OPTION 2
Location 1 Nos (no) H (m) Area (m2) Qty (m3)
800mm dia. CBP (nos) 55.00 26.00 0.50 715.00 715.00
800mm dia. CBP (nos) 26.00 29.50 0.50 383.50 383.50
800mm dia. CBP (nos) 10.00 28.00 0.50 140.00 140.00
OPTION 3
Location 1 Nos (no) H (m) Area (m2) Qty (m3)
800mm dia. Secant (nos) 55.00 26.00 0.50 715.00 715.00 715.00
800mm dia. Secant (nos) 26.00 29.50 0.50 383.50 383.50 383.50
800mm dia. Secant (nos) 10.00 28.00 0.50 140.00 140.00 140.00
OPTION 4
Nos (no) H (m) Area (m2) Qty (m3)
CBP Wall 800mm dia. CBP (nos) 8.00 28.00 0.79 176.96
800mm dia. CBP (nos) 51.00 29.50 0.50 752.25
800mm dia. CBP (nos) 42.00 26.00 0.50 546.00
Retaining wall Length (m) Height (m) Thickness (m) Qty (m3)
Section A-A 30.00 12.00 0.60 216.00
Section B-B 28.00 12.00 0.60 201.60
Earthwork
Cut volume Section A-A 12.00 13.00 30.00 4,680.00
Cut volume Section C-C Top 20.00 17.00 53.00 18,020.00
Cut volume Section C-C Middle 12.00 6.00 53.00 3,816.00
Cut volume Section C-C Bottom 6.00 8.00 53.00 2,544.00