Drive Test. We found those sites have high enough DL PRB Utilization,
Maximum Number of RRC Connection User and high Packet Loss

Date
Single Site Verification Phase4A_V.21 2018/06/29 4 (8)
Site ID:ZJKT_4503

3.MapReview
3.1 RSRPPlot

Average RSRP = -94.93 dBm


3.2 SINRPlot

Average SINR=7.22dB

Date
Single Site Verification Phase4A_V.21 2018/06/29 5 (8)
Site ID:ZJKT_4503

3.3 DownlinkThroughputPlot

Average Throughput=18.09Mbps
3.5 PCIPlot (Overshooting Criteria)

Date
Single Site Verification Phase4A_V.21 2018/06/29 6 (8)
Site ID:ZJKT_4503

Cell
Distanc Overshooting
Distance e (70% criteria Overshooting
Site Name Cell
1st tier km site (>80%sampel<=c (Yes/No)
distance ell distance) - %
)-km
ZJKT_4503 ZJKT_4503_11 0.41 Km 0.29 Km 80.28% No
ZJKT_4503 ZJKT_4503_12 0.64 Km 0.45 Km 90.80% No
ZJKT_4503 ZJKT_4503_13 0.28 Km 0.20 Km 80.12% No

Note: First Neighbour site should show into the plot to chechk over shooting or not
 Conclusion_1 : Refer to the OSS TA, More than 90% samples >= 70% cell
distance. So this Infill site have overshooting for Sector 1 and Sector 2
 Conclusion_2 : Refer to the PCI Plot, DT Route PCI is matching with site PCI.
So this Infill site does not have crossfiber.

Cell Distance and TA Mapping Table :


Distance to 1st tier (m) 111 334 557 780 1003 1226 1449 2229 3009 3789 4457 5671 9026 14374

Cell distance (m) 78 234 390 546 702 858 1014 1560 2106 2652 3120 3900 6318 10062

TA Value in EMS 1 3 5 7 9 11 13 20 27 34 40 50 81 129

Date
Single Site Verification Phase4A_V.21 2018/06/29 7 (8)
Site ID:ZJKT_4503

4 .SPEEDTEST

3.1 OOKLA SPEEDTEST


Sector 1 Sector 2 Sector 3

3.2 NperfSPEEDTEST
Sector 1 Sector 2 Sector 3

Date
Single Site Verification Phase4A_V.21 2018/06/29 8 (8)
Site ID:ZJKT_4503

3.3 Opensignal SPEEDTEST


Sector 1 Sector 2 Sector 3

5. Coverage Plot RSRP TDD

Date
Single Site Verification Phase4A_V.21 2018/06/29 9 (8)
Site ID:ZJKT_4503

6. SITE AUDIT

Antenna Azimuth & Tilt Information


Azimuth Measurement Capture (Alpha) FDD & TDD Azimuth Measurement Capture (Beta) FDD & TDD

Azimuth Measurement Capture (Gamma) FDD & TDD Antenna View (Alpha) FDD & TDD

Antenna View (Beta) FDD & TDD Antenna View (Gamma) FDD & TDD

Mechanical Tilt Measurement Capture (Alpha) FDD & TDD Mechanical Tilt Measurement Capture (Beta) FDD &
TDD

Mechanical Tilt Measurement Capture (Gamma) FDD & TDD Electrical Tilt Measurement Capture (Alpha) FDD &
TDD

Date
Single Site Verification Phase4A_V.21 2018/06/29 10 (8)
Site ID:ZJKT_4503

Refer to EMS RET Value

Electrical Tilt Measurement Capture (Beta) FDD & TDD Electrical Tilt Measurement Capture (Gamma) FDD &
TDD

Refer to EMS RET Value Refer to EMS RET Value

Panoramic (FDD & TDD)


00 FDD 0 deg 300 FDD
TDD 30 deg TDD

600 FDD 60 deg 900 FDD


TDD 90 deg TDD

1200 FDD 120 1500 FDD


deg TDD 150 deg TDD

Date
Single Site Verification Phase4A_V.21 2018/06/29 11 (8)
Site ID:ZJKT_4503

1800 FDD 180 2100 FDD


deg TDD 210 deg TDD

2400 FDD 240 2700 FDD


deg TDD 270 deg TDD

3000 FDD 300 3300 FDD


deg TDD 330 deg TDD

Antenna Height (Alpha) FDD & TDD Antenna Height (Beta) FDD & TDD

Antenna Height (Gamma) FDD & TDD

Date
Single Site Verification Phase4A_V.21 2018/06/29 12 (8)
Site ID:ZJKT_4503

7. JUSTIFICATION

 Peak Value
Test Date : 07 June 2018
 We static test surrounding ZJKT_4503 and We found those sites have high enough DL
PRB Utilization, Maximum Number of RRC Connection User and high Packet Loss

MAXIMUM DL PDCP THROUGHPUT (Mbps)

Date
Single Site Verification Phase4A_V.21 2018/06/29 13 (8)
Site ID:ZJKT_4503

TOTAL DOWNLINK TRAFFIC VOLUME (GByte)

MAXIMUM NUMBER OF RRC CONNECTION USER

Date
Single Site Verification Phase4A_V.21 2018/06/29 14 (8)
Site ID:ZJKT_4503

ENodeB Packet Loss

Date
Single Site Verification Phase4A_V.21 2018/06/29 15 (8)