Académique Documents
Professionnel Documents
Culture Documents
Work Enviroment
INPUT
Training Needs
New hires Training
(What Should We
Be Receiving?)
HOW?
(Instructions, Procedures, Methods)
Terex Intranet
Terex Magazine
Job descriptions
Training Sessions
Induction Session to New hires
Procedures
Training Procedure
anagement
Trained Hours
Personnel Performance
WITH WHOM?
mmunication Leader
OUTPUT
(What Should
We Deliver?)
HOW?
(Instructions, Procedures, Methods)
Data Analysis
Solving Problem Techniques
Procedures
Internal Audit Procedure
Corrective/Preventive Procedure
All the rest QMS Procedures
nager
WITH WHOM?
Quality manager
Terex Managers
Operations Director
Internal Auditors
Terex Team Members
Quality Engineers
OUTPUT
(What Should
We Deliver?)
on Implementation
HOW?
(Instructions, Procedures, Methods)
Rolling Cost
Operational Analysis
Financial Analysis
Approval Process
Procedures
New Product Quotation
eering Manager
WITH WHOM?
Cost Engineering Manager
Cost Engineer
Cost Analyst
Purchasing Buyers
Operations Director
Controller
OUTPUT
(What Should
We Deliver?)
Procurement
ECN's
INPUT MRO Requisitions
(What Should We MRP
Be Receiving?) Supplier Quotes Process
Purchasing Manager
Buyers
Tool Crib Personnel
Receiving Personnel
Supplier Quality Engineer
Receiving Quality Inspector
MRO Suppliers
Raw Material - Out Source Suppliers
PO's OUTPUT
Supplier Selection (What Should
Obtain Purchased Parts We Deliver?)
IR/MRDR's
Debit Memos
Supplier Delivery ?
Supplier Quality
Process Name: Production Planning &
Logistics
Export Personnel
ction Managers
livery Performance
Process Name: Resource Management
Infraestructure
INPUT
New Lay out Proposal
Work orders
Infraestructure
(What Should We PM Calendar & Schedule
Be Receiving?) Safety Requirements
HOW?
(Instructions, Procedures, Methods)
Procedures:
Lay out Planning
Maintenance Procedure
Electronic Data Back up
g Manager,
e Manager & IT Administrator
WITH WHOM?
Manufacturing Engineers
Terex Managers
Maintenance Engineer
Maintenance Techincian
Maintenance Manager
Maintenance Supervisor
Operation Manager
IT Administrator
OUTPUT
(What Should
Customer Requirements
Customer Complaints
INPUT
Supplier Quality
ANSI/ASME Specifications
Quality Assurance
(What Should We Customer Feedback
Be Receiving?) ECN's
Customer Drawings
HOW?
(Instructions, Procedures, Methods)
Customer Communication
Supplier Communication
Quality Alerts
Procedures:
Corrective/Preventive Action
Receiving Inspection
Control of Non Conforming Product
Training
Inspection Procedures
Calibration and Control of Measuring Devices
ager
WITH WHOM?
Quality Assurance Manager
Customer Service Engineer
Quality Auditors
Supplier Quality Engineer
Quality Assurance Engineer
Welding Engineer
Production Operators
Terex Manufacturing Team Members
INPUT
Quality Objectives
Internal & External Audit Results
Management
(What Should We Financial Objectives
Be Receiving?)
Leadership
HOW?
(Instructions, Procedures, Methods)
QMS
Quality Manual
Data Analysis
Staff Meetings
Procedures:
Internal Audits
Management Review
Corrective and Preventive Action
Internal Communication
Director
WITH WHOM?
Operations Director
Operations Manager
Quality & Engineering Manager
Controller
Purchasing Manager
Production Control & Logistics
Human Resource & Safety Manager
Management Representative
Quality Policy
Management Review
Process Maps
Leadership We Deliver?)