Académique Documents
Professionnel Documents
Culture Documents
15 x 180 = 2,700
I.C
2 14
3
4
5
13
12
11
be carried out as per structural engineers
g.t
details.
6 10
7 9
8
4. All Drain pipes passing under buildings
I.C
or drive-way are to be encased in 150mm
thick concrete surround.
18,200
18,200
g.t g.t
PROPOSED
I.C 2/5817 5. All Plumbing, water reticulation and
PROJECT I.C I.C
drainage to be left clean and in working
order to the entire satisfactionof M.O.H.
Septic
g.t Tank g.t
I.C I.C 6. D. P. C. to be of approved quality
ACCESS ROAD plastic membrane provided under
all walls.
p.v p.v
1 2 3 4 5 6
p.v 4,400 3,400 3,400 3,400 3,400
ROOF SPECS
ROOF PITCH 22.5° decra or equivalent
roofing tiles on 50mm x 50mm battens on
75mm x 50mm truses to S.E details.
2,925
2,925
p.v p.v p.v WINDOW SPECS
prefabricated aluminium casement
windows with permanent ventilation to
BEAM SPECS
door and window schedules to
p.v p.v p.v p.v p.v p.v p.v p.v p.v p.v p.v 300mm x 200mm R.C beam to
architects approval. p.v p.v p.v
S.E details
300
LOUNGE
2,700
900mm high ms railing
p.v Toilet with ms balustrades
2,400
DOOR SPECS
Stack Stone cut Grey prefabricated aluminium casement door with
Mazeras Finish p.v p.v p.v p.v p.v p.v p.v p.v p.v p.v p.v permanent ventilation to door and window
p.v p.v p.v
schedules to architects approval.
300
WINDOW SPECS
LOUNGE
2,700
Toilet prefabricated aluminium casement windows with
2,400
permanent ventilation to door and window
ELEVATION 01 ELEVATION 02
schedules to architects approval.
S-Y
S-Y
p.v p.v p.v p.v p.v p.v p.v p.v p.v p.v p.v
p.v p.v
300
E-3 E-3 p.v R.C FLOOR SLAB SPECS
A B C D A B C D 150mm R.C floor slab to S.E details on
2,700
Toilet 1000G polythene sheet on 25mm blinding on
2,400
3,775 4,450 3,775 3,775 4,450 3,775 approved compacted hardcore filling.
12,200
12,200 G.L FOUNDATION SPECS
200 All R.C foundation & struct.elements to s.e details
200 3,575 200 2,025 2,025 200 3,575 200 200
150
150
200 4,175 200 1,425 1,425 200 4,175 200 on 50mm1:4:8 concrete blinding,hardcore on firm
ground free from loose soil or base. depths to be
200
1,800 200
200
200
200
shw 1,900 shw cotton soils from below new buildings prior to
200 1,800
shw shw
commencing foundation.
whb whb whb whb
200
wc wc wc wc
ROOM G5 ROOM G6 ROOM F5 ROOM F6
4,400
4,400
4,400
4,400
p.v
p.v
4,200
4,200
4,200
p.v p.v (ceramic tiles ff) 3,675 200 1,028 600 1,000 600 1,022 200 3,575 200
200
900
1,100
1 15
p.v 1 15
p.v
15 x 180 = 2,700
15 x 180 = 2,700
p.v p.v
I.C
2 14 2 14
7,600
3 13 3 13
2
4 12
2 2
4 12
2 A B C D
600
600
5 11 5 11
200
200
200
6 10 6 10
ROOM F7
1,100
1,100
p.v p.v
ROOM G4
p.v
ROOM G7 ROOM F4
p.v
roofing tiles on 50mm x 50mm battens on
CHECKED BY:
(ceramic tiles ff) (ceramic tiles ff) 75mm x 50mm truses to S.E details.
3,400
3,400
3,400
3,400
(ceramic tiles ff) (ceramic tiles ff)
3,200
3,200
900
900
8
600
3,222
2,925
250
250
±0.000 +2.700
whb
shw I.C shw
whb whb
shw shw
whb
600
900
600
2,325
wc wc wc wc
3 3 3 3
500
200
500
6,600
200
200
200
wc g.t g.t wc wc wc
600
900
600
600
p.v p.v p.v p.v
whb whb whb whb
shw shw shw shw
18,100
18,200
18,200
18,200
18,200
p.v
250
250
p.v p.v
p.v
300
100
3,400
3,400
3,400
E-4
E-4
Void
900
900
ROOM S3
3,200
3,200
3,200
Plastered and Painted with
2,700
ROOM S8
E-2
E-2
2,400
1,800
2,200
I.C
1,100
1,100
(ceramic tiles ff) p.v p.v (ceramic tiles ff) (ceramic tiles ff) p.v p.v (ceramic tiles ff)
I.C I.C
BEAM SPECS
600 300
4 4 4 4
600
600
200
200
200
300
PROPOSED DEVELOPMENT FOR
1,100
1,100
p.v p.v
p.v p.v
ROOM F9
2,700
ROOM G2 ROOM G9 ROOM F2 ROOM F3 ROOM F8 ESTHER WAITHIRA KIMANI
3,400
3,400
3,400
3,400
2,400
1,800
(ceramic tiles ff) (ceramic tiles ff)
3,200
3,200
3,200
P.O BOX
900
900
p.v
Septic p.v (ceramic tiles ff) p.v p.v
Tank
250
250
300
whb whb whb whb
600
900
600
p.v p.v p.v p.v ON LR. NO. Ruiru/Ruiru East Block 2/5817
wc
I.C I.C wc wc wc p.v p.v p.v
300
R.C FLOOR SLAB SPECS
5 5 5 5
500
200
500
6,600
200
200
2,700
wc wc wc wc
600
ROOM G3
600
900
600
whb
p.v p.v whb whb
p.v p.v whb ROOM G8 1000G polythene sheet on 25mm blinding on
2,400
shw shw p.v shw
50
250
p.v
approved compacted hardcore filling. Cleint
100
200
3,400
3,400
3,400
3,400
900
3,200
3,200
ROOM G1 ROOM F1 LOUNGE ROOM F10 All R.C foundation & struct.elements to s.e details
1,800
(ceramic tiles ff)
2,200
2,200
150
150
200
200
200
200
200
200
cotton soils from below new buildings prior to TYPICAL GROUND,1st & 2nd FLOOR PLANS
1,275 1,500 2,650 1,500 2,500 1,500 1,275 commencing foundation.
200 3,575 200 1,375 1,650 1,225 200 3,575 200
ELEVATIONS, SECTION AND SITE PLAN.
200 2,575 200 3,950 200 1,100 200 3,575 200
12,200
12,200 Drawn by: Date:
S-Y