DEAD LOAD OF BLEACHERS

SECTION A - B (1)
A concrete+hallow(mm²) A hallow(mm²) A (m²)concrete N of steps
B1 43750 0 0.04375 2
S1 62500 0 0.0625 1
Hand Rail

SECTION B - C (1)
A concrete+hallow A hallow A concrete N of steps
B2 250000 122500 0.1275 2

SECTION C - D (1)
A concrete+hallow A hallow A concrete N of steps
B3 250000 122500 0.1275 2
S2 62500 22500 0.04 1
Hand Rail

SECTION D - E (1)
A concrete+hallow A hallow A concrete N of steps
B4 250000 122500 0.1275 2
S3 62500 22500 0.04 1
Hand Rail

SECTION E - F (1)
A concrete+hallow A hallow A concrete N of steps
B5 250000 122500 0.1275 2

SECTION F - G (1)
A concrete+hallow(mm²) A hallow(mm²) A (m²)concrete N of steps
B1 250000 122500 0.1275 2
S1 62500 22500 0.04 1
Hand Rail

SECTION G - H (1)
A concrete+hallow A hallow A concrete N of steps
0
SECTION A - B (6)
A concrete+hallow(mm²) A hallow(mm²) A (m²)concrete N of steps
B1 250000 122500 0.1275 2
S1 62500 22500 0.04 1
Hand Rail

SECTION B - C (6)
A concrete+hallow A hallow A concrete N of steps
B2 250000 122500 0.1275 2

SECTION C - D (6)
A concrete+hallow A hallow A concrete N of steps
B3 250000 122500 0.1275 2
S2 62500 22500 0.04 1
Hand Rail

SECTION E - F (6)
A concrete+hallow A hallow A concrete N of steps
B5 250000 122500 0.1275 2
S2 62500 22500 0.04 1
Hand Rail

SECTION F - G (6)
A concrete+hallow(mm²) A hallow(mm²) A (m²)concrete N of steps
B1 250000 122500 0.1275 2
S1 62500 22500 0.04 1
Hand Rail

SECTION G - H (6)
A concrete+hallow A hallow A concrete N of steps
0
Ƴ of concrete(kN/m³) Load
23.6 2.065
23.6 1.475
1
Total Load (kN/m) = 4.54

Ƴ of concrete(kN/m³) Load
23.6 6.018

Total Load (kN/m) = 6.018

Ƴ of concrete(kN/m³) Load
23.6 6.018
23.6 0.944
1
Total Load (kN/m) = 7.962

Ƴ of concrete(kN/m³) Load
23.6 6.018
23.6 0.944
1
Total Load (kN/m) = 7.962

Ƴ of concrete(kN/m³) Load
23.6 6.018

Total Load (kN/m) = 6.018

Ƴ of concrete(kN/m³) Load
23.6 6.018
23.6 0.944
1
Total Load (kN/m) = 7.962

Ƴ of concrete(kN/m³) Load
23.6 0
Total Load (kN/m) = 0

Ƴ of concrete(kN/m³) Load
23.6 6.018
23.6 0.944
1
Total Load (kN/m) = 7.962

Ƴ of concrete(kN/m³) Load
23.6 6.018

Total Load (kN/m) = 6.018

Ƴ of concrete(kN/m³) Load
23.6 6.018
23.6 0.944
1
Total Load (kN/m) = 7.962

Ƴ of concrete(kN/m³) Load
23.6 6.018
23.6 0.944
1
Total Load (kN/m) = 7.962

Ƴ of concrete(kN/m³) Load
23.6 6.018
23.6 0.944
1
Total Load (kN/m) = 7.962

Ƴ of concrete(kN/m³) Load
23.6 0

Total Load (kN/m) = 0


SECTION A - B (1')
A concrete+hallow(mm²) A hallow(mm²) A (m²)concrete N of steps
B1 250000 122500 0.1275 2
S1 62500 22500 0.04 2
Hand Rail

SECTION B - C (1')
A concrete+hallow A hallow A concrete N of steps
B2 250000 122500 0.1275 2

SECTION C - D (1')
A concrete+hallow A hallow A concrete N of steps
B3 250000 122500 0.1275 2
S2 62500 22500 0.04 2
Hand Rail

SECTION D - E (1')
A concrete+hallow A hallow A concrete N of steps
B4 250000 122500 0.1275 2
S3 62500 22500 0.04 2
Hand Rail

SECTION E - F (1')
A concrete+hallow A hallow A concrete N of steps
B5 250000 122500 0.1275 2

SECTION F - G (1')
A concrete+hallow(mm²) A hallow(mm²) A (m²)concrete N of steps
B1 250000 122500 0.1275 2
S1 62500 22500 0.04 2
Hand Rail

SECTION G - H (1')
A concrete+hallow A hallow A concrete N of steps
0
SECTION A - B (6')
A concrete+hallow(mm²) A hallow(mm²) A (m²)concrete N of steps
B1 250000 122500 0.1275 2
S1 62500 22500 0.04 2
Hand Rail

SECTION B - C (6')
A concrete+hallow A hallow A concrete N of steps
B2 250000 122500 0.1275 2

SECTION C - D (6')
A concrete+hallow A hallow A concrete N of steps
B3 250000 122500 0.1275 2
S2 62500 22500 0.04 2
Hand Rail

SECTION E - F (6')
A concrete+hallow A hallow A concrete N of steps
B5 250000 122500 0.1275 2
S2 62500 22500 0.04 2
Hand Rail

SECTION F - G (6')
A concrete+hallow(mm²) A hallow(mm²) A (m²)concrete N of steps
B1 250000 122500 0.1275 2
S1 62500 22500 0.04 2
Hand Rail

SECTION G - H (6')
A concrete+hallow A hallow A concrete N of steps
0
1')
N of steps Ƴ of concrete(kN/m³) Load
2 23.6 6.018
2 23.6 1.888
1
Total Load (kN/m) = 8.906

1')
N of steps Ƴ of concrete(kN/m³) Load
2 23.6 6.018

Total Load (kN/m) = 6.018

1')
N of steps Ƴ of concrete(kN/m³) Load
2 23.6 6.018
2 23.6 1.888
1
Total Load (kN/m) = 8.906

1')
N of steps Ƴ of concrete(kN/m³) Load
2 23.6 6.018
2 23.6 1.888
1
Total Load (kN/m) = 8.906

1')
N of steps Ƴ of concrete(kN/m³) Load
2 23.6 6.018

Total Load (kN/m) = 6.018

1')
N of steps Ƴ of concrete(kN/m³) Load
2 23.6 6.018
2 23.6 1.888
1
Total Load (kN/m) = 8.906

1')
N of steps Ƴ of concrete(kN/m³) Load
23.6 0
Total Load (kN/m) = 0

6')
N of steps Ƴ of concrete(kN/m³) Load
2 23.6 6.018
2 23.6 1.888
1
Total Load (kN/m) = 8.906

6')
N of steps Ƴ of concrete(kN/m³) Load
2 23.6 6.018

Total Load (kN/m) = 6.018

6')
N of steps Ƴ of concrete(kN/m³) Load
2 23.6 6.018
2 23.6 1.888
1
Total Load (kN/m) = 8.906

6')
N of steps Ƴ of concrete(kN/m³) Load
2 23.6 6.018
2 23.6 1.888
1
Total Load (kN/m) = 8.906

6')
N of steps Ƴ of concrete(kN/m³) Load
2 23.6 6.018
2 23.6 1.888
1
Total Load (kN/m) = 8.906

6')
N of steps Ƴ of concrete(kN/m³) Load
23.6 0

Total Load (kN/m) = 0


SECTION A - B (2)
A concrete+hallow A hallow A concrete N of steps
B8 250000 122500 0.1275 2
S4 62500 22500 0.04 2
Hand Rail

SECTION B - C (2)
A concrete+hallow A hallow A concrete N of steps
B9 250000 122500 0.1275 2

SECTION C - D (2)
A concrete+hallow A hallow A concrete N of steps
B10 250000 122500 0.1275 2
S5 62500 22500 0.04 2
Hand Rail

SECTION D - E (2)
A concrete+hallow A hallow A concrete N of steps
B11 250000 122500 0.1275 2
S6 62500 22500 0.04 2
Hand Rail

SECTION E - F (2)
A concrete+hallow A hallow A concrete N of steps
B12 250000 122500 0.1275 2

SECTION F - G (2)
A concrete+hallow A hallow A concrete N of steps
B8 250000 122500 0.1275 2
S4 62500 22500 0.04 2
Hand Rail

SECTION G - H (2)
A concrete+hallow A hallow A concrete N of steps
B14 0
S7
SECTION A - B (5)
A concrete+hallow A hallow A concrete N of steps
B8 250000 122500 0.1275 2
S4 62500 22500 0.04 2
Hand Rail

SECTION B - C (5)
A concrete+hallow A hallow A concrete N of steps
B9 250000 122500 0.1275 2

SECTION C - D (5)
A concrete+hallow A hallow A concrete N of steps
B10 250000 122500 0.1275 2
S5 62500 22500 0.04 2
Hand Rail

SECTION E - F (5)
A concrete+hallow A hallow A concrete N of steps
B12 250000 122500 0.1275 2
S5 62500 22500 0.04 2
Hand Rail

SECTION F - G (5)
A concrete+hallow A hallow A concrete N of steps
B8 250000 122500 0.1275 2
S4 62500 22500 0.04 2
Hand Rail

SECTION G - H (5)
A concrete+hallow A hallow A concrete N of steps
B14 0
S7
(2)
N of steps Ƴ of concrete(kN/m³) Load A concrete+hallow
2 23.6 6.018 B8 250000
2 23.6 1.888 S4 62500
1 Hand Rail
Total Load = 8.906

(2)
N of steps Ƴ of concrete(kN/m³) Load A concrete+hallow
2 23.6 6.018 B9 250000

Total Load = 6.018

(2)
N of steps Ƴ of concrete(kN/m³) Load A concrete+hallow
2 23.6 6.018 B10 250000
2 23.6 1.888 S5 62500
1 Hand Rail
Total Load = 8.906

(2)
N of steps Ƴ of concrete(kN/m³) Load A concrete+hallow
2 23.6 6.018 B11 250000
2 23.6 1.888 S6 62500
1 Hand Rail
Total Load = 8.906

(2)
N of steps Ƴ of concrete(kN/m³) Load A concrete+hallow
2 23.6 6.018 B12 250000

Total Load = 6.018

(2)
N of steps Ƴ of concrete(kN/m³) Load A concrete+hallow
2 23.6 6.018 B8 250000
2 23.6 1.888 S4 62500
1 Hand Rail
Total Load = 8.906

(2)
N of steps Ƴ of concrete(kN/m³) Load A concrete+hallow
23.6 0 B14
S7
Total Load = 0

(5)
N of steps Ƴ of concrete(kN/m³) Load A concrete+hallow
2 23.6 6.018 B8 250000
2 23.6 1.888 S4 62500
1 Hand Rail
Total Load = 8.906

(5)
N of steps Ƴ of concrete(kN/m³) Load A concrete+hallow
2 23.6 6.018 B9 250000

Total Load = 6.018

(5)
N of steps Ƴ of concrete(kN/m³) Load A concrete+hallow
2 23.6 6.018 B10 250000
2 23.6 1.888 S5 62500
1 Hand Rail
Total Load = 8.906

(5)
N of steps Ƴ of concrete(kN/m³) Load A concrete+hallow
2 23.6 6.018 B12 250000
2 23.6 1.888 S5 62500
1 Hand Rail
Total Load = 8.906

(5)
N of steps Ƴ of concrete(kN/m³) Load A concrete+hallow
2 23.6 6.018 B8 250000
2 23.6 1.888 S4 62500
1 Hand Rail
Total Load = 8.906

(5)
N of steps Ƴ of concrete(kN/m³) Load A concrete+hallow
23.6 0 B14
S7
Total Load = 0
SECTION A - B (2')
A hallow A concrete N of steps Ƴ of concrete(kN/m³) Load
122500 0.1275 1 23.6 3.009
22500 0.04 1 23.6 0.944
1
Total Load = 4.953

SECTION B - C (2')
A hallow A concrete N of steps Ƴ of concrete(kN/m³) Load
122500 0.1275 1 23.6 3.009

Total Load = 3.009

SECTION C - D (2')
A hallow A concrete N of steps Ƴ of concrete(kN/m³) Load
122500 0.1275 1 23.6 3.009
22500 0.04 1 23.6 0.944
1
Total Load = 4.953

SECTION D - E (2')
A hallow A concrete N of steps Ƴ of concrete(kN/m³) Load
122500 0.1275 1 23.6 3.009
22500 0.04 1 23.6 0.944
1
Total Load = 4.953

SECTION E - F (2')
A hallow A concrete N of steps Ƴ of concrete(kN/m³) Load
122500 0.1275 1 23.6 3.009

Total Load = 3.009

SECTION F - G (2')
A hallow A concrete N of steps Ƴ of concrete(kN/m³) Load
122500 0.1275 1 23.6 3.009
22500 0.04 1 23.6 0.944
1
Total Load = 4.953

SECTION G - H (2')
A hallow A concrete N of steps Ƴ of concrete(kN/m³) Load
0 23.6 0
Total Load = 0

SECTION A - B (5')
A hallow A concrete N of steps Ƴ of concrete(kN/m³) Load
122500 0.1275 1 23.6 3.009
22500 0.04 1 23.6 0.944
1
Total Load = 4.953

SECTION B - C (5')
A hallow A concrete N of steps Ƴ of concrete(kN/m³) Load
122500 0.1275 1 23.6 3.009

Total Load = 3.009

SECTION C - D (5')
A hallow A concrete N of steps Ƴ of concrete(kN/m³) Load
122500 0.1275 1 23.6 3.009
22500 0.04 1 23.6 0.944
1
Total Load = 4.953

SECTION E - F (5')
A hallow A concrete N of steps Ƴ of concrete(kN/m³) Load
122500 0.1275 1 23.6 3.009
22500 0.04 1 23.6 0.944
1
Total Load = 4.953

SECTION F - G (5')
A hallow A concrete N of steps Ƴ of concrete(kN/m³) Load
122500 0.1275 1 23.6 3.009
22500 0.04 1 23.6 0.944
1
Total Load = 4.953

SECTION G - H (5')
A hallow A concrete N of steps Ƴ of concrete(kN/m³) Load
0 23.6 0

Total Load = 0
TECHNOLOCIGAL UNIVERSITY OF THE PHILLIPINES-TAGUIG
KM 14 EAST SERVICE ROAD, WESTERN BICUTAN, TAGUIG CITY
CIVIL ENGINEERING DEPARTMENT

SLAB DESIGN

SLAB - S1 (A-B-1)

Design Criteria:
f'c 28 Mpa
fy 415 Mpa
concrete cover on both sides - mm
concrete cover on bottom 20 mm
Dead load 7.962 kN/m
Live load 4.8 kN/m
Short span 2 m
Long span 6 m
ɸ 0.9

COMPUTATION: 1m strip analysis

L/S 6000/2000= 3> or = 2


hence, slab is designed as one way slab

1. Det. The minimum slab thickness "h"

Min.Slab thickness (t): L/28

=6000/28

h= 214.28571 mm = 220 mm

2. Solve for Effective Depth


Use20mm ø - Main bar
d= h-Cc-1/2 Main bar Ø
d=220-20-20/2
d= 190 mm

3. Solve for Factored Load

ω= 1.2(DL) + 1.6(LL)
ω=1.2(7.962)+1.6(4.8)

ω= 17.2344 kN/m
4. Solve For Mu
Mu=(ω)(L)²/8
Mu=(17.2344)(6)²/8

Mu = 77.5548 kN-m

5. Solve for Rn
Mu=ɸRnbd²
77554800=0.9Rn(1000)*(190)²

Rn= 2.3870 Mpa


THE PHILLIPINES-TAGUIG
ERN BICUTAN, TAGUIG CITY
DEPARTMENT
6. Solve for Steel Ratio

ρ=0.85fc'/fy [1- √1-2Rn/0.85fc']


=0.85(28)/415[1-√1-(2(2.387)/0.85(28)]
ρ= 0.0060735

If ρ is < ρMax and > ρMin, use ρ


If ρ is > ρMax, increase the depth of slab to ensure ductile failure
if ρ is < ρMin, use ρ = ρMin

ρMin= 1.4/fy ρMax= 0.75ρBalance ρBal =


= 1.4/415
ρMin= 0.0033735 ρMax= 0.021615 ρb= 0.02882

therefore, use ρ=ρMin


ρ= 0.00607

7. Solve for the area of Main bar

As=ρbd
=0.00607(1000)(190)
As= 1153.9642 mm²

8. Determine N of Main bars


As=∏(d)²/4 X N
1153.96=∏(20)²/4 X N
N= 3.6732 = 4 pcs

9. Spacing of Main bars


Provisions: Choose Smallest
S= Abar/As X 1000
S=3(h)
S= 450 mm

S= Abar/As X 1000
S=314.15/1153.96 X 1000
S= 272.24351 = 280 mm
S=3(h)
S=3(220)
S= 570 mm

therefore,use 280mm Spacing of Main bars


10. Solve for the area of Temperature bars
Use 12mmØ - Temp. bar
At= 0.002(b)(h)
At=0.002(1000)(220)
At= 440 mm

11. Determine N of Temp. bar


At= ∏(d)²/4 X N
ρb= 0.85fc'β(600)/fy (fy+600)
440=∏(12)²/4 X N
N= 3.8905 = 4 pcs

12. Spacing of Temp. Bars


Provisions: Choose Smallest
S= Abar/At X 1000
S= 5(h)
S= 450 mm

S= Abar/At X 1000
S=113.097/440 X 1000
S= 257.039 = 300 mm

S= 5(h) S= 5(300)
S=5(220)
S= 1100 mm

therefore,use 300mm Spacing of Temperature bars


TECHNOLOCIGAL UNIVERSITY OF THE PHILLIPINES-TAGUIG
KM 14 EAST SERVICE ROAD, WESTERN BICUTAN, TAGUIG CITY
CIVIL ENGINEERING DEPARTMENT

SLAB DESIGN

SLAB - S2 ( B-C-1)

Design Criteria:
f'c 28 Mpa
fy 415 Mpa
concrete cover on both sides - mm
concrete cover on bottom 20 mm
Dead load 6.018 kN/m
Live load 4.8 kN/m
Short span 2 m
Long span 6 m
ɸ 0.9

COMPUTATION: 1m strip analysis

L/S 6000/2000= 3> or = 2


hence, slab is designed as one way slab

1. Det. The minimum slab thickness "h"

Min.Slab thickness (t): L/28

=6000/28

h= 214.28571 mm = 220 mm

2. Solve for Effective Depth


Use20mm ø - Main bar
d= h-Cc-1/2 Main bar Ø
d=220-20-20/2
d= 190 mm

3. Solve for Factored Load

ω= 1.2(DL) + 1.6(LL)
ω=1.2(6.018)+1.6(4.8)

ω= 14.9016 kN/m
4. Solve For Mu
Mu=(ω)(L)²/8
Mu=(14.9016)(6)²/8

Mu = 67.0572 kN-m

5. Solve for Rn
Mu=ɸRnbd²
67057200=0.9Rn(1000)*(190)²

Rn= 2.0639 Mpa


THE PHILLIPINES-TAGUIG
ERN BICUTAN, TAGUIG CITY
DEPARTMENT
6. Solve for Steel Ratio

ρ=0.85fc'/fy [1- √1-2Rn/0.85fc']


=0.85(28)/415[1-√1-(2(2.0639)/0.85(28)]
ρ= 0.00521

If ρ is < ρMax and > ρMin, use ρ


If ρ is > ρMax, increase the depth of slab to ensure ductile failure
if ρ is < ρMin, use ρ = ρMin

ρMin= 1.4/fy ρMax= 0.75ρBalance ρBal =


= 1.4/415
ρMin= 0.0033735 ρMax= 0.021615 ρb= 0.02882

therefore, use ρ=ρMin


ρ= 0.00521

7. Solve for the area of Main bar

As=ρbd
=0.0052(1000)(190)
As= 989.89776 mm²

8. Determine N of Main bars


As=∏(d)²/4 X N
989.89=∏(20)²/4 X N
N= 3.1509 = 4 pcs

9. Spacing of Main bars


Provisions: Choose Smallest
S= Abar/As X 1000
S=3(h)
S= 450 mm

S= Abar/As X 1000
S=314.15/989.89 X 1000
S= 317.36537 = 320 mm
S=3(h)
S=3(220)
S= 570 mm

therefore,use 320mm Spacing of Main bars


10. Solve for the area of Temperature bars
Use 12mmØ - Temp. bar
At= 0.002(b)(h)
At=0.002(1000)(220)
At= 440 mm

11. Determine N of Temp. bar


At= ∏(d)²/4 X N
ρb= 0.85fc'β(600)/fy (fy+600)
440=∏(12)²/4 X N
N= 3.8905 = 4 pcs

12. Spacing of Temp. Bars


Provisions: Choose Smallest
S= Abar/At X 1000
S= 5(h)
S= 450 mm

S= Abar/At X 1000
S=113.097/440 X 1000
S= 257.039 = 300 mm

S= 5(h) S= 5(300)
S=5(220)
S= 1100 mm

therefore,use 300mm Spacing of Temperature bars


TECHNOLOCIGAL UNIVERSITY OF THE PHILLIPINES-TAGUIG
KM 14 EAST SERVICE ROAD, WESTERN BICUTAN, TAGUIG CITY
CIVIL ENGINEERING DEPARTMENT

SLAB DESIGN

SLAB - S3 ( C-D-1)

Design Criteria:
f'c 28 Mpa
fy 415 Mpa
concrete cover on both sides - mm
concrete cover on bottom 20 mm
Dead load 7.962 kN/m
Live load 4.8 kN/m
Short span 2 m
Long span 6 m
ɸ 0.9

COMPUTATION: 1m strip analysis

L/S 6000/2000= 3> or = 2


hence, slab is designed as one way slab

1. Det. The minimum slab thickness "h"

Min.Slab thickness (t): L/28

=6000/28

h= 214.28571 mm = 220 mm

2. Solve for Effective Depth


Use20mm ø - Main bar
d= h-Cc-1/2 Main bar Ø
d=220-20-20/2
d= 190 mm

3. Solve for Factored Load

ω= 1.2(DL) + 1.6(LL)
ω=1.2(7.962)+1.6(4.8)

ω= 17.2344 kN/m
4. Solve For Mu
Mu=(ω)(L)²/8
Mu=(17.2344)(6)²/8

Mu = 77.5548 kN-m

5. Solve for Rn
Mu=ɸRnbd²
77554800=0.9Rn(1000)*(190)²

Rn= 2.3870 Mpa


THE PHILLIPINES-TAGUIG
ERN BICUTAN, TAGUIG CITY
DEPARTMENT
6. Solve for Steel Ratio

ρ=0.85fc'/fy [1- √1-2Rn/0.85fc']


=0.85(28)/415[1-√1-(2(2.387)/0.85(28)]
ρ= 0.0060735

If ρ is < ρMax and > ρMin, use ρ


If ρ is > ρMax, increase the depth of slab to ensure ductile failure
if ρ is < ρMin, use ρ = ρMin

ρMin= 1.4/fy ρMax= 0.75ρBalance ρBal =


= 1.4/415
ρMin= 0.0033735 ρMax= 0.021615 ρb= 0.02882

therefore, use ρ=ρMin


ρ= 0.00607

7. Solve for the area of Main bar

As=ρbd
=0.00607(1000)(190)
As= 1153.9642 mm²

8. Determine N of Main bars


As=∏(d)²/4 X N
1153.96=∏(20)²/4 X N
N= 3.6732 = 4 pcs

9. Spacing of Main bars


Provisions: Choose Smallest
S= Abar/As X 1000
S=3(h)
S= 450 mm

S= Abar/As X 1000
S=314.15/1153.96 X 1000
S= 272.24351 = 280 mm
S=3(h)
S=3(220)
S= 570 mm

therefore,use 280mm Spacing of Main bars


10. Solve for the area of Temperature bars
Use 12mmØ - Temp. bar
At= 0.002(b)(h)
At=0.002(1000)(220)
At= 440 mm

11. Determine N of Temp. bar


At= ∏(d)²/4 X N
ρb= 0.85fc'β(600)/fy (fy+600)
440=∏(12)²/4 X N
N= 3.8905 = 4 pcs

12. Spacing of Temp. Bars


Provisions: Choose Smallest
S= Abar/At X 1000
S= 5(h)
S= 450 mm

S= Abar/At X 1000
S=113.097/440 X 1000
S= 257.039 = 300 mm

S= 5(h) S= 5(300)
S=5(220)
S= 1100 mm

therefore,use 300mm Spacing of Temperature bars


TECHNOLOCIGAL UNIVERSITY OF THE PHILLIPINES-TAGUIG
KM 14 EAST SERVICE ROAD, WESTERN BICUTAN, TAGUIG CITY
CIVIL ENGINEERING DEPARTMENT

SLAB DESIGN

SLAB - S4 ( G-H-1)

Design Criteria:
f'c 28 Mpa
fy 415 Mpa
concrete cover on both sides - mm
concrete cover on bottom 20 mm
Dead load 7.962 kN/m
Live load 4.8 kN/m
Short span 2 m
Long span 6 m
ɸ 0.9

COMPUTATION: 1m strip analysis

L/S 6000/2000= 3> or = 2


hence, slab is designed as one way slab

1. Det. The minimum slab thickness "h"

Min.Slab thickness (t): L/28

=6000/28

h= 214.28571 mm = 220 mm

2. Solve for Effective Depth


Use20mm ø - Main bar
d= h-Cc-1/2 Main bar Ø
d=220-20-20/2
d= 190 mm

3. Solve for Factored Load

ω= 1.2(DL) + 1.6(LL)
ω=1.2(7.962)+1.6(4.8)

ω= 17.2344 kN/m
4. Solve For Mu
Mu=(ω)(L)²/8
Mu=(17.2344)(6)²/8

Mu = 77.5548 kN-m

5. Solve for Rn
Mu=ɸRnbd²
77554800=0.9Rn(1000)*(190)²

Rn= 2.3870 Mpa


THE PHILLIPINES-TAGUIG
ERN BICUTAN, TAGUIG CITY
DEPARTMENT
6. Solve for Steel Ratio

ρ=0.85fc'/fy [1- √1-2Rn/0.85fc']


=0.85(28)/415[1-√1-(2(2.387)/0.85(28)]
ρ= 0.0060735

If ρ is < ρMax and > ρMin, use ρ


If ρ is > ρMax, increase the depth of slab to ensure ductile failure
if ρ is < ρMin, use ρ = ρMin

ρMin= 1.4/fy ρMax= 0.75ρBalance ρBal =


= 1.4/415
ρMin= 0.0033735 ρMax= 0.021615 ρb= 0.02882

therefore, use ρ=ρMin


ρ= 0.00607

7. Solve for the area of Main bar

As=ρbd
=0.00607(1000)(190)
As= 1153.9642 mm²

8. Determine N of Main bars


As=∏(d)²/4 X N
1153.96=∏(20)²/4 X N
N= 3.6732 = 4 pcs

9. Spacing of Main bars


Provisions: Choose Smallest
S= Abar/As X 1000
S=3(h)
S= 450 mm

S= Abar/As X 1000
S=314.15/1153.96 X 1000
S= 272.24351 = 280 mm
S=3(h)
S=3(220)
S= 570 mm

therefore,use 280mm Spacing of Main bars


10. Solve for the area of Temperature bars
Use 12mmØ - Temp. bar
At= 0.002(b)(h)
At=0.002(1000)(220)
At= 440 mm

11. Determine N of Temp. bar


At= ∏(d)²/4 X N
ρb= 0.85fc'β(600)/fy (fy+600)
440=∏(12)²/4 X N
N= 3.8905 = 4 pcs

12. Spacing of Temp. Bars


Provisions: Choose Smallest
S= Abar/At X 1000
S= 5(h)
S= 450 mm

S= Abar/At X 1000
S=113.097/440 X 1000
S= 257.039 = 300 mm

S= 5(h) S= 5(300)
S=5(220)
S= 1100 mm

therefore,use 300mm Spacing of Temperature bars


TECHNOLOCIGAL UNIVERSITY OF THE PHILLIPINES-TAGUIG
KM 14 EAST SERVICE ROAD, WESTERN BICUTAN, TAGUIG CITY
CIVIL ENGINEERING DEPARTMENT

SLAB DESIGN

SLAB - S5 ( A-B-2)

Design Criteria:
f'c 28 Mpa
fy 415 Mpa
concrete cover on both sides - mm
concrete cover on bottom 20 mm
Dead load 8.906 kN/m
Live load 4.8 kN/m
Short span 2 m
Long span 6 m
ɸ 0.9

COMPUTATION: 1m strip analysis

L/S 6000/2000= 3> or = 2


hence, slab is designed as one way slab

1. Det. The minimum slab thickness "h"

Min.Slab thickness (t): L/28

=6000/28

h= 214.28571 mm = 220 mm

2. Solve for Effective Depth


Use20mm ø - Main bar
d= h-Cc-1/2 Main bar Ø
d=220-20-20/2
d= 190 mm

3. Solve for Factored Load

ω= 1.2(DL) + 1.6(LL)
ω=1.2(8.906)+1.6(4.8)

ω= 18.3672 kN/m
4. Solve For Mu
Mu=(ω)(L)²/8
Mu=(18.3672)(6)²/8

Mu = 82.6524 kN-m

5. Solve for Rn
Mu=ɸRnbd²
82652400=0.9Rn(1000)*(190)²

Rn= 2.5439 Mpa


THE PHILLIPINES-TAGUIG
ERN BICUTAN, TAGUIG CITY
DEPARTMENT
6. Solve for Steel Ratio

ρ=0.85fc'/fy [1- √1-2Rn/0.85fc']


=0.85(28)/415[1-√1-(2(2.5439)/0.85(28)]
ρ= 0.0064981

If ρ is < ρMax and > ρMin, use ρ


If ρ is > ρMax, increase the depth of slab to ensure ductile failure
if ρ is < ρMin, use ρ = ρMin

ρMin= 1.4/fy ρMax= 0.75ρBalance ρBal =


= 1.4/415
ρMin= 0.0033735 ρMax= 0.021615 ρb= 0.02882

therefore, use ρ=ρMin


ρ= 0.00650

7. Solve for the area of Main bar

As=ρbd
=0.00649(1000)(190)
As= 1234.6392 mm²

8. Determine N of Main bars


As=∏(d)²/4 X N
1234.63=∏(20)²/4 X N
N= 3.9300 = 4 pcs

9. Spacing of Main bars


Provisions: Choose Smallest
S= Abar/As X 1000
S=3(h)
S= 450 mm

S= Abar/As X 1000
S=314.15/1234.63 X 1000
S= 254.4543 = 260 mm
S=3(h)
S=3(220)
S= 570 mm

therefore,use 260mm Spacing of Main bars


10. Solve for the area of Temperature bars
Use 12mmØ - Temp. bar
At= 0.002(b)(h)
At=0.002(1000)(220)
At= 440 mm

11. Determine N of Temp. bar


At= ∏(d)²/4 X N
ρb= 0.85fc'β(600)/fy (fy+600)
440=∏(12)²/4 X N
N= 3.8905 = 4 pcs

12. Spacing of Temp. Bars


Provisions: Choose Smallest
S= Abar/At X 1000
S= 5(h)
S= 450 mm

S= Abar/At X 1000
S=113.097/440 X 1000
S= 257.039 = 300 mm

S= 5(h) S= 5(300)
S=5(220)
S= 1100 mm

therefore,use 300mm Spacing of Temperature bars


TECHNOLOCIGAL UNIVERSITY OF THE PHILLIPINES-TAGUIG
KM 14 EAST SERVICE ROAD, WESTERN BICUTAN, TAGUIG CITY
CIVIL ENGINEERING DEPARTMENT

SLAB DESIGN

SLAB - S6 ( B-C-2)

Design Criteria:
f'c 28 Mpa
fy 415 Mpa
concrete cover on both sides - mm
concrete cover on bottom 20 mm
Dead load 6.018 kN/m
Live load 4.8 kN/m
Short span 2 m
Long span 6 m
ɸ 0.9

COMPUTATION: 1m strip analysis

L/S 6000/2000= 3> or = 2


hence, slab is designed as one way slab

1. Det. The minimum slab thickness "h"

Min.Slab thickness (t): L/28

=6000/28

h= 214.28571 mm = 220 mm

2. Solve for Effective Depth


Use20mm ø - Main bar
d= h-Cc-1/2 Main bar Ø
d=220-20-20/2
d= 190 mm

3. Solve for Factored Load

ω= 1.2(DL) + 1.6(LL)
ω=1.2(6.018)+1.6(4.8)

ω= 14.9016 kN/m
4. Solve For Mu
Mu=(ω)(L)²/8
Mu=(14.9016)(6)²/8

Mu = 67.0572 kN-m

5. Solve for Rn
Mu=ɸRnbd²
67057200=0.9Rn(1000)*(190)²

Rn= 2.0639 Mpa


THE PHILLIPINES-TAGUIG
ERN BICUTAN, TAGUIG CITY
DEPARTMENT
6. Solve for Steel Ratio

ρ=0.85fc'/fy [1- √1-2Rn/0.85fc']


=0.85(28)/415[1-√1-(2(2.0639)/0.85(28)]
ρ= 0.00521

If ρ is < ρMax and > ρMin, use ρ


If ρ is > ρMax, increase the depth of slab to ensure ductile failure
if ρ is < ρMin, use ρ = ρMin

ρMin= 1.4/fy ρMax= 0.75ρBalance ρBal =


= 1.4/415
ρMin= 0.0033735 ρMax= 0.021615 ρb= 0.02882

therefore, use ρ=ρMin


ρ= 0.00521

7. Solve for the area of Main bar

As=ρbd
=0.0052(1000)(190)
As= 989.89776 mm²

8. Determine N of Main bars


As=∏(d)²/4 X N
989.89=∏(20)²/4 X N
N= 3.1509 = 4 pcs

9. Spacing of Main bars


Provisions: Choose Smallest
S= Abar/As X 1000
S=3(h)
S= 450 mm

S= Abar/As X 1000
S=314.15/989.89 X 1000
S= 317.36537 = 320 mm
S=3(h)
S=3(220)
S= 570 mm

therefore,use 320mm Spacing of Main bars


10. Solve for the area of Temperature bars
Use 12mmØ - Temp. bar
At= 0.002(b)(h)
At=0.002(1000)(220)
At= 440 mm

11. Determine N of Temp. bar


At= ∏(d)²/4 X N
ρb= 0.85fc'β(600)/fy (fy+600)
440=∏(12)²/4 X N
N= 3.8905 = 4 pcs

12. Spacing of Temp. Bars


Provisions: Choose Smallest
S= Abar/At X 1000
S= 5(h)
S= 450 mm

S= Abar/At X 1000
S=113.097/440 X 1000
S= 257.039 = 300 mm

S= 5(h) S= 5(300)
S=5(220)
S= 1100 mm

therefore,use 300mm Spacing of Temperature bars


TECHNOLOCIGAL UNIVERSITY OF THE PHILLIPINES-TAGUIG
KM 14 EAST SERVICE ROAD, WESTERN BICUTAN, TAGUIG CITY
CIVIL ENGINEERING DEPARTMENT

SLAB DESIGN

SLAB - S7 ( C-D-2)

Design Criteria:
f'c 28 Mpa
fy 415 Mpa
concrete cover on both sides - mm
concrete cover on bottom 20 mm
Dead load 8.906 kN/m
Live load 4.8 kN/m
Short span 2 m
Long span 6 m
ɸ 0.9

COMPUTATION: 1m strip analysis

L/S 6000/2000= 3> or = 2


hence, slab is designed as one way slab

1. Det. The minimum slab thickness "h"

Min.Slab thickness (t): L/28

=6000/28

h= 214.28571 mm = 220 mm

2. Solve for Effective Depth


Use20mm ø - Main bar
d= h-Cc-1/2 Main bar Ø
d=220-20-20/2
d= 190 mm

3. Solve for Factored Load

ω= 1.2(DL) + 1.6(LL)
ω=1.2(8.906)+1.6(4.8)

ω= 18.3672 kN/m
4. Solve For Mu
Mu=(ω)(L)²/8
Mu=(18.3672)(6)²/8

Mu = 82.6524 kN-m

5. Solve for Rn
Mu=ɸRnbd²
82652400=0.9Rn(1000)*(190)²

Rn= 2.5439 Mpa


THE PHILLIPINES-TAGUIG
ERN BICUTAN, TAGUIG CITY
DEPARTMENT
6. Solve for Steel Ratio

ρ=0.85fc'/fy [1- √1-2Rn/0.85fc']


=0.85(28)/415[1-√1-(2(2.5439)/0.85(28)]
ρ= 0.0064981

If ρ is < ρMax and > ρMin, use ρ


If ρ is > ρMax, increase the depth of slab to ensure ductile failure
if ρ is < ρMin, use ρ = ρMin

ρMin= 1.4/fy ρMax= 0.75ρBalance ρBal =


= 1.4/415
ρMin= 0.0033735 ρMax= 0.021615 ρb= 0.02882

therefore, use ρ=ρMin


ρ= 0.00650

7. Solve for the area of Main bar

As=ρbd
=0.00649(1000)(190)
As= 1234.6392 mm²

8. Determine N of Main bars


As=∏(d)²/4 X N
1234.63=∏(20)²/4 X N
N= 3.9300 = 4 pcs

9. Spacing of Main bars


Provisions: Choose Smallest
S= Abar/As X 1000
S=3(h)
S= 450 mm

S= Abar/As X 1000
S=314.15/1234.63 X 1000
S= 254.4543 = 260 mm
S=3(h)
S=3(220)
S= 570 mm

therefore,use 260mm Spacing of Main bars


10. Solve for the area of Temperature bars
Use 12mmØ - Temp. bar
At= 0.002(b)(h)
At=0.002(1000)(220)
At= 440 mm

11. Determine N of Temp. bar


At= ∏(d)²/4 X N
ρb= 0.85fc'β(600)/fy (fy+600)
440=∏(12)²/4 X N
N= 3.8905 = 4 pcs

12. Spacing of Temp. Bars


Provisions: Choose Smallest
S= Abar/At X 1000
S= 5(h)
S= 450 mm

S= Abar/At X 1000
S=113.097/440 X 1000
S= 257.039 = 300 mm

S= 5(h) S= 5(300)
S=5(220)
S= 1100 mm

therefore,use 300mm Spacing of Temperature bars


TECHNOLOCIGAL UNIVERSITY OF THE PHILLIPINES-TAGUIG
KM 14 EAST SERVICE ROAD, WESTERN BICUTAN, TAGUIG CITY
CIVIL ENGINEERING DEPARTMENT

SLAB DESIGN

SLAB - S8 ( F-G-2)

Design Criteria:
f'c 28 Mpa
fy 415 Mpa
concrete cover on both sides - mm
concrete cover on bottom 20 mm
Dead load 8.906 kN/m
Live load 4.8 kN/m
Short span 2 m
Long span 6 m
ɸ 0.9

COMPUTATION: 1m strip analysis

L/S 6000/2000= 3> or = 2


hence, slab is designed as one way slab

1. Det. The minimum slab thickness "h"

Min.Slab thickness (t): L/28

=6000/28

h= 214.28571 mm = 220 mm

2. Solve for Effective Depth


Use20mm ø - Main bar
d= h-Cc-1/2 Main bar Ø
d=220-20-20/2
d= 190 mm

3. Solve for Factored Load

ω= 1.2(DL) + 1.6(LL)
ω=1.2(8.906)+1.6(4.8)

ω= 18.3672 kN/m
4. Solve For Mu
Mu=(ω)(L)²/8
Mu=(18.3672)(6)²/8

Mu = 82.6524 kN-m

5. Solve for Rn
Mu=ɸRnbd²
82652400=0.9Rn(1000)*(190)²

Rn= 2.5439 Mpa


THE PHILLIPINES-TAGUIG
ERN BICUTAN, TAGUIG CITY
DEPARTMENT
6. Solve for Steel Ratio

ρ=0.85fc'/fy [1- √1-2Rn/0.85fc']


=0.85(28)/415[1-√1-(2(2.5439)/0.85(28)]
ρ= 0.0064981

If ρ is < ρMax and > ρMin, use ρ


If ρ is > ρMax, increase the depth of slab to ensure ductile failure
if ρ is < ρMin, use ρ = ρMin

ρMin= 1.4/fy ρMax= 0.75ρBalance ρBal =


= 1.4/415
ρMin= 0.0033735 ρMax= 0.021615 ρb= 0.02882

therefore, use ρ=ρMin


ρ= 0.00650

7. Solve for the area of Main bar

As=ρbd
=0.00649(1000)(190)
As= 1234.6392 mm²

8. Determine N of Main bars


As=∏(d)²/4 X N
1234.63=∏(20)²/4 X N
N= 3.9300 = 4 pcs

9. Spacing of Main bars


Provisions: Choose Smallest
S= Abar/As X 1000
S=3(h)
S= 450 mm

S= Abar/As X 1000
S=314.15/1234.63 X 1000
S= 254.4543 = 260 mm
S=3(h)
S=3(220)
S= 570 mm

therefore,use 260mm Spacing of Main bars


10. Solve for the area of Temperature bars
Use 12mmØ - Temp. bar
At= 0.002(b)(h)
At=0.002(1000)(220)
At= 440 mm

11. Determine N of Temp. bar


At= ∏(d)²/4 X N
ρb= 0.85fc'β(600)/fy (fy+600)
440=∏(12)²/4 X N
N= 3.8905 = 4 pcs

12. Spacing of Temp. Bars


Provisions: Choose Smallest
S= Abar/At X 1000
S= 5(h)
S= 450 mm

S= Abar/At X 1000
S=113.097/440 X 1000
S= 257.039 = 300 mm

S= 5(h) S= 5(300)
S=5(220)
S= 1100 mm

therefore,use 300mm Spacing of Temperature bars


TECHNOLOCIGAL UNIVERSITY OF THE PHILLIPINES-TAGUIG
KM 14 EAST SERVICE ROAD, WESTERN BICUTAN, TAGUIG CITY
CIVIL ENGINEERING DEPARTMENT

SLAB DESIGN

SLAB - S8 ( G-H-2)

Design Criteria:
f'c 28 Mpa
fy 415 Mpa
concrete cover on both sides - mm
concrete cover on bottom 20 mm
Dead load 8.906 kN/m
Live load 4.8 kN/m
Short span 2 m
Long span 6 m
ɸ 0.9

COMPUTATION: 1m strip analysis

L/S 6000/2000= 3> or = 2


hence, slab is designed as one way slab

1. Det. The minimum slab thickness "h"

Min.Slab thickness (t): L/28

=6000/28

h= 214.28571 mm = 220 mm

2. Solve for Effective Depth


Use20mm ø - Main bar
d= h-Cc-1/2 Main bar Ø
d=220-20-20/2
d= 190 mm

3. Solve for Factored Load

ω= 1.2(DL) + 1.6(LL)
ω=1.2(8.906)+1.6(4.8)

ω= 18.3672 kN/m
4. Solve For Mu
Mu=(ω)(L)²/8
Mu=(18.3672)(6)²/8

Mu = 82.6524 kN-m

5. Solve for Rn
Mu=ɸRnbd²
82652400=0.9Rn(1000)*(190)²

Rn= 2.5439 Mpa


THE PHILLIPINES-TAGUIG
ERN BICUTAN, TAGUIG CITY
DEPARTMENT
6. Solve for Steel Ratio

ρ=0.85fc'/fy [1- √1-2Rn/0.85fc']


=0.85(28)/415[1-√1-(2(2.5439)/0.85(28)]
ρ= 0.0064981

If ρ is < ρMax and > ρMin, use ρ


If ρ is > ρMax, increase the depth of slab to ensure ductile failure
if ρ is < ρMin, use ρ = ρMin

ρMin= 1.4/fy ρMax= 0.75ρBalance ρBal =


= 1.4/415
ρMin= 0.0033735 ρMax= 0.021615 ρb= 0.02882

therefore, use ρ=ρMin


ρ= 0.00650

7. Solve for the area of Main bar

As=ρbd
=0.00649(1000)(190)
As= 1234.6392 mm²

8. Determine N of Main bars


As=∏(d)²/4 X N
1234.63=∏(20)²/4 X N
N= 3.9300 = 4 pcs

9. Spacing of Main bars


Provisions: Choose Smallest
S= Abar/As X 1000
S=3(h)
S= 450 mm

S= Abar/As X 1000
S=314.15/1234.63 X 1000
S= 254.4543 = 260 mm
S=3(h)
S=3(220)
S= 570 mm

therefore,use 260mm Spacing of Main bars


10. Solve for the area of Temperature bars
Use 12mmØ - Temp. bar
At= 0.002(b)(h)
At=0.002(1000)(220)
At= 440 mm

11. Determine N of Temp. bar


At= ∏(d)²/4 X N
ρb= 0.85fc'β(600)/fy (fy+600)
440=∏(12)²/4 X N
N= 3.8905 = 4 pcs

12. Spacing of Temp. Bars


Provisions: Choose Smallest
S= Abar/At X 1000
S= 5(h)
S= 450 mm

S= Abar/At X 1000
S=113.097/440 X 1000
S= 257.039 = 300 mm

S= 5(h) S= 5(300)
S=5(220)
S= 1100 mm

therefore,use 300mm Spacing of Temperature bars


BEAM LOADINGS A-H-1
a b

DIMENSION
STRUCTURE unit
b d
BEAM 0.25 0.35 m
SLAB 1 0.215 m

Unit wt. of concrete: 23.6 kN/mᶟ

1-2 2-3 3-4


DL SELF WEIGHT OF BEAM 2.065 2.065 2.065
DL SELF WEIGHT OF SLAB 5.074 5.074 5.074
SUSPENDED METAL LATH
DL 0.48 0.48 0.48
WITH GYPSUM PLASTER
DL GYPSUM BOARD 0.008 0.008 0.008
DL SELF WEIGHT OF COLUMN 24.13 24.13 24.13
LL LIBRARY( READING AREA) 2.9 2.9 2.9

TOTAL WEIGTH = 1.2(DL)+1.6(LL)


=1.2(36.863+1.6(2.9)
ω= 48.8756 KN/m
L1 L2

TOTAL
6.195
5.074

1.44
0.024
24.13
2.9
TOTAL 36.863
MOMENT DISTRIBUTION A-H-1

TOTAL WEIGHT: 48.8756 KN/m

LENGTH UNIT DISTRIBUTION FACTOR


L AB 6 m DF-AB 1
L BC 6 m DF-BA 0.5
L CD 6 m DF-BC 0.5
L DE 6 m DF-CB 0.5
L EF 6 m DF-CD 0.5
L FG 6 m DF-DC 0.5
L GH 6 m DF-DE 0.5
DF-ED 0.5
BEAM STIFFNESS I/L DF-EF 0.5
Let I 12 DF-FE 0.5
AB 2 DF-FG 0.5
BC 2 DF-GF 0.5
CD 2 DF-GH 0.5
DE 2 DF-HG 1
EF 2
FG 2 FIXED END MOMENTS
GH 2 FEM-AB -146.6268 KN/m
FEM-BA 146.6268 KN/m
FEM-BC -146.6268 KN/m
FEM-CB 146.6268 KN/m
FEM-CD -146.6268 KN/m
FEM-DC 146.6268 KN/m
FEM-DE -146.6268 KN/m
FEM-ED 146.6268 KN/m
FEM-EF -146.6268 KN/m
FEM-FE 146.6268 KN/m
FEM-FG -146.6268 KN/m
FEM-GF 146.6268 KN/m
FEM-GH -146.6268 KN/m
FEM-HG 146.6268 KN/m
JOINT A BB CC DD EE
DF 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
FEM -146.627 146.6268 -146.627 146.6268 -146.627 146.6268 -146.627 146.6268 -146.627
1ST DIST. 146.6268 00 00 00 00
CO 0 73.3134 0 00 00 00
2ND DIST. 0 -36.6567 -36.6567 00 00 00
CO -18.3284 00 -18.3284 0 00 00
3RD DIST. 0 00 9.164175 9.164175 00 00
CO 0 0 4.582088 00 4.582088 0 0 -4.58209
4TH DIST. 0 -2.2910438 -2.29104 00 -2.29104 -2.29104 2.291044 2.291044
CO -1.14552 00 -1.14552 -1.14552 0 1.145522 -1.14552 0
5TH DIST. 0 00 1.145522 1.145522 -0.57276 -0.57276 0.572761 0.572761
CO 0 0 0.572761 0 -0.28638 0.572761 0.28638 -0.28638 -0.57276
6TH DIST. 0 -0.2863805 -0.28638 0.14319 0.14319 -0.42957 -0.42957 0.429571 0.429571
CO -0.14319 0 0.071595 -0.14319 -0.21479 0.071595 0.214785 -0.21479 -0.0716
7TH DIST. 0 -0.0357976 -0.0358 0.178988 0.178988 -0.14319 -0.14319 0.14319 0.14319
CO -0.0179 0 0.089494 -0.0179 -0.0716 0.089494 0.071595 -0.0716 -0.08949
8TH DIST. 0 -0.0447469 -0.04475 0.044747 0.044747 -0.08054 -0.08054 0.080545 0.080545
CO -0.02237 0 0.022373 -0.02237 -0.04027 0.022373 0.040272 -0.04027 -0.02237
9TH DIST. 0 -0.0111867 -0.01119 0.031323 0.031323 -0.03132 -0.03132 0.031323 0.031323
CO -0.00559 0 0.015661 -0.00559 -0.01566 0.015661 0.015661 -0.01566 -0.01566
10TH DIST. 0 -0.0078307 -0.00783 0.010627 0.010627 -0.01566 -0.01566 0.015661 0.015661
SUM -19.6629 180.606514 -180.607 137.6824 -137.682 148.4167 -148.417 148.4167 -148.417
FF GG H
0.5 0.5 0.5 0.5 1
146.6268 -146.627 146.6268 -146.627 146.6268
00 00 -146.627
00 0 -73.3134 0
00 36.6567 36.6567 0
0 18.32835 00 18.32835
-9.16418 -9.16418 00 0
00 -4.58209 0 0
00 2.291044 2.291044 0
1.145522 1.145522 00 1.145522
-1.14552 -1.14552 00 0
0.28638 0 -0.57276 0 0
-0.14319 -0.14319 0.28638 0.28638 0
0.214785 0.14319 -0.0716 0 0.14319
-0.17899 -0.17899 0.035798 0.035798 0
0.071595 0.017899 -0.08949 0 0.017899
-0.04475 -0.04475 0.044747 0.044747 0
0.040272 0.022373 -0.02237 0 0.022373
-0.03132 -0.03132 0.011187 0.011187 0
0.015661 0.005593 -0.01566 0 0.005593
-0.01063 -0.01063 0.007831 0.007831 0
137.6824 -137.682 180.6065 -180.607 19.66293
BEAM LOADINGS A-H-1

DIMENSION
STRUCTURE unit
b d
BEAM 0.25 0.35 m
SLAB 1 0.215 m

Unit wt. of concrete: 23.6 kN/mᶟ

1-2 2-3 3-4 DE


DL SELF WEIGHT OF BEAM 2.065 2.065 2.065 2.065
DL SELF WEIGHT OF SLAB 5.074 5.074 5.074 5.074
SUSPENDED METAL LATH
DL 0.48 0.48 0.48 0.48
WITH GYPSUM PLASTER
DL GYPSUM BOARD 0.008 0.008 0.008 0.008
DL SELF WEIGHT OF COLUMN 24.13 24.13 24.13 24.13
LL LIBRARY( READING AREA) 2.9 2.9 2.9 2.9

TOTAL WEIGTH = 1.2(DL)+1.6(LL)


=1.2(68.62+1.6(2.9)
ω= 86.984 KN/m
TOTAL
8.26
10.148

1.92
0.032
48.26
2.9
TOTAL 68.62
MOMENT DISTRIBUTION A-H-1

TOTAL WEIGHT: 48.8756 KN/m

LENGTH UNIT DISTRIBUTION FACTOR


L AB 6 m DF-AB 1
L BC 6 m DF-BA 0.5
L CD 6 m DF-BC 0.5
L DE 6 m DF-CB 0.5
L EF 6 m DF-CD 0.5
L FG 6 m DF-DC 0.5
L GH 6 m DF-DE 0.5
DF-ED 0.5
BEAM STIFFNESS I/L DF-EF 0.5
Let I 12 DF-FE 0.5
AB 2 DF-FG 0.5
BC 2 DF-GF 0.5
CD 2 DF-GH 0.5
DE 2 DF-HG 1
EF 2
FG 2 FIXED END MOMENTS
GH 2 FEM-AB -146.6268 KN/m
FEM-BA 146.6268 KN/m
FEM-BC -146.6268 KN/m
FEM-CB 146.6268 KN/m
FEM-CD -146.6268 KN/m
FEM-DC 146.6268 KN/m
FEM-DE -146.6268 KN/m
FEM-ED 146.6268 KN/m
FEM-EF -146.6268 KN/m
FEM-FE 146.6268 KN/m
FEM-FG -146.6268 KN/m
FEM-GF 146.6268 KN/m
FEM-GH -146.6268 KN/m
FEM-HG 146.6268 KN/m
JOINT A BB CC DD EE
DF 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
FEM -146.627 146.6268 -146.627 146.6268 -146.627 146.6268 -146.627 146.6268 -146.627
1ST DIST. 146.6268 00 00 00 00
CO 0 73.3134 0 00 00 00
2ND DIST. 0 -36.6567 -36.6567 00 00 00
CO -18.3284 00 -18.3284 0 00 00
3RD DIST. 0 00 9.164175 9.164175 00 00
CO 0 0 4.582088 00 4.582088 0 0 -4.58209
4TH DIST. 0 -2.2910438 -2.29104 00 -2.29104 -2.29104 2.291044 2.291044
CO -1.14552 00 -1.14552 -1.14552 0 1.145522 -1.14552 0
5TH DIST. 0 00 1.145522 1.145522 -0.57276 -0.57276 0.572761 0.572761
CO 0 0 0.572761 0 -0.28638 0.572761 0.28638 -0.28638 -0.57276
6TH DIST. 0 -0.2863805 -0.28638 0.14319 0.14319 -0.42957 -0.42957 0.429571 0.429571
CO -0.14319 0 0.071595 -0.14319 -0.21479 0.071595 0.214785 -0.21479 -0.0716
7TH DIST. 0 -0.0357976 -0.0358 0.178988 0.178988 -0.14319 -0.14319 0.14319 0.14319
CO -0.0179 0 0.089494 -0.0179 -0.0716 0.089494 0.071595 -0.0716 -0.08949
8TH DIST. 0 -0.0447469 -0.04475 0.044747 0.044747 -0.08054 -0.08054 0.080545 0.080545
CO -0.02237 0 0.022373 -0.02237 -0.04027 0.022373 0.040272 -0.04027 -0.02237
9TH DIST. 0 -0.0111867 -0.01119 0.031323 0.031323 -0.03132 -0.03132 0.031323 0.031323
CO -0.00559 0 0.015661 -0.00559 -0.01566 0.015661 0.015661 -0.01566 -0.01566
10TH DIST. 0 -0.0078307 -0.00783 0.010627 0.010627 -0.01566 -0.01566 0.015661 0.015661
SUM -19.6629 180.606514 -180.607 137.6824 -137.682 148.4167 -148.417 148.4167 -148.417
FF GG H
0.5 0.5 0.5 0.5 1
146.6268 -146.627 146.6268 -146.627 146.6268
00 00 -146.627
00 0 -73.3134 0
00 36.6567 36.6567 0
0 18.32835 00 18.32835
-9.16418 -9.16418 00 0
00 -4.58209 0 0
00 2.291044 2.291044 0
1.145522 1.145522 00 1.145522
-1.14552 -1.14552 00 0
0.28638 0 -0.57276 0 0
-0.14319 -0.14319 0.28638 0.28638 0
0.214785 0.14319 -0.0716 0 0.14319
-0.17899 -0.17899 0.035798 0.035798 0
0.071595 0.017899 -0.08949 0 0.017899
-0.04475 -0.04475 0.044747 0.044747 0
0.040272 0.022373 -0.02237 0 0.022373
-0.03132 -0.03132 0.011187 0.011187 0
0.015661 0.005593 -0.01566 0 0.005593
-0.01063 -0.01063 0.007831 0.007831 0
137.6824 -137.682 180.6065 -180.607 19.66293
BEAM LOADINGS A-H-1
a b

DIMENSION
STRUCTURE unit
b d
BEAM 0.25 0.35 m
SLAB 1 0.2 m

Unit wt. of concrete: 23.6 kN/mᶟ

2-3 2-3 3-4


DL SELF WEIGHT OF BEAM 2.065 2.065 2.065
DL SELF WEIGHT OF SLAB 167.796 167.796 167.796
SUSPENDED METAL LATH
DL 0.48 0.48 0.48
WITH GYPSUM PLASTER
DL GYPSUM BOARD 0.008 0.008 0.008
DL SELF WEIGHT OF COLUMN 0 0 0
LL LIBRARY( READING AREA) 2.9 2.9 2.9

TOTAL WEIGTH = 1.2(DL)+1.6(LL)


=1.2(175.455+1.6(2.9)
ω= 215.186 KN/m
L1 L2

TOTAL
6.195
167.796

1.44
0.024
0
2.9
TOTAL 175.455
MOMENT DISTRIBUTION A-H-1

TOTAL WEIGHT: 215.186 KN/m

LENGTH UNIT DISTRIBUTION FACTOR


L AB 8 m DF-AB 1
L BC 8 m DF-BA 0.5
L CD 8 m DF-BC 0.5
L DE 0 m DF-CB 0.5
L EF 0 m DF-CD 1
L FG 0 m DF-DC 1
L GH 0 m DF-DE 0
DF-ED 0
BEAM STIFFNESS I/L
Let I 12
AB 1.5
BC 1.5
CD 1.5
DE 0

FIXED END MOMENTS


FEM-AB -1147.659 KN/m
FEM-BA 1147.6587 KN/m
FEM-BC -1147.659 KN/m
FEM-CB 1147.6587 KN/m
FEM-CD -1147.659 KN/m
FEM-DC 1147.6587 KN/m
FEM-DE 0 KN/m
FEM-ED 0 KN/m
JOINT A BB CC DD EE
DF 1 0.5 0.5 0.5 1 10 0
FEM -1147.66 1147.65867 -1147.66 1147.659 -1147.66 1147.659 0 0
1ST DIST. 1147.659 00 00 -1147.66 0 00
CO 0 573.829333 0 0 -573.829 00 00
2ND DIST. 0 -286.91467 -286.915 286.9147 573.8293 00 00
CO -143.457 0 143.4573 -143.457 0 286.9147 0 00
3RD DIST. 0 -71.728667 -71.7287 71.72867 143.4573 -286.915 0 00
CO -35.8643 0 35.86433 -35.8643 -143.457 71.72867 0 00
4TH DIST. 0 -17.932167 -17.9322 89.66083 179.3217 -71.7287 0 00
CO -8.96608 0 44.83042 -8.96608 -35.8643 89.66083 0 00
5TH DIST. 0 -22.415208 -22.4152 22.41521 44.83042 -89.6608 0 00
CO -11.2076 0 11.2076 -11.2076 -44.8304 22.41521 0 00
6TH DIST. 0 -5.6038021 -5.6038 28.01901 56.03802 -22.4152 0 00
CO -2.8019 0 14.00951 -2.8019 -11.2076 28.01901 0 00
7TH DIST. 0 -7.0047526 -7.00475 7.004753 14.00951 -28.019 0 00
CO -3.50238 0 3.502376 -3.50238 -14.0095 7.004753 0 00
8TH DIST. 0 -1.7511882 -1.75119 8.755941 17.51188 -7.00475 0 00
CO -0.87559 0 4.37797 -0.87559 -3.50238 8.755941 0 00
9TH DIST. 0 -2.1889852 -2.18899 2.188985 4.37797 -8.75594 0 00
CO -1.09449 0 1.094493 -1.09449 -4.37797 2.188985 0 00
10TH DIST. 0 -0.5472463 -0.54725 2.736231 5.472463 -2.18899 0 00
SUM -207.77 1305.40132 -1305.4 1459.313 -939.889 0 0 0 0
FF GG H

00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
0 0 0 0 0
BEAM LOADINGS A-H-1 AB
a
3.5
DIMENSION
STRUCTURE unit
b d
BEAM 0.25 0.35 m 0
SLAB 1 0.215 m

Unit wt. of concrete: 23.6 kN/mᶟ

1-2 2-3 3-4 DE


DL SELF WEIGHT OF BEAM 2.065 2.065 2.065 2.065
DL SELF WEIGHT OF SLAB 114.1945 52.6575 119.9765 88.146
SUSPENDED METAL LATH
DL 0.48 0.48 0.48 0.48
WITH GYPSUM PLASTER
DL GYPSUM BOARD 0.008 0.008 0.008 0.008
DL SELF WEIGHT OF COLUMN 0 0 0 0
LL LIBRARY( READING AREA) 2.9 2.9 2.9 2.9

TOTAL WEIGTH = 1.2(DL)+1.6(LL)


=1.2(218.3345+1.6(2.9)
ω= 266.6414 KN/m
AB BC
b L1 L2 a b L1 L2
1 7 8 2.5 3 5 8

0.19 0 0.205 0 0.215 0 0.185

CD
a b L1 L2
3.5 1 7 8
TOTAL
8.26
208.1225 0 0.215 0 0.2

1.92
0.032 DE
0 a b L1 L2
2.9 3 2 6 8
TOTAL 218.3345

0 0.2 0 0.215
MOMENT DISTRIBUTION A-H-1

TOTAL WEIGHT: 266.6414 KN/m

LENGTH UNIT DISTRIBUTION FACTOR


L AB 7 m DF-AB 1
L BC 5 m DF-BA 0.4166666667
L CD 7 m DF-BC 0.5833333333
L DE 6 m DF-CB 0.5833333333
L EF 0 m DF-CD 0.4615384615
L FG 0 m DF-DC 0.4615384615
L GH 0 m DF-DE 1
DF-ED 1
BEAM STIFFNESS I/L DF-EF 0
Let I 12 DF-FE 0
AB 1.7142857143 DF-FG 0
BC 2.4 DF-GF 0
CD 1.7142857143 DF-GH 0
DE 2 DF-HG 0
EF 0
FG 0 FIXED END MOMENTS
GH 0 FEM-AB -1088.786 KN/m
FEM-BA 1088.7857 KN/m
FEM-BC -1088.786 KN/m
FEM-CB 1088.7857 KN/m
FEM-CD -1088.786 KN/m
FEM-DC 1088.7857 KN/m
FEM-DE -799.9242 KN/m
FEM-ED 799.9242 KN/m
FEM-EF 0 KN/m
FEM-FE 0 KN/m
FEM-FG 0 KN/m
FEM-GF 0 KN/m
FEM-GH 0 KN/m
FEM-HG 0 KN/m
JOINT A BB CC DD EE
DF 1 0.41666667 0.583333 0.583333 0.461538 0.461538 1 10
FEM -1088.79 1088.78572 -1088.79 1088.786 -1088.79 1088.786 -799.924 799.9242 0
1ST DIST. 1088.786 00 00 -133.321 -288.862 -799.924 0
CO 0 544.392858 0 0 -66.6604 0 -399.962 -144.431 0
2ND DIST. 0 -226.83036 -317.563 38.8852 30.76632 184.5979 399.9621 144.4308 0
CO -113.415 0 19.4426 -158.781 92.29895 15.38316 72.21538 199.9811 0
3RD DIST. 0 -8.1010842 -11.3415 38.78134 30.68414 -40.4301 -87.5985 -199.981 0
CO -4.05054 0 19.39067 -5.67076 -20.215 15.34207 -99.9905 -43.7993 0
4TH DIST. 0 -8.0794467 -11.3112 15.10005 11.9473 39.06852 84.64845 43.79927 0
CO -4.03972 0 7.550027 -5.65561 19.53426 5.973648 21.89963 42.32423 0
5TH DIST. 0 -3.1458445 -4.40418 -8.09588 -6.40553 -12.8646 -27.8733 -42.3242 0
CO -1.57292 0 -4.04794 -2.20209 -6.4323 -3.20276 -21.1621 -13.9366 0
6TH DIST. 0 1.68664102 2.361297 5.036726 3.985102 11.24533 24.36488 13.93664 0
CO 0.843321 0 2.518363 1.180649 5.622664 1.992551 6.96832 12.18244 0
7TH DIST. 0 -1.0493179 -1.46904 -3.9686 -3.13999 -4.13579 -8.96087 -12.1824 0
CO -0.52466 0 -1.9843 -0.73452 -2.06789 -1.57 -6.09122 -4.48044 0
8TH DIST. 0 0.8267915 1.157508 1.634743 1.293423 3.535945 7.661215 4.480436 0
CO 0.413396 0 0.817371 0.578754 1.767973 0.646711 2.240218 3.830607 0
9TH DIST. 0 -0.3405714 -0.4768 -1.36892 -1.0831 -1.33243 -2.88693 -3.83061 0
CO -0.17029 0 -0.68446 -0.2384 -0.66621 -0.54155 -1.9153 -1.44346 0
10TH DIST. 0 0.28519248 0.399269 0.527692 0.417514 1.133934 2.456856 1.443465 0
SUM -122.517 1388.43058 -1388.43 1003.795 -997.139 1170.308 -1122.81 0 0
FF GG H
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
0 0 0 0 0
BEAM LOADINGS A-H-1
a b

DIMENSION
STRUCTURE unit
b d
BEAM 0.25 0.35 m
SLAB 1 0.205 m

Unit wt. of concrete: 23.6 kN/mᶟ

1-2 2-3 3-4


DL SELF WEIGHT OF BEAM 2.065 2.065 2.065
DL SELF WEIGHT OF SLAB 125.316 127.7055 79.9155
SUSPENDED METAL LATH
DL 0.48 0.48 0.48
WITH GYPSUM PLASTER
DL GYPSUM BOARD 0.008 0.008 0.008
DL SELF WEIGHT OF COLUMN 0 0 0
LL LIBRARY( READING AREA) 2.9 2.9 2.9

TOTAL WEIGTH = 1.2(DL)+1.6(LL)


=1.2(340.596+1.6(2.9)
ω= 413.3552 KN/m
L1 L2

TOTAL
6.195
332.937

1.44
0.024
0
2.9
TOTAL 340.596
MOMENT DISTRIBUTION A-H-1

TOTAL WEIGHT: 413.3552 KN/m

LENGTH UNIT DISTRIBUTION FACTOR


L AB 8 m DF-AB 1
L BC 8 m DF-BA 0.5
L CD 8 m DF-BC 0.5
L DE 0 m DF-CB 0.5
L EF 0 m DF-CD 0.5
L FG 0 m DF-DC 0
L GH 0 m DF-DE 0
DF-ED 1
BEAM STIFFNESS I/L
Let I 12
AB 1.5
BC 1.5
CD 1.5
DE 0

FIXED END MOMENTS


FEM-AB -2204.561 KN/m
FEM-BA 2204.5611 KN/m
FEM-BC -2204.561 KN/m
FEM-CB 2204.5611 KN/m
FEM-CD -2204.561 KN/m
FEM-DC 2204.5611 KN/m
FEM-DE 0 KN/m
FEM-ED 0 KN/m
JOINT A BB CC DD EE
DF 1 0.5 0.5 0.5 0.5 00 1
FEM -2204.56 2204.56107 -2204.56 2204.561 -2204.56 2204.561 0 0
1ST DIST. 2204.561 00 00 00 00
CO 0 1102.28053 0 00 00 00
2ND DIST. 0 -551.14027 -551.14 00 00 00
CO -275.57 00 -275.57 0 00 00
3RD DIST. 0 00 137.7851 137.7851 00 00
CO 0 0 68.89253 00 68.89253 0 00
4TH DIST. 0 -34.446267 -34.4463 00 00 00
CO -17.2231 00 -17.2231 0 00 00
5TH DIST. 0 00 8.611567 8.611567 00 00
CO 0 0 4.305783 00 4.305783 0 00
6TH DIST. 0 -2.1528917 -2.15289 00 00 00
CO -1.07645 00 -1.07645 0 00 00
7TH DIST. 0 00 0.538223 0.538223 00 00
CO 0 0 0.269111 00 0.269111 0 00
8TH DIST. 0 -0.1345557 -0.13456 00 00 00
CO -0.06728 00 -0.06728 0 00 00
9TH DIST. 0 00 0.033639 0.033639 00 00
CO 0 0 0.016819 00 0.016819 0 00
10TH DIST. 0 -0.0084097 -0.00841 00 00 00

SUM -293.937 2718.95921 -2718.96 2057.593 -2057.59 2278.045 0 0 0


FF GG H

00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0

0 0 0 0 0
BEAM LOADINGS A-H-1
a b

DIMENSION
STRUCTURE unit
b d
BEAM 0.25 0.4 m
SLAB 1 0.205 m

Unit wt. of concrete: 23.6 kN/mᶟ

2-3 2-3 3-4


DL SELF WEIGHT OF BEAM 2.36 2.36 2.36
DL SELF WEIGHT OF SLAB 76.185 70.622 74.34
SUSPENDED METAL LATH
DL 0.48 0.48 0.48
WITH GYPSUM PLASTER
DL GYPSUM BOARD 0.008 0.008 0.008
DL SELF WEIGHT OF COLUMN 0 0 0
LL LIBRARY( READING AREA) 2.9 2.9 2.9

TOTAL WEIGTH = 1.2(DL)+1.6(LL)


=1.2(229.691+1.6(2.9)
ω= 280.2692 KN/m
L1 L2

TOTAL
7.08
221.147

1.44
0.024
0
2.9
TOTAL 229.691
MOMENT DISTRIBUTION A-H-1

TOTAL WEIGHT: 280.2692 KN/m

LENGTH UNIT DISTRIBUTION FACTOR


L AB 8 m DF-AB 1
L BC 8 m DF-BA 0.5
L CD 8 m DF-BC 0.5
L DE 0 m DF-CB 0.5
L EF 0 m DF-CD 0.5
L FG 0 m DF-DC 0
L GH 0 m DF-DE 0
DF-ED 0
BEAM STIFFNESS I/L
Let I 12
AB 1.5
BC 1.5
CD 1.5
DE 0

FIXED END MOMENTS


FEM-AB -1494.769 KN/m
FEM-BA 1494.7691 KN/m
FEM-BC -1494.769 KN/m
FEM-CB 1494.7691 KN/m
FEM-CD -1494.769 KN/m
FEM-DC 1494.7691 KN/m
FEM-DE 0 KN/m
FEM-ED 0 KN/m
JOINT A BB CC DD EE
DF 1 0.5 0.5 0.5 0.5 00 0
FEM -1494.77 1494.76907 -1494.77 1494.769 -1494.77 1494.769 0 0
1ST DIST. 1494.769 00 00 00 00
CO 0 747.384533 0 00 00 00
2ND DIST. 0 -373.69227 -373.692 00 00 00
CO -186.846 00 -186.846 0 00 00
3RD DIST. 0 00 93.42307 93.42307 00 00
CO 0 0 46.71153 00 46.71153 0 00
4TH DIST. 0 -23.355767 -23.3558 00 00 00
CO -11.6779 00 -11.6779 0 00 00
5TH DIST. 0 00 5.838942 5.838942 00 00
CO 0 0 2.919471 00 2.919471 0 00
6TH DIST. 0 -1.4597354 -1.45974 00 00 00
CO -0.72987 00 -0.72987 0 00 00
7TH DIST. 0 00 0.364934 0.364934 00 00
CO 0 0 0.182467 00 0.182467 0 00
8TH DIST. 0 -0.0912335 -0.09123 00 00 00
CO -0.04562 00 -0.04562 0 00 00
9TH DIST. 0 00 0.022808 0.022808 00 00
CO 0 0 0.011404 00 0.011404 0 00
10TH DIST. 0 -0.0057021 -0.0057 00 00 00
SUM -199.3 1843.5489 -1843.55 1395.119 -1395.12 1544.594 0 0 0
FF GG H

00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
00 00 0
0 0 0 0 0

Vous aimerez peut-être aussi