Vous êtes sur la page 1sur 1

Pre-Construction Risk Assessment (PCRA)

Project Name: Project Location:


FDC# Project Manager:
Architect: Contractor:
Project Description:

See page 2 for additional information, interventions or action plans


YES NO
A. Will construction directly affect patient care areas? Apakah konstruksi akan mempengaruhi area perawatan pasien secara langsung?

B. Will HVAC systems be affected by the construction (i.e., outside air intakes, exhaust Akankah sistem HVAC dipengaruhi oleh konstruksi (yaitu, intake udara luar, knalpot
systems, air handlers)? If yes, note which systems and provide an action plan. sistem, penangan udara)? Jika ya, catat sistem mana dan berikan rencana tindakan
C. Are Utility Shut Downs Required? Check all that apply. Apakah Utilitas Shut Down Dibutuhkan? Periksa semua yang berlaku.
HVAC Steam
Hot / Cold Domestic Water Medical Gas
Sanitary Electric
Other (Specify):
ALL utility shut downs must be coordinated with contractor, Facilities Services, affected departments
and hospital administration in order to minimize disruption to operations. semua penutupan utilitas harus dikoordinasikan dengan kontraktor, Layanan Fasilitas, departemen yang terkena dampak dan administrasi rumah sakit untuk meminimalkan gangguan terhadap operasi.
D. Will construction activities generate noise that will disrupt occupants adjacent to, Akankah kegiatan konstruksi menghasilkan kebisingan yang akan mengganggu penghuni yang berdekatan,
above, or below the construction area? di atas, atau di bawah area konstruksi?
a. If yes, affected occupants must be notified. Sebuah. Jika ya, penghuni yang terkena dampak harus diberi tahu.
b. How will work be managed to minimize disruption? b. Bagaimana cara kerja dikelola untuk meminimalkan gangguan?

E. Will construction activities generate vibration that will disrupt occupants adjacent to, Akankah aktivitas konstruksi menghasilkan getaran yang akan mengganggu penghuni yang berdekatan,
above, or below the construction area? di atas, atau di bawah area konstruksi?
a. If yes, affected occupants must be notified. Sebuah. Jika ya, penghuni yang terkena dampak harus diberi tahu.
b. How will work be managed to minimize disruption? b. Bagaimana cara kerja dikelola untuk meminimalkan gangguan?

F. Does the construction area contain any environmental hazards? Apakah area konstruksi mengandung bahaya lingkungan?
Asbestos Chemicals (Specify): Asbestos Chemicals (Tentukan):
Other (Specify): Lainnya (Tentukan):

G. Will contractor deliveries or debris removal be made outside of normal working hours? Apakah pengiriman kontraktor atau pembersihan puing dilakukan di luar jam kerja normal?
If yes, describe hours and any special requirements. Jika ya, jelaskan jam dan persyaratan khusus apa pun.

H. Will debris removal require precautions above and beyond those required for the Apakah penghapusan puing-puing memerlukan tindakan pencegahan di atas dan di luar yang diperlukan untuk
assigned ICRA precaution level? (i.e., covered carts, wiped down for levels III-IV) menetapkan tingkat pencegahan ICRA? (yaitu, keranjang yang tertutup, dihapus untuk tingkat III-IV)
If yes, describe additional precautions. Jika ya, jelaskan tindakan pencegahan tambahan.

I. Are there any other circumstances that may affect care, treatment and services? Adakah keadaan lain yang dapat mempengaruhi perawatan, perawatan, dan layanan?

YES NO
Has an ICRA been developed for this project? Apakah ICRA telah dikembangkan untuk proyek ini?
Date Reviewed _______________________ ICRA Level Assigned ________________

Reviewed by: Date:

TJC Standard EC 02.06.05 states that space must be managed during demolition, renovation or new construction to reduce risk to those in the organization. This
form addresses Element of Performance 2. An ILSM must be completed to comply with Element of Performance 3 (See ILSM for Construction and Renovation
Projects Form). An ICRA must be completed to comply with Element of Performance 3 (See Infection Control Risk Assessment and Permit Form).

Page 2 Pre-Construction Risk Assessment (PCRA)


ADDITIONAL INFORMATION

Project Name: Project Location:


FDC# Project Manager:
Architect: Contractor:

YES NO
A. Spaces that will be affected:

B. HVAC systems affected by the construction:

C. Utility Shutdowns with greater than usual impact:

D. Construction activities generating disruptive noise:

E. Construction activities generating disruptive vibration:

F. Environmental hazards requiring special attention:

G. Deliveries or debris removal made outside of normal working hours:

H. Debris removal require precautions above and beyond those required for the
assigned ICRA precaution level?

I. Are there any other circumstances that may affect care, treatment and services?

Reviewed by :
Initials Form date 7/10/2015

Vous aimerez peut-être aussi