Construction Work of New Building for

The Faculty of Engineering, Science and Technology of


The National University of Timor-Leste
Method Statement (Formwork)

Construction Work of New Building for


The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste

Method Statement
(Formwork)

JULY 2018
RINKAI-NISSAN Construction Co., Ltd

PM CM Check

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

SECTION 301-FORMWORK

1. Formwork
1.1.General
1.1.1. Reference
a. Contract Document – Volume II Technical Specification Division 3 Section
301-Form Work.
b. Public building construction standard Specification (Architectural work edition)
for 2016
c. Goverment building departament of ministery of land, infrastructure, transport
and tourism

1.1.2. Scope Application

The method statement is to lay down a systematic procedure for the requested
activities of the formwork to ensure that the formwork work must be performed in
accordance with the latest drawings. Method statements include general procedures
to be followed for the installation of formwork on foundations, shear wall, columns,
beams, girder and slab. It shall be submitted and approved by R.E. before starting
work.

1.1.3. Change- Doubt-Consultation


When constructing the construction, if it is not specified in the design book, it seems
to be important in matters other than the description.
If problems arise, report them to supervisors and consult and consent to construct.
When not specified in the design books, in the case where there is a difference, in
principle, it is based on instructions from the supervisor.

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

2. Organization
This Organization is responsible in implementation of this Method Statement. The
organization is as follow:

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

3. Method Of the Construction


3.1.Preparatory work
a. To ensure the work went smoothly, formwork must be prepared before executing
work
b. Detailed schedule, time schedule, equipment, labor mobilization, and field
administration must be completed and prepared before executing work.
c. To ensure the work went smoothly, Rinkai Nisan Co.Ltd contractor need to
constantly monitoring and surveying materials placement.
d. Location and Site, see in the Site Planning Drawing (Appendix 1.1.)

3.2.Equipment and Materials


3.2.1. Equipment List
Equipment Type Number Remarks
Welding Machine Lakoni, Kentaro 3
Saw Machine Maktek, Maix 3
Drill Machine Maktek, Kentaro 3
Cutting Weld Maktek 3
Sirkel Maktek 2
Tower Crane 1

3.2.2. Major Material


a. Plywood
- For Foundation Girder, Foundation Column and Column:
Used plywood (2240 x 1220 x 18 mm)
- For Girder, Beam and Slab
Used plywood (2240 x 1220 x 12 mm)
b.

3.3.Material inspection
a. Imported materials will be visually inspected upon arrival at the site and checked
for alignment, presence or absence of dirt, severe rust and the like. The damaged
material will be placed in a separate area so as not to mistake at the time in using.
b. Check the size and quantity of material such as hollow, scafolding and phenolic
film and it shall be according to the requirement.

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

3.3.1. Material Storage


a. The material will be stored according to type, size and length of each type of
material.
b. Material will be stored and arranged in such a way as to prevent exposure to
sludge etc.

3.3.2. Shipment
a. Shipment inspection
- Confirmation of material requested on site (processing book etc.)
- Based on (1), check the type of shipping material
o Size for all material form work
o Quantity
- Confirmation of delivery slips
b. Inspection timing / frequency
- Inspection at time of shipment from time to time.

3.4.Formwork Fabrication
a. Determination for formwork fabrication
b. Hollow and Phenolic film will be cut according to the approved drawing
c. The hollow and Phenolic film will be assembled according to the approved
drawing
d. Marking
e. Form work Placing

4. Construction Procedure
4.1.Handling of Formwork
a. All formwork will be handled to construction area after it is assembled at
fabrication area.
b. Tower crane will be used for hoisting formwork from fabrication or storage area
to the installation area

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

4.2.Formwork Installation
4.2.1. Foundation Slab
(1) Flow Chart

(2) Material List

No. Materials Material & Size Remarks


Steel (□-50x50)
1 Hollow
Steel (□-40x20)
2 Form Material Phenolic film (2440 x 1220 x 12 mm)
Separator
3
Plastic Cone Plastic (Ø12 mm)
Rebar Rebar (Ø16 mm)
4 Coverege (Spacer) Concrete (40 mm and 70 mm)
5 Concrete Block Concrete (39x19x19)cm
6 Form Oil Sika separol 10

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

(3) Step

(The Material name see in the Appendix 1.2.)

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

4.2.2. Foundation Girder


(1) Flow Chart

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

(2) Material List

No. Materials Material & Size Remarks


Steel (□-50x50)
1 Hollow
Steel (□-40x20)
2 Form Material Phenolic film (2440 x 1220 x 18 mm)
Separator
3 Separator Steel (Ø12 mm)
Plastic Cone Plastic (Ø12 mm)
4 Coverege (Spacer) Concrete (40, 60, 65 and 100 mm )
5 Support Pipe Steel Pipe Galvanize ( Ø 1.5”)
6 Scaffolding Steel (170x121.9x4.2x0.25) cm
7 Tie rod Steel (Ø12 mm)
8 Form Oil Sika separol 10

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

(3) Step

(The matrial name see in the Appendix 1.3.)

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

4.2.3. Beam and Slab


(1) Flow Chart

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

(2) Material List for Girder and Beam

No. Materials Material & Size Remarks


Steel (□-50x50)
1 Hollow
Steel (□-40x20)
2 Form Material Phenolic film (2440 x 1220 x 12 mm)
3 Coverege (Spacer) Concrete (40 mm)
4 Support Pipe Steel Pipe Galvanize (Ø 1.5” )
5 Tie Rod Rebar (Ø12 mm)
Scaffolding (Main Frame) Steel (170 x 95 x 4.2 x 0.25)cm
6 Scaffolding (Leader Frame) Steel (100x95x4.2x0.25)cm
U-Head Steel (Ø 1.3”)
7 Equal Angle Steel Steel (L 30 x 30 x 2.3)
8 Form Oil` Sika separol 10

(3) Material List for Slab

No. Materials Material & Size Remarks


Steel (□-50x50)
1 Hollow
Steel ((□-100x50)
2 Form Material Phenolic film (2440 x 1220 x 12 mm)
3 Coverege (Spacer) Concrete (30 mm)
4 Support Pipe Steel Pipe Galvanize (Ø 1.5” )
Scaffolding (Main Frame) Steel (170 x 121.9 x 4.2 x 0.25)cm
5
U-Head Steel (Ø 1.3”)
6 Form Oil Sika separol 10

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

(4) Step

(The material name see in the Appendix 1.4.)

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

4.2.4. Column
(1) Flow Chart

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

(2) Material List

No. Materials Material & Size Remarks


Steel (□-50x50)
1 Hollow
Steel (□-40x20)
2 Form material Phenolic film (2440 x 1220 x 18 mm)
3 Coverege (Spacer) Concrete (40 mm and 60 mm)
4 Support Pipe Steel Pipe Galvanize (Ø 1.5”)
5 Scaffolding (Main Frame) Steel (170x121.9x4.2x0.25) cm
6 Tie rod Rebar (Ø12 mm)
7 Form Oil Sika separol 10

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

(3) Step

(The Material name see in the Appendix 1.5.)

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

5. Schedule

6. Quality Control
6.1.Formwork Quality Control Planning Table

Control Item Part Measuring Method How to organize results Tolerance Remarks
Vertical Lowering swing, tilt measurement by Write on the frame diagram as a
Pillar + 10 mm
Accurancy scale reference for finishing work
Lowering swing, tilt measurement by Write on the frame diagram as a
Wall + 10 mm
scale reference for finishing work
Stretch the water yarn straight and Write on the frame diagram as a
Way /Street Beam-Slab-Wall + 5 mm per 3 m
measure the error on the scale reference for finishing work
Write on the frame diagram as a
Level Floor Accuracy Level -5mm - +10mm
reference for finishing work
Write on the frame diagram as a
Doorway Measured from reference level -5mm - +10mm
reference for finishing work
Write on the frame diagram as a
Window Opening Measured from reference level -15mm - +5mm
reference for finishing work
Write on the frame diagram as a
Beam Botton Measured from reference level
reference for finishing work

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

7. Formwork Dismastling
7.1.General
a. Forms, shoring and/ or false work will be removed after approved by R.E
b. Form work removal will be done gradually
c. Form ties, groove strips and other temporary items will be removed as dismantling
work progresses
d. Concrete faces, joints and recesses will be maintained for free from damage

7.2.Time of Removal

The length of time


The mean temperature of (˚C)
Percentage Design
Place Kind Concrete The period of leaving forms and support
Strength %
5 ˚C or more but less
15 ˚C or more less than 5 ˚C
than 15 ˚C
Centering Under Girders
Standard Concrete 28 days 100
Beams, Lintels
Floor Slabs, Roof Slabs,
Standard Concrete 17 days 25 days 28 days 85
Concrete
Wall, Columns and sides of
beams and all others Standard Concrete 3 days 5 days 8 days 25
vertical surfaces

7.2.1. Temperature of Dili, East Timor: capital of East Timor

1 2 3 4 5 6 7 8 9 10 11 12
Monthly
Month Month Month Month Month Month Month Month Month Month Month Month
Record high temperature
36 35.5 36.6 36 35.7 36.5 34.1 35 34 34.5 36 35.5
(℃)
Average high
31.3 31.1 31.2 31.5 31.3 30.7 30.2 30.1 30.3 30.5 31.4 31.1
temperature (℃)
Average temperature
27.7 27.6 27.4 27.4 27 26.8 25.5 25.1 25.4 26 27.2 27.4
(℃)
Average lowest
24.1 24.1 23.5 23.5 22.8 21.9 20.8 20.1 20.5 21.5 23 23.6
temperature (℃)
Historical lowest
19 16.2 16.5 18.2 13.2 14.5 12.4 11.8 13.4 16.1 18 16.7
temperature (℃)

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

a. Dili's average temperature · December and January are below 32 ℃. The construction
period will be around 32 ° C from July to December.
JISS 5 FORM WORK/ SUPPORT DILI , HERA, UNTL SITE
1) Period of shelf life of foundation, beam
side, pillar and wall Therefore, UNTL SITE → temperature is about 32 ° C and
Ordinary Portland cement over 20 ° C → it is 3 days old.
aged 4 days
2) Period of support under construction
under beam (including sliding board) Therefore, since UNTL SITE → temperature is around 32 ° C,
it is the time when it reaches design standard strength or
When the compressive strength of the
concrete reaches 100% of the design higher, but it will be left for the shortest 28 days
standard strength of the member.
3 ) Support period under support of slab
(including sliding board)
Therefore, since UNTL SITE → temperature is around 32 °
When the compressive strength of the C, it reaches 85% or more of the design standard strength,
concrete reaches 85% or more of the but it will be left for the shortest 17 days.
design standard strength of the member
4) Cantilevered beam · Support under
Therefore Therefore, since UNTL SITE → 4)
the slab
2), and 3). 2), and 3).

b. In disassembling the form, work shall be done after discussing dismantling range
work procedures etc before starting work.
c. When disassembling the mold, instruct them to perform dismantling work so as not to
give impact or damage to the concrete by dropping the disassembled material.
d. In principle, we will not change the support plan.
7.2.2. Striking the Formwork:
e. Always have the approval of the Consultant before the striking formwork
f. Be careful when striking formwork and always use safety tools
g. Be careful and slowly when striking formwork, do not be broken and put in a safe
place if the condition of the formwork can still be used again
h. Paint the code number into a reusable formwork
i. Before reuse the formwork, the surface must be cleaned

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

8. Safety procedure

The all fabrication of formwork according with the JICA safety plan:

Kay points for the formwork

8.1.1. At the time of fabrication of forms


The contractor shall be
a. Always arrange materials and tools in an orderly manner at form fabrication
worksshops
b. Always inspect machinery and tools used to fabricate forms, ensure the safety
davice functions properly prior to use.
c. Take meansures to ensure that no unauthorized workers have access to the form
fabricate forms worksop.
d. Ensure that two workers have access to the form fabrication worksop.
e. Take meansures to prevent cargo collapse or scattering when storing form
materialis or fabricate forms.
f. Ensure that fabricated forms are free of protrusions such as nails

8.1.2. At the time of assembly of forms


a. When there is a risk of workers being injured by renforcing bars, etc. after
triping or falling, the contractor shall take security menasure such as covering
of reinforcing bars with protective sheets before performing the assembly
works.
b. Form assembly places shall always be kept in order
c. Menasure of no-entry of unautorized workers shall be taken
d. Where works is undertaken at a place more tham two meters above ground level,
the contractor shall construct scaffolding prior to the commencement of work.
Where it is impossible to contrucct scaffolding, workers shall use protective
gear to prevent falls, such as safety belts or fall arrestors when conducting the
works. Where safety belts are used, the contractor shall affix appropriate
aquipment to connect the belts.
e. Once reinforcement fabricated, the contractor shall not use rebars as access
platforms or working floors.

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

f. All garbage and the rest of the rebar/ hollow that will not use again will be
gathered and throw it into the Disposal Area (Waste Material)
g. The contractor shall ensure that heavy or big forms are handled by not a single
worker but by two or more workers.
h. The contractor shall firmly affix assembled form so as to prevent their collapse
by wing or vibration
i. Before Installation of Formwork should be cleaned And brush by oil Formwork
j. And after the removed formwork, which can be used again must clean the
concrete attached to the surface and the brush again formwork oil, use it again
in the same place

8.1.3. At the time of dismantle of forms


The contractor shall be:
a. Not use the outsides of the assmbled reiforcing bars or forms as access platforms
or working floors
b. Suspend works in case of danger caused by bad weather such as strong wing or
raintorms
c. Not dismantle form shoring system before the prescrbed strength of concrete is
ascertined.

9. Site Inspection Plan


a. The exact date and time of form inspection prior to concrete placement or form
closing will be informed to as early as possible. However, because of very tight
schedule of the whole project, timing of inspection needs to be flexible.
b. An approved formwork checklist attached will be provided to inspect the form
erection. This sheet will be filled by the staff who is not only performs the
internal inspection but also attends the inspection by contractor.

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

Appendix 1.1.

(Site Planning Drawing)

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

Appendix 1.2.
(Formwork for foundation Slab)

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

Appendix 1.3.
(Formwork for foundation Girder)

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

Appendix 1.4.
(Formwork for Slab and Beam)

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

Appendix 1.5.
(Formwork for Column)

RINKAI-NISSAN Construction Co., Ltd.


Construction Work of New Building for
The Faculty of Engineering, Science and Technology of
The National University of Timor-Leste
Method Statement (Formwork)

Appendix 1.6.

(Inspection Sheet)

RINKAI-NISSAN Construction Co., Ltd.