Masterplan Report

30 September 2016
London Bridge Campus, masterplan vision
Executive Summary

The London Bridge Campus masterplan supports the The masterplan sets out the potential for re-development • Regenerate the Yards and Lanes within the The site falls within the London Bridge, Borough and
Development Partners aim to create an integrated and enhancement of the London Bridge Campus. Borough High Street Backlands to create a new Bankside Opportunity Area (Annex 1 of the London
healthcare, research and education campus. The Taking into account possible future space needs of vibrant place with retail and other commercial and Plan March 2016) and is recognised for its potential for
Development Partners, Guy’s and St Thomas’ NHS the Partners the masterplan also identifies further education activities intensification, particularly surrounding London Bridge
Foundation Trust (the Trust or GSTT), King’s College opportunities for maximising commercial development • Preserve the historic buildings and spaces and Station. London Borough of Southwark (LBS) have
London (KCL) and Guy’s and St Thomas’ Charity (the space within the site and meeting the objectives of LB enhance their setting already consulted on the preferred draft policy for the
Charity), are working together to create a practical Southwark. • Create new, legible high quality public realm and New Southwark Plan. Later this year LBS will consult
property strategy to support the vision of King’s Health open space across the campus on area specific visions and policies including London
Partners (KHP) with a ambition to become one of the The Partners brief identifies the following masterplanning • Develop flexible sustainable infrastructure Bridge and this will be an opportunity to influence
top ten academic healthcare organisations in the world. opportunities: and buildings to reduce running costs and policy and to reflect and safeguard aspirations for the
• Value of Guy’s properties and prospect to build environmental impacts. development of the London Bridge Campus.
Currently KHP delivers excellence in education tall
providing a unique breadth of education and training • Contribute to regeneration of London Bridge The total size of the London Bridge estate is currently The site comprises two identifiable campus areas; to
to 9,500 students and is recognised nationally and Quarter 283,326m2 (GIA) of which 252,376m2 is occupied by the west the King’s College London University buildings
globally for delivering excellence in research. KCL, • Proximity to a major London transport hub the Partners. Taking into account future trends and centred around Memorial Park and also occupying the
ranked 5th in the UK QS World University Rankings • Create a Bio-medical Research Hub for commercial space needs both the Trust and KCL have identified ‘Backlands’ area behind Borough High Street, and
2014 and the Trust one of the UK’s busiest and most and academic income their space requirements to accommodate growth. the Guy’s Hospital Campus encompassing much of
successful NHS Foundation Trusts are both members • Maximising floor area with flexible built For the Trust an uplift from 139,635m2 to 190,478m2 is the site to the east of Great Maze Pond Road. For the
of KHP. Together the King’s Health Partnership has a infrastructure assumed and for KCL a modest uplift from 112,311m2 masterplan study the buildings within the site boundary
combined staff of 31,000 and a turnover in excess of • Create a combined vision to add value to “GSTFT, to 120,650m2. The Charity’s requirement is to maintain are owned by either the Partners with the exception of
£3bn per annum. Approximately 5,000 hospital staff Guy’s, Charity, St Thomas’ and KCL” brand. a similar amount of floor space to that which it currently Ronald McDonald House and the Munro Clinic which
and 500 University staff work on the London Bridge occupies, approximately 430m2. Overall the combined are owned by third parties. A collective masterplanning
Campus, 3,000 students are based on the Campus and Specific opportunities identified within the masterplan anticipated future space requirement of the Partners is approach has been taken which maximises the benefit
half a million patient visits are made each year. include: 311,558m2 an increase of 23% from existing. of development across the entire site and therefore the
• Create clear connections north-south across ownership of individual buildings has been put aside.
In a competitive global economy universities and the site, improving permeability and connecting Strategically the Campus is exceptionally well located
research centres are recognising that they must change the site with the station and the residential adjacent to a major London transport hub. In recent
and adapt to sustain and grow and that the physical neighbourhood to the south years London Bridge has seen major transformation,
environment plays a critical role to their future success. • New entrances to the site from St Thomas Street completed projects include the Shard and the highly
In London there is significant demand for healthcare and London Bridge Station successful revitalised Borough Market. Further
based research and development space on sites which • Opening up the ground floor of the Southwark significant developments are taking place including
combine healthcare and research on a single site such as and Bermondsey Wing on St Thomas Street with the re-development of London Bridge Station which is
the London Bridge Campus (MedCity Report, Planning potential retail activity to contribute to the vision due for completion in 2018 following which passenger
for Growth – Demand for Healthcare R&D Space in for a pedestrian priority boulevard numbers are predicated to increase from 55 to 90
London, March 2016). Southwark Council have a strong • Strengthen the connection with Borough High million per annum.
vision for the area as ‘a globally significant, historic and Street, creating coherent routes through the
vibrant place of modern commerce, enterprise and Backlands and routes east-west across the site
creativity’.
During the masterplan study several development station. On the western side, from Borough High Street,
scenarios were tested and from these options the the routes into the campus through the Backlands are
following development principles were established: informal and build upon the character of the existing
Yards and Lanes. The east-west route is continued
• The lecture theatre must be re-provided before through Memorial Park connecting through to Weston
demolition of the existing theatre commences Street.
• The student accommodation in Wolfson House
must be re-provided on campus before demolition The proposed buildings in the Backlands will have a mix
of the existing building of uses including the Student Village with residential
• There is no immediate requirement to re-build the accommodation for 500 students, a new lecture theatre
swimming pool and seminar spaces. To the south a new bio-sciences
• The activities in the Borough Wing must be building will face onto Newcomen Street and to the
re-provided before it can be demolished this north a new commercial development adjoins New
includes; operating theatres, wards, treatment City Court which is also planned for redevelopment
rooms, research space and offices by Great Portland Estates. In this area the Yards and
• The activities in Nuffield House must be re- Lanes will be re-invigorated with active ground floor
provided before it can be demolished this includes; uses including community education spaces, retail and
2 day case operating theatres and the sleep clinic cafes and restaurants.
St Thomas Street, Station and Campus Gateway
• The Mortuary must be re-provided before it can be
demolished The historic core of Old Guy’s House and the University
• The Central Stores and other hospital activities buildings facing onto Memorial Park are retained and
located adjacent to the Mortuary can be relatively enhanced with a new feature building, the Bio-Science
easily relocated. Hub connected to the retained New Hunts House. To
the east of Great Maze Pond Road the existing Guy’s
The masterplanning vision is for the Campus to hospital site is transformed with the replacement of the
become an integrated and connected piece of the city. Borough Wing and the opening up of the Southwark
A coherent hierarchy of routes and spaces across the and Bermondsey Wing with shop fronts facing onto St
campus will create a new sense of place linking the site Thomas Street, a new pedestrian entrance and street
with the surrounding context. A vibrant mix of activities orientated north-south linking from the new station
intermingled across the site; healthcare, research, concourse through to Snowsfields. Two large scale
education, student residential, retail and commercial, developments sit either side of this route rising up in
will enliven the whole area. New buildings are sited to scale towards the Guy’s Tower. A new centralised Out-
maximise potential for development whist responding Patients Department and other hospital activities are
to the scale of surrounding streets and spaces. located opposite, on the south side of Snowsfields.
Strong pedestrian routes north-south provide clear Other developments on Snowsfields include new
connections from the site to London Bridge Station offices for the Charity and the potential re-development
and the residential area to the south responding to the of Elizabeth Newcomen House for residential use.
anticipated changes that are taking place around the

Great Maze Pond Road, Campus Heart


The opportunity for maximising commercial/ third party Careful consideration has been given to potential
space on the campus is significant. Early discussions phasing options for the masterplan. The main driver is
have taken place with LBS who are supportive of to safely maintain ongoing operations whist maximising
development on the campus and feedback from these opportunities for development across the campus. The
meetings has been used to develop the public realm and study has identified some key enabling projects that will
tall buildings strategies. The area to the east of Great be required.
Maze Pond Road is considered by LBS as suitable for
a tall buildings cluster, the tallest of which should be no These include:
taller than the existing Guy’s Tower (149m) and stepping • Relocation of the Mortuary to the basement of the
down in height to the south and east in response to the main hospital
context. The masterplan proposals take into account • Relocation of the Central Stores to the basement
the impact of the development on the London View of the main hospital
Management Framework and local townscape views • Relocation of the Wards from the eastern part of
which will need to be discussed in detail with LBS and the Borough Wing to the vacant ex-SLAM Wards
the GLA as development plans are progressed. in the Bermondsey Wing
• Expansion of Theatres capacity in the atrium of
Overall the masterplan proposals represent a the Southwark & Bermondsey Wing.
potential total gross internal area of 543,478m2. This
Newcomen Street, Memorial Park Gateway
accommodates the Partners combined future space An outline programme and capital cost estimate have
requirements of 311,558m2 plus a further 231,920m2 been prepared by Essentia based on the masterplan
of additional related space for third party/ commercial proposals and phasing strategy. Deloitte Real Estate
uses, representing a combined increase in space of have provided advice in relation to potential value
92%. and implementation of the masterplan. The next
masterplanning steps should seek greater clarity on the
The masterplan sets out an access and movement Partners space requirements, develop outline proposals
strategy for the site. Priority is given to pedestrians with for the identified enabling and first stage projects to test
clear gateways into the campus and a legible hierarchy programme and cost assumptions, establish planning
of routes and spaces connecting all parts of the site certainty with LBS through further consultation
through to the surrounding neighbourhoods. Vehicle and input into the Local Plan and undertake wider
access within the campus will be predominately for consultation to garner support for the redevelopment
servicing, patient transport and drop-off. plans with stakkeholders including the GLA as part of
the engagement process.
A sustainable future for the campus is a key objective
and the masterplan outlines a sustainability and
infrastructure strategy to create a healthy campus with
the aim to deliver cost savings alongside environmental
and social benefits.

Snowsfields, ODP and Campus Gateway


6 London Bridge Campus Masterplan

Contents
C
1. Introduction and Masterplan Objectives 6. Townscape and Visual Analysis
1.1 Purpose of the Masterplan Report 6.1 LVMF – Protected Views and Vistas
1.2 Masterplan Team 6.2 Local Views
1.3 Masterplan Study Area 6.3 Streetscape
1.4 Masterplan Objectives
7. Phasing
2. Future Space Needs 7.1 Options
2.1 Context and Briefing Process 7.2 Preferred Phasing
2.2 Space Analysis 7.3 Theatres Strategy
2.3 Future Trends and 10 Year Plan for Growth
2.4 Space Requirements 8. Appendix
A. Masterplan Drawings
3. Site Context and Estate Analysis B. Space Analysis and Area Schedules
3.1 London Context and Campus Location C. Alternative Massing Studies
3.2 Site Location D. Access and Movement Review – Report by Urban Flow
3.3 Town Planning Context E. Notes from Briefing Meetings
3.4 Site Context and Character F. Client Briefing Documents
3.5 Routes and Linkages
3.6 Open Space and Public Realm
3.7 Historic Analysis, Conservation Areas and Heritage Assets
3.8 Buildings Strategy
3.9 Site Constraints
3.10 Masterplanning Opportunities

4. Development Scenarios and Principles

5. Masterplanning Strategy
5.1 The Masterplan
5.2 Public Realm and Landscape
5.3 Landscape Masterplan
5.4 Approach to Height and Massing
5.5 Flexible Buildings
5.6 Access and Movement
5.7 Sustainability and Infrastructure
Introduction and
Masterplan Objectives 1
8 London Bridge Campus Masterplan

1.1 Purpose of the Masterplan 1.2 The Masterplan Team 1.3 Masterplan Study Area

1 Report

The Masterplan Report sets out an estates framework BDP were appointed by the Development Partners The study area for the masterplan is the London Bridge
and vision to support the development of the campus in May 2016 to prepare an integrated masterplan for Campus and considers the local and wider London
at London Bridge. This brings together the combined Healthcare, Research & Education at London Bridge. context. The study area includes the ownership
interests of the three main landowners (the Development The masterplan has been led by BDP Architects with boundaries of the Trust, KCL and the Charity. Further
Partners); Guy’s and St Thomas’ NHS Foundation Trust support from the following: additional development plots owned by third parties
(the Trust or GSTT), King’s College London (KCL) and have also been identified during the briefing process
the Guy’s and St Thomas’ Charity (the Charity) with the and have been considered in the study.
BDP Landscape – Landscape and Public Realm
aim to create a joint vision for property development
Strategy
known as the Integrated Healthcare, Research &
Education Investment Strategy. BDP Engineering – Sustainability and Infrastructure
Strategy
The masterplan supports the Development Partners BDP Planning – Town Planning consultation and
vision to create an integrated healthcare, research and review of proposals
education campus which maximises opportunities for
development to accommodate the KCL and Trust plans Urban Flow – Transport and movement advice
for growth and create further flexible accommodation
for additional growth and commercial activities The BDP team have also worked closely with Deloitte,
centred around the Life Sciences. The report identifies Real Estate the jointly appointed Development Advisor
the potential space need and additional capacity of and Essentia who have provided Project Management
the site. The report summarises the key findings of and Cost Management advice.
a detailed analysis of the existing estate at London
Bridge, the planning context and future changes within
the London Bridge area, the potential for maximising
development opportunities on the site and an appraisal
of the impacts on the townscape and London Plan
strategic views.

The masterplan strategy considers buildings,


landscape and public realm, access and movement,
sustainability and infrastructure, phasing and decant.

The report is divided into the following sections:

1. Introduction and Masterplan Objectives


2. Future Space Needs
3. Site Context and Estate Analysis
4. Development Scenarios
5. Masterplanning Strategy
6. Town Planning and Visual Analysis
7. Phasing
London Bridge Campus Location
Master Plan - September 2016 9

1.4 Masterplan Objectives 1.5 The Requirements of the


Development Partners
1
The Development Partners are working together to significant investment to address maintenance issues There is a strong need for commercial space related The brief identifies the following requirements from
create a practical property strategy to support the and improve the quality of the internal environment to Life Sciences and Bio-medical Research at London each of the Partners:
vision of King’s Health Partners (KHP) and its member for the building users. Externally the public realm Bridge. The masterplan must be flexible to allow the
organisations to deliver their respective ambitions. and wayfinding across the campus is poor with weak partners to capitalise on this demand by creating The Charity
KHP include; King’s College London, Guy’s and St connections between parts of the campus and the flexible buildings that are suitable for a range of uses • Deliver clinical and/or commercial value
Thomas NHS Trust, King’s College Hospital NHS surrounding area. The joint masterplan approach including healthcare, research, teaching and learning commensurate with prominence to enhance the
Trust and the South London and Maudsley NHS Trust. provides a significant opportunity to enhance the and offices. Charity portfolio
The masterplan supports the Development Plan with experience of the campus for staff, students and • As part of the overall strategy, the Charity will seek
funding options for the London Bridge Campus. It visitors. It also will ensure that the future needs of As part of the Masterplanning study two meetings to reduce its exposure to property having assisted
illustrates the property development opportunities on the Development Partners are brought together in have been held with Southwark Council to discuss in the delivery of the overall strategy.
the joint land holdings in order to assist in the creation a coherent plan to meet the increasing demands for the emerging proposals and understand the Council’s
of a long-term property development strategy that is healthcare, research and education. vision for London Bridge as ‘a globally significant, King’s College London
capable of implementation. A significant part of the historic and vibrant place of modern commerce, • Education Hub, Imaging and Biomedical
masterplan is to identify the commercial opportunities London Bridge Campus Planning Principles enterprise and creativity’. Engineering Research
for the site which will feed into the Development Plan. The following principles specific to the London Bridge
• Research growth, innovative education facilities
Campus masterplan have been identified as part of the The key objectives that are identified are to:
through KITS investment proposals
The Vision and ambition of KHP is: briefing process:
• Modernising Infrastructure and buildings to
• Cater for the increased capacity of London Bridge
facilitate commercial partnerships including
• To be a world leading clinical and academic • Maintain a world class academic and clinical Station from 55m to 90m passenger arrivals per
relocation of Greenwood Theatre
partnership environment with a core mission to benefit the year
• Enhancement of cultural facilities.
• To form a number of globally competitive clinical population of SE London/ England • Create better permeability through the area
academic Institutes • Financially viable and space-efficient • Provide more green spaces The Trust
• To become one of the top 10 academic healthcare • Match the best of the competition • Re-invigorate retail activity in the area • Replace and enlarge aged infrastructure including
organisations in the world • Able to respond to changes in external environment Surgical and Inpatients.
• Promote new large scale developments to create
• To maintain a thriving clinical academic programme • High quality, dynamic, flexible facilities, designed growth of residential and mixed used schemes. • Capacity, create flexibility with longevity through
of activity, attracting the best staff and students generically wherever possible diversifying revenue streams in a constrained
to work in excellent facilities that deliver tangible financial environment.
• Student, research and clinically-focussed
improvements in patient care.
• Ability for third party/academic and commercial • Infrastructure stabilisation and renewal. Re-
partners to be co-located provision and modernisation of space for
The Trust and KCL have operational space and property
administrative functions.
requirements that need to be accommodated in the • Joint use of facilities where possible (e.g. teaching,
masterplan. The masterplan also makes provision for meeting spaces, clinical skills and social).
new and expanded services that both the Trust and
KCL are planning on the campus.

The London Bridge Campus has developed in many


phases over time by the various landowners based on
the demands of the time. As a result the Estate is varied
in terms of the quality of buildings and public realm.
In many instances the current building stock requires
Future Space Needs 2
12 London Bridge Campus Masterplan

2.1 Context and Briefing Process

2
In the coming years, the Higher Education and is one of six UK Academic Health Science Centres. Research and Specialist Research Services • The Partners’ intention to deliver the scheme
Research market will continue to become increasingly KHP includes; five Medical Research Centres, three including gene and cell therapy through innovative models and not solely through
competitive. An increase in the number of providers in National Institute for Health Research Centres and a • Trust – Replace and enlarge aged infrastructure traditional methods. The outputs of the study
the UK and greater international competition means British Heart Foundation Centre of Excellence. The including Surgical and Inpatients capacity. Create are to be used in market testing to understand
students are becoming more business and consumer Institute of Psychiatry and SLaM are recognised as a flexibility with longevity through diversifying the funding, revenue and delivery implications
aware, expecting more for their investment in learning, leading mental health research centre in Europe. revenue streams in a constrained financial of this ambitious programme. It is important for
and demanding buildings and facilities that are of environment the Partners to have this guiding principle at the
high quality and fit for purpose. Social interaction Guy’s and St Thomas’ NHS Foundation Trust is among forefront of the masterplanning proposals
• University – Research growth, innovative education
and collaborative learning have become important the UK’s busiest, most successful NHS foundation
facilities. Modernising Infrastructure and buildings • Unlocking the site’s potential income streams
features of the student experience and the London trusts and member within KHP. The Trust provides
to facilitate commercial partnerships through identification and articulation of Enabling
Bridge Campus must provide spaces to facilitate a full range of hospital and community services for
• Charity – To enable the delivery of a vibrant clinical, and Early Development proposals
these activities. This coupled with the planned growth people in Southwark, Lambeth and Lewisham, as well
of the campus present significant challenges for the as specialist services for patients from further afield research and education hub with commercial • The plots and the total development is to attract
estate in terms of enhancement of existing buildings including cancer and cardiovascular. The Trusts Care partners and innovation space to enhance the and accommodate sufficiently diverse and
and facilities and expansion of the estate if it is to Quality Commission inspection in 2015/16 achieved a Endowment Portfolio. appropriate levels of revenue or investment from
continue to attract the best staff and students and also ‘good’ overall rating. Recent building and infrastructure suitable primary and secondary partners
commercial partners. projects include the Guy’s Tower refurbished delivering The Masterplan Brief and Site Strategies • Proposals must allow the site to run effectively
£111k annual savings, carbon reduced by 8,000 tonnes The Development Partners brief as set out in the during development phases with no reduction in
Context – King’s Heath Partnership over the lifetime of the refurbishment and the new Masterplan Proposal, 17 May 2016, sets out the operational parameters
King’s Health Partners (KHP) vision is to form a number Cancer Centre which opens in October 2016. masterplan brief and vision for the London Bridge
of globally competitive clinical academic institutes – Campus. The masterplan is required to support • Identification of long-term key expansion sites
to be a world leading academic partnership - with Together the King’s Health Partnership has a combined the joint vision for property development known as inside and beyond the Partners’ current land
an ambition to become one of the top 10 academic staff of 31,000 and a turnover in excess of £3bn per the Integrated Healthcare, Research & Education ownership. This will include the additional need
healthcare organisations in the world. Currently annum. Investment Strategy. This emerging strategy supports for KCL Lab space in addition to the Innovation
KHP deliver excellence in clinical service within a the King’s Health Partners (KHP) Institute Model to and Translation Centre
comprehensive portfolio of excellent quality innovative London Bridge Campus Staff, Student and Visitor create excellent education and teaching facilities at the • Consolidate Viapath spaces across both
services. KHP is recognised internationally in renal and Numbers London Bridge Campus. campuses and articulate consolidation option
liver disease, dermatology, haematology, children’s, Breakdown of staff, students and visitors to the London proposals
neurosciences, fetal medicine and mental health. Bridge Campus: The brief sets out the following key site strategies:
• Generically the overall campus proposals are to
• 5,000 hospital staff enhance the Partners’ standing in the community
KHP delivers excellence in education providing a • To maximise flexible property proposals that are
and with key stakeholders, helping it meet
unique breadth of education and training to 9,500 • 500 university staff capable of being used in the long term for hospital,
its corporate and social responsibilities and
students. KHP is at the forefront of innovation, exploiting • 3,000 students on campus research, commercial and residential uses whilst
sustainability aspirations.
new technology and currently building capacity for maximising site development and floor areas
• 500,000 patient visits per year
translational research. KHP is recognised nationally
• The Masterplan output is to be utilised to establish
and globally for delivering excellence in research. London Bridge Campus Masterplan Aims
land valuations and development cost estimates
KCL was ranked 5th in UK in QS World University For the London Bridge Campus the following aims
that will enable funding opportunities to be fully
Rankings 2014; 8th in the world for Clinical, Pre-clinical have been identified:
explored
and Health (Times Higher, 2015). In recent rankings
the national assessment of research excellence (REF • KHP Institute Model – to create/ build on existing • To support and enable KHP Institute Model as set
2014) ranked KCL 2nd for Bio-medical research. KHP centres of excellence for Cancer, Transplantation, out and enhance the Charity’s Portfolio
Master Plan - September 2016 13

2.2 Space Analysis

2
Development of the Masterplan Proposals Total Size of the London Bridge Estate
The masterplan has been developed in close The total size of the London Bridge Campus is
collaboration with the Development Partners through approximately 283,000m2 (GIA). This includes 20,000m2
a series of fortnightly workshop meetings. Members of of residential accommodation bringing the total size of
the Core Working Group are: the non-residential estate to 263,000m2.

Alastair Gourlay (the Trust) The split by occupancy is:


Ralph Luck (KCL) Today GIA (m2)
Professor Simon Howell (KCL) Trust 139,635
David Renton (the Charity) KCL 96,224

Gail Macdonald (the Charity) Charity 430


Other 26,850
Alex Newman- Burke (Essentia)
Total 263,139
BDP
Existing Non - Residential Estate
The following additional briefing meetings have also
Today GIA (m2)
been held:
KCL 16,087
Other 4,100
23.06.16 - KCL Space Needs Briefing and Review of
Total 20,187
Existing KCL Buildings at Guy’s
23.06.16 - Review of Existing Guy’s Space and Buildings Existing Residential Estate
29.06.16 - Briefing with GSTT Charity
14.07.16 - Review of Clinical Requirements and Cost
with the Trust/ Essentia
04.08.16 – Sustainability and Infrastructure Briefing
18.08.16 - Review of Clinical Requirements and Cost
with the Trust/ Essentia

The draft Masterplanning proposals were presented at The London Bridge Campus
a Masterplan Briefing to the Senior Stakeholders on 10
August 2016.
14 London Bridge Campus Masterplan

2
London Bridge Estate Today

Schedule of Existing Accommodation


Building Building Name GIA m2
Number
GH02 Cunliffe Laboratories 1415
GH03 Tower Wing 57139
GH04 Borough Wing & Tabard Annexe 27359
GH06 Southwark and Bermondsey Wing 53739
GH07 Tower Link 3854
St
Th GH08 Boiler House 2961
om GH09 New Salmons Centre 254
as
S tr GH10 Old Guy’s House 14712
ee
t

t GH11 Central Stores 1905


re e

GH12 Mortuary 438


St

GH13 Tabard House 150


igh

GH14 Nuffield House 3320


hH

GH16 OC 80
ug

GH17 Addison House 2946


ro

GH18 Works Department 1154


Bo

GH19 Henriette Raphael 5802


GH20 Hodgkin Building 16838
GH21 Shepherds House 4994
oad

GH25 New Hunt’s House 18884


GH28 Doyle’s House 714
nd R

GH41 Greenwood Theatre 1500


o

GH45 20 Newcomen Street 227


ze P

GH46 Cancer Treatment Centre 20000


GH47 Swimming Pool 630
t Ma

GH48 Multi Storey Car Park 10900

treet
GH50 Wolfson Centre 3532
G re a

GH51 Francis House 1282

S
Ne GH54 Three Tuns House 422
wc

Weston
o me
nS Total Non-residential Estate 257,148
tr e
et fields
Snows Building Building Name GIA m2
Number
GH22 Wolfson House 8126
GH26 Iris Brook House 1714
GH27 Orchard Lisle House 6247
GH30 Sarah Swift House 936
GH32 Elizabeth Newcomen House 3200
GH49 Hotel 5526
GH52 Snowsfields Flats 430

Total Residential Estate 26,179

Estate Total 283,326


Master Plan - September 2016 15

2.3 Future Trends

2
In a competitive global economy, universities and will provide a variety and choice of settings; offering quality of experience and service. Students come
research centres are recognising that they must change more spaces and choice ranging from open to with high expectations (and with high fees) and will
and adapt to sustain and grow and that the physical enclosed and quiet to collaborative. This will empower be attracted by institutions with a distinctive and
environment plays a critical role to their future success. the user to choose the best environment to meet their welcoming identity.
needs. Digital infrastructure will be in place to support
Collaboration – Future environments will dissolve anytime anywhere working and a high quality teaching MedCity
traditional boundaries and support collaborative and learning environment will be complemented by The recent MedCity report ‘Planning for Growth-
working between learners, academics and clinicians high quality social, catering, leisure, sport and living Demand for Healthcare R&D Space in London’, March
from different disciplines. High quality collaborative accommodation. Evidence shows that many students 2016 confirms that there is demand in London for
space will increase as a percentage of the overall estate. reject or select institutions based on the physical healthcare based research and development space
Academic workspaces will increasingly adopt flexible environment. related to Life Sciences activities. The report identifies
open plan concepts and support mobile working the significant demand for space that is close to
practises adopted in the ‘real world’. This will break Outreach – Future environments will feel open and both an academic base and hospital site, excellent
down the barriers between disciplines and between welcoming and encourage accessibility. They will transport links such as those at London Bridge are Project Office
students and academics. Standard ‘formal’ didactic physically connect with their communities, be human also highly desirable in selecting a location. The core
‘teaching’ spaces will be replaced with a mix of spaces scale and be shaped around the user experience. facilities that are required are for spin outs – close to
designed to accommodate interactive project based Routes, spaces and buildings will form a coherent their originating faculty, grow on space, innovation
learning and research. whole experience and showcase the activities of the centre space – for small and larger companies, lounge/
institution; raising awareness and promoting outreach community meeting spaces and spaces within or very
Change – Future environments will be flexible, allowing to learners, researchers and partners. New types of close to hospitals. The masterplan development brief
users to configure different settings for learning and space will encourage wider participation and wider is to maximise the opportunities for creating such
research. Adaptable spaces will offer engagement audiences taking part in seminars, workshops, lectures space on the London Bridge Campus in addition to
opportunities with a wide range of partners. Mobile and events. Blended learning will drive the need for high accommodating the space needs of the Partners as
furniture and walls which can be easily re-configured quality Media Labs where talks, events and lectures set out in Section 1.
will become an essential part of the learning and can be captured for e-learning.
research environment.
Sustainability & Wellbeing – A strong sense of place
Quiet Staff Space
Multi Use and Sharing – Future environments towards the creation of a place people want to be. In a
will support the trend towards student centred, carbon conscious world, universities must be overt in
collaborative and flexible spaces with multi-functional their attitude to sustainability. Future environments will
and shared environments. Spaces will be designed to adopt low carbon technologies and foster low carbon
maximise utilisation so that they can be used creatively behaviours. Future environments will reflect meaningful
throughout the day for different activities and by engagement and feedback from the people who will
different users. This will result in multi-functional use and operate them. Good day lighting, air quality,
spaces with high utilisation and in a reduction of poorly views and the effective use of outdoors will contribute
utilised dedicated specialist space. Future estates will to a sense of wellbeing.
‘do more with less’.
Identity – University/ Healthcare estates are the
Student Centred – Estates will support new ways of physical expression of the vision and values of the
delivering learning to the learner. Future environments institution. Future environments will have a distinct
must be student centric, not institution centric. They identity for each location while ensuring a consistent Multi Use Space Breakout Space
16 London Bridge Campus Masterplan

2
Precedents and Scale Comparisons
Royal Sussex County Hospital, Brighton Ann & Robert H. Lurie Children’s Hospital of Chicago, USA
3Ts Proposal
11 Storeys + 2 Basement Levels 22 Storeys + 1 Basement Level
Stage 1 62,000m2 116,000m2

Floor 20 - Typical Acute Care Unit

Figure 5.1 - Aerial view, Stages 1 and 2

Brighton 3Ts: Design & Access Statement


98

Building Footprint Overlaid on Site Plan Building Footprint Overlaid on Site Plan Floor 11 - Public Spaces
Master Plan - September 2016 17

2
Chemical Engineering Building, University of Cambridge Covent Garden Area, Central London

4 Storeys
10,000m2

Building Footprint Overlaid on Site Plan Footprint of Covent Garden Overlaid on the Site
18 London Bridge Campus Masterplan

2.4 Space Requirements

2
Both the Trust and KCL have plans for future growth at Step 3 from the Borough Wing, an expanded BSU, additional Summary of Combined Space Requirements
the London Bridge Campus which the masterplan needs Service capacity increased for growth (10 Years), research capacity and incubator space and space
to accommodate. The Charity’s space requirements identifies projected functional content to meet current to accommodate the re-location of Chemistry to the Today GIA (m2) Future GIA (m2) % increase
for their offices are modest. In addition to these HBN or best practice standards. London Bridge Campus. The total space requirement Trust 139,635 190,478 36
needs the masterplan seeks to maximise the potential for new and replacement facilities is 29,400m2 of which KCL 96,224 107,650 12
development opportunities on the site for commercial The conclusion of the study identifies an increase in 17,980m2 replaces existing facilities. This results in a Charity 430 430 0
space for third parties to be co-located on the site. space required from 28,093m2 today to 49,529m2 net increase of 11,420m2 bringing the total size of the Other 26,850 219,971 764
This will also include the potential for ground floor following the steps referred to above. An additional non-residential KCL estate from 96,224m2 today to Total 263,139 531,479 107
retail space relating to the public realm improvements allowance of 40,841m2 has been made to allow for, as 107,650m2 . Non - Residential Estate
and the development of the new concourse at London yet undefined, future growth of other areas of the Trust
Bridge Station adjacent to St Thomas Street and estate. For the space calculation this is based upon an The Charity Space Requirements
also the reinvigoration of the Yards and Lanes in the assumption of a 76% increase in the space currently The Charity require 280m2 (3,000sqft) of office
Today GIA (m2) Future GIA (m2) % increase
Backlands area of Borough High Street as identified by accommodated within the Southwark and Bermondsey accommodation and a further 93m2 (1,000sqft) of
Southwark Council and the vision developed by Team Wing (this excludes any allowance for expansion of the storage space. This would approximately replicate/ KCL 16,087 13,000 -19
London Bridge. Tower Wing accommodation/ activities). replace the existing offices located in Francis House. Other 4,100 12,000 193
Total 20,187 25,000 24

The Trust Space Requirements Combining the current size of the Trust estate with The Residential Estate Residential Estate
For the Trust the known future space requirements the projections for growth over the next ten years KCL currently occupy 559 study bedroom places on
are summarised in the Essentia Space Assessment this increases the size of the estate from 139,635m2 the campus in Orchard Lisle, Iris Brook and Wolfson
Today GIA (m2) Future GIA (m2) % increase
report dated April 2015. The report identifies the today to 190,478m2 . An efficiency has been identified House. The brief replaces this accommodation with 500
existing and future space needs for the replacement in rationalising and co-locating the out-patients new study bedroom places within the masterplan. The Trust 139,635 190,478* 36
of the Borough Wing, Cunliffe Laboratories, Nuffield departments onto a single site this reduction has been proposed area of this development is approximately KCL 112,311 120,650 7
House and Mortuary. Each of these buildings is no included in the 190,478 of 4,000m2 when compared 13,000m2. Charity 430 430 0
longer fit for purpose and the study provides a high with the areas noted above. Other 30,950 231,971 650
level assessment of the clinical and research services The Trust occupy one residential building on the Total 283,326 543,479 92
carried out in these buildings to determine what space KCL Space Requirements campus; Elizabeth Newcomen House and let out one Combined Estate
needs to be re-provided elsewhere to clear the sites for For KCL the future space requirements relate to their residential property directly on Assured Shorthold * Includes 4,000m2 redcution in OPD space
redevelopment. vision for an expanded Bio-sciences Hub on the Tenanicies; Sarah Swift House. Redevelopment of anticipated due to co-location of services.
London Bridge Campus. KCL also require 500 study these sites is optional as their development is not
The study follows a three step approach to assess the bedroom places in residential accommodation to considered necessary to the success of the overall
future space requirements: replace the current on-site provision in Wolfson House Development Plan.
and Orchard Lisle House.
Step 1
Assessment of current provision of services, identifies KCL’s space requirements have been reviewed and are
current functional content and current space confirmed in their briefing document. The brief identifies
a range of activities which require new or expanded
Step 2 space on the campus including enhanced student
Assessment of current provision of services, identifies facilities, re-provision of the Guy’s Day Nursery, re-
current functional content uplifted to meet current HBN provision of the Greenwood Theatre with new lecture
or best practice standards theatre and seminar space, relocation of Guy’s DIID
Master Plan - September 2016 19

2
Combined Space Requirements
Existing Guys Estate Existing KCL Estate
Total Existing Estate Occupied by Guys 139,635 Total Existing Non-Residential Estate Occupied by KCL 96,224 Notes
Total Existing Residential Estate Occupied by KCL 16,087 559 bedspaces
Total Size of KCL Estate 112,311
Demolition
Existing Areas to be Demolished Total Area (GIA) m2 Notes
Cunliffe Laboratories (Imaging) 1,600 Included in Essentia brief KCL Future Space Requirements (non-residential)
Borough Wing & Tabard Annexe 22,615 Included in Essentia brief
Existing Space to be reprovided (GIA) m2 Total Space Requirement (GIA) m2
Tower Link 3,154 Other space to be reprovided
Boiler House 2,961 Other space to be reprovided Student Facilities 2,000 2,500
New Salmons Centre 254 Other space to be reprovided Guy's Day Nursery (Trust operation) 350 500
1,905 Relocate offsite Leacture Theatre & Seminar Spaces 1,500 3,000
Central Stores
Sports Facilities 630 600
Mortuary 438 Included in Essentia brief
Guy's DIID (Infectious diseases from Borough Wing) 4,000 4,000
Tabard House 150 Other space to be reprovided
Guy's - Infrastructure- BSU 700 2,000
Nuffield House 3,320 Included in Essentia brief
Additional Research Capacity 6,000
OC 80 Other space to be reprovided
335 Relocate offsite Additional Incubator Space 2,000
Addison House
Chemistry relocation 8,800 8,800
Works Department 1,154 Other space to be reprovided
422 Other space to be reprovided 17,980 29,400
Three Tuns House
Total Guys Space to be Demolished 38,386
Net Increase in KCL Space Required (non-residential) 11,420

Future Space Requirements Total Future Size of KCL Estate (non-residential) 107,644
Total Guys Space to be Retained 101,069 Existing buildings retained
Notes:
Total Guys Space included in Essentia Brief 49,529 As Essentia Document *
Gene Therapy Partnership and Dental School relocation of offices from Denmark Hill to be accommodated in Tower Wing -
Total Other Guys Space to be Reprovided 8,174 Not inc in Essentia Brief
not included here
Consolidation of OPD Space from 12,000m2 to 8,000m2 -4,000 Consolidation of Space
Re-use of vacant space and consolidation within Main Hospital -5,135 Vacant & Consolidation of Space
Total Guys Fututure Space Requirement 149,637
KCL Future Space Requirements (residential)
Future Space Requirements allowing for Additional Growth Number of bedspaces Total Space Requirement (GIA) m2
Student residential accommodation 500 13000
Expansion of Southwark and Bermondsey Wing accommodation 40,841 Additional Space for growth
Total Guys Future Space Requirement with Additional Growth 190,478
Future Size of KCL Estate
Total Future Non-Residential Estate Occupied by KCL 107,644 Notes
Assumptions/ Notes:
Total Residential Estate Occupied by KCL 13,000 500 bedspaces
* Future Space Requirements for Replacement of Borough Wing, Cunliffe Labs, Nuffiled House and Mortuary as per Essentia Space
Total Size of KCL Estate 120,644
Assessment Report - April 2015
** Future Space Requirements allowing for additional growth based on a 76% GIA space increase in the size of the Southwark and
Bermondsey Wing - currently 53,739m2 (excludes expansion of the Tower Wing accommodation/ activities)

The Trust Space Requirement Summary Table KCL Space Requirements Summary Table
20 London Bridge Campus Masterplan

Diagram to illustrate the increase in area for activities in Borough Wing, Cunliffe Laboratories, Nuffield House and Mortuary, as set out in Essentia Space Assessment Report, April 2015.
Site Context and
Estate Analysis 3
22 London Bridge Campus Masterplan

3.1 London Context and Campus

3 Location

London Context
The Higher Education sector in London is a global
success story with approximately 370,000 students in
London; an increase of 60% since 1995/96. The growth
in international students enrolling at London universities
has been significant and recent studies show that this
trend is set to continue (London Calling: International
Student’s contribution to Britain’s economic growth,
London First/PwC, May 2015) placing a demand on the
need for academic and living space.

London has a world renowned reputation in Higher


Education institutes and both international and local
students want to be able to attend a prestigious
university situated in central London. Students have
access to an unparalleled array of academic resources
including a wealth of world renowned libraries,
museums and research institutes on their doorstep. It
is in this competitive Higher Education market that KHP
must compete to attract the best staff and students.

The London knowledge economy is very strong with


the capital accounting for 23% of the UK’s economic
output in 2014 (London and the Knowledge Economy,
GVA Research, Spring 2015). Life Sciences activities are
identified as a strong contributor with a considerable
need for medical and science sectors to be close to
hospitals, particularly teaching ones. The new Catapult
Centre for cell therapy at Guy’s and the private medical
centre based in the Shard are examples that are
supporting the emerging medical sector at London
Bridge.

The London Bridge Campus within the London Regional Context


Master Plan - September 2016 23

3.2 Site Location

3
The masterplan site is located adjacent to London
Bridge mainline station in the London Borough of
Southwark. The site is close to the south bank of the
River Thames and immediately south of the station.
To the west lies Borough High Street/ Borough Market
and to the east Bermondsey Street and Tower Bridge.

Local landmarks include the Guy’s Tower within the


site, an icon of the London skyline, and The Shard
located immediately to the north of the site, the tallest
building in London. Southwark Cathedral is also close
by to the north-west adjacent to Borough Market. A
Shakespeare’s
range of cultural activities in the area are within walking TATE
Globe HMS
Modern Southwark
distance of the site. Cathedral Belfast
Hay’s
Galleria
Campus Connections
The location directly adjacent to London Bridge, a City
major transport hub, makes the campus one of the best Tube & Hall
connected places in the capital. London Bridge station Station
is served by London Underground (Northern and Borough The
Tube
Jubilee Lines) and mainline passenger services. There Market Shard To
ole
yS
are Thameslink trains running between Bedford and tre Potters
et
Brighton as well as Southeastern services from Cannon Fields
Street to destinations in southeast London, Kent London Park
King’s
and East Sussex. It is also the terminus for Southern Bridge Station
College
commuter and regional services to south London and London Guy’s
numerous destinations in South East England. Hospital Station

London Bridge station is currently undergoing a major


re-development with passenger journeys forecast to
increase from 55million to 90million per year in the St.John’s
next few years. The new concourse, which will open

Berm
Courtyard
in 2018, will unify the station for the first time providing

onds
access to all platforms. There will also be more Tube
et
trains to more destinations including a connection to tre

ey St
S
Crossrail services at Farringdon, providing links across h Residential Area
ig
H Leathermarket

reet
and beyond London in all directions. Entrances on gh
Garden
r ou
Tooley Street and St Thomas Street will connect the Bo
surrounding areas including the masterplan site which
lies directly to the south of the new entrance on St
Thomas Street. Wider Area Context Map
24 London Bridge Campus Masterplan

3.3 Town Planning Context

3
Introduction
This section of the report provides an overview of the Vinopolis
London
HMS
Bridge
planning context related to the future development of City Pier Belfast

the London Bridge Campus. In particular, it identifies


the planning considerations and benefits of adopting
Southwark
a masterplan process, outlines the status of planning Cathedral
policy and identifies the London Bridge development Hay’s
Galleria
context in order to provide a discussion of the key Tooley S
treet
planning themes of relevance to the preparation of the
masterplan and the delivery of development.
London Bridge is experiencing rapid growth,
City
galvanised by the area’s outstanding strategic location Borough
The Old
Hall
Operating Museum
and major developments in the area including the Market

redevelopment of London Bridge Station, which will


see a 60% increase in Thameslink rail capacity (London London
Bridge Plan), and an emerging cluster of tall buildings, To Bridge
ole City Potters
yS
delivering a substantial increase in commercial and The tre Fields
et
residential floorspace. This dynamic and fast moving Shard
London
Park

King’s Bridge
context is managed by a comprehensive planning Science
Station
College Gallery
policy framework, including regional and local plans, London
and masterplan studies, as identified below.
In order to be cognisant of the planning context Guy’s
Hospital
and identify both the potential for and nature of Gordon
Museum
redevelopment of the London Bridge Campus a
High
et

masterplan approach is now being adopted. The


Stre

Greenwood Density
Theatre Area
London Bridge Campus Masterplan enables significant St.John’s
igh

Courtyard
hH

benefits in planning terms, allowing future development


oug

to:
Bor

Residential Area

Berm
• Build on and supplement adopted and emerging

onds
planning policies and plans for the campus and

ey St
London Bridge area, and where appropriate
Leathermarket
provide an evidence base to challenge policies;

reet
Garden

• Integrate with and complement surrounding Fashion &


Textile Museum
developments, schemes and initiatives; and
Commercial/ Mixed Uses Areas Borough Market GreenAreas
Areas Tube Station Entrance
• Take a holistic view of campus development, London Bridge Station Residential Area
Green
Railway Station Entrance
allowing opportunities and constraints to be
Existing Uses Surrounding the Site
addressed across the campus as a whole, and
identify the appropriate capacity and form of
development.
Master Plan - September 2016 25

3
Planning Policy Framework • Town Centres (July, 2014) London Bridge station, complemented by transport Science, Education and Medical Hub
This section of the report sets out the planning policy • Character and Context (June, 2014) infrastructure improvements and the area’s ability Planning policy across all levels seeks to promote the
framework of relevance to the London Bridge Campus • Sustainable Design and Construction (April, 2014) to deliver a mix of land uses including an enhanced distinctive and crucial contribution made by specialist
Masterplan. There are a number of adopted planning leisure and cultural offer and the creation of synergies clusters of activity to London. In particular planning
• London View Management Framework (March,
policy documents that comprise the London Borough 2012) with the existing centre of medical excellence. policy recognises the importance of London’s medical,
of Southwark’s (LBS) Development Plan and are used Furthermore, development within the opportunity health, academic and research clusters, such as
to set out the strategy for development and determine Emerging Policy and Evidence Studies area is also encouraged to support the regeneration MedCity, and provides strong support for their growth
planning applications across the borough. In addition • LBS New Southwark Plan Preferred Option Draft of wider surrounding areas, such as Snowsfields and to provide continued world leading excellence.
to the Development Plan, regard has to be given to (October, 2015) Tabard Gardens.
national, regional and local planning policy including The London Bridge Plan identifies the London Bridge
• London Bridge Plan – A Collective Vision and
Supplementary Planning Documents (SPDs), and also Strategy At the local level the LBS Core Strategy sets an Science, Education and Medical Hub as one of the four
emerging planning policy. overarching vision for the area and identifies key character areas, and states:
LBS consulted on the New Southwark Plan Preferred development that will continue the transformation
The planning policy framework consists of the following Option Draft, which sets out overarching strategic of London Bridge into a thriving centre of activity, “The reorientation of Guy’s and King’s campuses will
documents: policies and development management policies from where major landowners including TfL, the Primary embrace St. Thomas Street, utilising architecture and
October 2015 to February 2016. LBS is also preparing Care Trust and King’s College will help to deliver large placemaking to transform the area and connect to a
National scale change. This change is driven by and centred reimagined Borough High Street. London Bridge’s
to consult on area specific visions and policies,
• National Planning Policy Framework (NPPF) including the London Bridge, later this year, where on improvements to London Bridge station, which quality of life will be directly improved by integrating
(March, 2012) there will be an opportunity to influence policy to reflect provides a highly sustainable location for intensification, and better connecting the educational and medical
• National Planning Policy Guidance (NPPG) and safeguard aspirations for the development of the significantly increases transport capacity, and campuses in the district, establishing stronger
(March, 2014) (as amended) London Bridge Campus. Once consultations have provides an upgraded public realm which enhances partnerships, and creating a more navigable and
been concluded LBS will review the draft policies in interchange and improves connectivity. Planning porous environment. This will provide opportunities
Regional relation to responses ahead of anticipated adoption in policy also recognises the importance of key cultural for interesting shared spaces, and a new market for
• London Plan (March, 2016) 2017. centres in the area, including Borough Market and retail uses to serve an increasing professional and
Bermondsey Street, and encourages development, educational clientele.” (page 6)
Local Key Planning Themes which complements the offer and helps to better reveal
• LBS Core Strategy (April, 2011) A review of the adopted and draft planning policy and connect these areas.
framework, and recent planning applications of The planning policy context provides strong policy
• LBS Southwark Plan (2007) (Saved Policies)
relevance to the London Bridge Campus Masterplan In 2015 Team London Bridge Business Improvement support in relation to the principle of developing of the
Supplementary Planning Guidance / Documents has identified the following key planning themes. District (BID) in partnership with LBS prepared the campus. Notwithstanding this, there are a number of
London Bridge Plan a Collective Vision and Strategy other planning issues that will need to be addressed as
• LBS Section 106 Planning Obligations / CIL (April,
London Bridge as a Centre of Major Development to identify the principles and projects for development, summarised below.
2015)
The importance of the redevelopment of London and help guide the emerging New Southwark Plan and
• LBS Sustainable Transport SPD (March, 2010)
Bridge is recognised within regional and local policy. investment decisions in the area. The plan sets out In addition, hospital developments can be complex due
• LBS Sustainable Design and Construction SPD Annex 1 of the London Plan (March, 2016) designates to clinical planning considerations, which can affect the
principles to help create identity, support the economy,
(February, 2009) London Bridge within the London Bridge, Borough and scale and massing of buildings. It will be important to
and identify key projects to contribute towards
• GLA Central Activities Zone (March, 2016) Bankside Opportunity Area, including an indicative placeshaping. The plan also identifies the importance of explain any such constraints and specific operational
• Social Infrastructure (May, 2015) employment capacity of 25,000 and 1,900 minimum partnerships in the delivery of a collaborative approach requirements to LBS and other key stakeholders. In
• Accessible London: Achieving an Inclusive new homes. The Opportunity Area is recognised for and outcome focused projects, recognising the role of particular, how these affect the design of any proposed
Environment (October, 2014) its potential for intensification, particularly surrounding the area’s Science, Education and Medical Hub. buildings.
26 London Bridge Campus Masterplan

3
Heritage Archaeology is also visible in two river prospects 12B Southwark LBS encourages sustainable travel and seeks to
The London Bridge Campus benefits from a wide The campus is located within an Archaeology Priority Bridge and 10A Tower Bridge. The designation of these minimise levels of car parking within the Central
variety of heritage assets within its immediate area Zone as identified within the LBS Local Plan. As such, views seek to ensure proposed development does Activities Zone. However, in the case of hospitals
and setting, which provide a visually rich environment planning applications must be accompanied by an not harm the overall composition of views towards essential car parking would be allowed where it can
and contribute to the sense of place. Planning policy archaeological assessment and evaluation, including St. Paul’s Cathedral or the juxtaposition between key be justified through a Transport Assessment. In terms
across all levels seeks to conserve and enhance the the impact of the proposed development. elements including river frontages and key landmarks. of cycle parking the policy seeks to ensure a minimum
significance of heritage assets and their settings. There are also a number of local views relevant to the of 1 space per 250sqm for retail and employment uses,
London Bridge’s Cluster of Tall Buildings development of the campus, which need to be identified with the provision of other land uses determined on an
Conservation Areas Recent years have seen the emergence of a cluster in coordination with the LBS conservation officer. individual basis as applications come forward.
The campus is partially situated within the Borough of tall buildings at London Bridge, with the opening
High Street Conservation Area to the west and adjacent of the Shard (310 metres). in addition, the approval of Any new development will have to respect the setting Culture and Leisure
to the Bermondsey Street Conservation Area to the the Quill (110 metres), Fielden House (95 metres) and of the designated views, particularly in relation in The London Bridge Campus is situated within the
east. Within and in close proximity to these areas it will the proposed redevelopment of New City Court (108 relation to scale and massing. Depending on the height London Bridge Strategic Cultural Area, as identified in
be important development preserves or enhances the metres), as well as to the existing Guy’s Tower (149m), of any buildings proposed, a townscape and visual the London Plan, which seeks to protect and enhance
setting of the Conservation Areas, particularly in views are redefining the London skyline. Whilst tall buildings assessment is likely to be required to support new the provision of arts, culture and tourism. At the local
from the Conservation Areas towards the campus. and high density development make optimal use of development. level the LBS Core Strategy states:
In this regard, scale and massing will be key design sites with high levels of public transport accessibility;
Recent planning applications in the neighbouring
issues to be addressed to ensure an appropriate design careful design is required to ensure they also contribute “There will be a mix of uses that blend well with and
area, including Fielden House have not regarded the
response is provided in relation to the surrounding their immediate setting by ensuring a human scale is help improve the surrounding neighbourhood areas
background of LVMF viewing corridors, placing greater
context. felt at street level and that the public realm is designed and historic places and create a lively and friendly
precedence on the local views, the need to be visually
proportionate to the scale of buildings thereby helping place throughout the day and week.”
subservient to the Shard, and not altering the viewers
Listed Buildings to make a significant contribution to the environmental
ability to appreciate landmarks or harm the setting of
There are a number of listed buildings in the surrounding enhancements of the wider area. The London Bridge Campus is adjacent to a number of
heritage assets.
area, including: significant cultural and leisure destinations, including
The Shard sets a precedent in terms of height that Materials Borough Market and Bermondsey Street, in addition to
• The George Inn – Grade I future buildings can respond to, there is an agreed Appropriate materials will also be required to ensure the Southbank and riverfront. Planning policy supports
general principle that that future tall buildings must that any proposal responds to the surrounding heritage development, which enhances the area’s distinct offer
• Guy’s Hospital Main Building including wings and
step down from The Shard. The masterplan provides context. and supports London Bridge as a cultural destination
chapel – Grade II*
an opportunity to holistically consider the future for visitors.
• Newcomen Street terraces – Grade II development of a tall buildings cluster, ensuring location Transport
• Borough High Street properties – Grade II and scale respond to the surrounding heritage assets, The campus is situated in a highly accessible location The London Bridge Plan recognises the importance of
key local and strategic views and the established scale by public transport, buses, underground and rail cultural and leisure uses in the area, and specifically
• St. Thomas Street properties – Grade II
of neighbouring areas. services within close proximity, and as such sits seeks to:
within PTAL rating level 6b. Planning policy seeks to • “Highlight heritage principles.
The presence of a number of listed buildings in the Views ensure there are no adverse impacts on transport
• Encourage economic opportunities to strengthen
surrounds means that any new development will The London View Management Framework (LVMF) networks and adequate provision has been made
the cultural offer and diversify the mix.
need to respect the setting of these heritage assets. (March, 2012) designates protected views across for servicing, circulation, parking and access. Given
In addition, if the proposals directly affect any listed London, which are considered to make a significant current arrangements across the campus, there is a • Create linkages between existing cultural assets
buildings on the site (e.g. through demolition) then contribution to the image and character of London. The clear opportunity to rationalise access and servicing through partnerships, programming and public
listed building consent will be required along with a site falls within the background consultation areas of and significantly enhance the public realm and quality realm, in a way that is digital, physical and sensory.
robust justification and mitigation strategy. 2A.1 Parliament Hill and 3A.1 Kenwood. The campus of pedestrian environment.
Master Plan - September 2016 27

3
• Identify architectural gems to be preserved and network, and take account of the specific requirements Local Plan. This would enshrine the masterplan in It would be prudent to engage with surrounding
highlighted. of hospital development and the constraints imposed planning policy and help to smooth the planning landowners, residents and businesses at the
• Implement public art opportunities to reinforce by the historic significance of the area. application process for individual developments. appropriate time. This will give LBS the comfort that the
coherence and a sense of place.” plans have buy-in, and thehave already been through
Student Housing Engagement public scrutinym. In the case of hospitals and education
The LBS Core Strategy identifies a housing target of As part of the engagement process, it will be important public engagement is usually very positive and
The London Bridge Plan identifies a number of projects,
1,900 net new homes from 2011 to 2021. Planning to undertake wider consultation in order to garner provides an opportunity for stakeholders and residents
to ensure the delivery of a world class environment,
policy seeks to ensure this includes the provision of support for any redevelopment plans. We have to get behind the principle of the redevelopment.
enhance leisure facilities and better connect existing
student homes to meet the needs of universities and highlighted some of the key stakeholders below: Notwithstanding this tthere are always objectors but
centres of activity. Within the masterplan area, the plan
colleges. these can be minimised through a carefully managed
proposes the creation of the Thomas Street Boulevard,
and timed engagement process.
which reimagines the street as pedestrian focused link, • LBS – a number of strategic-level meetings should
CIL
with a vibrant cultural and evening economy, between be held with key officers from LBS to ensure that
Future development of the campus will be required to
Bermondsey and Borough Market, as well as improving high-level support exists. Engagement with LBS
pay the mayoral and LBS Community Infrastructure
the setting of the London Bridge Campus and links to will be key to determining how the campus vision
Levy (CIL), which seeks to raise funds for physical
London Bridge Station. can align with emerging planning policy and the
infrastructure projects, including transport, schools,
best approach for delivering development.
health and sports facilities.
Sustainability • GLA – Engagement with the GLA will be key as
The London Plan seeks to ensure development the area is identified as an Opportunity Area
minimises carbon dioxide emissions and maximises Education and health development are exempt from
within The London plan. Its redevelopment also
opportunities for sustainability in accordance with the mayoral CIL, with all other types of development
forms a key part of the jigsaw in the wider London
energy hierarchy: required to pay £35 per sqm. Education and health
Bridge area.
development is also exempt from LBS CIL with £100
per sqm for student housing and £125 per sqm for • Political support - it would be advisable to begin
• Be lean: use less energy early consultation with senior members to achieve
retail.
• Be clean: supply energy efficiently political buy-in for the plans at a strategic level.
Next Steps • London Bridge Team – it will be important to
• Be green: use renewable energy
In order to successfully take the redevelopment plans engage with the London Bridge Team, to ensure the
through the planning process, engagement and masterplan proposals align with other emerging
Core Strategy Policy 13 - High Environmental Standards
consultation with LBS and the GLA will be key. LBS schemes in the area, and the masterplan’s
- reinforces the London Plan, requiring:
is currently reviewing its Local Plan, which provides aspirations are included in the emerging vision for
the opportunity to influence planning policy before it is the area.
“...development to meet the highest possible
adopted. Once policy is adopted it will be used in the
environmental standards, including targets based on • Historic England - Due to the large number of
determination of planning applications.
the Code for Sustainable Homes and BREEAM, and surrounding heritage assets and location in a
…development to be designed and built to minimise protected viewing corridor, early consultation with
It is noted that LBS is consulting on a number of draft
greenhouse gas emissions across its lifetime. This will Historic England would be advantageous to agree
area visions and schedule of draft proposals sites later
be achieved by applying the energy hierarchy.” principles and gain buy-in to the proposals.
this year, including London Bridge. There may be an
opportunity to agree with LBS that the masterplan can
Future development will need to explore opportunities
set the vision for the London Bridge Campus, and be
for renewable energy technologies, including
incorporated into planning policy through the emerging
connection to the Guy’s Hospital CHP district heating
28 London Bridge Campus Masterplan

3.4 Site Context and Character

3
The Site are predominately heathcare, research, teaching and There is an opportunity to develop existing housing Properties on Borough High Street
The site comprises two identifiable campus areas; to related residential accommodation. sites owned by the Charity; Sarah Swift House and Corner of Borough High Street and Newcomen Street
the west the King’s College London University buildings Elizabeth Newcomen House. However, following review Land to the east of the site on St Thomas Street
The buildings included within the site boundary are all
centred around Memorial Park and also occupying the it is considered that these sites are not fundamental to Public House on Snowsfields
owned by either the Charity, NHS Trust or KCL. The
Backlands area behind Borough High Street, and to the masterplan and future development of the site.
ownership and building occupier drawings included Great Portland Estates are proposing redevelopment of
the east the Guy’s Hospital campus encompassing
here show how interlinked the relationships are between A number of further sites owned by third parties are also New City Court adjacent to Francis House. Preliminary
much of the site to the east of Great Maze Pond Road.
the three building owners. A collective masterplanning considered as part of the masterplan these include: discussions have taken place with the developers to
Both the University and Guy’s Hospital occupy various approach has been taken that maximises the benefit of better understand their intentions for the site. Both
Ronald McDonald House parties (developer and the Partners) would benefit
buildings across the site within the two halves of the development across the entire site and therefore for the
Munro Clinic from a collective masterplanning strategy for this part
campus for example KCL occupies buildings on Weston masterplan study the ownership of individual buildings
Street to the east and Guy’s occupy buildings including has been put aside. Further development opportunities have also been of the site, something which Southwark Council have
the Mortuary in the Backlands area. The building uses identified including: encouraged.
Owned by KCL Occupied by KCL

Owned by GSTFT Occupied by GSTFT with KCL


emedded space

Owned by Guy’s & St. Thomas’ Occupied by Guy’s & St. Thomas’
Charity Charity / Charity third party tenants
Site Boundary Site Boundary

Owned by KCL
Occupied by KCL
Owned by GSTFT
Occupied by GSTFT with KCL
emedded space
Owned by Guy’s & St. Thomas’
Charity Occupied by Guy’s & St. Thomas’
Charity / Charity third party tenants
Site Boundary
Site Boundary

Building Ownership Across the Site Building Occupiers Across the Site
Master Plan - September 2016 29

3
Character Areas
Borough Market Hay’s Galleria City Hall_More London

Tooley Street Tower Bridge

London Bridge Station Bermondsey Street Residential Area Leathermarket Gardens


30 London Bridge Campus Masterplan

3
Microclimate
The north-south orientation of the site maximises the
opportunities for daylight and solar access into the
campus. This is already established with the orientation
of Memorial Park and Great Maze Pond Road creating
solar corridors. A wind tunnel effect is experienced
along Great Maze Pond Road created as a result of the
tall buildings and orientation of the street.

Key Views from the Site


Given the proximity of the site to the River Thames
and the City there is great opportunity to capitalise
on outstanding views across London form the higher
levels of the buildings.

Microclimate Key Views from the Site


Master Plan - September 2016 31

3
> 70m
40-70m
30-40m
20-30m
15-20m
Building Heights 10-15m
< 10m
The existing buildings on the site vary greatly in scale
A
and height. This existing context is import to inform the
scale and massing of future buildings including taller
buildings across the site. Several precedents for taller
buildings have already been established notably the
Guy’s Tower (149m) and the Cancer Centre (60m). The
Shard to the north of the site is 310m high and further
future developments with planning consent include
Fielden House (95m) on St Thomas Street and the Quill B
(110m) on Weston Street., A and B respectively on the
diagram opposite.

Building Age
> 70m
Beginning with the construction of Old Guy’s House in 40-70m
1774 the buildings within the site have been developed 30-40m
20-30m
in many stages over time. The main University buildings 15-20m
10-15m
to the west of Memorial Park were developed in the < 10m

late 19th/ early 20th Century. On the hospital site the


Building Heights Building Age
Borough Wing was constructed in 1961, followed by
Guy’s Tower Wing in 1974 and the Southwark and
Bermondsey Wing in 1997. The developments on
Weston Street are from 1975 and the Charity office
(Francis House) and Orchard Lisle residences were
constructed in the 1980’s.
32 London Bridge Campus Masterplan

3.5 Routes and Linkages

3
Overview
The London Bridge Campus is bound by Borough
High Street to the north-west, St Thomas Street to the
north-east, Weston Street to the east and Newcomen
Street/ Snowsfields to the south. Connections across
the campus are very poor with Great Maze Pond Road
providing the only direct route through the campus
north-south connecting St Thomas Street/ London
Bridge Station to the predominately residential area
to the south of the campus. Generally there is very
little permeability for pedestrians to move through the
campus and this is particularly so to the east of Great
Maze Pond Road where the footprint of the hospital
buildings severely restricts access in all directions.

To the west of Great Maze Pond, Memorial Park and


Old Guy’s House provide a less formal link north-south.
However the east- west routes through the Backlands
area linking to Borough High Street are poor. The routes
through the existing Yards and Lanes are difficult to
navigate, they are congested with servicing, buildings
obstruct lines of sight and often turn their backs to the
routes resulting in a very poor pedestrian experience
overall.
Master Plan - September 2016 33

3
Surrounding Streets

Borough High Street Weston Street

Newcomen Street/ Snowsfields St. Thomas Street


34 London Bridge Campus Masterplan

3
Existing Access and Movement Issues
The masterplan study area is characterised by narrow
streets, generally residential in nature, with constrained
footway widths and low – modest vehicle flows. The
notable exception to this is Borough High Street, an
important and very busy traffic north-south corridor,
though also carrying substantial pedestrian flows.
Borough High Street’s footways are though generally
narrow and insufficient for present pedestrian volumes,
offering a poor level of service.

St Thomas Street offers greater width but is currently


closed to through traffic east of Great Maze Pond Road
related to the ongoing London Bridge Station works. It’s
value to the local road network is limited beyond those
works too, offering access only to Great Maze Pond
Road for vehicular traffic. Related to this restricted use,
pedestrians are seen to benefit by sharing the road
space encouraged by the limited vehicle flows.

The general narrowness of local streets has led to one-


way traffic operation on streets including Newcomen
Street and Snowsfields and other adjoining streets
to the south. This limits vehicular movement access
possibilities, particularly for larger delivery vehicles.
Servicing opportunities are also limited from Borough
High Street, owing to the restricted width openings
available to delivery vehicles. Once within the site,
vehicle turning is severely constrained and loading
facilities limited.

Access and Movement Issues


Master Plan - September 2016 35

3
The masterplan site presents considerable difficulty in
terms of permeability for pedestrians and cyclists with
the large and disparate blocks obstructing clear and
legible paths through the area disrupting movement
along desire lines for substantial distances. This
is compounded by pockets of ad-hoc parking and
loading activity across the site, most notably found in
the area west of Great Maze Pond Road.

Whilst the southernmost Great Maze Pond Road


access is of modern design and geometry it does
not provide a full-length north-south vehicular link to
St Thomas Street with only Borough High Street and
Weston Street (some 200m distant) providing that
connection.

The main hospital entrance area accommodates


activity related to ambulance movements, patients’
transport vehicles and visitors – leading to congestion
and an intense, unwelcoming and somewhat chaotic
experience for all users. This requires the presence
of staff to manage movement activity utilising traffic
cones along with other ad-hoc means to enforce
access restrictions.

Existing Traffic Management


36 London Bridge Campus Masterplan

3
Summary
Pedestrian Flows
• Significant number of pedestrians walking in the
area – expected to increase very substantially
with the expansion of London Bridge station
• Narrow footway and high vehicular traffic flow,
especially on Borough High Street
• Poor wayfinding / lack of signage
• Lack of permeability throughout the campus
(east-west and north-south links)
• Lack of green / open spaces to enhance and
facilitate pedestrian journeys.

Cycling Routes and Facilities


• Poor wayfinding and lack of signage
• Limited width streets with one-way operation
require contraflow movement by cyclists – e.g.
eastward on Newcomen Street
• Lack of cycle parking facilities.

Guy’s Hospital Entrance


• Unwelcoming environment
• Poor arrangement and layout for all users
• Conflicting and confusing environment
• Ambulance, patients’ transport vehicles and
visitors all directed to the same entrance
• Staffed parking management needed to address
parking demands and conflicts.
Master Plan - September 2016 37

3
Parking
• Collingwood Street and Talbot Yard are dominated
by vehicles parked on-street
• Numerous vehicles, especially motorcycles park
on the footway
• One multi-storey car park is available in the area
but wayfinding and access to it is poor, notably
because its only entrance is located on King
Street, which is a one-way road.

Deliveries and Servicing


• On-street parking complicates delivery and
servicing on the campus
• Newcomen Street’s constrained width presents
considerable difficulty for large vehicles, forcing
deliverers to either trolley their deliveries or drive
on the footway
• Few entry/exiting points for delivery at the moment

Conclusion
Overall, the area presently has a number of significant
physical constraints to efficient operation and the
addition of London Bridge Station related movement
will serve to further emphasise those shortcomings.

Additional masterplan-related development will


require a very substantial improvement in movement
conditions, particularly for pedestrians to provide
for thus far supressed desire line movement and the
needed capacity to cater for numbers more related to
crowd than group pedestrian movement.
38 London Bridge Campus Masterplan

3.6 Open Space and Public Realm

3
The existing provision of open space and public
realm across the campus is very limited. Memorial
Park provides a welcome retreat from the dense
and chaotic arrangement of adjacent spaces on the
campus both to the east, Great Maze Pond Road and
to the west, the Yards and Lanes of the Backlands area
leading to Borough High Street. Memorial Park is the
main space for outdoor activities on the campus and
features attractive mature trees and lawn areas. There
are smaller more private garden spaces at Old Guy’s
House and Orchard Lisle student residences. The
majority of the remaining outdoor spaces are used for
car parking and servicing and have little landscape or
placemaking quality.
Master Plan - September 2016 39

3
Campus Character Areas
Old Guy’s House Borough Wing/ Tower Wing/ Southwark & Bermondsey Wing

Cancer Centre/ Great Maze Pond Road Memorial Gardens

Tablot Yard “The George” Yard The King’s Head Yard/ White Hart Yard Wolfson House Yard Orchard Lisle House
40 London Bridge Campus Masterplan

3.7 Historic Analysis, Conservation Areas and Heritage Assets

3
The site is subject to a number of heritage and planning Southwark was listed as a ‘burgh’ in 910 in the Anglo 18th century – Guy’s Hospital is established century, establishing the character of the surrounding
context considerations, including: Saxon “Burghal Hideage”, a list of burghs measured It was not until 1750 that other bridges were built over residential areas in medium rise apartment blocks.
by area. The Middle Ages saw the foundation of the the river in addition to London Bridge. Transport by
• The entire site falls within an Archaeological Market. It originates from a market that was held on coach had become a major feature of 18th century During this time Guy’s Hospital also began to expand
Priority Area Old London Bridge, and then in Borough High Street commercial life, and many of the coaches travelling with a bequest by William Hunt in 1829 allowing a
• The western part of the site lies within the Borough from as early as 1276. south from London set off from Borough. Inns had further hundred beds to be accommodated in Hunts
High Street Conservation Area been established along the High Street since the House, the site of the present day New Hunts House
• The eastern edge to Weston Street is adjacent to Post 16th century Middle Ages to service travellers, including the famous which replaced the earlier building in 1999.
the Bermondsey Conservation Area With the only bridge link over the river, Southwark was Tabard and The George. Such was the congestion
able to develop not only as a service centre for the in Borough High Street by 1756 that the market was 20th Century to Present
• Old Guy’s House within the site is Grade 2 listed
City, but also as an alternative location for businesses moved off the street to its present day site. Great Dover Borough’s lively mix of commercial activities continued
• The site is adjacent to the Grade I Listed George that were not welcome in the City for whatever reason. Street was constructed in 1814 to relieve the traffic to provide the essence of its character through the
Inn Public House and other Grade 2 listed Borough became noted for its skilled craftsmen, of on old Kent Street. Overcrowding had its obvious 20th century. Second World War bombing affected
buildings whom many were religious refugees and had to live human consequences, too, and the 18th century saw Guy’s Hospital and residential areas to the south. The
• The site falls within the Kenwood House and outside the City to avoid restrictions that would have the establishment of many humanitarian institutions east wing of Guy’s was rebuilt more or less exactly, but
Parliament Hill LVMF protected Vista corridors and been placed on them there. Other industries developed – schools, and notably Guy’s Hospital. The hospital modern redevelopment characterises the south end of
the river prospect views from Southwark Bridge – such as butchery and brewing, which spawned was founded in 1721 by Thomas Guy, established Borough High Street.
downstream and Tower Bridge – up stream associated trades in commodities such as leather as a hospital to treat ‘incurables’ discharged from St
• Other buildings within the site that are not listed and hops; and it became particularly infamous for its Thomas’ Hospital. The original buildings, known today Borough’s proximity to the City of London and good
but considered to make a positive contribution to entertainments. as Old Guy’s House, formed a courtyard facing St underground links continued to attract office business.
the Conservation Area. Thomas Street and include the Chapel on the east side. The Market itself has remained and the Guy’s Hospital
site has continued to develop over the 20th century
It will be important going forward to develop a detailed with new hospital and university buildings creating a
Victorian Development
understanding of the heritage assets to identify the significant medical, research and teaching campus to
The railway arrived in Southwark in 1836 resulting in the
significance of individual buildings and their potential the south of St Thomas Street and east of Borough
loss of the inns as a physical and economic resource,
for development. Any perceived harm to a heritage High Street around Old Guy’s House.
and the major impact of the viaducts on the townscape.
asset will need to be out-weighed by a Public Benefit
Even so, the enormous variety of commercial activity in
case. An overview of the history of the local area In 1974 the Guy’s Tower was completed, the tallest
Borough continued, often occupying premises and sites
including the site is given below. hospital in the world, and for a time the tallest building
that had been established for centuries on long narrow-
Roman Origins fronted sites. There were many different businesses on in London standing currently at 149m. The most recent
The development of the area commenced with the Borough High Street, including clothes and furniture developments on the site are the Wolfson Centre for
construction of a permanent bridge across the Thames shops, ironmongers, and estate agents. Certain historic Age Related Diseases, 2004 and the new Cancer Centre
built by the Romans shortly after the invasion of Britain trades developed prominence, such as the hop trade, opening in 2016. Surrounding the site London Bridge
in 43A.D. A Roman road, the forerunner of Borough and there were many hop merchants’ warehouses in and Borough continue to evolve, most recognisably the
High Street, lay just to the east of its present position the area. The foundation of the Metropolitan Board of construction of the Shard, currently the tallest tower in
and crossed the bridge into the provincial capital of Works opened up in 1855 to address London’s social London at 310m, and the ongoing re-development of
Londinium established on the north bank of the river. and sanitation problems. Philanthropic trusts like London Bridge Station immediately to the north of the
A large suburb was soon established on the southern the Peabody and the Improved Industrial Dwellings site planned to open in 2018.
bridgehead. The community that developed from this Engraving of Old Guy’s House, Company also began to erect tenement blocks to
time set the overall pattern of Borough as it still exists Established 1721 replace the slums. The process continued into the 20th
today.
Master Plan - September 2016 41

workforce. And the Market itself has remained, still the most distinctive
element of a distinctive Conservation Area. Moreover, with the opening
in 1999 of the specialist foods retail market on Fridays and Saturdays, it
has become a vibrant and successful public attraction.

3
Key to Historic Maps
1. 1658
2. 1794
3. 1830
4. 1896
5. 1936

1 2 3

4 5

map of 1658, showing


key street patterns, but
pment along much of
High Street
42 London Bridge Campus Masterplan

3.8 Building Strategy

3
The diagram opposite illustrates a high level analysis of Buildings to be re

the existing buildings, their current use and fitness for


Development site
purpose, the building condition and potential heritage
value. This study established the key buildings to Potential opportu
be retained within the masterplan (shown in BLUE)
Potential develop
and the main buildings identified for re-development (not owned by Pa

(shown in RED). Additionally opportunities for further Site Boundary


re-development were identified which could potentially
contribute to the overall success of the masterplan
(shown in ORANGE). Further sites, not owned by the
ST
partners, indicated on the plan (hatched) have also been TH
OM
AS
identified which may also contribute to the masterplan ST
RE
ET
vision and longer term growth of the campus.

ET
RE
ST
IGH
HH
UG
RO
BO

ET
N ST R E
NE
WC
OM

W E S TO
EN
ST
RE
ET
S
IELD
WS F
SNO

Buildings to be retained

Development site

Potential opportunity

Potential development opportunity


(not owned by Partners)

Site Boundary
Master Plan - September 2016 43

3.9 Site Constraints

3
There are significant constraints which must be taken Listed buildings
into consideration as the masterplan develops and
Buildings to be reta
individual building projects come forward:
• Listed buildings adjacent to the site including the Other campus build
Grade 1 Listed George Public House located off
2.
Borough High Street in the Backlands area. Within LVMF Protected Vi
London Bridge
the site the only listed building is Old Guy’s House Station Conservation area
(Grade 2) which sits at the historic core of the site St
Th 1. Borough High S
om
• Part of the western side of the campus lies within as
Str 2. Tooley Street

et
ee
the Borough High Street Conservation Area. Also t

re
The Shard

St
3. Bermondsey Str
the western side of the campus is adjacent to the

gh
Hi
Bermondsey Street Conservation Area Site boundary

h
ug
ro
• London View Management Framework constraints

Bo
on height and massing of development
• Buildings and spaces to be retained including key
assets such as the Gordon Museum located in the
Hodgkin building
• Scale of the existing surrounding residential areas
and Borough High Street may restrict in places
the height and scale of proposed buildings
• Rights of Light and Sunlight & Daylight impacts Memorial
of new developments on buildings within the site park
and neighbouring buildings and spaces

treet
• Ownership of buildings particularly those owned/

Weston S
occupied by third parties will need to be taken 3.

into account
Ne
wc
• Maintaining ongoing operations for the Hospital om
en
Str L o w s c a le
and the University during construction including eet r e s i de ntia l
safe access to buildings field
1. Snows
• Phasing of works and decanting Listed buildings

• Potential impacts of other planned developments Buildings to be retained

around the site such as the Quill, Fielden House


Other campus buildings L o w s c a le
and New City Court r e s i d e ntia l
2.
LVMF Protected Views
• Re-developmentLondon
of London
Bridge Bridge station and
Station Conservation area boundary
St
Th
the new concourse 1. Borough High Street
om
• as SRestricted
tre pavement widths and access issues 2. Tooley Street
et
The Shard
on surrounding streets may impose limitations on 3. Bermondsey Street

access to the site both in construction and day to Site boundary

day in use.
44 London Bridge Campus Masterplan

3.10 Masterplanning Opportunities

3
Ideagram
The Partners Masterplanning brief identifies the following Buildings to be

opportunities:
Development s

• Value of Guy’s properties and prospect to build tall Green Spaces


• Contribute to regeneration of London Bridge Quarter St
• Proximity to a major London transport hub Th Development s
om owned by othe

• Create a Bio-medical research Hub for commercial and as


Str

et
academic income ee

re
t

St
• Maximising floor area with flexible built infrastructure

gh
Hi
• Create a combined vision to add value to “GSTFT, Guy’s,

h
Charity, St Thomas’ and KCL” brands.

ug
ro
Bo
Through the masterplan study these opportunities have been
developed. The masterplan draws on Southwark Council’s vision
for the London Bridge Quarter and this site in particular which
offers great potential in unlocking this part of London Bridge to
create a new permeable piece of the city. a
c
t
i v
Specific opportunities identified within the masterplan include:
i t
y
• Create clear connections north-south across the site,
improving permeability and connecting the site with the
station and the residential neighbourhood to the south

treet
• New entrances to the site from St Thomas Street and London
Bridge Station Ne
wc
om

Weston S
• Opening up the ground floor of the Southwark and Bermondsey en
Wing on St Thomas Street with potential retail activity to Str
eet
contribute to the vision for a pedestrian priority boulevard
• Strengthen the connection with Borough High Street, creating
coherent routes through the Backlands and routes east-west
across the site
• Regenerate the Yards and Lanes within the Borough High Snow
sfield
Street Backlands to create a new vibrant place with retail and
other commercial and education activities
• Preserve the historic buildings and spaces and enhance their
Buildings to be retained
setting
• Create new, legible high quality public realm and open space Development site

across the campus Green Spaces

St • Develop flexible sustainable infrastructure and buildings to


Th Development site -
omreduce running costs and environmental impacts. owned by others
as
Str
ee
t
Options Development
Scenarios 4
46 London Bridge Campus Masterplan

4 Development Scenarios and Principles

4
Overview Scenario 1
Early in the masterplanning study a series of Court by Great Portland Estates was also identified.
development scenarios were tested with the Partners
to identify a preferred strategy for development of the Five development scenarios were reviewed by the
campus and in particular the key first moves that are Partners as illustrated opposite. Each test an alternative
necessary to enable the future development of the scenario for development
masterplan.
Scenarios 1, 2 and 5 were identified as preferred as they
From this the following principles were established: all consolidate hospital activities to the east of Great
• The lecture theatre must be re-provided before Maze Pond Road and locate the student residential
demolition of the existing theatre commences village in the Backlands area. Following further review
Scenario 1 emerged as the preferred development
• The student accommodation in Wolfson House
scenario as it best met the Partners objectives and
and Orchard Lisle House must be re-provided on
requirements as set out in the principles listed above.
campus before demolition of the existing building
• There is no immediate requirement to re-build the
swimming pool
• The activities in the Borough Wing must be
re-provided before it can be demolished this
includes; operating theatres, wards, treatment
rooms, research space and offices
• The activities in Nuffield House must be re-
provided before it can be demolished this
includes; 2 day case operating theatres and the
sleep clinic
• The Mortuary must be re-provided before it can
be demolished
• The Central Stores and other hospital activities
located adjacent to the Mortuary can be relatively
easily relocated to the basement of the Southwark
and Bermondsey Wing as part of an enabling
stage.

An opportunity for development of Francis House and


the residential grouping to the south (Orchard Lisle and
Iris Brook) to be developed as a single development
potentially related to the development of New City
Master Plan - September 2016 47

4
Scenario 2 Scenario 3
48 London Bridge Campus Masterplan

4
Scenario 4 Scenario 5
The Masterplanning
Strategy 5
50 London Bridge Campus Masterplan

5.1 The Masterplan

5
Masterplan
The masterplan vision is for the campus to become
an integrated and connected piece of the city. A
coherent hierarchy of routes and spaces across the
site will create a new sense of place linking the site
with the surrounding context. A vibrant mix of activities
intermingled across the site; healthcare, research,
education, student residential, retail and commercial,
will enliven the whole area. New buildings are sited to
maximise potential for development whist responding St
Th
om
to the scale of surrounding streets and spaces. as
Str
ee
t
The proposed buildings in the Backlands area off
Borough High Street will have a mix of uses including
the Student Village with residential accommodation for
500 students and a new lecture theatre and seminar

et
tre
spaces. To the south a new bio-sciences building will

hS
Hig
face onto Newcomen Street and to the north a new gh
commercial development connects into the proposed
rou

re-development of New City Court adjacent to the site.


Bo

In this area the Yards and Lanes will be invigorated with


new uses and active ground floor frontages including
community education spaces, retail and cafes and
restaurants.

The historic core of buildings; Old Guy’s House,

Road
Shepherds House, Henriette Raphael and the Hodgkin

ond
building are mostly retained with the rear extensions

ze P
removed and a new fit-for-purpose academic building

treet
t Ma
added to the rear of the Hodgkin building. These historic

S
G re a
buildings contribute to the setting of Memorial Park, Ne

Weston
wc
o me
an important space and feature within the campus, nS
tre
which is retained and enhanced with the demolition et
of the weak Nuffield House building to the south. This
sfie lds
is replaced by a new feature building, the Bio-Science Snow
Hub, connected to the retained New Hunts House bio-
medical building.

To the east of Great Maze Pond Road the existing Guy’s


hospital site is transformed with the replacement of the
Borough Wing and the opening up of the Southwark
Master Plan - September 2016 51

5
Pedestrian Movement and Key Spaces
and Bermondsey Wing to create an active frontage
to St Thomas Street and a new pedestrian entrance
and street orientated north-south to align with the
new London Bridge Station concourse entrance. Two
large scale developments sit either side of this route
which opens up to the south onto Snowsfields. The tall
building elements rise up in scale towards the Guy’s
Tower.

A new centralised out-patients department and other


hospital activities are located opposite, on the south
side of Snowsfields. Other developments along the
south side of Snowsfields include new offices for the
Charity and the potential re-development of Elizabeth
Newcomen House for residential use.

Key Routes and Spaces


The diagram opposite illustrates the hierarchy of
proposed routes and spaces across the campus and
the strong connections created with the surrounding
area.

On the western side, from Borough High Street, the


routes into the campus are informal and build upon the
character of the existing Yards and Lanes. Wayfinding
is improved with clear lines of sight from one space to
the next making the area easier to navigate. The route
east-west extends through Memorial Park and the new
development on the eastern side of the campus linking
with Weston Street.

Strong pedestrian links north-south provide clear


connections from the site to London Bridge Station
and the residential area to the south. Great Maze
Pond Road is retained and new links are created off St
Thomas Street to the west of Old Guy’s House and to
the east of the Tower Wing aligning with the new station
concourse entrance to the north and the proposed
development on the south side of Snowsfields. Here a
new public space is proposed for arrivals and drop-off.
52 London Bridge Campus Masterplan

5.2 Public Realm and Landscape

5
Public Realm
Public Realm
Creating a new public realm across the site is central
to the masterplan vision of opening up the campus to
become a connected piece of the city. The increase in
activity across the site and the increase in passenger
numbers arriving at London Bridge station following
its re-development will both have a significant impact
on the area. The public realm strategy reflects this by
creating a series of new, connected spaces within the
campus.
Master Plan - September 2016 53

5
Character Areas
Character Areas
The masterplan identifies three distinct character areas
across the site:

• Borough High Street Yards


• Memorial Park
• The Eastern Quarter

The images on the following pages reflect the varying


nature of each of these areas and the types of activities
that may take place within the public realm.
54 London Bridge Campus Masterplan

5 Character Areas -
Borough High Street Yards and Lanes

Key to Images
1, 7 Retail and Restaurant/Cafes
St. Christopher’s Place, West End, London
2, 5, 6 Outdoor eating/food and beverage trends
3, 4 Retail and Restaurants/Cafes
Slingsby Place, Covent Garden, London

1 2 3
6
7
5 4
Master Plan - September 2016 55

5
Character Areas - Memorial Park

Key to Images
1, 3 Memorial Park Central Space
looking North towards Old Guy’s House
2 Looking South towards Nuffield House and
the War Memorial
4 The Hodgkin Building West elevation

1 2

4 3
56 London Bridge Campus Masterplan

5 Character Areas -
Eastern Quarter

Key to Images
1, 7 City of London, Bennetts Associates
2 New Development, Toronto
3, 4 Cardinal Place, London
5 Thomas Moore Place, London
6 More London, London

1 3
2
4
7 6 5
Master Plan - September 2016 57

St Thomas Street, Station and Campus Gateway Newcomen Street, Memorial Park Gateway

Great Maze Pond Road, Campus Heart Snowsfields, ODP and Campus Gateway
Master Plan - September 2016 59

5.3 Landscape Masterplan

5
The drawing opposite illustrates the potential to create
a pedestrian focused external environment with
attractive areas of green and soft landscape through
out the campus.
9

10
11

7 8

2
13

6 3

12 4
1 Memorial Park
2 St Thomas Street Entrance
3 Great Maze Pond Road Entrance
4 Hospital Arrival and Drop-Off
5 Out-Patients Entrance Snowsfields
5
6 Southern Yards
7 Talbort Yard
8 New Square
9 New City Court Yard
10 Old Guy’s House Quad
11 Great Maze Pond Gateway
12 New Gateway Newcomen Street
13 Student Village

Roof Level - Landscape Plan


60 London Bridge Campus Masterplan

5
Key Landscape Views within the Campus

View from Memorial Park towards the new Bio-Science Hub

Ground Level - Landscape Plan View from Backlands towards Old Guy’s House
Master Plan - September 2016 61

5
Masterplan Diagrams
BUILDING DESIGN PARTNERSHIP SHALL H
MADE OF THIS DOCUMENT OTHER THAN F
ISSUED.

ALL DIMENSIONS SHOULD BE CHECKED O


DO NOT SCALE FROM THIS DRAWING
ANY DRAWING ERRORS OR DIVERGENCIE
OF BUILDING DESIGN PARTNERSHIP AT T

NOTES

REVISION / DESCRIPTION

KEYPLAN

CLIENT

Public Areas

Proposed Buildings

Exicting Buildings
16 Brewhouse Yard

Proposed Retail
Clarkenwell
London EC1V 4LJ
United Kingdom
T +44 (0)20 7812 8000
F +44 (0)20 7812 8399
www.bdp.com

Key Routes and Spaces Microclimate and Environment Entrances / Ground Floor Uses / Active Frontages
PROJECT TITLE

Project Name

P2007447
ap00200 DRAWING TITLE

1 1 : 1000
Masterplan - Ground F

DRAWING No.

(SK)AP3
62 London Bridge Campus Masterplan

5.4 Approach to Height and Massing

5
The heights strategy has been informed by assessment
of the existing context, historic analysis, character
assessments, and review of recently approved
planning applications, local and London wide planning
strategies.

The key considerations that have influenced the


strategy are: Redevelopment of
• Relationship to the Shard and the Guy’s Tower New City Court
Fielden House
• Relationship to Borough High Street Conservation
Area and Bermondsey Street Conservation
• Local Views which contribute to orientation and
experience.
• London Plan Strategic Views and Panoramas
• Retention and enhancement of existing streetscape
character
This has led to defining the following design principles: Guy’s Tower
1. The central part of the site, including the listed Guy’s
Hospital and Memorial Garden to be enhanced
as the historic core of the area and be low rise in
character. The Quill
2. Buildings immediately to the east and west of
the historic core should frame it and enhance its
Cancer Centre
character. The same applies to buildings adjacent
to the listed George Inn, located to the west of the
site boundary
site boundary.
3. New buildings between the buildings framing the listed buildings

western side of Memorial Gardens and Borough historic core


High Street could be taller than the existing but
lower to higher rise building
step down from east to west towards Borough High
Street. relate to adjacent buildings
4. The area to the east of Great Maze Pond Road is proposed tall building
suitable for creating a cluster of taller buildings,
which can be of similar height to the Guy’s Tower. approved tall building
However they should step down in height to south NTS existing tall building
and east in response to the existing context. N
Master Plan - September 2016 63

5
5. New building frontages along Newcomen Street
should respond to the existing buildings on
the southern side of the road and enhance the
streetscape character. Continuous building line
will be preferable and where taller elements are
proposed these could be set back from the building
line.
6. The redevelopment presents an opportunity for
reinstating and improving the streetscape quality
of the western part of Snowsfields. Building height
should be considered in relation to the width of the
street. Where much taller buildings are proposed
these should be set back from the building line, A) Provide active frontages at ground B) Articulate street frontages to provide setbacks C) Respect scale and proportion of the streets by stepping tall
so that their visual impact is minimised and where level with generous floor heights in order at strategic points and create facade rhythm. buildings back to reduce their visual impact.
possible the historic urban character of the area to give prominence to street level.
enhanced.
7. New buildings along Weston Street should sensitively
respond to the character and height of buildings
within the Bermondsey Street Conservation Area.
Building along the street frontage should respect
the existing streetscape qualities and where taller
elements are proposed they should be set back so
that their immediate visual impact is minimised.
8. The north-eastern part of the site will potentially
accommodate taller buildings. These need to be
designed to respond to London Bridge Station
frontage and enhance the character of St Thomas
Street with appropriate scale of development at
street level.
9. New taller blocks parallel to Great Maze Pond and
Borough High Street, should not be longer than
existing Guy’s Tower Façade and if it is should be
D) Buildings location and design to frame and address E) Buildings location and design to minimise overshadowing of open spaces.
subject to façade treatment that has vertical rather
open spaces.
than horizontal emphasis.
10. Some more generic best practice design principles
are also illustrated to the right.
64 London Bridge Campus Masterplan

Existing Massing Proposed Massing


Master Plan - September 2016 65

Summary of Proposed Estate Schedule of Proposed Accommodation

Building Code Building Name Building Area


GIA (m2) 5
Retained Buildings
GH03 Tower Wing 57139
GH06 Southwark and Bermondsey Wing (partial) 47839
GH10 Old Guy’s House 14712
GH19 Henriette Raphael (partial) 3730
GH20 Hodgkin Building (partial) 5074
GH21 Shepherds House 4994
GH25 New Hunt’s House 18884
GH46 Cancer Treatment Centre 20000
GH49 Hotel 5526

Retained Building Total 183,129

Proposed Building
A Plot A 25400
B Plot B 83000
C Plot C 34000
D Plot D 120000
E Plot E 18000
Fa Plot Fa 24600
Fb Plot Fb 24450
Fc Plot Fc 15400
G Plot G 1700
H Plot H 9000
I Plot I 3000
J Plot J 1800

Proposed Building Total 360,350

Estate Total 543,479


66 London Bridge Campus Masterplan

5
Site Section

The Shard

CHAPEL

BD

BD
BD

BD
310m

S002
G12B
SH
G12C
SH
LAJ1
S004

G02
G.20BN

A6GF0180

G11
G.20CN
R002

R001

R006
Key Plan

+150

+130
The Quill
Potential (Proposed)
Fielden house +110 110m
New city court
Redevelopment (Proposed)
100m
+90

+40
+40 +40

+25 +23 +25


+17 +17

Proposed Henriette New Hunt’s


Proposed Mixed use Development
Student Village Raphael House
House

Borough Memorial Great Maze New arrival Weston


High Street Park Pond Road Piazza Street
Master Plan - September 2016 67

5
Proposed Building Heights
The diagram opposite shows the proposed building
heights illustrated in the massing and townscape
studies.

The building height strategy is set out earlier in this


section.

100m
108m

57m 310m

38m
17m
19m
30m

20m 10m 45m


150m
35m 35m

18m 22m
25m
130m
25m 110m
30m 25m 40m
30m
150m
25m
25m 110m 110m
40m 90m
25m 40m
50m
130m
25m
90m 40m
70m
60m
35m 24m 15m
25m
20m
23m 55m
15m

24m

15m

Proposed Building Heights


68 London Bridge Campus Masterplan

5.5 Flexible Buildings

5 commercial

Core and Grid Arrangement


The Partners brief calls for flexible buildings that will hospital clinical/ hospital clinical/
FM/ fire FM/ fire lab/off
be suitable for a range of uses; hospital, research commercial evacuation lifts evacuation lifts
commercial commercial lift/sta
laboratory and commercial uses. The following study
demonstrates how the core arrangement for vertical
circulation within the towers (Plits B and D) could
work to allow for access for the different users whilst
providing safe emergency egress for patients. lab/office lab/office office
commercial commercial evacu
lift/stair core lift/stair core lab/office stair/ lab/office stair/
lift core lift core
A 8.1m grid is illustrated in the diagrams as the optimum
arrangement for a range of clinical activities. This is also
tested for laboratory and office uses in the diagrams.
A floor to floor height of 4.5m offers optimum flexibility
office fire office fire
for the range of uses required. This could be reduced evacuation stair evacuation stair office fire
office fire
where the use is soley for office based activity.
BUILDING DESIGN PARTNERSHIP SHALL HAVE NO RESPONSIBILITY FOR ANY USE MADE
OF THIS DOCUMENT OTHER THAN FOR THAT WHICH IT WAS PREPARED AND ISSUED.
evacuation stair evacuation stair
ALL DIMENSIONS SHOULD BE CHECKED ON SITE.
hospital
DO NOT SCALE FROM THIS DRAWING
ANY DRAWING ERRORS OR DIVERGENCIES SHOULD BE BROUGHT TO THE ATTENTION
OF BUILDING DESIGN PARTNERSHIP AT THE ADDRESS SHOWN BELOW.

The next page sets out some key principles for flexible NOTES
floor plates, which would be developed and tested at Entrances - Ground Floor
the next stages of the project. hospital public lifts/
hospital public lifts/
bed evacuation lift
bed evacuation lift
hospital hospital + matress + matress
evacuation stair evacuation stair
Entrances - Ground Floor Core Arrangement - Lower Levels
hospital clinical/ Entrances - Entrances - Ground Floor
Ground Floor Core arrangement
Core arrangement - lower levels
- lower levels
FM/ fire 24300 16200 24300
evacuation lifts
8100

8100
24300 24300
16200 16200
24300 24300 24300 24300
lab/office stair/
lift core 8100 8100 8100 8100 8100
5700 8100 5700 8100 8100 8100 2

48600

48600
8100

8100
8100

8100

8100
office fire
evacuation stair
48600

48600

48600
48600

48600

48600

48600
or or
hospital public lifts/
bed evacuation lift
Core Arrangement - Upper Levels 8.1m Grid Overlaid

2400
+ matress

2400
evacuation stair
8.1m grid overlaid
2400 2400
Core arrangement - lower levels Core arrangement - upper levels
Master Plan - September 2016 69
office fire
evacuation stair office fire
BUILDING DESIGN PARTNERSHIP SHALL HAVE NO RESPONSIBILITY FOR ANY USE MADE
OF THIS DOCUMENT OTHER THAN FOR THAT WHICH IT WAS PREPARED AND ISSUED.

evacuation stair
ALL DIMENSIONS SHOULD BE CHECKED ON SITE.

DO NOT SCALE FROM THIS DRAWING


ANY DRAWING ERRORS OR DIVERGENCIES SHOULD BE BROUGHT TO THE ATTENTION
OF BUILDING DESIGN PARTNERSHIP AT THE ADDRESS SHOWN BELOW.

NOTES

hospital public lifts/


bed evacuation lift
hospital + matress
evacuation stair

commercial
Entrances - Ground Floor FM/ fire
hospital clinical/

evacuation lifts
Core arrangement - lower levels
5 Core

Flexible Floor Plates


The following Design Principles for Flexible Floorplates 8. A minimum template free of any communications
for Hospital/ Research Laboratory/ Commercial Uses
lab/office would be sized
24300 16200
to accept a24300 standard 24 bed ward. 24300 24300
lift/stair core lab/office stair/
are set out below. These are intended as a guide at lift core
8100 9. Assume ‘fire streets’ are not used as a basic 8100 8100 5700 8100 8100 2400 1500 6600
this stage to inform the development of the masterplan.
fire provision but may be used on the podium
floors in combination with providing essential
8100

8100

8100
Design Principles for Flexible Floorplates
interdepartmental circulation.
1. Public lifts may or may not be shared foroffice fire
hospital,
evacuation stair 10. In a fire engineering solution assume there will office fire
office and laboratory users. evacuation stair
need to be four fire compartments per floor, all
2. Vertical circulation will extend into the lowest level four of which will need to interconnect for the
48600

48600

48600

48600
of clinical accommodation i.e. 2 basement levels. purposes of horizontal fire evacuation and refuge or
independently of serving any lobby serving a fire
3. Stairs serving hospital floors would need to be
and mattress evacuation stair or lift/ firefighting
hospital public lifts/
mattress evacuation size but a view could be
lift. bed evacuation lift
taken that above a certain level they could be + matress

2400
hospital
reduced to laboratory/ office size. 11. Assume that inevacuation
additionstair
to a low level plant room
and a roof level plant room, an interstitial plant
4. Bed lift and bed fire evacuation lifts will be required 2400
und Floor room
Core at every sixth
arrangement floor levels
- lower or alternatively a vertical Core arrangement - upper levels
as high as there is clinical accommodation.
stack of plant rooms serving each floor will be
5. Accepting any hospital above ground level is required.
required to be a fire engineered solution, current Upper Level Wards
accepted practice is that the fire engineered 8.1m grid overlaid
12. Assume that 4% of the floor area would be lost Upper levels wards Upper levels laboratorie
for ducts.
solution follows as closely as possible to published
16200 24300
guidance as is practicable (HTM 05-02). 13. From 24300
our brief/ area analysis we anticipate that 24300 24300
the clinical accommodation may not need to go
6. Any floor that is flexible for hospital/ laboratory/ 8100 8100 5700 8100 8100 2400 1500 6600 8100
above six storeys on plots B and D.
office is 4.5m floor to floor. If such a floor is to be
used for offices there would be an over provision
8100

8100

8100
support space
of ceiling height.
CLIENT

7. Given the different clinical uses possible and the write-up space

pressure on perimeter window area the structural


grid used for any floor for clinical accommodation
48600

48600

48600

48600
should be able to accommodate an HTM single or
REVISION / DESCRIPTION DRAWN CHECKED DATE REVISION / DESCRIPTION DRAWN CHECKED DATE REVISION / DESCRIPTION DRAWN CHECKED DATE REVISION / DESCRIPTION DRAWN CHECKED DATE REVISION / DESCRIPTION DRAWN CHECKED DATE REVISION / DESCRIPTION DRAWN CHECKED DATE REVISION / DESCRIPTION DRAWN CHECKED DATE REVISION / DESCRIPTION DRAWN CHECKED DATE

bedroom pattern employing any one of the laboratories


three normal hospital patterns (bathroom on
corridor wall, bathroom on window wall or nested
2400

bathrooms).

2400

Upper Level Laboratories Upper Level Offices


d Upper levels wards Upper levels laboratories Upper levels offices
70 London Bridge Campus Masterplan

5.6 Access and Movement

5
Accommodating the very substantial movement * To maximise route flexibility for all site users • Example Actions: Closure of Newcomen Street as requiring site access
increases related to London Bridge Station and the and visitors a through route with use of alternative route(s) e.g.
• Providing a central goods delivery point
masterplan requires a fundamental re-planning of the * To maximise street carrying capacity for all Long Lane
movement environment – an opportunity presented site users and visitors • Southwark Council have proposals to alter • Providing for the on-site forwarding of goods
through the re-provision/ removal/ replacement of • Example Action: shared use of St Thomas Street traffic management which better reflect wider within the site by hand / trolley / buggy etc
several of the buildings in the masterplan area. through shared surface. placemaking and connectivity aims – see plan • Minimise site service access points for large
and extract deliveries and restrict access to roads:
The following are high level movement principles
intended to help steer onward masterplan development Wayfinding • With appropriate width to accommodate
with that movement growth in mind. Along with these • Arrange site to provide for optimum legibility – Parking associated turning movements
principles, we include some example early stage ‘self-describing streets’ • Co-ordinate on-site provision with (external) on- • Where associated access routes minimise impact
actions that may be considered at a later time to street parking supply and control to minimise on-
• Action e.g. provide clear vistas through site with on the residential area
assist in putting these principles in action. Clearly, site supply and limit on-street overspill parking
visual cues to destination
considerable downstream design would be required to
• Provide high quality supporting and informative • Actively manage parking within the site, with Example Actions
assess the merits of associated actions and these are
direction signing to, and within, the site to key and provision limited to valid / essential use only
offered as indications of principles in action rather than • Use of Great Maze Pond Road junction with
intermediate destinations • Example Action: Barrier controlled parking supply Snowsfields – offering appropriate geometry for
necessarily proven as fully appropriate or feasible.
• Example Action: extension of ‘Legible London’ with tariffs targeted to minimise stay durations to turning movements
Physical Site Design (i.e. TfL supported) signing within site along with minimum levels
• Servicing for King’s College buildings via one way
Pedestrian & Cyclist Movement – Desire Lines key hospital-related visitor information
system within the campus accessed from GMPR
• Accommodate identified pedestrian and cyclist Hospital Access
& Newcomen Street
movement desire lines to / through the site Traffic Management • Rationalise access points for various user groups
• Provide ample and high quality cycle-related • Seek opportunities to provide limited carriageway to minimise activity and conflicts at single points:
facilities e.g. cycle parking widening as part of development block frontage(s) • Separate visitor arrival points whether on foot or
• Example Action: Cycle Hub provision – high to enable better 2-way movement by vehicle parking area
capacity parking provided at a central and • Minimise / prohibit two-way movement on limited
accessible location with associated user facilities • Example Actions:
width roads to avoid congestion and impact on
residents • Shared parking areas but separate parking access
Pedestrian Movement Capacity & Flexibility points
• Where possible provide access ‘loops’ to / within
• Provide for high capacity pedestrian movement site to minimise vehicle search activity, on-site • Drop-off and visitor parking in front of the new
links movement and impact on external road network OPT building through carriageway set-back/bay
• Encouraging the shared use of connections within • Consider limited access (and possible closure) for
the site by all users, i.e. vehicles, pedestrians, external roads Servicing
cyclists, where safe and practicable
• n.b. maintaining access for local residential area • Incorporate Consolidated Delivery regime:
• Where possible, make Shared Use of external will be a key consideration
streets too (‘Shared Space): • Minimising the numbers of delivery vehicles

Southwark Council Proposed Traffic Plan for Vehicles


Master Plan - September 2016 71

5
Development Planning
Beyond the specific ‘physical’ site planning principles,
there are development planning means by which the
generated movement demand may be managed to
minimise impact and therefore the need for remedial
measures.

Travel Demand Management – Travel Planning


• Ensure masterplan development related vehicular
movement (and parking demand / provision) is
managed to minimum levels through:
• Parking provision management
• Active promotion of sustainable travel mode use

Land Use Mix / Planning


In preparing land use mix proposals, consideration
should be given to minimising the coincidence of similar
development types with similar travel characteristics
e.g. high movement generating uses, peak user arrival/
departure times etc.
72 London Bridge Campus Masterplan

5.7 Sustainability and Infrastructure

5
In accordance with local planning requirements Be Lean
and the Guy’s and St Thomas’ NHS Foundation The highest possible standards of thermal insulation
Trust sustainability targets, any new development and air tightness and energy efficient lighting should be
will be assessed under the BREEAM environmental specified for all new developments, in accordance with
assessment methodology for achieving a minimum Part L 2013 minimum standards.
rating of BREEAM ‘Excellent’.
The opportunities to integrate passive measures initially
Current Performance come from layout and massing. Developing massing
The Trust have set an ambitious programme to deliver to minimise east/west glazing, to harness solar gains,
cost savings while delivering environmental and social and to consider floor plate depth for natural ventilation
benefits. The Trust’s sustainability strategy (2016-2020) potential have all been considered. This includes the
identifies sustainability as a driver for innovative service addition of atria to maximise daylight penetration and
provision. To date, the Trusts sustainability programme
opportunity for drawing in fresh air.
has saved the Trust over £3m each year in energy water
and waste costs and has reduced carbon emissions by We seek to use air movement to passively cool
over 15% since 2007, exceeding their carbon reduction and ventilate, reducing the need for mechanical air
target of 10% by 2015. conditioning systems. This needs to be balanced
with internal acoustic or functional requirements and
Future targets include a commitment to invest in energy
local air quality standards, particularly in clinical and
efficiency to reach or exceed 34% reduction in carbon
emissions by 2020 (against a 2007/08 baseline) and by scientific research spaces.
80% by 2050. Meeting and exceeding these and future Be Clean
targets will require the master plan to be driven by low Once energy demand has been reduced as far
carbon design. as possible, priority should be to use local (or
KCL has committed to a target of a 43% reduction in decentralised) energy sources, this will mean exploring
Scope 1 and 2 carbon emissions by 2019/20 against a the potential for future connection to the South East
2005/06 baseline. The implementation of their carbon London Combined Heat and Power (SELCHP) network. Guy’s and St Thomas’ Heat Map
management plan has led to annual savings and during
Where connection to a wider energy network is not
2014/15 KCL had achieved a reduction of 8% against
possible, onsite heating systems should be designed
the baseline.
to minimise CO2 emissions. These should incorporate
Energy Strategy district network heating systems. Network systems
In line with local planning requirements for the London maximise energy efficiency through load balancing
Borough of Southwark, the development will follow the and efficiencies in run-time/outputs.
energy hierarchy – Lean, Clean, Green, to achieve a
Be Green
minimum 25% improvement over Building Regulations
energy efficiency standards, and a reduction in carbon An initial review highlights technologies likely to be
emissions of 20% from onsite renewable energy suitable for the site to be a combination of PV, an
generation. extended case of CHP and CCHP, and Ground Source
Heat Pumps – adaptable for multiple applications
Sustainable energy systems of the future will rely on relating to both efficient end-use and renewable supply.
two major principles – efficient end-use and efficient Rooftop Solar Panels
use of renewables.
Master Plan - September 2016 73

5
Future Opportunities for renewables To meet these targets, development will be required to Flood Risk Waste
As the grid is de-carbonised, the ability for gas-fired minimise water use as far as possible by incorporating The site lies in flood zone 3 due to its proximity to the The Trust has identified waste as a key area of strategic
CHP engines to deliver net reductions in carbon appropriate water efficiency and water recycling River Thames. Although protected by the Thames focus within their sustainability strategy and has set
emissions will be compromised. Solar thermal, waste measures in line with the water hierarchy. This puts barrier, an assessment and management strategy for targets for overall waste to be recycled. A good waste
and biogas-fired CHP engines, or CHP engines fired the focus on improving system efficiency and reducing surface water will need to be developed to reduce any management strategy is already in place, with 100%
by a de-carbonised grid will continue to yield a net consumption at the point of use. risk of localised flooding. of domestic waste processed via waste to energy and
reduction in carbon emissions. Fuel cells also provide transportation of waste by barge, cutting 3000 lorry
onsite power and often by-product heat, which can be Following opportunities to reduce water demand, water Opportunities to incorporate Sustainable Urban trips annually.
fed into campuses network. While fuel cells are still recycling systems can then be used to collect rainwater Drainage Systems (SuDS) will be identified, taking into
more expensive than competing technologies, this gap or greywater for the supply of non-potable uses such consideration the constrained site. Incorporating SuDS In accordance with the waste hierarchy, the first step
is rapidly narrowing with technical advances. as WC flushing or commercial washing. These not only into early design considerations will help to identify for any waste management strategy will be to minimise
reduce mains water consumption, but also reduce the systems that manage runoff close to its source to avoid waste generated before seeking routes for disposal.
Water Demand amount of rainfall discharged to drains and sewers. the need for large storage areas. Space efficient SuDS Storage considerations will need to be planned into any
The Trust has a target to reduce water consumption include green roofs, bioretention gardens, permeable new developments. The use of bailers and compactors
by 20% by 2020 and 30% by 2050. Ambitious water Consideration will need to be given to the available paving, rainwater harvesting and tree pits. onsite should be considered, reducing space needed
recycling targets have also been set, with a target roof collection area and the construction and location for site management as well as reducing the number of
recycling rate of 75% by 2020/21 and 100% by 2050/51. of storage tanks. Where space is constrained, modular collections by waste management contractors.
In 2015/16, the Trust had reduced water consumption storage tanks can be interconnected to maximise
by 12%, with a 58% water recycling rate. Currently, the storage volume.
Trust has not set targets for water consumption per m2
but aims to set these for the master plan.
74 London Bridge Campus Masterplan

5
Ecology Thermal Energy Systems
The development will ensure that disruption to Existing Thermal System
existing ecology is minimised throughout design and The existing thermal energy infrastructure is based
construction. Habitats will be enhanced where possible around a centrally located boiler house at the base of
with additional areas for foraging and nesting created. the Tower Block which generates hot water for heating.
Key to the development will be the provision of areas Whilst this is currently produced as High Temperature
that improve the quality of biodiversity on the site, Hot Water at around 160oC there is currently work
with species chosen to enhance ecological diversity. underway to reduce the operating temperature to less
Opportunities for the inclusion of green and brown roofs than 95oC (Low Temperature Hot Water – LTHW) thus
will provide ecological value and offer wider benefits reducing transmission energy losses. The hot water
including attenuating rainwater, reducing the urban is distributed to local secondary heating plant in each
heat island effect, improving thermal performance, air building or group of buildings by a district heating
quality, and reducing energy costs. pipework network.

The district heating network serves both the Guy’s and


KCL sites as shown in the diagram on the right.

The energy centre includes a 3MW combined heat


and power (CHP) unit that generates electrical power
for use on site with the waste heat being injected into
the site heating system. The CHP is a relatively recent
addition to the site and is understood to provide
a significant proportion of the Hospital’s electrical
demand and heat demand, although it is understood Existing campus heat network
that when the new Cancer Centre comes on-line this
capacity will be largely used by the development. The and provide decentralised standalone boilers. It should Implementation of the masterplan creates the
CHP is believed to have a further useful remaining be noted that the Backlands area of the campus is opportunity to renew the primary thermal energy
life of 8-10 years, although when the boiler house is planned to be the first area to be cleared and this may infrastructure with a view to:
finally decommissioned there is likely to be very little impact on the investment strategy for this part of the
Bio - Diverse Roof economic life remaining for the CHP unit. site. • Meeting the increased load, taking account of the
load growth at each phase of the masterplan.
Whilst the CHP plant is relatively new, the existing
boiler plant is over 30 years old and is expected to Analysis of Predicted Thermal Load Growth • Provide new energy efficient plant and systems
Energy Infrastructure Strategy
reach the end of its useful life during implementation An analysis of the campus thermal loads has been incorporating the most appropriate renewable
The development of the site energy strategy will
of the masterplan. undertaken based on building area as given in the and low carbon technologies
address the Carbon Reduction Targets for the campus
Massing Breakdown and is shown in Table 1 overleaf. • Improve reliability and resilience
and look at how the phased construction programme
will impact on delivery of infrastructure services to the There is currently an Energy Performance Contract The analysis indicates that the peak demand for • Provide a flexible and adaptable thermal energy
new and retained estate. (EPC) being carried out by a third party of which the heating will increase to around 50MW by completion system
heating temperature reduction forms part. Coupled of the masterplan, which represents an increase of
with this are proposals to disconnect much of the around 60-70% on the existing plant and infrastructure
Backlands area, e.g. Mortuary from the district network capacity.
Master Plan - September 2016 75

5
Review of Meeting the Thermal Loads • Ground Source Heat Pumps (GSHP) – Local GUYS INFRA-STRUCTURE THERMAL ENERGY PROPOSALS Date - Aug 16
The campus will be a large site and thus benefit in ground source heating, with the option for cooling On Existing Standby
PLOT BUILDING APPROXIMATE APPR0X BUILDING Indicative Loads at Each
reducing Carbon emissions and energy demand from as well, would be particularly suitable for the REFERENCE REFERENCE AREA - M2 NOTES LOAD - W/M
2
LOAD - KW
Heat
network
Fuel
Required
COMMENTS
Existing Step 2 Ste

an integrated energy approach. residential and commercial elements of the site BUILDINGS TO BE RETAINED

and should be considered for each of the local GH03 Tower Wing 57139 110 6285 Yes Yes 6.3 6.3 6.
GH06 Southwark and Bermondsey Wing 47839 (partially retained) 110 5262 Yes Yes 5.3 5.3 5.
In addition to providing the thermal site load there is also thermal energy plants GH10 Old Guy’s House 14712 110 1618 Yes Yes 1.6 1.6 1.
GH19 Henriette Raphael 3730 (partially retained) 110 410 Yes Yes 0.4 0.4 0.
the benefits associated with low carbon technologies, • Bore Hole Cooling - Local ground source cooling GH20 Hodgkin Building 5074 (partially retained) 110 558 Yes Yes 0.6 0.6 0.
GH21 Shepherds House 4994 110 549 Yes Yes 0.5 0.5 0.
for example: would be particularly suitable for the commercial GH25 New Hunt’s House 18884 110 2077 Yes Yes 2.1 2.1 2.
GH46 Cancer Treatment Centre 20000 95 1900 ? Yes 1.9 1.9 1.
elements of the site and should be considered for GH49 Hotel 5526 60 332 ? No 0.3 0.3 0.

• Combined Heat and Power (CHP) to generate on- each of the commercial buildings Existing Area 177898
Total of
Retained 19 MW
site electricity and use the waste heat produced to • Fuel Cells - Option worth exploring as part of
Loads

heat the buildings, as already being utilised on the final design solution. Whilst this is an emerging NEW BUILDINGS

Trust’s site. The electricity output is dependent technology its use in the future should be allowed Plot A Outpatients Department 24500 85 2083 Yes 2.1 2.
Plot B Clinical and commercial 83000 95 7885 No 7.
on heat demand which in summer, when lower, with flexible ‘new technology’ space allowed in Plot C Commercial 34000 70 2380 No 2.
Plot D Clinical and commercial 120000 95 11400 Yes
can limit the size of the CHP. This technology the energy centres Plot E Bio-Sciences Hub 18000 100 1800 Optional 1.
Plot Fa Bio-sciences and commercial hub 40000 85 3400 Optional
currently offers the best potential for substantial Plot Fb Teaching and Student residential 24450 60 1467 No Partial Backup may be requested 1.5 1.
Plot G Clinincal 0 Area TBC 95 0 Yes
energy and CO2 emissions savings for the health There are many ways to meet the thermal demand Plot H Residential 9000 60 540 No
Plot I Residential 3000 60 180 No Mains Power Supply could be derived from Plot H Transformer
care elements of the site; however, CHP cannot for the campus and below are outline thoughts on a Plot J Commercial 5600 70 392 No 0.4 0.

be considered as a renewable source as it still strategy that suits the phasing of the development, suits Total of New
New Area 361550 32 MW
uses Carbon fuel, albeit in a more efficient way. the profiles of loads anticipated and gives manageably Loads

Increased capacity Co-generation should be sized systems for maintenance and resilience.
considered for the new energy centres Total Site Area 539448
Total Site
51 MW
Options Load

• Combined Cooling, Heating and Power (CCHP)


The principal alternatives appear to as follows:
often described as ‘Tri-generation’ uses the same Table 1 Analysis of Site Thermal Loads
Notes :
2
1
principles as CHP but uses the spare heat in 1. Provide a new single thermal energy centre at an 2
Additional Building area to be Circa 260,000M
Phasing of the buildings will dictate the buld up of load on the local network infrastructure.
3 Consideration to electrical billing to be given to establish whether the building supplies are on a private Client or UKPN HV feed.
summer to produce cooling. This would involve early stage in programme. This would replace the 4 The Option of for CHP will be dictated by the chosen energy centre options the space for which will be dictated by the development program.
• Works will be ongoing in the energy centre for Disadvantages
the addition of absorption type chillers to convert existing energy centre and would have capacity for APPR0X BUILDING
the duration
am in presentaion of 24)the masterplan- representing
for plot labeling (slide a
LOAD - W/M 2
• Potential for increased efficiencies through load
LOAD - KW
the CHP waste heat into chilled water for cooling. expansion the serve the new buildings. Existing Building Area in Plot to be New plot massing
significant riskGIAto(m2)ongoing(GIA)
demolished operations.
m2 sharing not realised.
A district cooling network would distribute
BUILDINGS TO BE DEMOLISHED
the cooling water to the various buildings. Advantages • Less/no opportunity to incorporate CHP and Tri-
2. PlotInclude
A smaller
11860 local thermal
25400energy plant in each
0 0 Car Park- assumed unheated 0.0
The effectiveness of this depends on the balance • Optimum solution for overall efficiency and plant Plot B
new 26150
development and 83000
progressively decommission125 3269generation 3.3 3.3
Plot C 9650 34000 125 1206 1.2 1.2
of heating and cooling loads for each building. capacity Plot D
the
Plot E
26100
existing plant
4030
120000
18000
125
125 • Increase plant area required overall
3263
504
3.3
0.5
3.3
0.5
3.

It can be particularly effective in healthcare and • Potential to be the least expensive solution overall
Plot Fa 13200 40000 125 1650 1.7 1.7 1.
Plot Fb 1535 24450 125 • Likely to be more expensive overall.
192 0.2
research buildings with higher cooling demands Advantages
Plot G
Plot H
5900
3200
0
9000
125
125
738
400
0.7
0.4
0.7
0.4
0.
0.
• Expensive primary fuel network required (gas &
• Solar thermal heating – the uses the sun to heat Disadvantages Plot I 936
• No large single site required.
Plot J 430
3000
5600
125 117
0 Assumed on independent plant
0.1
0.0
0.1 0.

back-up oil) 0.0 0.0 0.


water which can then be used to heat domestic • Requires a large area on the Guy’s site at an early • Flexible- no dependency on subsequent phases. 0.0 0.0 0.
• Increased operational/maintenance costs of
hot water. Whilst this is often used in domestic stage in the programme. Totals 30 34 41
• Resilient- plant failure will only affect a single multiple plant.
housing the application to large scale sites is • Will be significantly under-utilised in early stages building Loads on Existing Energy Centre Start Step 2 Ste
less practical, especially when other low carbon of the redevelopment with consequent losses in Existing Retained
Existing to be demolished
19
11
19
11
19
6
technologies, such as CHP are employed efficiency.
Moved to new plant
Total 30 30 25
Reduction 1% 17

Loads on New Energy Centres


Outpatients Plant 2.5 2.
Residential Plant 1.5 1.
West EC 11
East EC 25
76 London Bridge Campus Masterplan

5
3. Provide a number of larger thermal energy centres This strategy will involve: Thermal Load (MW)
serving groups of buildings. Step Area Existing Total Indicative Solution
New
• The provision of local thermal energy plant in the Boilerhouse Campus
Advantages early phases (Outpatients and Residential) which Modify existing heat distribution
1 Clear part of Backlands site N/A 30 30
• Good potential for increased efficiencies through could be connected to the wider site distribution network to suit
load sharing. at some point in the future Local Energy Centres using GSHP
Construction of Student Village 1.5 as primary heating (and cooling
• Reduces potential for under-utilisation of plant in • Establishing separate larger energy centres
source for offices and Outpatients)
early phases incorporating CCHP with heating and cooling 2 30 34
• Flexible, less dependency on other/subsequent distribution networks on the East and West sides
Construction of OPD and offices
of the campus serving the subsequent phases. 2.5
phases. (Snowfields)
• More resilient than a single energy centre (Option • Progressive transfer of retained buildings onto the PV on roofs and facade
1) new networks and subsequent decommissioning
Demolish part Borough Wing,
of the existing boiler house. Provide temporary plant for
3 Residences and Lecture Theatres 4 25 29
remaining Borough Wing hub
Disadvantages • Extension of the new infrastructure to serve the and remainder of Backlands site
• Plant may still be slightly under-utilised initially but final developments in the masterplan.
Establish new 25MW Energy Centre
for less time Construction of Block B 8 19 in Block B incorporating CCHP ready
• Requires more space overall for transfer of Retained Estate
• Works will be ongoing in the energy centre for
the duration of the masterplan- representing a 4 36 Establish new 11MW Energy Centre
significant risk to ongoing operations Construction of Block C in Block C incorporating CCHP ready
for transfer of Retained Estate

Indicative Masterplan Solution 5


Construction of Block C PV as appropriate on buildings
The final solution will need a more detailed analysis
Transfer Retained Estate to new Complete connection to new heating
at the time when the outcome of the Masterplan is
Energy Centres and cooling networks
implemented and further information on the types of
developments are fully defined; however, at this time
5 21 0 36 Block B 25MW Energy Centre
in terms of meeting the phased load growth, optimum
carbon reduction potential for the site and future Decommission existing boiler house
proofing, a combination of options 2&3 is proposed as 11 Block B 11MW Energy Centre
offering the best compromise. Increase capacity of Block B Energy
Construction of Block D 32.5
Centre to 33MW
6
Increase capacity of Block B Energy
Construction of Block F 13 0 50
Centre to 13MW

Notes
CCHP – Combined Cooling Heating Power
GSHP – Ground Source Heat Pump
PV – Photo-voltaic
Master Plan - September 2016 77

5
Mechanical Engineering Phasing Diagrams
Enabling works will be essential to the infrastructure Metering Strategy
services throughout the redevelopment. This will The campus will accommodate the three client bodies
involve the disconnection, isolation and diversion of in various buildings and with the commercial space
services and some temporary plant hubs to facilitate provide house many tenants. Whilst full consideration
safe demolition and construction whilst maintaining to the agreement of energy charging will need to be
the operation of the buildings during the development developed, it is recommended that comprehensive
phases. metering is provided throughout the buildings so that
Cost Centres can be established and heating and
New gas supplies for each of the energy centres. Whilst cooling consumption metered accurately.
there is an extensive gas distribution network on and
surrounding the site, the requirements will need to be
This will generate a significant quantity of data and will
discussed with the statutory supplier at an early stage.
need to be analysed through interfacing software by
the Energy Management team.
The diagrams that follow indicate how the new energy
centres could be established and is summarised in the
following table.

Phase 1

Phase 2
78 London Bridge Campus Masterplan

Phase 3 Phase 4

Phase 5 Phase 6
Master Plan - September 2016 79

5
Electrical Energy Systems PLOT BUILDING APPROXIMATE APPR0X BUILDING SUPPLIED SUPPLIED GENERATOR
Existing Electrical System REFERENCE REFERENCE AREA - M2 NOTES LOAD - W/M2 LOAD - kW AT HV AT LV BACKUP COMMENTS

The Guy’s Hospital site is served by a number of BUILDINGS TO BE RETAINED


11kV incoming supplies from St. Thomas Street
feeding main 11KV switchpanels located in the main GH03 Tower Wing 57139 80 4571  
GH06 Southwark and Bermondsey Wing 47839 (partially retained) 80 3827  
boiler house building GH08 and within the Southwark GH10 Old Guy’s House 14712 80 1177  
& Bermondsey wing GH06. From these locations GH19 Henriette Raphael 3730 (partially retained) 80 298 Optional  
there are 11kV supplies to local transformers as well GH20 Hodgkin Building 5074 (partially retained) 80 406  
as transformers in the Borough Wing GH04. These GH21 Shepherds House 4994 80 400  
GH25 New Hunt’s House 18884 80 1511  
transformers provide Low Voltage (LV) 400V supplies GH46 Cancer Treatment Centre 20000 80 1600  
to the smaller surrounding hospital buildings. GH49 Hotel 5526 60 332  Optional

Total of
The Guy’s stand-by generators consist of both To maintain this retained load will require modification to the
Existing Area 177898 Existing 14 MW
HV & LV distribution network as the buildings are modified.
11kV generators located within the Southwark & Loads
Bermondsey Wing GH06 and Low Voltage (LV) 400V
generators located adjacent the main boiler house NEW BUILDINGS
GH08. Additionally a gas turbine 3MW Combined Heat
Plot A Outpatients Department 25400 65 1651  
and Power (CHP) system is located in the GH08 and is
Plot B Clinical and commercial 83000 70 5810  
connected into the 11kV private distribution network at Plot C Commercial 34000 80 2720  
the main 11kV switchboard in the boiler house. Plot D Clinical and commercial 120000 70 8400  
Plot E Bio-Sciences Hub 18000 80 1440  
Plot Fa Bio-sciences and commercial hub 40000 80 3200  
From the Main 11KV panels HV cables run within the
Plot Fb Teaching and Student residential 24450 60 1467  Optional Partial Backup may be requested
basement and ducts around the site. Plot G Clinincal 0 Area TBC 70 0 ? ? 
Plot H Residential 9000 50 450  NO
Buildings on the Backlands and Western side of the Plot I Residential 3000 50 150 Optional  NO Mains Power Supply could be derived from Plot H Transformer
Plot J Commercial 5600 80 448  
campus are predominantly serving at LV from the local
UKPN network. Total of New This load will require the installation of new HV supplies and
New Area 362450 26 MW
Loads transformer for each building as it is developed.

Analysis of Predicted Electrical Load Growth


Given this total load which is an increase of circa 20MW,
An analysis of the campus electrical loads has been Total Site
Total Site Area 540348 40 MW consideration to the siting of a Primary substation may need
undertaken based on building area as given in the Load
to be agreed with UKPN, if power not available locally.
Massing Breakdown and is shown in Table 2 opposite.
Table 2 Analysis of Site Electrical Loads
The analysis indicates that the peak demand for heating
will increase to around 40MW by completion of the
masterplan, which represents an increase of around
100% of the existing infrastructure capacity.
80 London Bridge Campus Masterplan

5
Review of Meeting the Electrical Loads at the time when the outcome of the Masterplan is The hospital 11kV network will serve 11kV/400V sub-
New 33kV / 11KV networks to the campus development implemented and further information on the types of stations within the agreed buildings, each configured
As a general rule, 11KV network supplies are capable developments are fully defined. in a ring or as an N+1 arrangement to facilitate
of a supply rating of circa 8MW and with initial estimate maintenance with minimum downtime. The sub-
for the total development in the order of 40MW. The At the point in the development when the main boiler stations will be supplied on this dual feeder basis with
estimated capacity for the existing development is house is demolished, which houses a main 11kV HV cables run on diverse routes to provide network
20MW therefore a further 20MW is to be agreed in switchpanel, gas turbine CHP unit and LV generator resilience and provide supply security.
stages for the new development. plant, a new central 11kV switch room will need to be
established as an enabling package to replace the Where the supply is not derived from the Hospital HV
This size of supply can be either supplied via several 11kV and LV electrical switchrooms. network the supply from UKPN may have to be re-
11,000 volt HV supplies or at a higher voltage (33kV) instated by them after the fault is identified, which can
from a primary HV sub-station. Where supplies route to or through buildings to be delay restoration of power.
demolished these will need to be removed and diverted
A review of the local primary substation will be required to ensure continuity of supply to other buildings, i.e. the The HV network serving each stage of the development
by UKPN due to the increased load and this may require current Borough Wing transformer supply will need to should have sufficient spare capacity / spare ways at
a significant cost to be funded by the development. be removed when the building is partially demolished the main 11kV switch panels for future development.
and this transformer supports the Cunliffe Laboratory
This network will require agreement with UKPN who and other surrounding buildings that are planned to be Designated cable routes will need to be defined early
will be providing the revised incoming electrical infra- demolished at a later date. This will therefore require to allow cable ducts for future changes to HV/ LV power
structure required to support the new increased temporary supplies to be installed to maintain operation (& Data) as the development grows to reduce the need
development size. for adding ducts within finished areas where changes
Distribution within the new development to the HV supply network are required and new sub
The Client will need to agree which of the new buildings During the re-development consideration particularly supplies between smaller buildings are to be installed.
will need to be on the private development supply needs to be given to the Hospital’s power supply
(i.e. the Hospital HV network) which will require sub network as these elements have to comply with the 11kV/400V sub-stations
metering and billing of the individual tenants / buildings Health Technical Memorandums (HTM) in terms of Sub-stations will be located within each individual
and buildings that will be supplied directly by UKPN down time and speed of re-instatement of supply after building & comprising 11kV intake, transformers and
and metered/billed directly by their own electricity a mains power failure. This will affect the generator main LV switchboard.
suppliers. back-up arrangements which can be centralised and
distributed at HV to all buildings on the Hospital network Where required generators / CHP will be interconnected
It is likely that some temporary supply arrangements or local on a building by building basis, supplied at LV. to these substations either at 11kV or LV to suit the final
will need to be put in place that will change as the
system design.
development phases progress. As with the back-up generators the CHP generation
can be located centrally and feed at HV or locally at
Due to the size of the development most of the new LV but will this will require more space overall if not
buildings will be supplied at 11kV and have separate centrally located.
11kV switchgear, transformers and LV distribution
systems. The Hospital distribution network will be designed
where required to provide “A” & ”B” supplies from
Indicative Masterplan Solution separate switchboards to each area served and this
The final solution will need a more detailed analysis would ideally come from alternate HV sources.
Master Plan - September 2016 81

5
Electrical Engineering Phasing Diagrams

Combined Heat and Power Systems Metering Strategy


Options for the CHP design are as follows: The campus will accommodate the three client bodies
in various buildings and with the commercial space
• Install smaller local units within each development provide house many tenants. Whilst full consideration
to meet the BREEAM needs.
 These would to the agreement of energy charging will need to be
probably be LV units and feed into the LV supply developed, it is recommended that comprehensive
system serving the individual building only. metering is provided throughout the buildings so
that Cost Centres can be established and electrical
• Install larger units centrally within major energy
consumption metered accurately.
centres within the development. The location of
these energy centres will need to be agreed and
This will generate a significant quantity of data and will
adopted as part of the staged development.
These
need to be analysed through interfacing software by
units would probably be HV units and feed into
the Energy Management team.
the HV supply system serving the site.

Peak Lopping
In order to limit Maximum Demand on the incoming
supplies to the campus there is the option to use the
standby generators to run at peak site loading thus
generating electricity on site, in addition to the CHP, to
reduce the incoming capacity. This is known as ‘Peak Phase 1
Lopping’. This can offer significant financial savings.
However, as with the CHP the generated power has
to run in parallel with the UKPN network and thus their
agreement is needed and certain protection measures
put in place. Furthermore, the generators use fuel oil
which has a high Carbon content and thus will increase
emissions. Therefore, the decision to employ Peak
Lopping needs to be carefully considered as part of
the overall site strategy.

Phase 2
82 London Bridge Campus Masterplan

Phase 3 Phase 4

Phase 5 Phase 6
Master Plan - September 2016 83

5
Data Systems BMS / Security / LV Signal Cables
As part of the re-development the existing data
• Similar to the ICT above, there will be a need to
distribution will need to be modified at each phase of
be routes to interconnect the buildings for other
the work.
shared LV systems, information exchange. It
would therefore be prudent to install additional
It is recommended that an IT Specialist is appointed at
ducts, probably on the same route as the ICT
an appropriate time to advise on:
systems.

• Enabling works to disconnect existing supplies Manholes / Cable Access Chamber


ready for demolition, divert / provide temporary
• Manholes will be required for the above systems
supplies to surrounding buildings affected by
and future ducted systems provided for the
the work and possibly establish new temporary
interconnection of power cables.
connections.
• It may be a consideration to have locked manholes
• Design of the new infra-structure with future
on the ICT duct system to restrict access into
equipment room locations and incoming /
these ducts to authorised personnel only, with
outgoing data connections established for each
keys for these manholes held by key staff only.
building.
• Building entry point strategy to facilitate diverse
routing of data cabling.
• Establishing any new local / central data centre
facilities within buildings and across the site.

Other system design considerations are as follows:

ICT / Data / Telephony


• Each building within the development will require
ducts for the connection of incoming / outgoing
data system cabling which could consist of both
copper and fibre optic cabling.
• Consideration to the interlinking ducts around the
development should be a major consideration
and designed with alternate routes between the
buildings of any interconnected buildings.
• These ducts would need to be installed as part of
the individual development and therefore routes
should be flexible to suit future changes to the
data network.
84 London Bridge Campus Masterplan
Townscape and Visual
Analysis 6
86 London Bridge Campus Masterplan

6.1 LVMF - Protected Views and Vistas

6
The site falls within the background view of the protected

3A
viewing corridors to St Paul’s Cathedral from Kenwood

.1
2A
(view 3A.1) and Parliament Hill (view 2A.1) as identified

K
.1

en
in the London Plan, London View Management Plan. 4A

1A.1
Pa

wo
.1
Pr

r
im

od
lia
Further views from Alexandra Palace, Primrose Hill and
ro

Alexa
Blackheath are also identified. In these views the site se

en
Hil
is visible in the panorama but outside of the protected l

tH

ndra
ill
viewing corridor.

There are two river prospect views which will also need

Pala
to be taken into consideration; from Southwark Bridge

ce
(view 12B) and Tower Bridge (view 10A). The key views
are illustrated on the following pages.

12B Southwark
Bridge 10A Tower
Bridge

6A
.1
Bl
ac
kh
ea
th

NTS
N

Protected View
Master Plan - September 2016 87

6
Protected Views
View 3A.1
The view south from Kenwood House shows the
proposed taller masterplan developments are visible
to the right of the Shard and St Paul’s Cathedral.
The proposed Fielden House sits in the background
between the Shard and the Cathedral. The outline of
the potential New City Court Development is shown
dotted in front of the proposed towers.

3A.1 Kenwood

View 2A.1
The view south from Parliament Hill shows the
proposed masterplan developments are all to the right
of St Paul’s Cathedral and the Shard clustered around
the Guy’s Tower.

2A.1 Parliament Hill


88 London Bridge Campus Masterplan

6
Protected Vistas
View 12B
In the view from Southwark Bridge the proposed
buildings sit to the right of Guy’s Tower. The proposed
Fielden House sits to the left in the background of
Southwark Cathedral.

Viewing Location 12B - Southwark Bridge View - down stream

View 10A
In the view from Tower Bridge the tallest proposed
building is just visible behind Guy’s Tower. The planning
consented Quill tower sits to the left.

Viewing Location 10A - Tower Bridge North Bastion - up stream


Master Plan - September 2016 89

6.2 Local Views

6
The following local views have been established
and tested to determine the potential impact of
the proposed masterplan developments within the
townscape setting.

Six local views have been identified and tested:


1. From Tooley Street / More London Place
2. From Bermondsey Street / St Thomas Street
St
3. From Snowsfields / Kirby Grove Th
om
as
4. From St George’s Churchyard Gardens Southwark Street St
ree
t
5. From Southwark Street / Railway bridge
6. From The George Inn Yard

d
tree

Pon
hS

aze
Hig

at M
gh

Gre
rou
Bo

Ne
wc
om
en
Str
eet

treet
Weston S
s
sfield
Snow

NTS
N
Local Views
90 London Bridge Campus Masterplan

6
Local View 1 - From Tooley Street / More London Place

Existing Proposed

This is a view southwards from the northern side of Tooley Street where it opens up in front of the Hilton Hotel The proposed development is likely to fill in the open views across the viaduct and as such should not dominate
at More London Place. The view is framed by the Shard to the right hand side and a four storey building at the the historic structures in the foreground. The massing and height has been sensitively managed to enhance the
corner with Bermondsey Street to the left. Most of the Guy’s Tower is visible across the railway viaduct of London perspective and impression of the new buildings blending with the sky in the background.
Bridge Station but partially concealed behind the Shipwright Arms building.
Master Plan - September 2016 91

6
Local View 2 - From Bermondsey Street

Existing Proposed

This view is taken at the eastern end of St Thomas Street, at the junction with Bermondsey Street, south of It will be important to consider how the proposed taller element located to the south of the Guy’s tower will relate
the tunnel. The view westwards along St Thomas Street is framed by the railway viaduct and the Shard in the to the scale of the existing buildings within the Bermondsey Street Conservation Area. It will be preferable that
distance to the right hand side with the Bermondsey Street corner building and trees in front of it visible to the they step down to the south and do not significantly exceed the height of the new Cancer Centre which is just
left. The Guy’s tower is in the middle of the view in the background. The new Cancer Centre building is also visible in this view.
visible behind the houses along Snowsfields. The recently approved Quill development will obstruct the view
to the Guy’s tower. In a similar manner other redevelopment planned alongside St Thomas Street will affect the
foreground of this view in the longer term.
92 London Bridge Campus Masterplan

6
Local View 3 - From Snowsfields / Kirby Grove

Existing Proposed

This is a view westwards along Snowsfields from the crossing with Kirby Grove. Although new development has Some parts of the proposed new development located between the new Cancer Centre and the Guys’ tower are
been just completed in the block on the northern side of Snowsfields within the Bermondsey Street Conservation likely to be visible in the background. It would be recommended that the proposed buildings slope down from
Area the Guy’s tower and the Shard are still visible on the right. The new Cancer Centre terminates Snowsfields north to south and do not exceed the height of the Guy’s tower and the Cancer Centre respectively.
in the distance, with the Guinness Trust buildings dating from 1897 visible in the foreground on the left hand side.
A similar view would be experienced from the grounds of Snowsfields primary School as well.
Master Plan - September 2016 93

6
Local View 4 - From St George’s Churchyard Gardens

Existing Proposed

This view is taken from St George’s Churchyard Garden. The garden, once the churchyard around St George the It is recommended that new development retains this relationship. If taller elements are proposed they could be
Martyr Church, is now cut off from the church. The northern boundary of the gardens, visible in the view to the clustered around the higher block of the Guy’s tower with buildings to the right of it should sloping down to relate
development site is the wall of the old Marshalsea Prison. The view is framed by the Southwark Local History to the height of the Courts building.
Library & Archive building on the left and the lane trees within the garden to the right. The back façade of the
Southwark Coroner’s Court is visible to right under the trees. The new Cancer Centre, Guy’s tower and the Shard
form a group of buildings, sloping down from north to south that are visible behind the old prison.
94 London Bridge Campus Masterplan

6
Local View 5 - From Southwark Street

Existing Proposed

This view is taken from the southern side Southwark Street on the eastern side of the Railway Bridge. The site The dominant element in the view is the Shard with Guy’s tower secondary in height to the south. Proposed taller
in foreground is not built up and the view would change if it was, a similar view is also experienced from trains buildings in the masterplan area should step down to south and have vertical emphasis to help break up the
running on the bridge above into Cannon Street Station and London Bridge Station. Some of the platforms at massing. The townscape will benefit from breathing space between taller elements which would be secondary
Blackfriars Station and Cannon Street Station also offer similar views to the masterplan area, with Southwark to the Shard and The Guy’s tower.
Cathedral also visible in the foreground.
Master Plan - September 2016 95

6
Local View 6 - From the George Inn Yard

Existing Proposed

This view provides the background setting of the Grade I listed George Inn. Visitors are invited to go through The redevelopment immediately to the east of the George should respect the scale and character of the existing
the gates of the Inn on Borough High Street and as they have just made a couple of steps the view opens up. historic context. The scale of the potential new development to the right of Guy’s tower should be designed to not
The three storey inn is on the right, with the view terminated by a 4 storey building and the Guy’s tower in the dominate the skyline but blend with it, be secondary to the Guy’s tower and, slope down to the south with vertical
background. emphasis in the treatment of the façade.
96 London Bridge Campus Masterplan

6.3 Streetscape

The following pages analyse the impact of the


development on the surrounding streetscape. The
studies on the following pages relate to Newcomen
Street, Snowsfields, Weston Street and Borough High Southwark Street
Street

d
Pon
Section D

aze
eet

at M
Str

Gre
igh
hH

Ne
wc
g

om
rou

en
Str
Bo

eet

Section A1 Section C2

et
Section A2

tre
s
sfield

Weston S
Sn o w

Key to Sections Section B3

Section A1-A3 Newcomen Street NTS Section A3 Section B2


Section B1-B3 Snowsfields N Section B1 Section C1
Section C1-C2 Weston Street
Section D Borough High Street

Borough High Street Newcomen Street Snowsfields Weston Street


Master Plan - September 2016 97

6
Street Image 1 - Weston Street
Weston Street runs north to south linking St Thomas
Street to Long Lane. The predominant width of the
street is 12m but it goes down to 9m just to the south
of the junction with Snowsfields. A tight urban grain

treet
existed in this area before but it has been lost through
the various 20th century interventions.
Section
C2

Weston S
The existing campus buildings fronting the western
side of Weston Street vary in height from 2 -the
fi elds
Snows
Greenwood Theatre to 18 - the Wolfson House, and
in facade length - from 44 to 15m. The ground floor
frontages are predominantly blank and uninviting.

The existing buildings on the eastern side of Weston View to North


Street which are within the Bermondsey Street Section
Conservation Area are of much finer grain. C1

The redevelopment represents an opportunity to


improve the frontages along Weston Street, establish
an attractive pedestrian environment and enhance the
settings of historic buildings. Where taller buildings are
proposed they should be set back from the building
line.

Existing Building Section

Proposed Building Section

Proposed Building at back

Section C1 Section C2 View to South


98 London Bridge Campus Masterplan

6
Streetscape - Snowsfields
The character of Snowsfields west of Weston Street is
very different to the tight urban grain of 19th Century
terraces. Frontages are poorly defined and often blank.
The recently completed Cancer Centre is built tight
against the building line and its presence is somewhat
s
overbearing against the two storey buildings on the sfield
south side of the street. Snow
Section
The new development provides an opportunity to B2
Section
consider street proportions and frontages on both B3
ion B1
sides of the street. At the moment the width varies from
Sect
11m at the Weston Street, to 17m at the multistorey car
park to 13 at Great Maze Pond Road. A consistent
width and height could be introduced along the street East of Great Maze Pond, the new cancer centre
with taller buildings set back from the building line to
create a street of human scale and proportions, which
opens up at main entrances and street junctions.

Existing Building Section

Proposed Building Section

Proposed Building at back

Section B1 Section B2 Section B3 West of Weston Street


Master Plan - September 2016 99

6
Street Image 3 - Newcomen Street
The western end of Newcomen Street has retained

t
tree
its historic character with widths ranging from 6 to 8

hS
metres and buildings of 3 - 4 storeys. The majority of
the street has been significantly changed by post war

Hig
development and the feeling of enclosure and scale

gh
has been lost.

rou
Sec
tion Ne
Bo
The redevelopment could provide better containment A1 wc
om
to the public realm located on the southern side of the Se en
cti Str
street and maintain a strong street frontage. The new on eet
development will need to be of appropriate scale and A2
proportions to maintain a consistent building line and
have regard to the quality of the adjacent Conservation
Area and listed buildings. Sec View to East
tion
A3

Existing Building Section

Proposed Building Section

Proposed Building at back

Section A1 Section A2 Section A3 View from Borough High Street


100 London Bridge Campus Masterplan

6
Street Image 4 - Borough High Street
Borough High Street is a Conservation Area and
includes a number of listed buildings. It is characterised
by continuous frontages only interrupted by narrow
lanes. The building height is predominantly 4 storeys
which creates comfortable street enclosure against
the width of the street.

The masterplan area is immediately to the east of


Borough High Street but only Guy’s tower is visible

t
tree
from the western pavement to the south of Union
Street where one of the buildings on the eastern side

hS
drops down to 2 floors.

Hig
Building heights within the masterplan area respect View to South

gh
the character and proportions of Borough High Street
with buildings immediately to the east being sensitively
Section D
rou
integrated within the existing urban grain.
Bo

Existing Building Section

Proposed Building Section

Proposed Building at back

Section D View from west side, south of Union Street


Phasing

7
102 London Bridge Campus Masterplan

7.1 Options

7
Two phasing options have been tested with the
Masterplanning team:

Option A - Phased demolition of Borough Wing


Option B - Single phase demolition of Borough Wing

Option A was selected to be tested further as this


option is less disruptive to ongoing operations on
the campus and also requires less decant within the
retained Hospital Estate.

F (b)

G
F (a)
F (c) D
E
B

H J A

Plot Diagram Showing Area for Partial Demolition of the Eastern End of the Borough Wing
Master Plan - September 2016 103

7.2 Preferred Phasing

7
Enabling Step
Enable

Area Total Demolition

Plot Action (m2)


Decant
G Construction 1700
G Refurbishment 2400 Construction

Refirbishment
Summary of Enabling Actions
Built
The following enabling works to the main hospital have been
identified which will be required before the following steps
can progress:

• Mortuary moves to basement - Plot G


GH06
• Central Stores (engineering) moves to basement - Plot G GH10

• Wards from eastern part of Borough Wing (3no.) move to


vacant SLAM wards (4no.) in Bermondsey Wing - Plot G Plot Fb GH21
• Expansion of theatres in atrium of Tower Wing - Plot G GH03
GH19

GH49 GH20 Plot G

GH25

Plot B

GH46

Plot A
Plot J
104 London Bridge Campus Masterplan

7
Step 1
Step 1

Area Total Demolition

Plot Action (m2)


Decant
A Demolition 12200
Construction
Fb Demolition 10815
Refirbishment
Summary of Step 1 Actions
Built

• Demolition of KCL Backlands around Talbot Yard -Plot Fb


• Demolition of Multi storey car park
• Demolition of Ronald McDonald House

GH06
GH10

Plot Fb GH21
GH03
GH19

GH49 GH20 Plot G

GH25

Plot B

GH46

Plot J
Master Plan - September 2016 105

7
Step 2
Step 2

Area Total Demolition

Plot Action (m2)


Decant
J Demolition 480
Construction
A Construction 25400
Fb Construction 22600 Refirbishment

Summary of Step 2 Actions Built

• Construction of 500 seat lecture theatre and seminar


spaces - Plot Fb
• Construction of 500 residential bedspaces - Plot Fb
• Construction of new consolidated Outpatients GH06
Department - Plot A GH10

• Demolition of Snowsfields flats - Plot J


Plot Fb GH21
GH03
GH19

GH49 GH20 Plot G

GH25

Plot B

GH46

Plot A
Plot J
106 London Bridge Campus Masterplan

7
Step 3
Step 3

Area Total Demolition

Plot Action (m2) Decant

B Demolition 26150
Construction
C Demolition 9650
E Demolition 4030 Refirbishment

J Construction 1800 Built

Summary of Step 3 Actions

• Demolition of Iris Brook House, Orchad Lisle House and


Plot C
Francis House - Plot C
• Demolition of Nuffield and Doyles House - Plot E GH06
GH10
• Demolition of east section of Borough Wing and south
link of Southwark and Bermondsey - Plot B
Plot Fb GH21
GH03
GH19

GH49 GH20 Plot G

GH25

Plot E Plot B

GH46

Plot A
Plot J
Master Plan - September 2016 107

7
Step 4
Step 4

Area Total Demolition

Plot Action (m2)


Decant
B Construction 83000
Construction
C Construction 34300
E Construction 18000 Refirbishment

G Construction 800 Built


C Refurbishment 6900
G Refurbishment 10000
Summary of Step 4 Actions
Plot C

• Construction of potential joint commercial development GH06


with New City Court - Plot C GH10

• Construction of Bio-sciences Hub - Plot E


• Construction of mixed-use clinical and commercial Plot Fb GH21
GH03
building - Plot B
GH19

GH49 GH20 Plot G

GH25

Plot E Plot B

GH46

Plot A
Plot J
108 London Bridge Campus Masterplan

7
Step 5
Step 5

Area Total Demolition

Plot Action (m2) Decant

D Demolition 26955
Construction
Fa Demolition 16300
H Demolition 3200 Refirbishment

I Demolition 900 Built

Summary of Step 5 Actions

• Demolition of KCL Backlands - Plot Fa


Plot C
• Demolition of remaining Borough Wing, Cunlifffe
Laboratories, Tower Link, Boiler House and New Salmon GH06
GH10
Centre - Plot D
• Demolition of Sarah Swift House and Elizabeth
Newcomen House - Plots H and I Plot Fb GH21
GH03
GH19

GH49 GH20 Plot G

Plot Fa

Plot Fc GH25 Plot D

Plot E Plot B

GH46

Plot H Plot A
Plot J

Plot I
Master Plan - September 2016 109

7
Step 6
Step 6

Area Total Demolition

Plot Action (m2)


Decant
D Construction 120000
Construction
Fa Construction 24600
Fc Construction 15400 Refirbishment

H Construction 9000
Built
I Construction 3000
Fa Refurbishment 2100
Summary of Step 6 Actions
Plot C
• Construction of new KCL academic facilities - Plot Fc
GH06
• Construction of commercial bio-sceinces centre - Plot Fa GH10

• New residential buildings Plots H and I


• Expansion of hospital and additional commercial activity Plot Fb GH21
GH03
- Plot D
GH19

GH49 GH20 Plot G

Plot Fa

Plot Fc GH25 Plot D

Plot E Plot B

GH46

Plot H Plot A
Plot J

Plot I
110 London Bridge Campus Masterplan

7
Completed Development
Master Plan - September 2016 111

7.3 Theatres Strategy

7
Masterplan to accommodate 22 theatres in total, distributed
as follows:

• Tower/ Southwark Wing first floor 11no


• OPD building on Snowsfields (plot A) 4no
• New development (plot B) 7no

The diagram opposite illustrates how the first floor of the


Southwark and Tower Wings could be reconfigured to
accommodate 11 theatres including the 4 existing theatres.

x 4

x 2 x 9

Existing Theatres Location

x 11

x 7

x 4

Proposed Theatres Location Theatres Study