Vous êtes sur la page 1sur 16

Transfer PLC Project to Conveyor Panel PC

1. Establishing connection Notebook -> Conveyor


 Connecting the Network via Network Cable
 Power up the Tracking Conveyor
 Connect a bluetooth / USB keyboard tot he Tracking Conveyor Panel PC

2. Set the correct IP Adress at your Notebook


 Open Networkconnections
 Go to modify Network Adapter Settings
 Choose Properties
 Choose Internetprotokoll Version 4 (TCP/IPv4)
 Choose properties for IPv4
 Set IP Adress: 172.20.1.18
Set Subnetzmask: 255.255.248.0
 Confirm with “OK“

3. Set correct IP Adress at Tracking Conveyor Panel PC


 Start
 Control Panel
 Network and Dial-up Connections
 Rightclick to FEC1
 Properties
 Specify an IP Adress
 Set IP Adress: 172.20.1.20
Set Subnetzmask: 255.255.248.0
 Cinfirm with “OK“
 Reboot Panel PC (Power off the Tracking Conveyor at least for 10 sec.)

4. Checking if Tracking Conveyor Panel PC is reachable from Notebook


 Open „CMD“ Box
 Enter: ping 172.20.1.20 and execute with “Enter“

Stand 18.01.2018 Seite 1 von 16


5. Start “Twin CAT 2 System Manager“
 Click (Rightclick) at notification Aerea to the “Twin CAT 2“ Symbol
 Start “System Manager“

6. Open the Project in the “System Manager“


 Choose “Open File“
 Choose the actual „.tsm“ file

Stand 18.01.2018 Seite 2 von 16


7. Establish connection to Remote PLC
 Click “Choose Target“

 Markup “Local“ and push “Search (Ethernet)…“

Stand 18.01.2018 Seite 3 von 16


 Confirm with “OK“

 Push “Broadcast Search“


 The shown up „Target“ in the list should be marked, the push “Add Route“. Memorize the “Host
Name“ for further settings in the “PLC Control“ software.

INFO: should no Target be shown up, follow the next step, otherwise proceed with page 6

Stand 18.01.2018 Seite 4 von 16


1. Choose “IP Address“
Go to “Enter Host Name / IP:“ enter the IP Adress “172.20.1.20“ and confirm with “Enter“
Mark the shown up Target
Push “Add Route“

Stand 18.01.2018 Seite 5 von 16


 Confirm “Logon Information“ with “OK“
 Close the “Add Route Dialog“ Window by pushing the “Close“ button

 Choose the correct Target with the correct “Host Name“ from the list and confirm with “OK“

Stand 18.01.2018 Seite 6 von 16


 “Runtime“ should now signalising “green“

8. Modification of settings with System Manager


 Mark “PLC-Configuration“
 Choose Topic “Plc Settings (Target)“
 Disable settings (untick checkbox) for “Clear Invalid Retain Data“ and “Clear Invalid Persistent
Data“
 Confirm with “Apply“

Important: Changes will only be set if “Runtime“ is active!!!

Stand 18.01.2018 Seite 7 von 16


 Confirm “Logon Information“ Window with “OK“

9. Activate Project
 Push “Generate mappings“
 Push “Check configurations“
 Push “Activate configurations“
 Confirm the “Activate Configuration“ Window with “OK“

Activate configurations

Generate mappings

Check configurations

 Confirm “Restart TwinCAT System in Run Mode“ Window with “OK“

Stand 18.01.2018 Seite 8 von 16


 TwinCAT System apply´s changed configuration to PLC
 Messages for status of PLC will be shown

INFO: System Manager can now be minimized

 Start up “PLC Control“


 Click (Rightclick) at notification Aerea to the “Twin CAT 2“ Symbol
 Start up “PLC Control“

Stand 18.01.2018 Seite 9 von 16


10. Open the Project with “PLC Control“
 Choose “Open File“
 Choose the actual „.pro“ file

INFO: If there should appear an error message, please apply the following settings.

- Choose Topic “Resources“


Doubleclick onto “PLC Configuration“

Stand 18.01.2018 Seite 10 von 16


- Mark “CX (ARM)“ and confirm with “OK“

11. Transfer / Apply Project at Target System (Conveyor-Panel)


 In “PLC Control“ choose the “Online“ menu
 Choose the„Choose Runtime System“

Stand 18.01.2018 Seite 11 von 16


 Choose same Target (“Host Name“) as choosen in “System Manager“
 Mark “Run Time 1“ and confirm with “OK“

 Choose again “Online“ and go to “Login“

Stand 18.01.2018 Seite 12 von 16


 Confirm here with “Ja“ or „Yes“

 Choose “Online“ and then choose “Run“

Stand 18.01.2018 Seite 13 von 16


 Now the PLC Control should signalize the „Online Status“ with “RUN“ -> “green“

 Choose again “Online“ and choose “Create Bootproject“

Stand 18.01.2018 Seite 14 von 16


12. Shutdown “System Manager“ and “PLC Control“
 In “PLC Control“ go to “Online“ menu and choose “Logout“

 Close the „PLC Control“ Window


 Confirm the Save Changes with “Nein“ or „No“

Stand 18.01.2018 Seite 15 von 16


 Close the “System Manager“ Window
 Confirm the Save Changes with “Nein“ or „No“

Stand 18.01.2018 Seite 16 von 16

Vous aimerez peut-être aussi