Crash Barrier Pedastal

Impact Force
Mass of the vehicle,m

Initial Speed of the vehicle,v


Final Speed of the vehicle,v

While moving Initial Kinetic Energy of the Vehicle,K.E1

After collsion Final Kinetic Energy of the Vehicle,K.E2

As per Work Energy Theorem, Work Done, W

Work Done,W
1219135.80246914

Allowing the barrier to displace by,D

Energy desipation due to crushing of vehicle


Deflection/crush of car due to impact, dc
(From Literature)

Therefore the reaction developed at the base of barrier,F

Reaction at the base of per Post (2 Nos in 3 m width)

Anchor Bolt properties


Dia
Anchor bolt stress area
yield strength of bolt
Tension capacity of each bolt
No of bolts per pedastal
Therefore moment resisted by bolts at each pedastal before failure
Bending moment at the top of pedastal due to impact (M)
Therefore No of barrier posts to fail due to impact
Therefore length of barrier over which failure of barrier posts occurs

Shear capacity of each bolt


Shear force transferred to pedastal top due to impact
Therefore No of barrier posts to fail due to impact
Therefore length of barrier over which failure of barrier posts occurs

From the above, it is considered that, approximately 16.5m length of barrier , 11 No's of barrier posts wo
The design of the pedastal is done based on the force tranferred to pedastal before the failure of barrier

Design of Pedastal
Maximum Axial Force (N)
Design forces
for each Maximum Shear due to impact at the top (V)
pedastal Bending moment at the base of pedastal due to impact (M)

Materials
Grade of concrete
fcd
Grade of Rebar
fyd

Check for minimum reinforcement


Assumed dimension of pedastal based on barrier detail=
Gross area of concrete
0.2% of gross area, Asmin1

Check for minimum reinforcement reqd to transfer anchor tensile force


No of bolts
Total tensile CAPACITY of bolts in each pedastal
Actual tension force in bolts due to impact
Asmin2

Check for reinforcement reqd due to bending


Height of plinth
Bending moment at the base of pedastal due to impact (M)
k
Z
Ast

Therefore, provide,8 No's of H12

Check for Shear Resistance


Provide 3 legs of H10 @300mm c/c
= 79 Tonnes
= 786.84 kN
= 79000 kgs
= 5.56 m/sec 20 kmph (Given) 12.42742 mph
= 0 m/sec 0 kmph

= (1/2)x m x v2
= 1219135.8024691 J

= (1/2)x m x v2
= 0 J

= K.E2-K.E1
= 1219135.80 J

= FxD
= FxD

= 1.3 m (For higher containment levels)

= 1.18 ft
= 0.36 m

= 735231.51 N
= 735.23 kN
= 367.62 kN (245.08 kN/m > 133kN/m)

= 20 mm
= 245.076 mm2
= 240 Mpa (Assumed)
= 58.82 kN
= 2 No's
= 25.64 kN-m (0.218m is lever arm)
= 275.71 kN-m
= 11 No's (Rounded up)
= 16.5 m

= 33.96 kN
= 67.92 kN
= 6.0 No's (Rounded up)
= 9 m

1 No's of barrier posts would fail after the impact.


ore the failure of barrier posts.

= 0.5 kN (Assumed)
= 67.92 kN Height of = 0.75
= 84.90 kN-m Height of P= 0.5

= C30/37
= 25 N/mm2 (partial safety factor=1.2, for accidental)
= 500 N/mm 2

= 434.78 N/mm2

= 500 x 425 mm2 500 425


= 212500 mm2
= 425 mm2

= 2
= 117636.48 N
= (Check based on actual grade of bolt/tensile capacity)
= 270.56 mm2

= 0.5 m
= 84.90 kN-m
= 0.04
= 412.30 0.95d= 412.3
= 473.36 mm2
Slab over 132kV Cable

Density of concrete = 25 kN/m3

Overburden Soil depth to slab spanning over cable = 1.747 m

Density of soil = 19 kN/m3

Spacing between the cables = 3.6 m

Width of cable = 0.95 m

Dispersed Pressure due to vehicle movement = 36 kN/m2

Overburden pressure due to soil = 33.19 kN/m2

Slab Thickness = 150 mm

Weight of slab = 3.75 kN/m2

Total pressure on slab = 72.94 kN/m2


(Soil overburden+Vehicle load+Wt of slab)

Base Presure Check

Length of slab considered = 1m

Trial total width of slab = 3m

SBC ( Assumed) = 115 kN/m2

Required total bearing Width on either side = 1.90 m


(Excluding width of 1m spanning over cable)

Therefore, Projection on either side of cable width = 0.95 m

Projection/ bearing width on either side of cable width


Provide 1000mm width on either side of cable width of 1m
Therefore Total width of slab is 3000mm

Reinforcement:
Provide bottom reinforcement of H16 @ 200mm c/c

Base pressure daigrams for different live loads


For 20Kpa , A minimum allowable Gross bearing capcaity of soil is expected=85kN/m 2

For 45Kpa , A minimum allowable Gross bearing capcaity of soil is expected=115kN/m 2


SBC = 115 kN/m2 (Assumed)

(Average 40kPa ground pressure disperesed at 35 deg to a depth of 1.747m)