Vous êtes sur la page 1sur 168

0

10

11
12

13

14
15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32
33

34

35

36

37

38

39

40

41
42

43

44

45
46

47

48

49

50

51

52
53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68
69

70

71

72

73

74

75

76

77

78

79

80

81

82

83
84

85

86
87

88

89

90
91

92

93

94

95

96

97

98

99
100

101

102

103

104

105

106
107

108

109
110

111

112

113

114
115

116

117

118

119

120

121

122

123

124

125

126
127

128

129

130

131

132

133

134

135

136

137

138

139

140

141

142

143

144
145

146

147

148

149

150

151
152
153

154

155
156

157

158

159

160

161

162
163

164

165

166

167

168

169

170

171

172

173

174

175

176

177
178
179

180
181
182

183

184
185
186

187

188
189

190

191

192

193

194

195

196

197

198

199

200

201
202

203

204

205

206

207

208

209

210

211

212

213

214

215

216

217

218

219

220
221

222

223

224

225

226

227

228

229

230

231

232

233

234

235

236

237

238
239

240
241
242

243
244
245

246
247

248
249
250
251

252
253
254

255
256

257
258
259

260
261
262
263
264
265
266
267

268
269
270

271
272
273
274
275
276
277
278

279
280
281
282
283

284

285
286

287

288
289
290
291

292
293

294

295
296
297

298
299
300

301
302

303
304

305
306

307
308
309
310
311
312
313

314

315
316

317
318
319
320
321
322

323
324

325
326
327
328
329
330
331

332
333
334

335

336

337

338
339

340

341

342
343

344

345
346
347

348
349
350
351

352
353

354
355
356
357
358
359
360
361
362
363

364
365
366
367
368

369
370
371

372
373

374
375
376
377

378
379
380
381

382
383

384

385

386
387
388

389
390
391

392

393

394

395

396
397
398

399

400

401
402
403
404
405
406
407

408
409

410
411

412

413
414
415

416

417

418

419

420
421

422

423

424
425
426
427
428
429

430
431
432
433
434
435

436
437
438
439

440
441
442

443

444

445

446

447

448

449

450

451

452
453
454
455

456

457

458

459

460

461

462
463

464

465

466

467
468

469

470

471

472

473

474

475

476

477

478

479

480

481

482
483

484

485

486

487

488

489

490

491

492

493

494

495

496
497

498

499

500
501

502
503

504

505

506

507

508

509

510

511

512
513

514

515

516
517

518

519
520
521

522
523

524

525

526

527

528

529
530

531

532

533

534

535

536

537

538

539

540

541

542
543

544

545

546

547

548

549

550

551

552

553

554

555

556

557

558

559
560

561

562

563

564

565

566

567

568
569
570
571
572

573

574

575

576

577

578

579

580
581

582
583

584

585

586

587

588

589

590

591

592
593

594
595

596

597

598
599

600

601
602

603

604

605
606
607
608
609
610

611

612
613

614
615

616
617

618

619

620

621

622

623

624

625
626

627

628

629

630

631

632

633

634

635

636
637

638

639

640
641

642

643

644

645
646

647

648

649

650

651

652

653

654

655

656

657

658

659
660
661
662
663
664

665

666
667

668
669

670

671
672

673

674
675

676

677

678
679
680

681
682
683
684
685

686
687
688
689

690

691
692
693
694
695
696

697

698

699

700

701

702

703

704

705

706

707

708

709

710

711

712

713
714

715

716

717
718

719

720

721

722

723

724

725

726
727

728

729

730

731

732

733

734

735

736

737

738

739
740

741

742

743

744

745

746

747

748

749

750

751

752

753

754

755
756

757

758
759

760

761

762

763

764

765

766

767

768

769

770

771

772

773
774

775

776

777

778

779

780

781

782

783

784

785

786

787

788

789

790

791

792
793

794

795

796

797

798

799

800

801

802

803

804

805

806

807

808

809
810

811

812

813

814
815

816

817

818

819

820

821
822
823

824

825

826

827

828

829

830

831

832

833

834

835

836
837

838

839
840

841

842

843

844

845

846

847

848

849

850

851

852

853

854

855
856

857

858

859

860

861

862

863

864

865

866

867

868

869

870

871

872
873

874

875

876

877

878

879

880

881

882

883

884

885
886

887

888

889

890

891

892

893

894

895
896

897

898

899

900

901

902

903

904

905
906

907
908

909
910
911
912

913

914

915

916

917

918

919

920

921

922

923

924

925

926

927

928
929

930
931
932
933
934

935
936
937
938

939
940

941

942

943

944

945

946

947

948

949

950

951

952
953

954

955

956

957
958

959
960

961

962

963

964
965

966

967

968

969

970

971
972
973
974
975
976
977
978

979

980
981

982

983

984

985
986

987

988

989

990

991

992

993
994

995
996
997
998
999
1000

1001
1002
1003

1004

1005

1006

1007

1008

1009

1010

1011

1012

1013

1014
1015

1016

1017

1018

1019

1020

1021

1022

1023

1024

1025

1026

1027

1028
1029

1030

1031

1032

1033

1034

1035

1036

1037

1038

1039

1040

1041

1042

1043
1044

1045

1046

1047

1048

1049

1050

1051

1052

1053

1054

1055

1056

1057

1058

1059
1060

1061

1062

1063

1064

1065

1066

1067

1068

1069

1070

1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
The third phase of an architect's regular services. [A] Schematic Design [B] Design Development [C] Con
Document [D] Construction
If portions of the buildings are erected at different periods of time, thus increasing the Architect's construct
period and burden of services, the charges pertaining to services rendered shall be doubled. A suspensio
construction for a period not exceeding ____ months shall not be covered by this provision. [A] 3 Months
Months [C] 9 Months [D] 12 Months
Approved form of security furnished by the Contractor and his Surety as a guarantee to the quality of the
materials and equipment installed and the workmanship performed by the Contractor. [A] Guarantee Bond
Proposal Bond [C] Payment Bond [D] Performance Bond
Approved form of security furnished by the Contractor and his Surety as a guarantee to the quality of the
materials and equipment installed and the workmanship performed by the Contractor. [A] Guarantee Bond
Proposal Bond [C] Payment Bond [D] Performance Bond
If the estimated cost for a residential project is P10,000,000.00, how much should the Architect bill the Cli
upon completion of the Schematic Design Phase if a downpayment of P50,000.00 has been made upon s
of the agreement ? [A] 500k [B] 150k [C] 350k [D] 850k
What pre-design service involves investigating, identifying and documenting the needs of the client for us
design of the project? [A] Project Financing [B] Economic Feasibility Studies [C] Architectural Programmin
Site Selection and Analysis
In what phase in Architects regular design services Does periodic visits to the site to familiarize himself wi
general progress and quality of the work? [A] Schematic Design [B] Design Development [C] Contract Do
[D] Construction

What method of compensation is most suitable for compensating the Architect's services for the pre-desig
phase? [A] MDPE [B] Lump Sum / Fixed Fee [C] Professional Fee + Reimb. Expenses [D] Combination

In Code of Ethics, does serving as professional adviser, accepts employment as Design Architect for a
competition project an unethical action with respect to the Architect's responsibility to __________? [A] Th
People / Public [B] Client [C] Contractor [D] Manufacturers and Dealers [E] Subordinates and Colleagues
This shall be issued by the Owner to the Contractor following the execution of the Contract Agreement. [A
to Proceed [B] notice to Start [C] Notice to begin [D] Notice to Initiate
Which is an ethical action with respect to the Architect's responsibility to his manufacturer's, dealers and a
[A] accepts market discounts credited to client [B] receives gifts or favors from agents [C] receives commi
placing him in a reciprocal frame of mind. [D] avails of technical services by manufacturer accompanied b
obligation
Listing of the different parts of the work indicating in each part the corresponding value in materials and la
including an allowance for profit and overhead. [A] Change Order [B] Breakdown of Work and Correspond
Value [C] Punchlist Items [D] None of the Above
Is An architect offering free design services for a church an example of ethical practice? [A] True [B] False
Not a function of the Construction Supervision Group. [A] prepares PERT-CPM [B] review extra work orde
claimed by contractor [C] conducts regular coordination meetings [D] check materials storage
A type of specification stipulating the use of specific product/s or processes without provision for substituti
Open [B] Closed [C] Brand Name [D] Performance
Included under Part I-General Requirements of a three-part section specification format. [A] Mixes [B] Fab
[C] Installation [D] requirements of regulatory agencies
Within how many days from the date the change is ordered shall any claim for adjustment involving quest
fact be asserted [A] 10 days [B] 15 Days [C] 30 Days [D] 60 Days
In BP 220 Economic and Socialized Housing Law, What is the minimum Door Width Construction for Toile
0.55 [B] 0.60 [C] 0.71 [D] 0.80
The Project Construction Cost referred to in the compensation of the Architect for his Regular Design Fee
the cost of the completed structure which include one of the following: [A] Grottos [B] swimming pool [C] m
pieces of furniture [D] communications and electronic system
When the design of the Architect is used again to build a sixth structure without amending the drawing and
specifications, how much shall the Architect's fee be computed? [A] 80% [B] 60% [C] 40% [D] 20%

A method of compensation that represents a risk situation to the Architect since his costs may exceed the
amount. [A] MDPE [B] Lump Sum or Fixed Fee [C] Professinal Fee + Reimb. Expenses [D] Turnkey
A full-time construction inspector as deemed necessary shall be engaged and paid for by the Owner and
under the technical control of whom? [A] Engineer [B] Owner [C] Contractor [D] Architect
The multiple of personnel direct expense is applicable only to what type of work? [A] Research [B] Econom
Feasibility [C] Architectural Programming [D] All of the Above
For a housing project exceeding 10 units, how much is the minimum fee chargeable for each additional un
excluding the fees for the first 10 units? [A] 10% of Minimum Basic Fee [B] 30% MBF for 2nd to 10th Unit
MBF for 11th Unit above [D] 60% MBF for 11th Unit and Above
What is the minimum basic fee for public health centers with a project construction cost of P50M or less?
[b] 6% [C] 7% [D] 8%
Which group classification belongs projects involving extensive detail such furniture design, built-in equipm
special fittings, screens, counters, interiors and other detailed parts of appurtenances of buildings or struc
and landscaping designs? [A] Group 1 Simple [B] Group 2 Moderate [C] Group 3 Exceptional [D] Group 5
Monumental [E] Group 8 Extensive
What is the minimum basic fee for public markets with a project construction cost of P50M. [A] 6% [B] 7%
[D] 10%
How are projects classified in determining the basis for the Architect's Basic Fee? [A] Degree of Project
Complexity [B] Owners Financial Funds [C] Contractors Adaptability to Project [D] Architects Reputation
What is the minimum basic fee for publishing plants with a project construction cost of P40M? [A] 2.4M [B
[C] 3.2M [D] 3.6M
A method of compensation that is flexible, easy to apply and is related to the size and the type of the proje
MDPE [B] PCC [C] Lumpsum / Fixed Fee [D] Professional Fee + Reimb. Expenses
Most expensive and time-consuming method of selecting the Architect. [A] Direct [B] Indirect [C] Design
Competition [D] All of the Above
A method of selection for an Architect most often used by an individual person undertaking a relatively sm
project [A] Direct [B] Indirect [C] Design Competition [D] All of the Above
What is the minimum basic fee for museums with a project construction cost of P100M? [A] 10% [B] 12%
[D] 20%
Not a criteria for computing the Architect's compensation. [A] talent and skill [B] Experience [C] Personal
Relations [D] Effort and Time availability
A Master's Degree in Architecture shall be credited how many months in the practical experience required
person applying for examination? [A] 6 Months [B] 12 Months [C] 24 Months [D] 3840 Hours
Who shall accredit Continuing Professional Development providers? [A] UAP [B] Board Of Architecture [C
[D] IAPOA
Duly notarized written contract or equivalent public instrument stipulating the scope of services and guara
compensation of such services. [A] Service Aggreement [B] Written Notice [C] Notice To Proceed [D] Non
Above
The government architect-of-record shall collect from the concerned national or local agency an incentive
cover the civil liabilities in the equivalent amount of ___% of the project cost of every project provided it sh
exceed ___% of his annual salary which shall be paid full completion of the project. [A] 1.5%/50% [B] 2%/
3%/50% [D] 4%/50%
The selection of a member of the Board of Architecture will commence with the submission of a list of five
nominees submitted by whom? [A] UAP [B] PRC [C] IAPOA [D] PRBOA
Project financing falls under what kind of service of the architect. [A] Comprehensive Services [B] Special
Allied Services [C] Pre Design [D] Regular Design Services
Comprehensive planning falls under what service of the architect. [A] Comprehensive Services [B] Specia
Allied Services [C] Pre Design [D] Regular Design Services
The fee of the architect for design-build services on a guaranteed maximum cost aside from his fee for reg
design services. [A] 7% [B] 10% [C] 12% [D] 15%
What percentage of an architect's work is liability under the civil code. [A] 5% [B] 10% [C] 20% [D] 50%
For interior design services, the architect shall be paid what percentage of the fee upon submission of the
design. [A] 5% [B] 25% [C] 50% [D] 20%
When the owner fails to implement the plans and documents for construction as prepared by the architect
architect is entitled to receive what percentage of his fee. [A] 35% [B] 50% [C] 85% [D] 98%
The minimum fee per appearance of an architect when rendering service as an expert witness shall be. [A
200PHP [B] 500PHP [C] 750PHP [D] Free of Charge
The minimum basic fee for specialized decorative building. [A] 10% [B] 12% [C] 15% [D] 20%
The minimum basic fee for industrial buildings with a project cost below 50 million pesos. [A] 6% [B] 7% [C
[D] 10%

The minimum basic fee for hospitals with a project cost below 50 million pesos. [A] 6% [B] 7% [C] 8% [D]
In design-build services, the single-point-responsibility of project delivery puts the legal liability for both the
and construction on the. [A] Engineer [B] Architect [C] Owner [D] Contractor [E] Manufacturer
The release of 10% retention by the owner shall be done after how many months from the date of final pa
[A] 1 Month [B] 3 Months [C] 6 Months [D] 12 Months
Printed documents stipulating the procedural and administrative aspect of the contract. [A] Specifications
General Conditions [C] Special Provisions [D] Written Notice
An outline specification enumerating the type and trade names of materials to be used. [A] Schedule of m
and Finishes [B] Breakdown of Work and Cost [C] Quotation [D] Estimate Cost
A per diem of not less than _____ plus traveling and living expenses shall be chargeable to the Owner on
occasion where the Architect or his duly authorized representative shall be required to perform services a
locality beyond the radius of ____ kilometers from his established office. [A] 500PHP/50KM [B] 500PHP/1
[C] 1000PHP/50KM [D] 1000PHP/100KM
Invitations issued to prospective bidders, giving information as to the nature of the proposed project, cond
for the issuance of contract documents, date of bidding, and estimated cost or information that would give
Contractor a general idea of the magnitude and extent of the project. [A] Written Notice [B] Instruction To B
[C] Invitation To Bid [D] Bid Bullentin
Which is included in the Architect's Professional Fee? [A] fees for soil tests [B] fees for electronic system d
[C] fees for mechanical systems design [D] fees for topograhical surveys
The act of conceiving, choosing and developing the type, disposition, arrangement and proportioning of th
structural elements of an architectural work giving due consideration to safety, cost-effectiveness, function
and aesthetics. [A] Structural Design [B] Structural Analyzation [C] Structural Conceptualization [D] Struct
Framework
What type of specification does this statement refer to? - "FAN - the fan shall be Model No. XYZ as manuf
by the Static Air Fan Company of Texas or an equal approved by the Architect" [A] Open [B] Close [C] Bra
Name [D] Performance [E] Combination
Included under Part 1 of a three-part section specification format. [A] General Requirements [B] Mixes [C]
Fabrication [D] Installation
A provision in the Architecture Act of 2004 pertaining to application of a foreign citizen taking the licensure
examinations. [A] Reciprocity [B] Reciprocality [C] Reflexibility [D] None of the above
Which of the following services are expected from the architect serving as building/ground administrator?
Building Maintenance [B] Bidding of tennants for rentals/utilities [C] Ownership [D] Partnership
What part of the Architect services is space/management studies? [A] Comprehensive Services [B] Speci
Allied Services [C] Design Build [D] Regular Design Services [E] None of the above
What is the general basis of the Architects minimum basic fee? [A] PCC [B] Contractors Funds [B] Owner
Financial Support [D] Architects Reputation
In BP 220 Economic and Socialized Housing Law, What is the minimum Door Width Construction for Bed
and Services Areas? [A] 0.55 [B] 0.60 [C] 0.70 [D] 0.80
What part of the Architects services is site selection and analysis? [A] Comprehensive Services [B] Specia
Allied Services [C] Design Build [D] Regular Design Services [E] None of the above
Which work item is chargeable to the Owner and not included in the regular scope of services? [A] miniatu
models of design studies [B] extra drafting of changes made by Owner [C] structural analysis [D] electrica
calculation
In BP 220 Economic and Socialized Housing Law, What is the minimum Door Width Construction for Main
[A] 0.55 [B] 0.60 [C] 0.71 [D] 0.80
In Regular Design Services of an Architect, What is the minimum basic fee for projects that are under Gro
Exceptional Buildings? [A] 6% [B] 7% [C] 9% [D] 10% [E] None of The Above
Which of the following does NOT constitute the post-construction services of the architect? [A] Real prope
evaluation [B] Post-construction evaluation [C] Building/ground administration [D] Building/equipment
maintenance
One of the methods of compensation for architectural service is based on technical hours and expenses &
by adding all costs of technical services (man-hours time rate). A multiplier is used to take care of overhea
profit. This method, however, is applicable only to non-creative work & aspects of pre-design services &
supervision work. What is this method called? [A] Lump Sum [B] Cost + Fixed Fee [C] MDPE [D] PCC
Which is not true for Consulting Architect? [A] assumes civil liability [B] with exceptional expertise [C] licen
Architect [D] with academic qualifications
Not included in the scope of practice of Architecture. [A] architectural designing [B] Structural Design [C] s
analysis [D] Quality Surveys
What pre-design service involves investigating, identifying and documenting the needs of the client for us
design of the project? [A] Project Financing [B] Economic Feasibility Studies [C] Architectural Programmin
Site Selection and Analysis
What is PD 49? [A] Intellectual Property law [B] Socialized Housing Law [B] Condominium and Subdivisio
Buyers Act [D] The Architectural law
What is LOI 1000? [A] Letter of Insertion Mandating Government Support only to the APO [b] Letter of Ins
Mandating Government Support only to the APO [c] Letter of Inscription mandating government support o
the APO [D] Too tired to read, i dont have any answer

What is EO 164? [A] Executive order regarding Hiring of Foreign Consultants [B] Executive order regardin
Socialized Housing law [c] Executive order regarding National building Code [D] None of the above
What is PD 1096? [A] Fire Code [B] National Building Code [C] Socialized Housing [D] Condominium and
Subdivision Buyers Protective Law
What is PD 957? [A] Fire Code [B] National Building Code [C] Socialized Housing [D] Condominium and
Subdivision Buyers Protective Law
What is BP 220? [A] Socialized Housing [B] National Building Code [C] Law Enhancing the Mobility of the
Disabled [D] Condominium and Subdivision Buyers Protective Law
What is BP 344? A] Socialized Housing [B] National Building Code [C] Law Enhancing the Mobility of the
Disabled [D] Condominium and Subdivision Buyers Protective Law
What is PD 1185? [A] Fire Code [B] National Building Code [C] Socialized Housing [D] Condominium and
Subdivision Buyers Protective Law
What is U.A.P Doc 205? [A] Regular Design Services [B] Specialized Allied Services [C] Post Constructio
Services [D] Comprehensive Architectural Services
What is U.A.P Doc 206? [A] Regular Design Services [B] Specialized Allied Services [C] Post Constructio
Services [D] Comprehensive Architectural Services
What is U.A.P Doc 207? [A] Design Build Services [B] Specialized Allied Services [C] Post Construction S
[D] Comprehensive Architectural Services
What is RA 545? [A] The Architectural Law [B] PRC Law [C] Intellectual Property law [D] Law of the Indies
What is U.A.P Doc 201? [A] Design Build Services [B] Specialized Allied Services [C] Post Construction S
[D] Comprehensive Architectural Services [E] None of the above
What is U.A.P Doc 202? [A] Regular Design Services [B] Specialized Allied Services [C] Post Constructio
Services [D] Comprehensive Architectural Services
What is U.A.P Doc 203? [A] Regular Design Services [B] Specialized Allied Services [C] Post Constructio
Services [D] Comprehensive Architectural Services
What is U.A.P Doc 204? [A] Regular Design Services [B] Specialized Allied Services [C] Post Constructio
Services [D] Construction Services
Which should be avoided in specifications writing? [A] long sentences [B] simple declarative sentences [C
ambiguous sentences [D] plain words/terms

What does ASTM stand for? [A] American Science for Testing and Materials [b] American Standards for Te
and Materials [c] American Society for Testing and Materials [D] American Specialization for Testing and M
Traditional name for construction inspectors. [A] Foreman [B] Labor [C] Clerk or Works [D] Mason
What is the basic rate for the first 100 hectares or less for subdivision planning for housing on properties w
Metro Manila, cities, regional centers and provincial capitals? [A] 5000 per hectare [b] 3000 per hectare [c
per hectare [d] its free of charge
What is Division 7 of the 16-division uniform construction index? [A] General Conditions [B] Doors and Wi
[C] Thermal and Moisture Protection [D] Specialties
What is Republic Act 7277? [A] Architecture Law [B] PRC law [C] Magna Carta for Disabled Persons [D]
Intellectual Property Law
How many groups are there in the "classification and general requirements of all buildings by use or occu
[A] 9 [B] 10 [C] 11 [D] 12
A price given by a contractor, sub-contractor, material supplier or vendor to furnish materials, labor or both
Cost [B] Estimates [C] Bill of materials [D] Bill of Quantities [E] Quotations

A statement from the architect confirming the amount of money due the contractor for work accomplished
Certificate of Payment [B] Certificate of Completion [C] Certificate of Performance [D] Certificate of Recog

A bond furnished by the contractor and his surety as a guarantee to execute the work in accordance with
terms of the contract. [A] Performance Bond [B] Surety Bond [C] Guarantee Bond [D] Proposal Bond [E] B
An offer to perform the work prescribed in a contract at a specified cost. [A] Bid [B] Estimate [C] Cost [D] N
the above
The fee of the architect for design-build services by administration. [A] 5% [b] 7% [c] 10% [d] 12%
A stipulation of the use of specific products or processes without provision for substitution. [A] Open
Specifications [B] Closed Specification [C] Brand name [D] Performance
A list of instructions stipulating the manner on which bids are to be prepared. [A] Instruction to Bidders [B]
bullentin [c] Written Notice [D] Special Provisions
The performance and Payment Bonds shall be released by the owner after the expiration of how many m
from the final acceptance of the work. [A] 1 Month [B] 2 Months [C] 3 Months [D] 4 Months
The Guarantee Bond is released how many months after the date of final payment. [A] 12 Months [B] 6 M
[C] 3 Months [D] 2 Months
How many days shall the Building Official issue a certificate of occupancy after final inspection of the proje
15 days [B] 30 Days [C] 45 days [D] 60 Days
A statute specifying the period of time within which legal action must be brought for alleged damage or inj
Statute Period [B] Statute of Limitation [C] Statutory Bond [D] Statute of Frauds
A bond, the form or content of which is prescribed by statute. [A] Statute Period [B] Statute of Limitation [C
Statutory Bond [D] Statute of Frauds
A rule that certain kinds of contracts are enforceable unless signed and in writing or unless there is a writt
memorandum of their terms signed by the party to be charged. [A] Statute Period [B] Statute of Limitation
Statutory Bond [D] Statute of Frauds
A contract transferring the right of possession of buildings, property, etc., for a fixed period of time, usually
periodical compensation called 'rent'. [A] Rent [B] Lease [C] Leasehold [D] Lessor [E] Lessee
A tenure by lease; real estate held under a lease. [A] Rent [B] Lease [C] Leasehold [D] Lessor [E] Lessee
The person receiving a possessory interest in buildings, property, etc., by lease. [A] Rent [B] Lease [C] Le
[D] Lessor [E] Lessee
The person granting a possessory interest in buildings, property, etc., by lease. [A] Rent [B] Lease [C] Lea
[D] Lessor [E] Lessee

Range of the multiplier for Multiple of Direct Personnel Expense. [a] 1.0 - 1.5 [b] 1.5 - 2.0 [c] 2.0 - 2.5 [d] 2
This type of compensation is only applied to non-creative work. [A] MDPE [B] PCC [C] Cost Fee + Expens
Lump Sum / Fixed Fee
Supervision Work is a non-creative work, true or false. [A] True [B] False
A world-wide used method of compensation for architectural services. [A] MDPE [B] PCC [C] Cost Fee +
Expense [D] Lump Sum / Fixed Fee
This method of compensation is applied only to pre-design services, supervision work, and other works w
Architect may perform other than the regular and specialized allied services. [A] MDPE [B] PCC [C] Cost
Expense [D] Lump Sum / Fixed Fee
This type of compensation is similar to the concept being charged by realtors, developers, and lawyers. [
MDPE [B] PCC [C] Cost Fee + Expense [D] Lump Sum / Fixed Fee
For reimbursable expenses, how many kilometers from the Architect's office shall a work be located to allo
reimbursable expenses. [A] 50kms [b] 100kms [c] 150kms [d] 200kms
This method of compensation is frequently used where there is continuing relationship on a series of proje
Professional Fee + Reimb. Expenses [B] MDPE [C] Lump Sum / Fixed Fee [D] MDPE
The full-time construction inspector shall be under the technical control and supervision of the _________
Engineer [B] Foreman [C] Owner [D] Contractor [E] Architect
Submission of shop drawings shall be accompanied by a ___ in duplicate. [A] Letter of Submittal [b] Lette
resignation [C] Letter of transmittal [D] Letter of Invoice
How many sets of shop drawings for approval shall the contractor submit to the Architect? [A] 1 [b] 2 [c] 3
5
Who shall have the responsibility of securing, but not liable for non-issuance, of the final occupancy perm
Owner [B] Architect [C] Engineer [D] Contractor [E] SubContractor [F] Mayor

True or false, can the owner relegate to the contractor the responsibility of establishing the lot lines, bound
lines, easements, and benchmarks provided that the owner pays the contractor for such works? [A] True [
Who shall have the responsibility for establishing lot lines, boundary lines, easements, and benchmarks?
Owner [B] Architect [C] Contractor [D] Building Official [E] Surveyor
Who shall pay for the services of a licensed surveyor for confirmation and certification of the location of co
centers, piers, walls, pits, trenches, pipe work, culvert work, utility lines, and other similar works required b
contract. [A] Owner [B] Architect [C] Contractor [D] Building Official
Professional Fee for the Architect as a full-time supervisor. [A] 1.0 - 1.5% [B] 2.0 - 5.0% [C] 1.5 - 3% [D] D
on the Negotiations
Professional fee for the Construction Manager. [A] 1.0 - 1.5% [B] 2.0 - 5.0% [C] 1.5 - 3% [D] Depends on t
Negotiations
Four types of Contracts for construction management. I. Firm Fixed Price II. Fixed Price Incentive III. CPIF
IV. Cost Plus Fixed Fee [A] I, II, III [B] II, III, IV [C] I, II, IV [D] I, III, IV [E] All of the Above
Under PD 1096, what should be the proportion of sidewalk width to that of the road right-of-way? [A] 1/3 [B
[C] 1/6 [D] 1/12
At what interest rate per month should a client pay the architect should the former fail to pay the latter bey
days from receipt of billing? [A] 1% [B] 1.5% [C] 2% [D] 3%
What code holds the architect responsible for the building/structure he designed for a certain period of tim
National Building Code [B] Structural Code [C] Fire Code [D] Civil Code
What type of compensation is applied to cases where the architect's personal time is required, such as
conferences, joint venture activities, etc.? [A] Per Diem + Reimb. Expenses [B] MDPE [C] PCC [E] Lump S
Fixed fee
What type of bond guarantees payment on all obligations arising from the contract? [A] Guarantee Bond [
Payment Bond [C] Performance Bond [D] Proposal Bond [E] Surety Bond
What type of compensation is applied to most of Gov't projects and entails more paper works and is
advantageous to both client and architect. [A] Per Diem + Reimb. Expenses [B] MDPE [C] PCC [E] Lump
Fixed fee
Professional Fee for the Project Manager. [A] 1.0 - 1.5% [B] 2.0 - 5.0% [C] 1.5 - 3% [D] Depends on the
Negotiations
If the Project Manager is hired by the owner, who shall have the responsibility of hiring the Construction
Manager? [A] Architect [B] Owner [C] Contractor [D] Project Manager [E] Project Representative
True or false, based on the Civil Code, the Project Manager has no legal responsibility insofar as design a
construction is concerned. [A] True [B] False
His primary responsibility is the exercise of overall cost control which relieves the owner of many of the an
that usually beset , particularly those concerned with forecasting cost and completion dates. [A] CM [B] PM
Architect [D] Contractor
In the architect's code of ethics, to whom does the architect has responsibility to seek opportunities for
constructive service in civic and urban affairs? [A] Subordinates [B] Contractor [C] Public [D] Manufacture
What PD created the PRC which regulates the practice of various professionals. [A] PD 1096 [B] PD 957
223 [D] PD 1185
Architect XYZ uses paid advertisements without sanction by professional consensus and years of experie
action is unethical with respect to his relation to whom? [A] Public [B] Subordinates [C] Owner [D] Contrac
Manufacturer
Additional information on contract documents issued to bidders before date of bidding. [A] Bid Bullentin [B
Written Notice [C] Invitation To Bid [D] Special Provisions
The offer of a bidder to perform the work described by the contract documents when made out and submi
the prescribed proposal form, properly signed and sealed. [A] Proposal [B] Bid [C] Cost [D] None of the Ab

The cashier's check or surety bond accompanying the proposal submitted by the bidder, as a guarantee t
bidder will enter into a contract with the owner for the construction of the work, if the contract is awarded t
[A] Bid Bond [B] Guarantee Bond [C] Proposal Bond [D] Performance Bond [E] Payment Bond
Instructions which may be issued prior to the bidding to supplement and/or modify drawings, specification
and/or general conditions of the contract. [A] Bid Bullentin [B] Written Notice [C] Invitation To Bid [D] Spec
Provisions
Written or printed description of work to be done describing qualities of material and mode of construction
Written Notice [B] Specifications [C] Contract Documents [D] Bid Bullentin
Means information, advice or notification pertinent to the project delivered in person or sent by registered
the individual, firm or corporation at the last known business address of such individual, firm or corporatio
Written Notice [B] Specifications [C] Contract Documents [D] Bid Bullentin
Includes labor or materials or both as equipment, transportation, or other facilities necessary to commenc
complete the construction called for in the contract. [A] Written Notice [B] Specifications [C] Contract Docu
[D] Bid Bullentin
Means to build-in, mount in position, connect or apply any object specified ready for the intended use. [A]
[B] Furnish [C] Install [D] Work
Means to purchase and/or fabricate and deliver to jobsite. [A] Provide [B] Furnish [C] Install [D] Work
Means to furnish and install. [A] Provide [B] Furnish [C] Install [D] Work
No further retention shall be made on the balance of the contract when how many percent of the contract
been completed? [A] 25% [B] 50% [C] 75% [D] 85%
No payment shall be made on contracts in excess of how many percent of the contract Price. [A] 35% [B]
65% [D] 85%
The guarantee bond is equal to how many percent of the contract price? [A] 5% [B] 15% [C] 30% [D] 10%

How many percent of the architect's fee is payable to the architect upon completion of the preparation of t
schematic design phase and up to final design development phase? [A] 5% [B] 10% [C] 20% [d] 30% [E] 3
Standard factor computed for changes and/or revisions made on completed contracts. [A] 1.0 [B] 1.5 [C] 2
2.5 [E] 3.0
Approximately, how many square meters of office space for the architect is built by the contractor as temp
facilities for the project. [A] 10sqm [b] 12sqm [c] 14sqm [d] 16sqm
All trees and other plants that need to be transplanted elsewhere within ___ meters shall be done by the _
his own expense. [A] 50mts/owner [b] 50 mts/contractor [C] 100mts/owner [d] 100mts/contractor

If there is a variance/discrepancy between the drawings and specifications, what shall be followed? [A] Dr
[B] Specifications [C] Own Discretion [D] It Depends [E] Reject the drawings and return it to the contractor
How many days prior to bidding shall the contractor seek the architect's clarification as to the particular a
work which requires evaluation of the architect? [A] 10 Days [B] 15 Days [C] 30 Days [D] 60 Days
How many days upon written notice can a contractor terminate a contract with a valid reason? [A] 10 Day
Days [C] 30 Days [D] 60 Days

Suspension of work for ___ days by order of any court or other public authority through no act or fault of th
contractor gives the him the right to terminate contract. [A] 90 Days [B] 120 Days [C] 150 Days [D] 180 Da
the contractor can terminate contract if the owner should fail to pay the contractor any sum within ______
days after its award by arbitration [A] 10 Days [B] 15 Days [C] 30 Days [D] 60 Days
the contractor can terminate contract if the owner should fail to act upon any request for payment within
__________ days after its certification by the architect. [A] 10 Days [B] 15 Days [C] 30 Days [D] 60 Days
What pre-design service involves investigating, identifying and documenting the needs of the client for us
design of the project? [A] Project Financing [B] Economic Feasibility Studies [C] Architectural Programmin
Site Selection and Analysis
Who declares bankruptcy as a valid reason for the termination of a contract? [A] Architect [B] Owner [C]
Contractor [D] Bank
Is making periodic visits to the site a responsibility of the Architect in the Construction Phase of the Regula
Design Services? [A] True [B] False
If portions of the buildings are erected at different periods of time, thus increasing the Architect's construct
period and burden of services, the charges pertaining to services rendered shall be doubled. A suspensio
construction for a period not exceeding ____ months shall not be covered by this provision. [A] 2 Months
Months [C] 6 Months [D] 12 Months
Arrange sequentially the following work according to the 16-division uniform construction index: i. Therma
Moisture Protection ii. Specialties iii.Finishes iv. Doors and Windows [A] I, IV, III, II [B] IV, I, III, II [C] III, I, IV
II, III, IV
Within 15 days after the awards of Bids, the payment to the Architect shall be adjusted so that it will amou
sum equivalent to how many percent of the Basic Fee, computed upon the winning Bid Price? [A] 35% [B
[C] 85% [D] 98%
The Architect's Fee is net to the Architect. What tax that the government may impose on the Architect sha
paid by the Owner? [A} Value Added Tax [B] Internal Revenue Tax [C] Sedula [D] Lot Tax
True or false, upon termination of contract and upon the decision of the architect that materials and equip
by the contractor which do not belong to him can be used and rent of such shall be borne by the failing co
[A] True [B] False
True or false, in case of suspension of work, all unpaid work executed including expenses incurred during
suspension shall be evaluated by the architect and charged to the owner. [A] True [B] False
True or false, the owner has no right to claim liquidated damages if he takes over the work from the contra
failure to complete the project. [A] True [B] False
How many days prior to canceling an insurance be given to the owner stipulating the intention to cancel?
Days [B] 15 Days [C] 30 Days [D] 60 Days
How many percent of the contract amount is the Performance Bond? [A] 5% [B] 10% [C] 15% [D] 30%
How many percent of the contract amount is the Payment Bond? [A] 5% [B] 10% [C] 15% [D] 30%
A contract provision setting forth the damages a party must pay in the event of his breach. [A] Penalty Cla
Arbitration [C] Breach of Contract [D] None of The Above
Basic Fee for Physical Planning Type 1 or site such as industrial estates, commercial centers, sports com
resorts, etc. [A] 5,000 For First 50 HEC [B] 4,000 For First 50 HEC [C] 3,000 For First 50 HEC [D] 2,000 F
50 HEC
Predecessor of PD 1096 [A] RA 6451 [B] RA 9266 [C] PD 1185 [D] PD 223
What presidential decree institutionalized the profession of environmental planning? [A] PD 1096 [B] PD 1
PD 1185 [D} PD 223
It is a right enforceable against specific property to secure payment of an obligation. [A] Deed [B] Lease [C
[D] Ammortization
Minimum basic fee for simple projects. [A] 5% [B] 6% [C] 7% [D] 8%
Minimum basic fee for alterations/renovations. [A] 50% [B] 100% [C] 150% [D] 200%
When the architect is engaged to render opinion or advise, clarification or explanation on technical matter
pertaining to his profession, the minimum basic fee shall be ___. [A] 200 / Hr [B] 500 / Hr [C] 750 / Hr [D] F
Charge
When rendering service as an expert witness, the architect is compensated ___/ hr. [A] 200 PHP [B] 500 P
1000 PHP [D] Free of Charge
Minimum basic fee for Group 5 Projects (monumental). [A] 10% [B] 12% [C] 15% [D] 20%
In PD 1185, what is the minimum distance of any exit from any opening or door if the building is not Fire
Sprinklered? [A] 45mts [b] 46mts [c] 60mts [d] 61mts

What is Group 6 Project classification? [A] Residential [B] Monumental Buildings [C] Repetitive [D] Alterat
Minimum Basic fee for housing projects. I. 10% of 1st unit II. 60% of 2nd to 10th Unit III. 30% for 11th unit
above [a] I and II pb[ II and III [c] 1 and III [d] All of them
Under what classification of Project does Hospitals and Medical Buildings fall? [A] Simple [B] Moderate [C
Exceptional [D] Monumental

Under what classification of Project does Stadium fall? [A] Simple [B] Moderate [C] Exceptional [D] Monum
As Per PD 1185, What class of fire if the flame is started from an "electrical wiring?" [A] Class A [B] Class
Class C [D] Class D
On the remaining 15% work fee of the architect, where does the 5% go. [A] Civil Code [B] Construction Ph
Contract Document Phase [D] Post Construction Services
Repairs and corrective works at the expense of the contractor should be done within how many days afte
notice by owner? [A] 5 Days [B] 10 Days [C] 15 Days [D] 30 days
As Per PD 1185, What is the required height of a building before it is required to be installed with Fire Spr
System? [A] 12mts. [B] 15mts [C] 18 mts. [D] 21 mts.
Failure on the part of the contractor to remove condemned work shall give the owner right to remove said
contractor's exepense and contractor shall pay the owner the expenses incurred within how many days fr
removal by the owner of said work? [A] 5 Days [B] 10 Days [C] 15 Days [D] 30 days
Contract time reckoning shall commence on the ___ from receipt of ___. [A] 14th Day / Notice to Proceed
Day / Notice to Proceed [C] 21th Day / Notice to Proceed [D] 28th Day / Notice to Proceed
An area of a city where municipal buildings are grouped. [A] Civic Center [B] Civic Area [D] Metropolis [D]
megalopolis
With a project construction cost of P50 Million & less, the min. basic fee of supermarkets is: [A] 6% [B] 7%
[D] 10%
True or False, is Preparing design documents/construction drawings & specifications a responsibility of th
architect during the contract document phase of his services? [A] True [B] False
Preparation of shop drawing is the sole function of the: [A] Architect [B] Contractor [C] Subcontractor [D]
Draftsman
Under design services, the min. basic fee of laboratories w/ project construction cost of P50 million and le
__________. [A] 6% [B] 7% [c] 8% [D] 10%
As Per Rule Vii and VIII of the National Building Code, What is the required Setbacks for an R-1 Resident
Development? [A] 4.5-2.0-2.0 [B] 2.0-2.0-4.5 [C] 2.0-4.5.2.0 [D] All varies
Compensation for services should be increased to a total of how many percent of the basic fee for alterati
existing structures belonging to groups 7 to 5? [A] 50% [B] 100% [C] 150% [D] 200%
With a project construction of P50 million and less, the min. basic fee of public markets is: [A] 6% [B] 7% [
[D] 10%
True or False, is Legal and administration component A component to be considered in the formulation of
master development plan? [A] True [B] false
Any article of property not consisting of or affixed to land plus any interest in land that is less than a freeho
Liens [B] Chattel [C] Reciprocity [D] Arbitration
The fee of the architect for Design-Build Services by administration aside from his fee for the regular desig
services is [A] 7% [B] 10% [C] 12% [D] 17%
Which of the following describes the lump sum or fixed fee method? [A] Related to size and type of projec
Applies generally to government projects [C] Applicable only to pre-design services [D] Most commonly us
ASEAN
The minimum basic fee of parking structure with a project construction cost of 50 million and less is [A] 6%
[C] 8% [D] 10%

Which of the following does NOT constitute the post-construction services of the architect? [A] Post-const
evaluation [B] Building/ground administration [C] Building/equipment maintenance [D] Real property evalu

Additional information which maybe used as an addition or amendment to the provisions of the standard
specifications are: [A] Special Provisions [B] Supplementary Specification [C] Written Notice [D] Addendum
In repetitive construction of building, what percent of the basic minimum fee is charged on succeeding str
after the third structure? [A] 20% [B] 40% [C] 60% [D] 80%
Within how many days from the date a change is ordered shall any claim for adjustment involving questio
facts be asserted? [A] 5 Days [B] 10 days [C] 15 days [D] 30 Days
In a typical owner-architect agreement, who is responsible for payment of surveys, soil explorations, and
laboratory fees? [A] Architect [B] Owner [C] Engineer [D] Building Official [E] Surveyor
Under Design Services, the minimum basic of fee of retail stores with project construction cost P 50 Millio
less is [A] 6% [B] 7% [C] 8% [D] 10%
What part of Architects services is architectural programming? [A] Schematic design [B] Pre-design [B] De
Development [D] Contract Documents
Under what phase of design services does the architect prepare complete construction drawings and
specifications on materials/construction methods? [A] Schematic design [B] Construction [C] Contract doc
[D] Design development
True or False, does Advances funding for payment of expenditures connected with work a service which i
performed by the Architect under the design-build service by administration? [A] True [B] False
What official body formulates rules and regulations relating to signing / sealing of drawings, specifications
other documents registered by the architect? [A] PRC [B] Board of Architecture [C] UAP [D] DPWH
What do you call the study which determines the viability of a project, such as the cost of development wh
brings about a potential return to the owner? [A] Architectural Programming [B] Economic Feasibility Stud
Site Analysis [D] Financial Programming
Which combination of types of specifications is impossible? [A] Closed and Brand Name [B] Open and Clo
Performance and Descriptive [D] Descriptive and Reference
How many percent of the cost of the work is the range of fees for landscape design services? [A] 5 - 15%
15% [C] 15 - 20% [D] 5 - 20%
A cost reimbursement type contract with provisions for a fee that is adjusted by "sharing" formulas applied
difference between the final allowable costs and the target costs [A] Cost Plus Incentive Fee [B] Lump Su
Fixed Fee [C] MDPE [D] Fixed Cost fee
What is the rate of the Management Fee for Post Construction Services based on percentage of gross ren
[A] 3 - 5% [B] 4 - 6% [C] 5 - 7% [D] 6 - 8%
As Per PD 1185, it is the slot / area which is allocated for Fire Trucks in case of there is a fire in a building
Lane [B] Harizontal Exit [C] Fire Trap [D] Fire Hazard
The total cost of all equipment, utilities and other items which were either designed, specified or procured
Architect and his Consultants for the Owner, that were used or installed in the project. [A] Cost of Work [B
Quotation [C] Bill of Materials [D] Breakdown of Work and Cost

As Per PD 1185, A fire caused by burning paper, cloth, etc. [A] Class A [B] Class B [C] Class C [D] Class d
For the preparation of detailed engineering drawings and specifications on roads, drainage, sewerage, po
communication system, an additional of how many percent of the cost of development is to be charged? [
[B] 2% [C] 3% [D] 4%
The min. basic fee of publishing plants w/ a project construction cost of 50 million & less is [A] 4% [B] 5%
[D] 7%
When were the 3 architectural organizations integrated into one association of architects called UAP? [A]
[B] 1974 [C] 1975 [D] 1976
What additional training is required of an Architect for the renewal of his professional license? [A] Mastera
[B] Continuing Professional Education [C] Doctoral Degree [D] All of the above
In the Architectfs Code of Ethics, to whom does the architect have responsibility to provide for arbitration
method for settlement of disputes? [A] Engineer [B] Contractor [C] Owner [D] Manufacturer
Within 15 days after the awards of Bids, the payment to the Architect shall be adjusted so that it will amou
sum equivalent to how many percent of the Basic Fee, computed upon the winning Bid Price? [A] 35% [B
[C] 85% [D] 98%
Promptly issuing the Certificates of Payment and the Final Certificate of Completion is a responsibility of t
Architect to whom? [A] Engineer [B] Contractor [C] Owner [D] Manufacturer
Who advocated the Virtues of an Architect, which has been the basis of UAP's principles of the Architect's
of Ethical Conduct? [A] Frank Lloyd Wright [B] Palladio [C] Marcus Vitruvius Pocio [D] Le Corbusier
Who manages the sewage treatment plant in the philippines? [A] DOH [B] DENR [C] Local Government [D
DPWH
P.D. 1096 [A] Fire Code [B] National building Code [C] Socialized Housing [D] Condominium Act
Maximum height of a combustible stand. [A] 2.40 [B] 2.70 [C] 3.00 [D] 3.30

Minimum spacing for seats in a chair type measurement from back to back. [A] 0.65 [B] 0.75 [C] 0.85 [D] 0
Maximum line of travel to an exit of an aisle. [A] 30 mts [B] 45 mts [c] 60 mts [D] 75 mts.
Maximum slope of an aisle. [A] 1/3 [B] 1/4 [C] 1/5 [D] 1/6 [E] 1/7 [F] 1/8

In standard seating, the minimum spacing of rows measured from back to back. [A] 0.74 [B] 0.84 [C] 0.94
Minimum width of any seat. [A] 0.30 [B] 0.35 [C] 0.40 [D] 0.45

Minimum area of a double acting door view panel. [A] 1.00 SQM [B] 1.15 SQM [C] 1.30 SQM [D] 1.45 SQ
Minimum clear width of an exit doorway. [A] 0.60 [B] 0.70 [C] 0.80 [D] 0.90
Maximum width of an exit door leaf. [A] 0.90 [B] 1.00 [C] 1.10 [D] 1.20
Minimum width of an exit corridor. [A] 0.90 [B] 1.00 [C] 1.10 [D] 1.20
Minimum number of exit for floors above the first storey having an occupant load of more than 10. [A] 2 [B
4 [D] 5 [E] 6
Number of exit for occupant load of 599-999. [A] 2 [B] 3 [C] 4 [D] 5 [E] 6
Minimum downward projection of a draft curtain [A] 0.15 MTS [B] 0.30 MTS. [C] 0.45 MTS. [D] 0.60 Mts.
Maximum floor area for an attic made of combustible materials. [A] 250 SQm [B] 500 SQm [C] 750 SQm [
SQm
Maximum center to center spacing of a draft curtain sprinkler. [A] 1.30 [B] 1.50 [C] 1.80 [D] 2.10
Maximum floor area for an attic made of incombustible materials. [A] 250 SQm [B] 500 SQm [C] 750 SQm
1000 SQm
Standard gauge for metal hoods in barbeques. [A] GA 16 [B] GA 17 [C] GA 18 [D] GA 19
Minimum height of a Siamese connection above grade. [A] 200 mm [B] 300 mm [C] 400 mm [D] 500 mm
Standard maximum distance of a standpipe from an opening in a stairway. [A] 200 mm [B] 300 mm [C] 40
[D] 500 mm
Minimum wall thickness of a fireplace. [A] 200 mm [B] 300 mm [C] 400 mm [D] 500 mm
Minimum number of exit for a projection room. [A] 1 [B] 2 [C] 3 [D] 4 [E] 5
Minimum extended portion of a chimney above the roof. [A] 300 mm [B] 400 mm [C] 500 mm [D] 600 mm
Minimum air space between walls of a masonry chimney above the roof. [A] 1" [B] 2" [C] 3" [D] 4"
Minimum thickness of glass used for floors. [A] 10.00 [B] 12.50 [C] 15.00 [D] 17.50
Maximum rise of one row of seat to the next. [A] 200 mm [B] 300 mm [C] 400 mm [D] 500 mm
Minimum number of exit for stands within a building serving an occupant load of 300. [A] 2 [B] 3 [C] 4 [D] 5

Minimum height of a guard rail located in front of the grandstand. [A] 600 mm [B] 700 mm [C] 800 mm [D]
Minimum width of a run in a stand stair. [A] 240 mm [B] 280 mm [C] 320 mm [D] 360 mm
Minimum spacing for seats with backrests measured from back to back. [A] 250 mm [B] 500 mm [C] 750 m
1000 mm
Minimum spacing for seats without backrests measured from back to back. [A] 600 mm [B] 700 mm [C] 80
[D] 900 mm
Minimum width of an exit door in an aisle. [A] 0.70 [B] 1.20 [C] 1.70 [D] 2.20
Minimum intensity of lights for exits. [A] 8.70 Lux [B] 10.70 Lux [C] 12.70 Lux [D] 14.70 Lux
Minimum width of side aisles. [A] 1.00 [B] 1.10 [C] 1.20 [D] 1.30
Minimum increase in width of aisles for every linear meter. [A] 10 mm [B] 20 mm [C] 30 mm [D] 40 mm
Minimum width of an aisle serving only one side. [A] 600 mm [B] 700 mm [C] 800 mm [D] 900 mm
Open space requirement for an interior lot. [A] 10% [B] 20% [C] 40% [D] 50%
Open space requirement for a corner lot or a through lot. [A] 10% [B] 20% [C] 40% [D] 50%
Bounded on all sides or around its periphery by building lines. [A] Outer Court [B] Inner Court [C] Through
[D] None of the Above
Minimum stair width for a residence. [A] 250 mm [B] 500 mm [C] 750 mm [D] 1000 mm
Standard minimum area of a toilet. [A] 0.90 [B] 1.20 [C] 1.50 [D] 1.80
Minimum dimension of a kitchen. [A] 0.90 [B] 1.20 [C] 1.50 [D] 1.80
Minimum area for vent shafts. [A] 0.50 SQM [B] 1.00 SQm [C] 1.50 SQM [D] 2.00 SQM

Air space requirement for a school room per person. [A] 2.80 CUM [B] 3.00 CUM [C] 6.00 CUM [D] 9.00 C

Air space requirement for a habitable room per person. [A] 9.00 cum [B] 12.00 cum. [C] 14.00 cum [D] 16
Minimum area of opening of an air duct. [A] 200 Sqmm [B] 300 Sqmm [C] 400 sqmm [D] 500 sqmm
Maximum projection beyond the property line of a footing along the national road and at least 2.40 mts. In
[A] 200 mm [B] 300 mm [C] 400 mm [D] 500 mm
Minimum clearance of a canopy or a marquee from the sidewalk. [A] 2.50 mts [B] 3.00 mts [C] 3.50 mts. [
mts
Minimum stair width for occupant load of less than 50. [A] 700 mm [B] 800 mm [C] 900 mm [D] 1000 mm
Minimum width of a temporary walkway. [A] 1.10 mts [B] 1.20 mts. [C] 1.30 mts [D] 1.40 mts
Minimum clearance of an arcade above sidewalk. [A] 2.50 mts [B] 3.00 mts [C] 3.50 mts. [D] 4.00 mts
Vacant space left between the building and lot lines less than 2.00 mts in width. [A] Unpaved Surface Are
Impervious Surface Area [C] Allowable Maximum Building Footprint [D] Setback [E] Road Right of Way
Minimum horizontal dimension of a court. [A] 2.00 [B] 3.00 [C] 4.00 [D] 5.00
Minimum width of a passageway connecting a street and a court. [A] 1.10 mts [B] 1.20 mts. [C] 1.30 mts [
mts

Standard air space requirement per person for factories. [A] 9.00 cum [B] 12.00 cum. [C] 14.00 cum [D] 16
Minimum headroom clearance for a mezzanine. [A] 1.50 mts [B] 1.80 mts [C] 2.10 mts [D] 2.40 mts
Air supply per person per minute for auditoriums. [A] 0.30 cum [B] 0.60 cum [D] 0.28 cum [D] 0.58 cum
Minimum total area of a window or an opening for a room without artificial ventilation. [A] 0% [B] 5% [C] 10
15%
Minimum dimension for a vent shaft. [A] 0.30 mts [B] 0.60 mts [C] 0.90 mts [D] 1.20 mts
Minimum horizontal clearance of the curb line to the outermost edge of the marquee. [A] 200 mm [B] 300
400 mm [D] 500 mm
Minimum clearance of the lowest portion of an awning to the ground. [A] 1.50 mts [B] 1.80 mts [C] 2.10 m
2.40 mts
Minimum height of a construction fence. [A] 1.50 mts [B] 1.80 mts [C] 2.10 mts [D] 2.40 mts
Minimum live load bearing capacity of a construction canopy. (per SQM) [A] 400 kgs [B] 450 kgs [C] 500 k
550 kgs [E] 600 kgs
Minimum height of a protective railing in a construction. [A] 1.00 mts [B] 1.10 mts. [C] 1.20 mts [D] 1.30 m
Minimum wind load capacity for roofs for vertical projection. (In KGS) [A] 100 kgs [B] 120 kgs [C] 140 kgs
kgs
Maximum height of a handrail above the stair thread. [A] 0.30 mts [B] 0.60 mts [C] 0.90 mts [D] 1.20 mts
Minimum ceiling height for naturally ventilated rooms. [A] 2.40 mts [B] 2.70 mts [C] 3.00 mts [D] None of th
Above
Minimum height of a handrail above the stair thread. [A] 0.70 [B] 0.80 [C] 0.90 [D] 1.00
Maximum dimension of a stair landing. [A] 1.00 mts [B] 1.10 mts. [C] 1.20 mts [D] 1.30 mts
Maximum slope of an exit court. [A] 1:8 [B] 1:10 [C] 1:12 [D] 1:14
Minimum width of run for circular stair. [A] 200 mm [B] 250 mm [C] 300 mm [D] 350 mm
Minimum headroom clearance for any stair. [A] 1.80 mts [B] 2.00 mts [C] 2.10 mts. [D] 2.40 mts
Maximum slope for an exit passageway. [A] 1:8 [B] 1:10 [C] 1:12 [D] 1:14

Maximum height of a Siamese connection above the ground. [A] 1.00 mts [B] 1.10 mts. [C] 1.20 mts [D] 1
Maximum distance of any portion of a building from the nozzle of a 23 mts fire hose. [A] 4.50 mts [B] 6.00
7.50 mts [D] 9.00 mts
Minimum number of exit for any stage. [A] 1 [B] 2 [C] 3 [D] 4

Minimum extension of a proscenium wall above the roof. [A] 1.00 mts [B] 1.10 mts. [C] 1.20 mts [D] 1.30 m
Minimum width of a stair in a stage egress. [A] 600 mm [B] 750 mm [C] 900 mm [D] 1050 mm
Minimum thickness of glass for jalousies. [A] 5.00 mm [B] 5.20 mm [C] 5.40 mm [D] 5.60 mm
Maximum length of glass for jalousies. [A] 1.00 mts [B] 1.10 mts. [C] 1.20 mts [D] 1.30 mts
Minimum width of exit in a stage. [A] 600 mm [B] 750 mm [C] 900 mm [D] 1050 mm
Minimum lateral spacing for plastic skylights. [A] 2.00 [B] 2.10 [C] 2.20 [D] 2.30 [E] 2.40 [F] 2.50
A store window in which goods are displayed. [A] Awning Window [B] Casement Window [C] Sliding Wind
Show Window
Maximum width of a business sign. [A] 1.00 mts [B] 1.10 mts. [C] 1.20 mts [D] 1.30 mts
Minimum distance of a sign from any electrical post or telephone wires. [A] 0.80 mts [B] 1.00 mts [C] 1.20
1.40 mts
Minimum open space requirement for a corner lot. [A] 10% [B] 20% [C] 40% [D] 50%
Minimum size of thread for an entrance or exit step. [A] 200 mm [B] 300 mm [C] 400 mm [D] 500 mm
Maximum slope for an entrance or exit ramp. [A] 1:8 [B] 1:10 [C] 1:12 [D] 1:14
Minimum number of steps for an entrance or exit stair. [A] 1 [B] 2 [C] 3 [D] 4
Standard turn circle of a wheelchair. [A] 1.20 mts [B] 1.40 mts [C] 1.50 mts [D] 1.70 mts
Office building parking ratio. [A] 1:100 sqm of GFA [B] 1:125 sqm of GFA [C] 1:150 sqm of GFA [D] 1:200 s
GFA
Standard size of a perpendicular parking slot. [A] 2.40 x 5.00 [B] 2.00 x 6.00 [C] 3.60 x 12.00 [D] None of
Above
Hotel building parking ratio. [A] 1:5 rooms [B] 1:10 rooms [C] 1:15 Rooms [D] 1:20 rooms
Hospital building parking ratio. [A] 1:15 beds [B] 1:20 Beds [C] 1:25 Beds [D] 1:30 beds
Maximum distance of a handicapped parking from the facility being served. [A] 30 mts [B] 45 mts [C] 60 m
75 mts
Colleges and university parking ratio. [A] 1:5 Classrooms [B] 1:10 Classrooms [C] 1:15 Classrooms [D] 1:
Classrooms
Theaters, cinemas, auditoria, and stadia parking ratio. [A] 1:25 sqm of spectator area [B] 1:50 sqm of spe
area [C] 1:75 sqm of spectator area [D] 1:100 sqm of spectator area

Minimum number of wheelchair seating space for 51-300 seating capacity for auditoriums. [A] 2 [B] 4 [C] 6
Minimum width of a dropped curb. [A] 0.70 [B] 0.80 [C] 0.90 [D] 1.00

Minimum Dimensions of an accessible elevator. [A] 1.00 x 1.30 [B] 1.10 x 1.40 [C] 1.20 x 1.50 [d] 1.30 x 1
Maximum distance of an accessible elevator from the entrance of a building. [A] 15 mts [B] 30 mts [C] 45
60 mts

Minimum height of signs on walls and doors for the disabled to see comfortable. [A] 1.20 [B] 1.30 [C] 1.40
Minimum door width for an accessible elevator. [A] 0.60 [B] 0.70 [C] 0.80 [D] 0.90
Minimum dimensions for an accessible water closet stall. [A] 1.10 x 1.40 [B] 1.50 x 1.50 [C] 1.70 x 1.80 [D
2.00
Maximum height of signs on walls and doors for the disabled to see comfortably. [A] 1.30 [B] 1.40 [C] 1.50
1.60
Minimum width of a parking slot for the disabled. [A] 2.70 [B] 3.20 [C] 3.70 [D] 4.20
Minimum run of a stair for Group A dwellings (residential) [A] 200 mm [B] 300 mm [C] 250 mm [D] 350 mm
Minimum ceiling height from 3rd floor to succeeding floors with artificial ventilation. [A] 1.80 [B] 2.10 [C] 2.
2.70
Minimum area of rooms for human habitation. [A] 3.00 sqm [B] 4.50 sqm [C] 6.00 sqm [D] 7.50 sqm
Least dimension of rooms for human habitation. [A] 1.50 mts [B] 2.00 mts [C] 2.50 mts [D] 3.00 mts
Least dimension of an air duct. [A] 200 mm [B] 300 mm [C] 400 mm [D] 500 mm
Maximum encroachment into a public sidewalk of a foundation at least 600 mm below the grade line. [A]
[B] 300 mm [C] 400 mm [D] 500 mm
Minimum width of an exit door. [A] 0.60 [B] 0.70 [C] 0.80 [D] 0.90
Maximum width reduced by handrails and doors fully opened to balconies and corridors. [A] 200 mm [B] 3
[C] 400 mm [D] 500 mm
Minimum width of stairs serving more than 50 occupants. [A] 1.20 [B] 1.20 [C] 1.30 [D] 1.40
Minimum width of stairs serving less than 10 occupants. [A] 600 mm [B] 750 mm [C] 900 mm [D] 1050 mm
Maximum reduction in width of a stair due to trims and handrails. [A] 50 mm [B] 75 mm [C] 100 mm [D] 12
Minimum run of a winding stair. [A] 100 mm [B] 125 mm [C] 150 mm [D] 200 mm
Maximum run of a winding stair. [A] 200 mm [B] 300 mm [C] 400 mm [D] 500 mm
Allowable tolerance in the rise and run of every step. [A] 5mm [B] 10mm [C] 15mm [D] 20mm
Width of stair requiring an intermediate handrail. [A] 1.50 mts [B] 2.00 mts [C] 2.50 mts [D] 3.00 mts
Minimum width of an aisle serving both sides. [A] 1.00 mts [B] 1.25 mts [C] 1.50 mts [D] 1.75 mts
Maximum number of seats between the wall and the aisle. [A] 7 [B] 14 [C] 21 [D] 28
Maximum distance between the back of each seat to the front of the seat behind it. [A] 200 mm [B] 300 m
400 mm [D] 500 mm
Maximum width of seat in a stand. [A] 450 mm [B] 460 mm [C] 470 mm [D] 480 mm
Maximum projection of a penthouse or other projections above the roof. [A] 6.40 [B] 7.10 [C] 7.60 [D] 8.40
Maximum ratio of a penthouse area to that of the supporting roof. [A] 1/2 [B] 1/3 [C] 1/4 [D] 1/5
Minimum thickness of masonry chimney for residentials. [A] 100 mm [B] 125 mm [C] 150 mm [D] 200 mm
Minimum thickness of rubble stone masonry chimney for residentials. [A] 200 mm [B] 300 mm [C] 400 mm
mm
Minimum firebox wall thickness. [A] 100 mm [B] 150 mm [C] 200 mm [D] 250 mm
Minimum thickness of smoke chamber back walls. [A] 100 mm [B] 150 mm [C] 200 mm [D] 250 mm

minimum thickness of front and side smoke chamber walls. [A] 100 mm [B] 150 mm [C] 200 mm [D] 250 m
Minimum number of storeys requiring one (1) or more dry standpipes. [A] 1 [B] 2 [C] 3 [D] 4
Minimum volume of water a dry standpipe should provide. [A] 600 liters / minute [B] 750 liters / minute [C]
liters / minute [D] 1050 liters / minute
Diameter of a dry standpipe requiring a two-way Siamese connection. [A] 3" [B] 4" [C] 5" [D] 6"
Diameter of a dry standpipe requiring a three-way Siamese connection. [A] 3" [B] 4" [C] 5" [D] 6"
Diameter of a dry standpipe requiring a four-way Siamese connection. [A] 3" [B] 4" [C] 5" [D] 6"
Minimum volume of water an interior wet standpipe should provide. [A] 150 liters / minute [b] 170 liters / m
190 liters / minute [d] 210 liters / minute
Minimum diameter of a wet standpipe. [A] 1" [B] 1 1/2" [C] 2" [D] 2 1/2"
Standard diameter of a dry standpipe opening. [A] 1" [B] 1 1/2" [C] 2" [D] 2 1/2"
Standard length of a fire hose. [A] 15 mts [B] 23 mts [C] 30 mts [D] 45 mts
Maximum distance of a hose nozzle to any portion of a building. [A] 3.00 mts [B] 4.50 mts [C] 6.00 mts [D]
mts
Standard diameter of a wet standpipe valve. [A] 1" [B] 1 1/2" [C] 2" [D] 2 1/2"
Maximum projection into a sidewalk of a sign 4.50 mts. above grade. [A] 0.80 mts [B] 0.90 mts [C] 1.00 m
1.10 mts
Minimum vertical clearance from the bottom of a signage to an arcaded sidewalk. [A] 4.00 mts [B] 5.00 mt
6.00 mts [D] 7.00 mts
Minimum vertical clearance from the bottom of a signage to non-arcaded sidewalk. [A] 2.70 mts [B] 3.00 m
3.30 mts [D] 3.60 mts
Number of days of work abandonment of stoppage for a building permit to expire. [A] 30 days [B] 60 days
days [D] 120 days
Width of planting strip for sidewalks 2.00 mts in width. [A] 0.80 mts [B] 0.90 mts [C] 1.00 mts [D] 1.10 mts
Minimum horizontal distance of the curb line to the outermost face of an arcade. [A] 200 mm [B] 300 mm [
mm [D] 500 mm
Maximum vertical clearance of an arcade above grade. [A] 4.00 mts [B] 5.00 mts [C] 6.00 mts [D] 7.00 mt
Slope of ramp of road-way to sidewalk. [A] 1/2 - 1/3 [B] 1/3 - 1/4 [C] 1/4 - 1/5 [D] 1/5 - 1/6

Slope of driveway to sidewalk where the height of curb is 200 mm and above. [A] 1:6 [B] 1:8 [C] 1:10 [D] 1
Minimum vertical clearance of primary lines from the crown of the pavement when crossing the highway. [
[B] 8.00 [C] 10.00 [D] 12.00
Minimum vertical clearance of primary lines from top of sidewalk when installed along the side of the high
3.00 mts [B] 4.50 mts [C] 6.00 mts [D] 7.50 mts
Vertical clearance of secondary lines from sidewalks along or crossing the street. [A] 3.00 mts [B] 4.50 mt
6.00 mts [D] 7.50 mts
Minimum clearance of conductors from the highest point of a roof. [A] 2.50 mts [B] 3.00 mts [C] 3.50 mts [
mts
Maximum height of a dumbwaiter. [A] 1.20 [B] 1.30 [C] 1.40 [D] 1.50
True or False, 3,861 sqcms. Is the Maximum area of a dumbwaiter. [A] False [B] True
Minimum clearance of conductors from any platform or ground or projection from which they might be rea
[A] 3.00 mts [B] 4.50 mts [C] 6.00 mts [D] 7.50 mts
Minimum vertical clearance of service drop of communication lines above ground at its point of attachmen
than building or pedestal. [A] 3.00 mts [B] 4.50 mts [C] 6.00 mts [D] 7.50 mts
Vertical clearance of a service drop communication line when crossing a street. [A] 4.50 mts [B] 5.00 mts
mts. [D] 6.00 mts.
Maximum capacity of a dumbwaiter. [A] 250 kgs [B] 263 kgs [C] 277 kgs [D] 290 kgs
Minimum width of an access road to a cul-de-sac. [A] 3.00 mts [B] 4.50 mts [C] 6.00 mts [D] 7.50 mts
Unit area per occupant for dwellings. [A] 18.60 SQM [B] 28.00 SQM [C] 45.50 SQM [D] None of the Above
Unit area per occupant for Hotels. [A] 18.60 SQM [B] 28.00 SQM [C] 45.50 SQM [D] None of the Above
Unit area per occupant for offices and garages. [A] 5.60 sqm [b] 8.40 sqm [c] 9.30 sqm [D] 3.25 sqm
Unit area per occupant for class rooms. [A] 1.80 sqm [B] 2.80 sqm [C] 3.25 sqm [D] 5.60 sqm
Unit area per occupant for stores - retail sales rooms upper floors. [A] 5.60 sqm [b] 8.40 sqm [c] 9.30 sqm
3.25 sqm
Unit area per occupant for nurseries for children. [A] 1.80 sqm [B] 2.80 sqm [C] 3.25 sqm [D] 5.60 sqm
Unit area for stores -retail sales room for basement and ground floor. [A] 1.80 sqm [B] 2.80 sqm [C] 3.25 s
5.60 sqm
Unit area for hospitals and sanitaria. [A] 5.60 sqm [b] 8.40 sqm [c] 9.30 sqm [D] 3.25 sqm
Unit area per occupant for aircraft hangars without repairs. [A] 28.00 sqm [B] 18.60 sqm [C] 28.00 sqm [D
sqm
Unit area per occupant for warehouses and mechanical equipment room. [A] 28.00 sqm [B] 18.60 sqm [C
sqm [D] 45.50 sqm
Unit area per occupant for theaters and the like. [A] 0.28 sqm [b] 0.65 sqm [C] 1.80 sqm [D] 3.25 sqm
Parking requirement for Hotels. [1] 1:5 room [B] 1:10 rooms [C] 1:15 rooms [D] 1:20 rooms
Parking requirement for public assembly buildings such as cinemas, auditoria, theaters, and the like. [A] 1
Sqm of spectators Area [B] 1:100 sqm of spectators Area [C] 1:150 sqm of spectators Area [D] 1:200 of sp
Area
Parking requirement for multi family living unit of 50 sqm floor area. [A] 1:4 units [B] 1:6 units [C] 1:8 units
units
Parking requirement for multi family living unit above 100 sqm floor area. [A] 1:1 unit [B] 1:2 Unit [C] 1:3 u
1:4 Units
Parking requirement for multi family living unit for 50-100 sqm floor area. [A] 1:1 unit [B] 1:2 Unit [C] 1:3 un
1:4 Units
Parking requirement for clubhouses, beach houses, and the like. [A] 1:50 Sqm of GFA [B] 1:100 sqm of G
1:150 sqm of GFA [D] 1:200 of GFA
Parking requirement for motels. [A] 1:1 unit [B] 1:2 Unit [C] 1:3 unit [D] 1:4 Units
Minimum parking requirement for the handicapped. [A] 1:25 parking Slots [B] 1:50 parking slots [C] 1:75 p
Slots [D] 1:100 parking slots
Parking requirement for Private colleges and universities. [A] 1:3 room [B] 1:5 rooms [C] 1:12 rooms [D] 1
rooms
Parking requirement for Public elementary, secondary, and vocational schools. [A] 1:5 room [B] 1:10 room
1:15 rooms [D] 1:20 rooms
In BP344, the required width of a corridor. [A] 1.00 [B] 1.10 [C] 1.20 [D] 1.30
Maximum slope of a drop curb towards the street. [A] 1:12 [B] 1:16 [C] 1:20 [D] 1:24
Maximum slope of a drop curb towards adjoining curb. [A] 1:12 [B] 1:16 [C] 1:20 [D] 1:24
Maximum spacing for wheelchair turnabouts. [A] 6.00 mts [B] 9.00 mts [C] 12.00 mts [D] 15.00 mts
Maximum slope of a ramp. [A] 1:12 [B] 1:16 [C] 1:20 [D] 1:24

Maximum distance of handicapped parking from the structure served. [A] 30 mts [B] 45 mts [C] 60 mts [D]
Preferred width of corridor for the disabled. [A] 1.20 [B] 1.40 [C] 1.50 [D] 1.70
Maximum height of a water closet from the floor. [A] 0.45 [B] 0.50 [C] 0.55 [D] 0.60
Preferred height of switches from the floor. [A] 1.00 [B] 1.10 [C] 1.20 [C] 1.30
Minimum height of a switch from the floor. [A] 0.70 [B] 0.80 [C] 0.90 [D] 1.00
Maximum height of a switch from the floor. [A] 1.00 [B] 1.10 [C] 1.20 [C] 1.30
Parking requirement for Public colleges and universities. [A] 1:3 room [B] 1:5 rooms [C] 1:12 rooms [D] 1:
rooms
In BP344, the minimum height of a handrail. [A] 0.60 [B] 0.70 [C] 0.80 [D] 0.90
Maximum length of a ramp for wheelchair. [A] 4.50 mts [B] 6.00 mts [C] 7.50 mts [D] 9.00 mts
Minimum length of a ramp landing for wheelchairs. [A] 1.20 mts [B] 1.50 mts [C] 1.80 mts [d] 2.00 mts
One or more habitable rooms which are occupied or which are intended or designated to be occupied by
family with facilities for cooking , sleeping, living, and eating. [A] Dwelling Unit [B] Livable Unit [C] Housing
[D] Habitable Unit
That portion of the foundation of a structure which spreads and transmits loads directly to the ground or so
Wall [B] Footing [C] Column [D] Beam
True or False, Course is A continuous horizontal layer of masonry units. [A] False [B] True
A room or suite of two or more rooms, designed and intended for , or occupied by one family for living, sle
eating, and cooking purposes. [a] Single Detached [B] row House [C] Apartment [D] Hotel
Field and test results records are the responsibility of the: [a] contractor [b] construction manager [c] owne
architect
A portion of the seating space of an assembly room, the lowest part of which is raised 1.20 mts or more a
level of the main floor. [A] Patio [B] Lobby [C] Balcony [D] Canopy
The pipe which connects a flue-burning appliance to a chimney. [A] Duct [B] Vent [C] Chimney Collector [D
of the above
A hearth and fire chamber or similarly prepared place in which a fire may be made and which is built in
conjunction with a chimney. (D.K. Ching p. 87) [A] FireBlock [B] Fireplace [C] Firewall [D] Fire Lane
A horizontal structural piece which supports the end of the floor beams or joists or walls over opening. [A]
[B] Purlins [C] Girder [D] Beam
Same as heliport except that no refueling, maintenance, repairs, or storage of helicopters is permitted. [A]
[B] Helistop [C] Runway [D] Service Drop
The vertical supports, such as posts or stanchions, as used in indigenous or traditional type of constructio
Column [B] Wall [C] Suportales [D] Beam
Any surface or underground construction covered on top, or any fire-proof construction intended for the st
valuables. [A] Roof [B] Vault [C] Ceiling [D] Mezzanine
A term which may be used synonymously with a partition. [A] Property Wall [B] Cross wall [C] Railings [D]
Retaining Wall
The unit area per occupant for hotels. [A] 28.00 sqm [B] 18.60 sqm [C] 28.00 sqm [D] 45.50 sqm
The unit area per occupant for dining establishments. [A] 1.40 sqm [B] 2.80 sqm [C] 3.25 sqm [D] 5.60 sq
The unit area per occupant for theaters. [A] 0.28 Sqm [B] 0.40 sqm [C] 0.65 sqm [D] 0.80 sqm
A building permit shall expire if work authorized is abandoned or suspended at any time after commence
a period of. [A] 30 days [B] 60 days [C] 3 Months [D] 4 Months
Front yards for commercial buildings abutting a road-right-of-way of 25-29 meters shall have a minimum w
[A] 8.00 [B] 6.00 [C] 5.00 [D] 3.00
Offices shall be provided how many cubic meters of air per person? [A] 14.00 Cum [B] 12.00 Cum [C] 9.0
[D] 6.00 Cum
Multiple living units of up to 6 units built on the same lot shall have an access road directly connecting sai
building to a public street a width of. [A] 3.00 [B] 4.00 [C] 5.00 [D] 6.00 [E] 6.70
Sidewalks of 2 mts or more in width shall include on its outer side a planting strip of not less than how ma
millimeters in width? [A] 200mm [B] 400mm [C] 600mm [D] 800mm
Arcades shall be cantilevered from the building line over the sidewalk and the horizontal clearance betwe
curb line and the outermost face of any part of the arcade shall not be less than. [A] 300mm [B] 400mm [C
500mm [D] 600mm
Printing plants shall be classified under what type of occupancy. [A] Industrial [B] Business and Mercantile
Storage and Hazardous [D] Institutional
Power plants shall be classified under what type of occupancy. [A] Industrial [B] Business and Mercantile
Storage and Hazardous [D] Institutional
Convents shall be classified under what type of occupancy. [A] Residentials, Hotels and Apartment [B] Bu
and Mercantile [C] Storage and Hazardous [D] Institutional
Repair garages shall be classified under what type of occupancy. [A] Industrial [B] Business and Mercanti
Storage and Hazardous [D] Institutional
Reformatories shall be classified under what type of occupancy. [A] Industrial [B] Business and Mercantile
Storage and Hazardous [D] Institutional
Turnabout should also be provided at or whitin how many meters of dead end. [A] 3.00 mts [B] 3.50 mts [C
mts [D] 5.00 mts
In B.P. 344, the maximum slope a ramp is. [A] 1:6 [B] 1:8 [C] 1:12 [D] 1:20
Under B.P. 344, a level area of not less than how many meters shall be provided at the top and bottom of
ramp. [A] 1.50mts [B] 1.80mts [C] 2.10mts [D] 2.40mts
Under what classification of occupancy does Mental Hospitals fall? [A] Industrial [B] Business and Mercan
Storage and Hazardous [D] Institutional
True or False, does the architect assists the Owner on documents for government approval included in th
Contract Document Phase of the Architect's Regular Design Services? [A] False [B] True
True or False, does taking part in paid endorsement of building material an unethical action respected to a
architect's responsibility to the people? [A] True [B] False - To the Client [C] False - To The Contractor [D]
To The Manufacturer
If the estimated cost for a residential project is P10,000,000.00, how much should the Architect bill the Cli
upon completion of the Schematic Design Phase if a downpayment of P50,000.00 has been made upon s
of the agreement? [A] 100k [B] 150k [C] 200k [D] 250k
Under what classification of occupancy does Monasteries fall? [A] Residentials, Hotels and Apartment [B]
Business and Mercantile [C] Storage and Hazardous [D] Institutional
Under what classification of occupancy does Aircraft hagars fall? [A] Residentials, Hotels and Apartment [
Business and Mercantile [C] Storage and Hazardous [D] Institutional
Under what classification of occupancy does cold storage and creameris fall? [A] Residentials, Hotels and
Apartment [B] Business and Mercantile [C] Storage and Hazardous [D] Industrial
Under what classification of occupancy does private garage fall? [A] Accessory [B] Assembly More than 1
Load [C] Storage and Hazardous [D] Institutional
Minimum loading slot requirement for Hospitals and hotels. [A] 1 Truck Loading Slot [B] 2 Truck Loading S
Truck Loading Slot [D] 4 Truck Loading Slot

Minimum travel distance from handicapped parking to facility being served. [A] 30.00 [B] 45.00 [C] 60.00 [
Percentage required for number of parking if parking garages are available within 200 meters of structure
10% [B] 20% [C] 30% [D] 40%
Assessment of Building permit is based on: I. Type of Occupancy or use II. Cost of Construction III. Floor
Hright V. Open Spaces [A] All of the above [B] I, II, III, IV [C] I, III, IV, V [D] I, II, IV, V
Parking requirement for markets. [A] 1:150 Sqm of Shopping Floor Area [B] 1:200 Sqm of Shopping Floor
1:250 sqm of Shopping Floor Area [D] None of the Above
Parking requirement for neigborhood shopping centers. [A] 1:100 Sqm of Shopping Floor Area [B] 1:150 S
Shopping Floor Area [C] 1:200 sqm of Shopping Floor Area [D] None of the Above
Parking requirement for multi-family living units of more than 100 sqm of living unit area. [A] 1:8 Units [B] 1
[C] 1:2 Units [D] 1:1 unit
Parking requirement for multi-family living units of up to 50 sqm of living unit area. [A] 1:8 Units [B] 1:4 Un
1:2 Units [D] 1:1 unit
Parking requirement for places of worship. [A] 1:50 sqm of Congregation Area [B] 1:75 sqm of congregatio
[C] 1:100 sqm of Congregation Area [D] None of the above
Maximum projection of a balcony over a street of over 3 meters but not more than 6 mts. [A] 0.40 [B] 0.50
[D] 0.70
Maximum projection of a balcony over a street of 10 mts to less than 11 mts in width. [A] 1.00 [B] 1.20 [C]
1.50
Maximum height of 1st the floor for a 2-story wood structure with a height of 7 mts. [A] 2.00 [B] 3.00 [C] 4.
5.00

Maximum spacing of posts for 2-story wooden structure with a height of 8 mts. [A] 2.00 [B] 3.00 [C] 4.50 [D
Under what classification of occupancy does fences of over 1.80 mts in height fall? [A] Accessory [B] Busi
and Mercantile [C] Storage and Hazardous [D] Institutional
Under what classification of occupancy does Aircraft repair hangars fall? [A] Industrial [B] Business and
Mercantile [C] Storage and Hazardous [D] Institutional
Under what classification of occupancy does factories and workshops using incombustible and non-explo
materials. [A] Industrial [B] Business and Mercantile [C] Storage and Hazardous [D] Accessory
Under what classification of occupancy does wood working establishements fall? [A] Industrial [B] Busine
Mercantile [C] Storage and Hazardous [D] Institutional
An Office mandated to coordinate and supervise the government's housing agencies. It is also tasked in
monitoring the performance of the housing sector, and involved in policy formations. [A] HUDCC [B] NHM
GSIS [D] SSS
An Insurance system for the private sector, where coverage is compulsory upon all employees not over si
age. [A] HIGC [B] NHMFC [C] GSIS [D] SSS
The insurance for the public sector or government employee. [A] HIGC [B] NHMFC [C] GSIS [D] SSS

A provident savings fund housing open to most private agencies. [A] Pag Ibig Fund [B] SSS [C] GSIS [D]
This is administered by NHMFC from funds contributed by SSS, HDMF and GSIS. [A] NHA [B] HIGC [C] H
[D] UHLP

This office administers the Pag Ibig Fund, it entitles Pag Ibig members who are public and private employ
well as the self employed to housing loans. [A] Pag Ibig Fund [B] HDMF [C] HIGC [D] NHMFC
Is it the human settlement regulatory commission [A] HLURB [B] HSRC [C] HSBC [D] UHLP

The agency tasked for the building of housing units and residential condominiums. Facilities joint venture
among landowners, deevelopers, financial institutions and local governments. [A] NHA [B] NPA [C] NFA [D
The agency takes care of insuring the subdivisions and is also a lending entity. [A] HDMF [B] HIGC [C] HS
UHLP
The government's principal regulatory body in housing and land development. It is to enforce, implement,
coordinate the land use policies and regulations on human settlements, including building rental laws. [A]
[B] HSRC [C] HSBC [D] UHLP
The minimum experience in hours an architect apprentice should have before taking the Architectural Boa
Exams in the Philippines. [A] 3480 [B] 3840 [C] 4830 [D] 4380

What does HLURB mean? (No choices!)

What does HIGC mean? (No choices!)

What does NHA mean? (No choices!)

What does NHMFC mean? (No choices!)

What does HDMF mean? (No choices!)

What does UHLP mean? (No choices!)

What does GSIS mean? (No choices!)


What does SSS mean? (No choices!)

What does HUDCC mean? (No choices!)


Under what classification of occupancy does police and fire stations fall? [A] Industrial [B] Business and
Mercantile [C] Storage and Hazardous [D] Institutional
What is Type III construction? [A] Wood Construction [B] Wood Construction w. Fure resistive materials [C
Masonry and Wood [D] Steel, Iron, Concrete, Masonry [D] 4 hour Fire Resistance Construction
What is the speed or MPM for an escalator? [A] 35 mpm [B] 36 mpm [C] 37 mpm [D] 38 mpm
Which of the following are the requirements for Building Permits? I. True copy of TCT II. Tax Declaration II
Property Tax IV. 5 Sets of Plans Duly Signed by various professionals IV. Lot Plan V. Site Development Pl
II, III, IV [B] II, III, IV, V [C] II, IV, V, VI [D] All of the Above

What is the requirements for Occupancy Permits? I. As Built Plans II. Certificate of Completion III. Logboo
Specification V. Special Provisions [A] I, II, III [B] I, III, IV [C] I, II, V [D] II, III, IV [E] III, IV, V [F] All of the ab
What is the angle of inclination for an escalator? [A] 30º [B] 35º [C] 40º [D] 45º
Number of wheelchair seating for an assembly seating capacity of 51-300. [A] 2 [B] 4 [C] 6 [D] 7
What is the required documents for the completion of Contract documents? I. Aggreement II. Specification
Special Provisions IV. General Requirments V. Drawings VI. Estimates VII. Pert CPM [A] I, II, III, IV, V [B]
V, VI [C] I, II, IV, V, VI, VII [D] All of the Above
A long interior passageway providing access to several rooms. [A] Road Right of Way [B] Easement [C] C
[D] Harizontal Exit
A raised rim of concrete, stone or metal which forms the edge of street, sidewalk, etc. [A] Ramp [B] Curb [
Central Refugee Station [D] Handrail

Under what group of Occupancies does school or day-care structures go? [A] Group A - Residential Dwel
Group D - Institutional [C] Group E - Business and Mercantile [D] Group C - Education and Recreation

Under what group of Occupancies does Power Plants, Ice Plants and Cold Storage Go? [A] Group G - Sto
and Hazardouz [B] Group F - Industrial [C] Group E - Business and Mercantile [D] Group D - Institutional
In Group D - Institutional Occupancies, from which Division does Mental hospitals, mental sanitaria, Jails,
Prisons go? [A] I [B] II [C] III [D] IV

In Group G - Storage and Hazardouz, from which division does Aircraft repair hangars go? [A] I [B] II [C] I
In Group I occupancies, how many occupant load does the group has? [A] More than 1000 [B] Less than
More than 300 [D] Less than 300
In Group J - Accessory, from which division does Agricultural Structures Go? [A] I [B] II [C] III [D] IV
Which is a true statement for this Group A - Residential Dwellings classification? [A] Reformatories [B] Ga
Filling and Service Stations [C] (Nuclear) Family Dwellings [D] Woodworking Establishments
What is the meaning of Group H Occupancy? [A] Industrial [B] Assembly other than Group I [C] Assembly
Occupant load 1000 or More [D] Education and Recreational
which of these occupancies are not classified in Group G - Storage and Hazardouz? [A] Repair Garages [
Woodworking Establishments [C] Aircraft Repair Hangars [D] Power Plants
True or False, Is Group C classified as Business and Mecantile Occupancies? [A] False - Industrial [B] Tru
False - Institutional [D] False - Residential
True or False, does convents and monasteries classified in the Group B class occupancy? [A] True - Resi
Multi Family Dwellings [B] False - Institutional [C] False - Residential Single Family Dwellings [D] False - B
and Mercantile
How many groups are there in the "classification and general requirements of all buildings by use or occu
[A] 9 [B] 10 [C] 11 [D] 12
In types of specifications, it is the result of the product, rather than the product itself are specified. [A] Bran
Name [B] Descriptive [C] Performance [D] Combination
In types of specifications, the desired product is specified by the name given and model number "or an eq
approved by the architect". [A] Brand Name [B] Descriptive [C] Performance [D] Closed
In types of specifications, gives a description of the product [A] Performance [B] Descriptive [C] Closed [D
Name
In types of specifications, it is possible to have combinations of performance, description and reference
specification [A] Brand Name [B] Open [C] Closed [D] Combination
In types of specificaitons, the item desired is referred to by a number corresponding to a number publishe
specification [A] Reference [B] Brand Name [C] Open [D] Closed
In types of specifications, there are two types, the single and the multi product [A] Open [B] Closed [C] Re
[D] Combination
In types of specifications, open because all manufacturers whose product meet performance or descriptio
specified may bid. [A] Closed [B] Open [C] Brand Name [D] Performance
In BP 344, What is the length of the wheelchairs for the disabled (All In Meters)? [A] 0.90 to 1.10 [B] 1.10
[C] 1.30 to 1.50 [D] 0.70 to 0.90
In BP 344, What is the width of the wheelchairs for the disabled (all in meters)? [A] 0.40 to 0.60 [B] 0.50 to
[C] 0.60 to 0.75 [D] 0.55 to 0.75
In BP 344, What is the comfortable reach of persons confined to Wheelchairs? [A] 0.50 to 1.00 above the
0.60 to 1.10 above the floor [C] 0.70 to 1.20 above the floor [D] 0.80 to 1.30 above the floor
In BP 344, A circle of __________ in diameter is a suitable guide in the planning of wheelchair turning spa
1.30 [B] 1.40 [C] 1.50 [D] 1.60
In Bp 344 basic physical planning requirements: Provisions shall be adapted and introduced to the physic
environment so that as many places or buildings as possible can be reached by all [A] Accessibility [B]
reachability [c] Usability [D] Orientation [E] Safety [F] Workability and Efficiency
In BP 344 Physical Planning requirements: designing for safety insures that people shall be able to move
with less hazards to life and health [A] Accessibility [B] reachability [c] Usability [D] Orientation [E] Safety [
Workability and Efficiency
In BP 344 Physical Planning requirements: the built environment shall be designed to allow the disabled c
to participate and contribute to developmental goals [A] Accessibility [B] reachability [c] Usability [D] Orien
[E] Safety [F] Workability and Efficiency
In Bp 344 Physical Planning Requirements: The built environment shall be design so that all persons, whe
be disabled or not, may use and enjoy it [A] Accessibility [B] reachability [c] Usability [D] Orientation [E] Sa
Workability and Efficiency
In BP 344 Physical Planning Requirements: The built environment shall be designed so that it shall be ac
to all people. This means that no criteria shall impede the use of facilities by either the handicapped or no
disabled citizens [A] Accessibility [B] reachability [c] Usability [D] Orientation [E] Safety [F] Workability and
Efficiency
In BP 344 Physical Planning Requirements: Finding a persons way inside and outside of a building or ope
shall be made easy for everyone [A] Accessibility [B] reachability [c] Usability [D] Orientation [E] Safety [F]
Workability and Efficiency
In BP 344 Standard of Accessibility for special type of facilities: In all assemblies with a seating capacity o
500, how many wheelchair space should the architect provided? [A] 1 [B] 2 [C] 3 [D] 4 [e] 5 [F] 6
In BP 344 Standard of Accessibility for special type of facilities: In all assemblies with a seating capacity o
how many wheelchair space should the architect provided? [A] 1 [B] 2 [C] 3 [D] 4 [e] 5 [F] 6
In BP 344 Standard of Accessibility for special type of facilities: In all assemblies with a seating capacity o
300, how many wheelchair space should the architect provided? [A] 1 [B] 2 [C] 3 [D] 4 [e] 5 [F] 6
In Bp 344 Requirements for Public Transportation: What is the minimum seating capacity for a regular bus
air conditioned bus? [A] 40 / 50 [B] 50 / 40 [C] 30 /40 [D] 40 / 30
In BP 344 Requirements for Public Transportation: regular Buses shall have at least _____ Designated se
disabled persons near Exit/Entrance Doors [A] 1 [B] 2 [C] 3 [D] 4 [E] 5 [F] 6
In BP 344 Requirements for Public Transportation: Air Conditioned Bus shall have at least _____ Designa
seats for disabled persons near Exit/Entrance Doors [A] 1 [B] 2 [C] 3 [D] 4 [E] 5 [F] 6
In BP 344 Dropped Curbs at crossings have a width corresponding to the width of the crossing; otherwise
minimum width is __________ (in meters) [A] 0.70 [B] 0.80 [C] 0.90 [D] 1.00
In Bp 344 dropped curbs shall be ramped towards adjoing curbs with a gradient not more than _________
1:6 [B] 1: 9 [C] 1:12 [D] 1:15

In Bp 344 walkways should have a minimum width of __________ (In meters) [A] 1.00 [B] 1.20 [C] 1.40 [D
In BP 344 Handrails shall be installed at __________ above steps or ramps. [A] 0.90 and 0.70 [B] 1.00 an
[C] 1.20 and 1.10 [D] 1.20 and 1.30
In BP 344 a __________ long extension o the handrail should be provided at the start and end of ramps a
stairs [A] 0.20 [B] 0.30 [C] 0.40 [D] 0.50
In Bp 344 handrails that require full grip should have a dimension of __________ (In Millimeters) [A] 20 to
30 to 50 [C] 40 to 60 [D] 50 to 70
In BP 344 accessible parking slots should have a minimum width of __________ [A] 2.50 [B] 3.20 [C] 3.50
3.70
In BP 344 a walkway from accessible spaces of __________ clear width shall be provided between the fr
of parked cars [A] 1.00 [B] 1.20 [C] 1.40 [D] 1.60

In BP 344 __________ entrance level should be provided where elevators are accessible [A] 1 [B] 2 [C] 3
In BP 344 ramps shall have a minimum clear width of [A] 1.00 [B] 1.10 [C] 1.20 [D] 1.30
In BP 344 ramps shall have a maximum gradient of __________ [A] 1:6 [B] 1:8 [C] 1:10 [D] 1:12
In BP 344 the length of the ramp should not exceed [A] 3.00 M. [B] 4.50 M. [C] 6.00 M [D] 7.50 M
In BP 344 All Doors shall have a minimum clear width of __________ [A] 0.60 [B] 0.80 [c] 0.90 [D] 1.10
In BP 344 a minimum clear spacing of __________ x __________ shall be provided before and extending
beyond a door. [A] 1.20 x 1.20 [B] 1.30 x 1.30 [C] 1.40 x 1.40 [D] 1.50 x 1.50
In BP 344 doorknobs and other hardware should be located between __________ and __________ abov
floor; __________ is the prefered [A] 0.72 and 0.96; 0.80 [B] 0.77 and 1.01; 0.85 [C] 0.82 and 1.06; 0.90 [
and 1.11; 1.00

In Bp 344 doors along major circulation routes should be provided with kick plates made of durable mater
height of __________ to __________ (in meters) [A] 0.30 to 0.40 [B] 0.40 to 0.50 [C] 0.50 to 0.60 [D] 0.60
In BP 344 Manual Switches shall be positioned within __________ to __________ above the floor [A] 1.0
1.10 [B] 1.10 to 1.20 [C] 1.20 to 1.30 [D] 1.30 to 1.40
In Bp 344 corridors shall have a minimum clear width of __________ [A] 1.00 [B] 1.20 [C] 1.40 [D] 1.60 [E
[D] 2.00
In BP 344 turnabout spaces should also be provided at or within __________ of every dead end [A] 2.50
[C] 3.50 [D] 4.00
In BP 344 accessible water closet stalls shall have a minimum area of __________ (in meters) [A] 1.50 x
1.60 x 1.80 [C] 1.70 x 1.80 [D] 1.80 x 1.90
In Bp 344 a turning space of __________ sq.m. with a minimum dimension of __________ for wheelchair
be provided for water closet stalls for lateral mounting [A] 2.00 sqm. / 1.25 m. [B] 2.10 sqm. 1.30 m. [C] 2
/ 1.50 m. [D] 2.50 sqm. / 1.60 m.
In Bp 344 the minimum number of accessible water closets in each floor level on that part of a floor level
accessible to the disabled shall be _________ where the total number of water closets on that level is
__________. [A] 1 / 10 [B] 1 / 15 [C] 1 / 20 [D] 1/ 20
In BP 344 the maximum height of water closets should be ________. Flush control should have a maximu
height of __________. [A] 0.40 / 1.20 [B] 0.45 / 1.20 [C] 0.50 / 1.20 [D] 0.50 / 1.20
In BP 344 the maximum height of lavatories should be __________. [A] 0.50 [B] 0.65 [C] 0.80 [D] 0.95
In BP 344 the knee recess for water closets should be [A] 0.50 to 0.60 [B] 0.60 to 0.70 [C] 0.70 to 0.80 [D]
0.90

In BP 344 the vertical clearance for water closet should be [A] 0.40 depth [B] 0.50 depth [C] 0.60 depth [D
In BP 344 urinals should have an elongated lip or through type; the maximum height of the lip should be [
[B] 0.38 [C] 0.48 [D] 0.58
In BP 344 accessible elevators should be located not more than __________ from the entrance and shou
easy to located with the aid of signs [A] 15 mts [B] 30 mts [C] 45 mts. [D] 60 mts.
In Bp 344 accessible elevators shall have a minimum dimension of __________ [A] 1.10 x 1.10 [B] 1.10 x
[C] 1.10 x 1.30 [D] 1.10 x 1.40
In Bp 344 control panels and emergency system of accessible elevators shall be within reach of a seated
centerline heights for the topmost buttons shall be between __________ from the floor [A] 0.90 to 1.20 [B
1.30 [C] 1.10 to 1.40 [D] 1.20 to 1.50
In Bp 344 button sizes at elevator control panels shall have a minimum of __________ diameter and shou
a maximum depression depth of __________. [A] 10 mm / 1 mm [B] 20 mm / 1 mm [C] 30 mm / 1 mm [d]
1mm
In Bp 344 the height of the top of the rail should be atleast ________ above the adjacent surface [A] 0.50
0.75 m. [C] 1.00 m [D] 1.25 m
In Bp 344 signs should not reduce the available footway width to less than __________ [A] 1.20 mts. [B] 1
mts. [C] 1.60 mts. [D] 1.80 mts.
What is the minimum dimension of a PWD Toilet as per BP 344? [A] 1.70m [B] 1.80m [C] 1.50m [D] 1.60m
What is the best way to provide for the convinience of both people in wheelchair and blind persons? [a] ra
[B] Tacile surfaces [c] Bright painted zebra crossing [d] Light controlled crossings with pedestrian phrases
audible signs
In BP344 what is the minimum width for a hallway? [a] 1.00M [b] 1.10m [c] 1.20m [d] 1.30m

As per bp344, what is the distance of the building main entrance to the elevator? [a] 60m [b] 30m [c] 20m
As Per BP344, what is the distance of a carpark slot to the nearest entrance of the building? [A] 60m [b] 3
45M [D] 15m

as per BP344, what is the minimum dimension of an elevator door width? [a] 0.70 [B] 0.80 [C] 0.75 [D] 0.8
What is the minimum size of an elevator shaft? [A] 1.70 x 1.80 [b] 1.30 x 1.60 [c] 1.10 x 1.40 [d] 1.20 x 1.5

Under BP344, walks should have __________ angle in order to guide the blind [a] 45º [b] 60º [c] 90º [d] 1
for parking areas of PWD, a walkway between the front ends of parked cars shall have a minimum clear w
[a] 1.00mts. [b] 1.10mts [c] 1.20mts [d] 1.30mts
What is the preferable height of doorknobs as per bp344? [a] 0.80 [b] 0.90 [c] 1.00 [d] 1.10

what is the angle of embossed tiles for the blind? [a] 30 degrees [b] 45 degrees [c] 60 degrees [d] 90 degr
What is the minimum clearance of a table from the floor considering the handicapped? [a] 0.71 [b] 0.74 [c
0.80
what is the preferred design for a stair considering users of crutches? [a] slanted nosing [b] projected nos
open riser stairs [d] right angle stair
As per bp344, what is the maximum height for a stair riser? [a] 150mm [b] 200mm [c] 250mm [d] 300mm
as per bp344, what is the minimum width of a stair? [a] 0.90 [b] 0.70 [c] 0.75 [d] 0.80
if there are 50 or less occupants, what is the minimum stair width? [a] 0.90 [b] 0.75 [c] 1.10 [d] 1.20
In BP344, what is the minimum width for a hallway? [a] 1.10 mts. [b] 1.20 mts. [c] 1.30 mts. [d] 1.40 mts.
In BP344, what is the minimum clear width for doors and windows? [A] 0.60 [b] 0.70 [C] 0.80 [D] 0.90
What general conditions of desig are important for the aged? [a] size, location, design [b] height of lavator
from the waist [c] grab bar [d] all of the above

What is the height of lighting switches? [a] 1.50 mts. [b] 1.20 to 1.30 mts [c] 1.30 to 1.40 mts. [d] 0.90 to 1
What is the minimum door width for hospital nursing units? [a] 1.20 [b] 1.30 [c] 1.40 [d] 1.10
When is a central refugee required? [a] RROW is 10mts above [b] RROW is 10 mts. Below [c] If there is n
RROW existing [D] None of the above
What is the minimum depth of a central refugee? [a] 1.0 mts. [b] 1.5 mts. [c] 2.0 mts. [d] 2.2 mts.
From BP344, what is the maximum width of a carriageway where a central refugee is not required? [a] 6 m
[b] 8 meters [c] 10 meters [d] 12 meters
Given a cost of the project, how much will be the value added tax? [a] 10% [b] 12% [c] 14% [d] 16%
If the owner decides to built a single detached house after 1 year, what will be the architects MBF? [a] 10%
15% [c] 20% [d] 5%
What should the architect do if the owner decides to change orders? [a] Check it with the contractor [b] fo
owner [c] neglect the owner [d] evaluate it
If the owner continously make changes, what methods of compensation should the architect employ [a] co
method [b] lump sum [c] percentage of construction cost [d] MDPE
what is the percentage of the architect if the owner gets all of the contract documents? [a] 35% [b] 50% [c
[d] 95%

The architect basic minimum fee if the pcc of the project is a bakery worth 2m pesos [a] 4% [b] 5% [c] 6%
IF an architect performs a full time supervision for a project, what will he receive as a minimum basic fee?
1.5% [b] 1.5 to 3% [c] 2 to 5% [d] 10%
Mr. Santos commissioned yur for a restaurant project last year. Due to the success of the restaurant, he w
you to do a 2nd restaurant using the same design, what will be your MBF? [a] 60% of MBF [b] 30% of MB
40% of mbf [d] 80% of mbf
How much percentage does Value added tax are being taken from an architects Minimum basic fee? [a] 5
8% [c] 12% [d] 15%
an architect makes a miniature model of the project for his own design study. Who should pay for it? [a] O
Contractor [c] Architect [d] Engineer [E] Subcontractor [F] all of the above
it is the most common method of compensation which is also fair to both the client and the architect [a] PC
MDPE [c] fixed fee or lump sum [d] Professional fee + Expenses
After all of the contract documents have been given to the owner, how much is the remaining professiona
15% [b] 5% [c] 10% [d] 8%

What is the standard progress of payment for an architects fee based on project phase? [a] 5%-10%-35%
95%-100% [b] 5%-15%-35%-85%-100% [c] 5%-15%-30%-85%-100% [d] 5%-15%-35%-85%-95%-100%
if the owner ask for a miniature model, who will pay for it? [a] Contractor [b] Architect [c] Subcontractor [d]
[E] All of the above [F] It's free
Who is responsible for the fee of an additional full time supervisor at the project? [a] architect [b] owner [c
contract [d] subcontractor
A client wanted your services for his new "single detached house" with a total project cost of 3M pesos. W
the percentage of your MBF? [a] 15% [b] 12% [c] 7% [D] 10%
refer to #632, will the percentage of your fee change if the owner decides to postpone the project for the f
year? [a] Yes [b] No [c] maybe, depends on the economy
Refer to #632, how much will you get if the client decides to defer the start of construction for a year? [a] 1
35% [c] 85% [d] 100%
Is it ethical and legal, for an architect to hire employees in a per project basis since SSS and Medicare is
required but only group insurance and employees can be terminated ever after 6 months? [a] Legal [b] Ille
depends on the employee [d] Under the table matters
A newspaper editor approaches an architect for an interview, is it okay to ask to be paid for the interview?
[b] no
Refer to #636, is it ethical to endorse a product? [a] yes [b] no
What must the client do if he wants to build another building of the same type? [a] get an another architec
a foreman to do the construction [c] ask the same architect who did the first one [d] DIY do it yourself
A client wants your design to be the same with another architect, what should you do? [a] Do it for more m
[b] don’t do it [c] think of other alternatives [d] I don’t care
you had a project for a client, a residential building. After the contruction, you found out that the client use
design for another project without your consent. What will you do? [a] forgive and forget [b] inform the ma
file a case with PRC [d] file a case in the court
How do you specift pipes [a] inside diameter [b] outside diameter [c] gauge [d] grade
Which is not a qualification of a specs writer? [a] degree and experience with construction management [b
contract with suppliers [c] library of references [d] degree and experience in latest construction trends and
materials
An architect needs to show his client the entirety of the project in full 3d and realistic form, what is the bes
do this? [a] animation [b] scale model [c] perspective [d] drawings
In the development of new technology, 3d and computer graphics had been widely used. What is the bene
trendy [b] cheaper [c] more efficient and realistic [d] popular
if the projects budget is constrained, what means should be used to achieve 3d understand of the project?
manual sketch [b] animation [c] scale model [d] drawings in autocadd
where does regular planning services fall? [a] regular services [b] special allied services [c] design and pla
services [d] construction services
What architectural service/phase is the part where the architect and client are choosing the contractor? [a
contract document phase [b] construction phase [c] design development phase [d] bidding phase
if an architect assumes the function of going to the project site for monitoring and supervision, what servic
being provided? [a] full time project supervision [b] project supervision [c] construction management [d] N
the above
At what stage are specifications done? [a] schematic phase [b] design development phase [c] contract do
phase [d] construction phase
after completion of contract drawings, specifications and other documents upon submission to a client, wh
stage is this? [a] contract document phase [b] construction phase [c] design development phase [d] schem
phase
Where does contract letting fall in architect services? [a] Pre Design [b] regular Services [c] specialized al
services [d] construction services
In a bidding, what is the role of the architect? [a] organize the bidding [b] award the project to the contract
choose the construction manager [d] chairman of the PBAC
In a bidding, what should be considered in the selection of the winning bid? [a] the losing bid [b] the lowes
the highest bid [d] the best bid
the architect has chosen a bidder but the owner does not approve, what can be done? [a] Rebid [b] Ask th
bidder to adjust the bid [c] cancel the project [d] do nothing

which is not a part of contract documents? [a] agreement [b] model [c] contract drawings [d] None of the a
if the owner wants to change the estimated cost after awarding to a winning bidder due to economic basis
should he do? [a] change order [b] revise scope of contact [c] change architect [d] cancel the project
if there is a discrepancy between text and the drawing, which one will prevail? [a] drawing [b] text [c] ask t
contractor [d] ask the architect
who does the architect approach for sound control? [a] electronics engineer [b] accoustics engineer [c] ele
engineer [d] DJ
Who is responsible for the site development plan? [a] architect [b] environmental planner [c] civil engineer
landscape engineer
who gives the directive to start the project? [a] owner [b] architect [c] Contractor [d] Project engineer
who approves the pert cpm? [a] architect [b] engineer [c] owner [d] contractor
who prepares the preliminary estimates? [a] architect [b] engineer [c] OJT trainee [d] contractor
Who Prepares the bill of materials? [a] Manufacturer [B] Dealer [C] Smuggler [d] Architect
Who prepares the shop drawings? [a] Arcihitect [b] Contractor [c] subcontractor [d] Draftsman
What is the role of the architect between the client and the contractor? [a] consultant [b] mediator [c] To ex
judicial orders with impartiality [d] None of the above
what is the foremost role of an architect with regards to the client? [a] design manager [b] design consulta
adviser [d] financier
Soil testing is the duty of [a] Construction Manager [b] Architect [c] foreman [d] Engineer
Whose responsibility is it to obtain a certificate of occupancy upon completion of the project? [a] architect
contractor [c] owner [d] Laborer
Who locates the points? [a] architect [b] geodetic engineer [c] civil engineer [d] Laborer

Who determines the cost and time of the project? [a] general contractor [b] project manager [c] architect [d
who is responsible for shortening the time and lessening the cost of the project? [a] architect [b] project m
[c] contractor [d] client
who owns the plans? [a] owner [b] architect [c] engineer [d] contractor
A plan is drawin by a company draftsman under the supervision of an RLA. Who owns the said document
draftsman [b] RLA [C] Company [D] client
It is the housing program of the government only for the underprivilaged and homeless citizens [a] Nation
Housing [b] Socialized Housing [c] Resettelement Program [D] Oplan demolitiom team MMDA
Who accredits the national organization of architects? [a] PRC [B] PRBOA [C] President [D] Mayor
What do you call an architect who wishes to practice architecture and is signed with the DTI? [a] Sole
Proprietorship [b] Partnership [c] Corporation [d] corporative

refer to #675, for partnership, which agency should they register with? [a] DTI [B} SEC [C] DOLE [D] DPW
what should be secured first before applying for a business permit [a] mayors permit [b] dole permit [c] ba
permit [d] DTI permit
where should you apply for a business permit? [a] City hall [b] SEC [C] DTI [D] BIR
Who is responsible for the implementation of RA9266? [a] PRBOA [b] OBO [C] DPWH [D] UAP
when planning to start an architectural firm in a certain locality, what should you first secure? [a] SEC perm
DTI Permit [C] Mayors Permit [D] all of the above
Under PD 1096, what is the minimum height of window from floor? [a] 0.80 [b] 0.82 [C] 0.85 [D] 0.90
Under NBC, what is the minimum dimension of kitchen? [a] 1.00 [b] 1.20 [c] 1.50 [d] 1.80
under nbc, what is the minimum dimension of a habitable room? [a] 1.50 [b] 1.80 [c] 2.00 [d] 2.20
what is the minimum headroom when a duct crosses the hallway? [a] 2.36m [b] 2.10m [c] 2.63m [d] 2.21m
The purpose of the National Building code is to provide all buildings and structures a framework of standa
requirements which is the [a] maximum [b] minimums [c] regulations [d] definitions
what is the minimum number of risers before having a landing? [A] 3 [B] 4 [C] 5 [D] 6
What is the Depth for Niche's (Cemetery) [A] 1.00m [B] 0.80m [C] 1.50m [D] 1.20m
as per bp 1096, what is the minimum height for a fence? [A] 1.00 [B] 1.20 [C] 1.60 [D] 2.00

It is the approving government unit for subdivision project development [A] NHA [B] HLURB [C] City Hall [
In planning a new building, an architect would have to look at regulations other than the zoning ordinance
a requirement for which of the following: [A] Width of the loading berth [B] Required size of easement [C]
Minimum lot size [D] Parking Area Size [E] Permissable roof covering
What is the minimum projection for balcony with a 6-9m RROW? [A] 600 [B] 800 [C] 900 [D] 1000
What is the minimum height for a construction fence? [A] 1.80 [B] 2.00 [C] 2.20 [D] 2.40
As per PD1185, what is the maximum height between landings [A] 2.41 [B] 3.60 [C] 3.66 [D] 4.23
As Per PD1096, what is the maxumum height between landings [A] 2.41 [B] 3.60 [C] 3.66 [D] 4.23
renovation is all about: [A] Changing the aesthetic value, Upgrading the value of occupancy [B] Mild Chan
which concerns about structural and partitions only [C] To change the use of occupancy or transfer [D] Ad
additional Floor are on the said occupancy
Addition is all about: [A] Changing the aesthetic value, Upgrading the value of occupancy [B] Mild Change
concerns about structural and partitions only [C] To change the use of occupancy or transfer [D] Add an a
Floor are on the said occupancy
Alteration is all about: [A] Changing the aesthetic value, Upgrading the value of occupancy [B] Mild Chang
which concerns about structural and partitions only [C] To change the use of occupancy or transfer [D] Ad
additional Floor are on the said occupancy
Conversion is all about: [A] Changing the aesthetic value, Upgrading the value of occupancy [B] Mild Cha
which concerns about structural and partitions only [C] To change the use of occupancy or transfer [D] Ad
additional Floor are on the said occupancy
Arch. Randy had a PF of 1M on his project. Under the architect design services, how much will he get up
signing of contract? [A] 50k [B] 100k [C] 200k [D] 500k
refer to question number 702, When arch. Randy ask by his client to prepare shop drawings and specifica
under what category of the design services will It fall? [A] Schematic Design Phase [B] Design Developme
Phase [C] Contract Document Phase [D] Construction Phase
Referring to answer in Number 701, how much is the percentage that he can get? [A] 5% [B] 15% [C] 35%
80%
Considering the percentage on number 702, how much will be the payment on this stage? [A] 50k [b] 100
200k [D] 500k
Upon completion of the project on number 703, how much percentage and value does Arch. Randy can g
respectively? [A] 5% = 50k [B] 15% = 100k [C] 100% = 100k [D] 35% = 200k
In a typical owner-architect agreement, which of the following is not generally included? [A] design and pla
of signs [B] Labor Contingencies [C] Ownership of documents [D] Arbitration
It is the amount to be paid for every delay in the contract time [A] Penalty [B] Liquidate Damages [C] Fine
Surcharge
The ________ are printed documents stipulating the procedural and administrative aspects of the contrac
The Specifications [B] Memorandum of Agreement [C] The general Conditions [D] The contract
There are two ways of undertaking a design-build service, one of which is: [A] By contract [B] By supervis
By guaranteed maximum cost [D] By guaranteed estimated cost
Building administrators are compensated on a monthly salary basis on: [A] Percentage of Construction Co
Percentage of gross monthly rentals [C] Lump Sum [D] Percentage of Net Income
__________ mandates government support only to PRC accrediate bonafide professional organization [A
[B] Board of Architecture [C] PIA [D] Commissioner
The ________ shall have the power, upon notice of hearing to suspend, and revoke any certificate of regi
[A] UAP national Presidents [B] Philippine President [C] PRC [D] Judge
if not clearly specified, a material could be installed: [A] at the contractors discretion [B] Only after the app
architect [C] With Owners Consent [D] If the cost is comparatively lower

The duties and responsibilities of the architect with the regards to his motives, conduct and sense of mora
are formulated under the: [A] UAP DOC 200 [B] Code of Ethics [C] Architect's National Code [D] All of the
Architect gomez got a proposed project of commercial building but her client does have no financial decis
his business. He asked the architect to suggest what is the best for his project that he will surely have a re
investment? From client's request, architect gomez makes a detailed cost benefit analysis to guide her cli
selecting from project business options. in which of the following pre design services did architect gomez
complied? [A] Project financing [B] Economic feasibility studies [C] Return of investment analysis [D] Proje
study

What is referred to a construction in an existing building involving changes in materials used partitioning lo
size of openings, etc. but not increase in overall area? [A] Alteration [B] Conversion [C] Renovation [D] Re
It is a submission of a dispute to an impartial board made up of a person acquinted with the project [A] Re
[B] Amicable Statement [C] Arbitration [D] Adjudication
In question number 716, compliance to this resolution is mandated within how many days? [A] 10 days [B
Days [C] 20 days [D] 30 Days
Who will pay for the temporary facilities at site? [A] Owner [B] Contractor [C] Architect [D] Project Manage

How much is the Minimum basic fee if Mr. Cruz House cost 20M pesos? [A] 1.8M [B] 2.0M [C] 2.2M [D] 2.
As per diem cost plus travelling and living expenses shall be chargeable to the owner or any occasion wh
architect of his duly authorized representative shall be required to perform services at a locality [A] P50 [B
[C] P1000 [D] P1500
In question number 720, how much radius of kilometers from his office shall be applied to this? [A] 25Km
100Km [C] 50Km [D] 150Km
Under the architect's design-build services, which of the following conditions should be observed? [A]
Permits/Licenses paid by architect [B] Client appoints personnel/other staff [C] Personnel cost deducted fr
architect's fee [D] None of the listed items
Client ask you to do a layout of his/her office. But your client does not have any idea what kind of busines
feasible in diera. What kind of design services does this situation fall? [A] Faesibility studies [B] Site Study
analysis [C] Pre Design Services [D] Business Study Services
What UAP Document does Number 723 fall? [A] UAP Doc 201 [B] UAP Doc 202 [C] UAP Doc 203 [D] UA
204
Joseph (the client) is looking for an architect, Dennis Den (the architect) is the one referred by Joseph's fr
Joseph ask Dennis Den to assist him in the determination of requirements for Dunia Lending Agency, and
expense relationshiop for his building in actual financing negotiations under Pre Design Services where d
Architect Dennis Den services fall? [A] Loan Services [B] Lending Services [C] Project Financing Services
None of the Above

Architect Hans is working in a Furniture company, he is an expert in doing the layout of workstations of an
office.commercial areas. What do you call this Pre Design Services that Archiect Hans rendered? [A] Layo
management studies [B] Space Management Studies [C] Space Allocation Studies [D] All of the Above
Al Asgar wants to setup an entertainment room on his new flat at al madinah residence. He instructed arc
reynald (who designed his flat) to design the entertainment room in the said flat, but architect reynald is no
expert in acoustical treatment and lighting treatment as well. so he hired a consultant such as acoustic an
illumination engineers (without getting approval from the client). is the consultant's fee, deductible from th
architect's fee? [A] Yes, because he is the one who hired them [B] Yes, because he did not informed the c
No, but he should inform the client and ask for approval [D] No, it's not part of his work

In a typical owner-architect aggrement, which of the following is not part of project construction cost? [A]
Plumbing/Electrical Fixtures/Accessories [B] Fire Fighting Features [C] Fixed Closets/Cabinets [D] Landsc
Architect chito loves to eat bread. Jane (the client) ask for the services of architect chito to do the bakery,
at the vacant lot along al rigga. They have agreed and decided to start the project with an estimated cons
cost of 10Million php. how much will architect chito recieved after signing the contract? [A] 25,000 [B] 35,0
30,000 [D] 40,000
from question number 729, how much will architect chito recieve upon the completion of schematic design
phase? [A] 50,000 [B] 70,000 [C] 60,000 [D] 80,000
from question number 730, how much will architect chito recieve upon the completion of design developm
phase? [A] 100,000 [B] 140,000 [C] 120,000 [D] 160,000
from question number 731, how much will architect chito receive upon the completion of contract docume
phase? [A] 250,000 [B] 350,000 [C] 300,000 [D] 400,000
from question number 732, how much will archittect chito will recieve if the project has been awarded to th
bidder amounting to a project cost of 9.5million php? [A] 50,000 [B] 55,000 [C] 60,000 [D] 70,000

from question number 733, if architect chito will also handle the design build by administration as instructe
much is the additional fee that architect chito will recieve? [A] 642,000 [B] 665,000 [C] 678,000 [D] 619,00

The measures taken to prevent fire or minimize the loss of life or property resulting from a fire, including li
fire loads and hazards, confining the spread of fire with fire-resistant construction, the use of fire detection
extinguishing systems, the establishment of adequate fire fighting services and the training of building occ
in fire safety and evacuation system (D.K. Ching p. 88) [A] Fire Safety [B] Plumbing [C] Mechanical [D] Ele

Any condition that increases the likelihood of a fire obstructs access to fire fighting equipment or delays th
egress of occupants in the case of fire. (D.K. Ching p. 88) [A] Fire Hazard [B] Ignition Point [C] Fire Load [
Tunnel test
The amount of combustible materials in a building measured in pounds per square foot of floor area (D.K.
p. 88) [A] Fire Hazard [B] Ignition Point [C] Fire Load [D] Tunnel test
Pertaining to a material capable of igniting and burning (D.K. Ching p. 88) [A] Fire Hazard [B] Combustible
Fire Load [D] Tunnel Test

Nothing or pertaining to a material, assembly or construction having a fire resistance rating required by its
Also called fire-resistive. (D.K. Ching p. 88) [A] [A] Fire Hazard [B] Combustible [C] Fire Load [D] Fire-Ra
The lowest temperature at which a substance will undergo spontaneous combustion and continue to burn
additional application of external heat (D.K. Ching p. 88) [A] Fire Hazard [B] Ignition Point [C] Fire Load [D
test
Any of various materials, as concrete gypsum or mineral fiber, used in making a structural member or sys
resistant to damage or destruction by fire (D.K. Ching p. 88) [A] Flame Spread rating [B] Fireproofing [C] F
retardant [D] Intumescent Paint

A test measuring the time it takes for a controlled flame to spread across the face of a test specimen, the
of the fuel the materials contributes to the fire and the density of the smoke developed by the fire. Also ca
Steiner Tunnel test (D.K. Ching p. 88) [A] Fire Hazard [B] Ignition Point [C] Fire Load [D] Tunnel test
A rating of how quickly a fire can spread along the surface of an interior finish material. Red oak flooring h
flame-spread rating of 100 while cement asbestos board has a rating of 0 (D.K. Ching p. 88) [A] Flame-Sp
Rating [B] Fireproofing [C] Flame Retardant [D] Intumescent Paint

A rating of the amount of combustible substances an interior finish material can contribute to a fire (D.K. C
88) [A] Fuel Contribution Rating [B] Flash Point [C] Liquid Filled Column [D] Spray-On Fireproofing
A compound used to raise the ignition point of a flammable material, thus making it more resistant to fire (
Ching p. 88) [A] Flame Spread rating [B] Fireproofing [C] Flame retardant [D] Intumescent Paint
As per PD 1185, what is the unit of exit width used to measure means of egress? [A] 50cm [B] 55cm [C] 6
65cm
As per PD 1185, dwelling units in row apartments shall be separated from each other by partition walls ha
fire resistance rating of how many hours? [A] 1 hour [B] 2 hours [C] 3 hours [D] 4 hours

In integrated system of underground or overhead piping or both connected to a source of extinguishing ag


medium which when actuated by its automatic detecting devices supresses fire. [A] Fire Protective Assem
Fire Alerting System [C] Fire Sprinkler System [D] Automatic Fire Suppression System
As per PD 1185, what is the maximum number of seats in rows seats between aisles for places of assemb
[B] 7 [C] 12 [D] 14
As per PD 1185, which is not a factor for determining degree of hazard? [A] type of occupancy [B] Constru
Materials Used [C] Combustibility of Contents [D] Floor Area
An extremely hot luminous bridge formed by passage of an electric current across a space between 2 con
or terminals due to incandescence of the conducting vapor [A] Pyrophoric [B] Flash point [C] Electric Arc [
Fulminate
A bar which extends across at least one half of each door leaf, which will open the door if subjected to pre
[A] Flush bolt [B] Door Jamb [C] Door Handle [D] Panic Hardware
As Per PD 1185, building over this height shall be required throughtout with automatic fire sprinkler system
10m [B] 12m [C] 15m [D] 20m

A rocket or liquid propellant which consist of combinations of fuels and oxidizers which ignite spontaneous
contact which other/ [A] Hypergolic fuel [B] Cryogenic [C] Corrosive Liquid [D] Combustible Liquid
As per PD 1185, what is the minimum number of exits for Class A places of assembly with a capacity of m
than 1000 persons? [A] 2 [B] 3 [B] 4 [D] 6
Passageway from one building to another or around a wall in approximately the same floor level (D.K. Ch
91) [A] Fire Lane [B] Harizontal Exit [C] Public Way [D] Vestibule
As per PD 1185, what is the minimum headroom clearance for Class B stairs? [A] 1.95m [B] 2.00m [C] 2.0
2.10m
Descriptive of any material which by its nature or as a result of its reaction with other elements produces a
drop in temperature of the immediate sorroundings [A] Oxidizing Material [B] Cryogenic [C] Combustible L
[D] Pyrophoric
As per PD 1185, what is the minimum opening width of doors? [A] 0.71 [B] 0.81 [C] 0.90 [D] 0.91
As per PD 1185, between any point in an institutional sleeping room or suite and an exit door of that room
shall not exceed how many meters? [A] 15 meters [B] 23 meters [C] 30 meters [D] 46 meters
A building unsafe in case of fire because it will burn easily or because it lacks adequate exits or fire escap
Fire Abatement [B] Fire Lane [C] Fire Hazard [D] Fire trap

As per PD 1185, what is the maximum force that is applied to the releasing device of the panic hardware i
direction of exit travel that shall cause the door latch to release? [A] 5 kilos [B] 6 kilos [C] 7 kilos [D] 8 kilos

As per PD 1185, what is the minimum width for any single door in a doorway? [A] 61cm [B] 71cm [C] 81cm
91cm
As per PD 1185, what is the minimum width of run exclusive of nosing or projection for Class B stairs? [A]
[B] 0.24m [C] 0.25m [D] 0.30m
As per PD 1096, what is the classification of buildings of masonry and wood construction with a one hour
resistivity throughout and exterior walls of incombustible fire resistive construction [A] Type I [B] Type II [C
[D] Type IV

As per PD 1096, a wheelchair transfer area is required for every how many parking spaces in buildings/st
intended for the use or occupancy of the handicapped? [A] 2 Spaces [B] 3 Spaces [C] 4 Spaces [D] 5 Sp

As per PD 1096, what is the minimum clearance between the established grade of a street and/or sidewa
the lowest undersurface of any part of a projecting balcony? [A] 2.00m [B] 2.40m [C] 2.80m [D] 3.00m

As per PD 1096, what is the minimum width dimension of a court? [A] 1.20m [B] 1.80m [C] 2.00m [D] 2.10
As per PD 1096, what is referred to by the total number of persons that may occupy a building or a portio
thereof at any one time? [A] Building Occupancy [B] Occupant Load [C] Building Usage [D] Unit Capacity
Which is not a requirement in applying for Building Permit? [A] Tax Declaration [B] Latest Income tax [C] P
and specifications [D] Current real Property tax
As per PD 1185, every room or space in educational occupancies with a capacity of over 50 persons shal
least how many doorways? [A] 1 doorway [B] 2 doorways [C] 3 doorways [D] 4 doorways
As per PD 1185, under what classification does fire in flammable liquids and gasses belong to? [A] Class
Class B [C] Class C [D] Class D
Degree of hazard is determined by: i. Fire resistance rating ii. Probability that a building, structure or facilit
catch fire iii. Difficulty in evacuating people iv. Difficulty in suppressing fire [A] I, II, III [B] II, III, IV [C] I, II, I
III, IV
As per PD 1185, what is the minimum aisle width for less than 60 seats in places of assembly? [A] 0.76 [B
[C] 0.91 [D] 1.00
Separated from other spaces of the building or structure by construction or equipment to provide a protec
of travel to the exit discharge. [A] Fire Lane [B] Harizontal Exit [C] Fire Exit [D] Vestibule

As per BP 220, how many percent of the gross subdivision area shall be allocated for community facilities
density is not more than 150 dwelling units per hectare in socialized housing? [A] 1% [B] 1.5% [C] 2% [D]

What is the minimum lot frontage of a regular lot for single-detached units as provided for in BP 220? [A] 4
[B] 6 meters [C] 8 meters [D] 10 meters
As per PD 957, what is the maximum block length without an alley? [A] 250 mts [B] 300 mts [C] 350 mts [
mts
As per BP 220, what is the minimum distance between buildings with more than 4 storeys? [A] 6m [B] 8m
[D] 12m

As per BP 220, which is not a site criteria for determining whether an economic and socialized housing sh
allowed? [A] Climate condition [B] Accessibility [C] Conformity to zoning [D] Availability of Basic needs
As per PD 957, what is the minimum lot frontage of an interior lot for single-detached units? [A] 3 meters [
meters [C] 5 meter [D] 6 meters
Which of the following is not included in the outline prescribed by the Department of Environment and Nat
Resources for the preparation of an Environmental Impact Statement? [A] Project Setting [B] Mitigation M
[C] Contingency Plans [D] Project Cost
As per BP 344, a level area of not less than how many meters shall be provided at the top and bottom of a
ramp? [A] 1.40 meters [B] 1.50 meters [C] 1.80 meters [D] 1.90 meters
As per BP 220, what is the minimum dimension for stairway tread and riser respectively? [A] 200 / 250mm
/ 200mm [C] 250 / 300mm [D] 300 / 250mm

As per BP 220, which of the following is not an important planning consideration for circulation system lay
Observe Heirarchy of raods [B] Consider topography [C] consider access and safety [D] Consider climate

As per BP 220, what is the minimum area for parks and playgrounds? [A] 50 sqm [B] 100 sqm [C] 150 sqm
200 sqm
As per PD 957, what is the minimum width for roads or right -of-way for residential condominium projects
meters [B] 8 meters [C] 10 meters [D] 12 meters
What is the minimum floor area for economic housing units as provided for in BP 220? [A] 16 sqm [B] 18 s
20 sqm [D] 22 sqm
What is the minimum lot frontage for rowhouse units in economic housing as provided for in BP 220? [A] 3
meters [B] 3.50 meters [C] 4.00 meters [D] 4.50 meters
As per PD 957, what is the minimum area for a single park/playground in a residential condominium proje
50sqm [B] 100sqm [C] 150sqm [D] 200sqm
As per BP 220, which among the following is the highest in the heirarchy of basic needs of human settlem
the provision of which shall be based on the actual setting which the project is located? [A] Park/Playgrou
Power [C] Water [D] Movement and Circulation

As per BP 220, what is the minimum clear width of stairways? [A] 0.60 mts [B] 0.70 mts [C] 0.71 mts [D] 0
As per BP 220, how many percent of the gross subdivision area shall be allocated for parks and playgrou
the density is 250 dwelling units per hectare in socialized housing?[A] 9% [B] 10% [C] 12% [D] 15%

What is the minimum floor area for open market housing units as per PD 957? [A] 22sqm [B] 30sqm [C] 4
[D] 54sqm
As per BP 220, what is the maximum length of an alley in a residential block? [A] 20 meters [B] 40 meters
meters [D] 80 meters
What is the minimum lot area for open market rowhouse units as prescribed in PD 957? [A] 50 sqm [B] 60
[C] 70 sqm [D] 80 sqm
As per PD 957, what is the minimum floor area of family condominium units for open market? [A] 18 [B] 22
[D] 36
As per BP 220, what is the maximum length for rowhouse units? [A] 50 meters [B] 100 meters [C] 150 me
250 meters
As per BP 344, entrances with vestibules shall be provided with at least how much depth to allow a disabl
person to open the door and allow his wheelchair to pass through easily? [A] 1.80 meters [B] 2.40 meters
meters [D] 3.50 meters
A dwelling on one lot containing separate living units for 3 or more families, usually provided with common
access, services, and use of land? [A] Cluster housing [B] Multi family dwellings [C] Rowhouse [D] PUD
What is the minimum lot area for single-detached socialized housing units as provided for in BP 220? [A]
[B] 62 sqm [C] 64 sqm [D] 72 sqm
As per PD 957, what is the prescribed ratio for saleable and non-saleable lots? [A] 60% / 40% [B] 70% / 3
75% / 25% [D] 80% / 20%
As per BP 220, what is the minimum distance between two buildings wherein the taller building has 3 or 4
storeys? [A] 4 meters [B] 5 meters [C] 6 meters [D] 7 meters
As per BP 344, accessible public washrooms and toilets shall permit easy passage of a wheelchair and m
allow how much turning space for wheelchairs? [A] 1.50 sqm [B] 1.70 sqm [C] 2.00 sqm [D] 2.25 sqm
As per BP 344, what is the maximum distance between reststops of turn-around spaces in walkways? [A]
meters [B] 6 meters [C] 10 meters [D] 12 meters
As per PD 957, parks/playground or other recreational facilities may not be required if the condominium is
not more than or _____ meters from a publicly accessible park/playground/or other recreational facilities.
[B] 400 [C] 800 [D] 1000

An interest in real property consisting of a separate interest in a unit in a residential, industrial, or commer
building and an undivided interest in common, directly or indirectly, in the land on which it is located and in
common areas of the building. [A] Apartelle [B] Townhouse [C] Apartment [D] Condominium

As per BP 220, maintain a ratio for house and lot where ___% of the selling price for a house and lot pack
allotted for the house and ____% for the lot. [A] 60% / 40% [B] 70% / 30% [C] 75% / 25% [D] 80% / 20%
He is a registered & licensed architect, who is academically and professionally qualified, & with exception
recognized expertise or specialization in any branch of architecture; [A] Architect of record [B] Consulting
Architect [C] Architect [D] Architect in charge of construction
It was the first law passed by the national assembly in 1921 where the maestros de obra or the master bu
are required to register as architects? [A] Engineers and Architect's Law act no. 2986 [B] Engineers and
Architect's Law act no. 2896 [C] Engineers and Architect's Law act no. 9286 [D] Engineers and Architect's
no. 8296
It refers to contracts or arrangements involving the transfer of systematic knowledge for the manufacture
product [A] technology transfer [B] transfer of record [C] contract documents [D] technical transfer
Within how many months shall be the release of Retention from date of Final Payment? [A] 2 months [B] 3
months [C] 4 months [D] 6 months
The value of extra work or change in construction plans by the owner. [A] Unit prices provided credit does
exceed 10% of original contract [B] Actual direct cost plust 15% for profit, overhead and tax [C] Value add
contingencies [D] Estimate and acceptance in lump sum

Which of the following is NOT the architect’s responsibility in relation to the contractor?
[A] The Architect shall immediately upon his personal knowledge and inspection, reject or condemn ma
equipment or workmanship which are not in conformity with the Contract Documents in order not to cause
Unnecessary delay and additional expense to the Contractor,
[B] The Architect shall not knowingly call upon the Contractor to correct or remedy oversights or errors
Contract Documents to the Contractor’s financial advantage.
[C] The Architect shall give the contractor every reasonable aid to enable him to fully understand the co
of the Contract Documents by furnishing clear, definite and consistent information in all pertinent contract
documents to avoid unnecessary mistakes that may involve extra costs to the Contractor.
[D] The Architect shall consider the needs and stipulation of the Contractor and the effect of his work up
life and well-being of the public and community as a whole
Condominium & Subdivision Buyers Protective Law. [A] PD 1216 [B] PD 1295 [C] PD 957 [D] PD 9514
In methods of compensation, if the Architect as Project Manager performs regular architectural services f
same project, he is compensated separately for these services as stipulated in what UAP Documents? [A
Doc 201 [B] UAP Doc 202 [C] UAP Doc 203 [D] UAP Doc 204
PD 957: In Design Standards for Residential Condominium Projects, offsite parking is allowed but must N
more how many meters away from the building it serves? [A] 31 meters [B] 50 meters [C] 100 meters [D]
meters
In a PERT CPM. ____________is a starting node to two or more activities [A] concurrent node [B] merge
[C] Simultaneous node [D] burst node
Contract Documents shall be the property of the_________. [A] Owner [B] contractor [C] architect [D] Pro
manager
When the owner hires an Architect of a firm to coordinate the whole range of Comprehensive Architectura
Services, it shall constitute? [A] Design build [B] Labour Supervision [C] Project management [D] Constru
services

A ____________ is a wall which extends vertically from lowest portion of the wall which adjoins two living
to a minimum height of 0.30 meters above the highest portion of the roof and extends horizontally 0.30 me
beyond the outermost edge of the abutting living units? [A] Block [B] Fireblock [C] Firewall [D] Blotline wal
Entities, agencies, organizations & the like that have been accredited/registered with the Board of Architec
the Professional Regulation Commission to deliver seminars, lectures, & other Continuing Professional Ed
Modules for Architects, other than the IAPOA which is automatically accredited by the Board of Architectu
United Architect of the Philippines [B] CPD Providers [C] Integrated Accredited Professional Organization
Architects [D] National Convetion
Defining open space in residential subdivision [A] BP 220 [B] PD 1216 [C] PD 957 [D] PD 579
A full time construction inspector hired by owner assisting in the supervision of the work. [A] Project
representative [B] Engineer [C] Architect [D] Contractor
A key housing agency that assist private developers to undertake low and middle income mass housing
production [A] NHMFC [B] HIGC [C] HLURB [D] NHA
Which article is NOT included in the Owner Contractor Agreement? [A] Time of Completion and Liquidated
damages [B] Performance and Payment bonds [C] Cost records [D] Payments
The _________ shall submit ________ copies of shop drawings for the architect’s approval [A] Engineer/
Sub-contractor/4 [C] Project representative/5 [D] Contractor/2
Refers to the most reasonable price of land and shelter based on the needs and financial capability of “pr
beneficiaries and appropriate financial schemes” (RA 7279). [A] Financial range [B] Affordable Cost [C] Ho
rental wage range [D] lower housing rate

Which of the following situation would trigger the owner to suspend work? [A] bankruptcy declared by BIR
Insuburdination [C] Non payment of contractors debt/non superintendence of contractor [D] All of the abov

The Contractor shall submit the following before Final Payment is to be released except for:
[A] 3 copies of directory of Panel boards with list of circuits, instructions and Manuals for Operating and
Maintenance of Fixture and Equipment and Keying Schedule
[B] Guarantee Bond equivalent to 40% of the Contract Price covering a period of one year after the Fin
Acceptance of the Work.
[C] Certificate of Final Building Occupancy.
[D] Original and 3 sets of prints of As-Built Drawings of the finished project.
After ___________ substantial completion of contract work, the architect shall inspect the project & issue
certificate of completion after certification, the contractor will finish outstanding work during period of maki
of all known defect of 60 days. [A] 90% [B] 95% [C] 98% [D] 100%
An unoccupied space other than a yard bounded on two opposite sides by building lines with the other op
side bounded by other open spaces whether public or private.[A] Inner Court [B] Open Court [C] Through
[D] Private Court
An unoccupied space other than a yard bounded on all sides or around its periphery by building lines [A] I
Court [B] Open Court [C] Through Court [D] Private Court
The classification of use or occupancy of buildings/structures or portions thereof. [A] Character of occupan
Type of construction [C] Zoning [D] Land use
Toilet and bath rooms, laundry rooms and similar rooms shall be provided with window or windows with an
not less than _____ of the floor area of such rooms, and such openings shall not be less than 240 sq. mm
[B] 1/10 [C] 1/15 [D] 1/20
The point of reference on the highest adjoining sidewalk or the highest adjoining ground surface. [A] Adjac
ground elevation [B] Establish ground elevation [C] datum [D] reference level
Minimum access road width for interior or rear lots on which more than 35 units of apartments, rowhouses
accesorias or group of single detached units are built [A] 4.00m [B] 5.00m [C] 6.00m [D] 7.50m

An unoccupied space other than a yard bounded on three sides by building lines with one side bounded b
another open space whether public or private. [A] Inner court [B] Open court [C] Through Court [D] Corne

The vertical distance from the established grade elevation to the highest point of the opening of a flat roof
average height of the coping of a flat roof, to the average height of the highest gable, pitch or hip roof or to
of the parapet, if the roof is provided with a parapet, whichever is higher. [A] Adjacent ground elevation [B
Established ground elevation [C] Height of building/structure [D] Building bulk
Not an example of a private open space [A] Alleys [B] Yards [C] setbacks [D] lightwells
The lowest point of elevation of the finished surface of the ground between the exterior wall of a building a
point 1.50 meters distant from the said wall. [A] Adjacent ground elevation [B] Establish ground elevation [
Datum [D] reference level
The enclosing wall of an iron or steel or the nonbearing portion of an enclosed wall between piers. [A] Cur
Wall [B] Firewall [C] Exterior Wall [D] Faced Wall
Any wall which subdivides a building so as to resist the spread of fire, by starting at the foundation and ex
continuously through the storey to, or above the roof. (D.K. Ching p. 89) [A] Party wall [B] Foundation wall
Firewall [D] Nonbearing wall

That part of any wall entirely above the roof line [A] Firewall [B] Curtain wall [C] Parapet Wall [D] Retaining
Any wall used to resist the lateral displacement of any material; a subsurface wall built to resist the lateral
pressure of internal loads. [A] Party wall [B] curtain wall [C] Foundation wall [D] Retaining wall
The floor area assigned to that use divided by the unit area per occupant. [A] density [B] Occupant load [C
building bulk [D] Floor area ratio
The line formed by the intersection of the outer surface of the enclosing wall of the building and the surfac
ground [A] building line [B] property line [C] Grade line [D] Ground line
A lot fornting on but one street or public alley and the remaining sides bounded by lot lines [A] through lot
Inside lot [C] interior lot [D] Corner lot
A structural unit, the integral parts of which have been built up or assembled prior to incorporation in the b
[A] Built up unit [B] Pre fabricated assembly [C] Prestressed unit [D] Modular Units

As per PD 1096, the parking requirements for mixed occupancies shall be the sum of ____% of the domin
and _____% of the each of the non-dominant use [A] 75% / 25% [B] 25% / 75% [C] 50% / 100% [D] 100%

Which is exempted from paying building permit fees? [A] Schools [B] Churches [C] Public markets [D] Mu
Every building with _______storeys in height shall be equipped with one or more dry standpipes. [A] 1 to
to 3 [C] 3 to 4 [D] 4+
The total aggregate area of plastics used in skylights, monitors, and sawtooth glazing shall not exceed ho
percent of the floor area of the room or occupancy sheltered. [A] 10% [B] 15% [C] 20% [D] 25%
A yard or court providing egress to a public way for one or more required units. (D.K. Ching p. 91) [A] Cou
[B] Harizontal Exit [C] Exit Courts [D] Setbacks
As per PD 1096, what is the total open space within lots (TOSL) for basic R-2 buildings/structures on basi
corner lot using minimum sizes? [A] 30% [B] 50% [C] 58% [D] 62.5%
A projecting window similar to a bay window, but carried on brackets or corbels. [A] Oriel Window [B] cano
window [C] Double hung window [D] French window
Standard automatic fire extinguishing systems shall be installed in every storey, basement or cellar with a
of ____square meters or more which is used for habitation, recreation, dining, study or work, and which h
occupant load of more than 20. [A] 100 [B] 150 [C] 200 [D] 250
A vertical opening through a building for elevators, dumbwaiters, mechanical equipment, or similar purpos
Soffit [B] Chute [C] Air Space [D] shaft
The number of wet standpipes when required shall be so determined that all portions of the building are w
6.0 meters of a nozzle attached to a hose ____ meters in length [A] 20 [B] 21 [C] 22 [D] 23

A movable shelter supported entirely from the exterior wall of a building and of a type which can be retrac
folded, or collapsed against the face of a supporting building [A] Canopy [B] Accessoria [C] Awning [D] Arc

The vacant space left between the building and the property lines. [A] Yards [B] Setbacks [C] Courts [D]
Easement
As per PD 1096, A.T.O. need not be consulted if buildings/structures is not more than how many meters in
beyond the 315 mtrs. or 500 mtrs. distance from strip edge? [A] 15 meters [B] 30 meters [C] 45 meters [D
meters

As per PD 1096, what is the minimum width of a planting strip on the outer side of a sidewalk of 2 meters
or more, separating the curb from the sidewalk pavement? [A] 500mm [B] 600mm [C] 700mm [D] 800mm

Means of egress between the termination of an exit and a public way. [A] Door itself [B] Exit/Egress Exit [C
exit [D] Exit discharge
An assembly made of incombustible material installed on openings except on exit doors and exhaust duc
prevention of spread of fire.[A] damper [B] Fire exit [C] Shutter [D] Fire retardant

Combination of an automatic fire or smoke detection system and a system of high velocity water spray no
Sprinkler Vent method [B] Spray nozzle method [C] Roller shutter method [D] Partial enclosure method

As per PD 1185, When a door discharges to the outside, change in floor level shall not be more than how
millimeters? [A] 202mm [B] 205mm [C] 207mm [D] 215mm
The assembly of a fire door, fire window or fire damper, including all required hardware, anchorage, frame
sills. [A] Fire exit [B] Fire assembly [C] Shutter [D] Fire protection

A fire assembly which may remain in an open position and which will close automatically if subjected to ei
the following conditions. [A] Shutter [B] Fire protection system [C] Self closing fire assembly [D] Fire damp

Combination of an automatic or smoke detection system, automatic exhaust system and an automatic wa
curtain [A] Sprinkler vent method [B] spray nozzle method [C] Rolling shutter method [D] Partial enclosure

A liquid mixture of binders and combustible solvents, which when spread on a surface becomes a durable
protective and decorative finish. [A] Fore coating [B] Fire softener [C] Organic Coating [D] Fire retardant
A rating of combustible material based on the density and volume of smoke developed within a certain pe
time when its surface is ignited. [A] Smoke resistance rating [B] Smoke retardant [C] Smoke developed ra
Smoke spread rating
Time duration that a material or construction can withstand the effect of a hundred fire test [A] fire spread
[B] fire resistance rating [C] flame spread rating [D] flame resistance rating
A continuous and unobstructed route of exit from any point in a building, structure or facility to a public wa
means of egress [B] Stairway [C] fire enclosure [D] fire rating
Kiosk designed to provide an effective barrier to the spread of smoke from floor to floor [A] Spray nozzle m
[B] Partial enclosure [C] rolling shutter method [D] Fire stopping concealed spaces

Concealed space in which exposed materials with flame-spread rating greater than class A are fire-stoppe
Spray nozzle method [B] Partial enclosure [C] rolling shutter method [D] Fire stopping concealed spaces

Automatic self-closing rolling shutter which completely encloses the top of each escalator [A] Spray nozzl
method [B] Partial enclosure [C] rolling shutter method [D] Fire stopping concealed spaces
Situation A: an architect drew up plans for a family... The owners went abroad.. After a year, the owners r
but instructed the architect to help them find a new lot... The task would entail the architect's personal time
stage in the architect's services will the architect perform? [A] Pre Design Services [B] Regular Design Se
[C] Comprehensive Architectural Services [D] Specialized Allied Services

Refer to question number 878, What will be the ideal method of compensation that the architect should us
is to find a new site for the project? [A] PCC [B] Per Diem + Reimbursable [C] MDPE [D] Lumpsum/Fixed

Refer to question number 878, What can the architect suggest to the owner to minimize spending? [A] Bu
new lot [B] Buy buying a Existing house and lot [C] Buying a new house and lot at the Metro [D] It varies,
on the owners capital
Refer to question number 878, How much is the architect compensated after he completed all plans and
documents for construction? [A] 65% [B] 75% [C] 85% [D] 80%
Situation B: Juan has been working at KSA for almost 15 years but he feels incomplete since he was not a
take the LEA when he is still in the Philippines. He heard that PRBOA is going to conduct FLEA at Jeddah
his family to send his TOR, Birth of Certificate and Diploma. What else does he need to be able to take FL
Loogbook Signed by a Filipino RLA [B] Certificate of Employment from his present company [C] Recomm
Letter from the embassy [D] Money
Refer to question number 882, after passing FLEA, his company had a big project. He was the one who m
of the drawings. To whom he is liable to? [A] Company [B] Philippine Government [C] Saudi Government
the Public
Refer to question number 882, after passing FLEA, who can administer his professional oath? [A] RLA's w
abroad [B] Ambasaddor of Philippine Embassy [C] PRBOA and will hold a special oathtaking ceremony [D
Company
Situation C: Architect Guevarra was commissioned to do a residential project. Everything worked out until
everything was done except that the owner ran out of budget to start the Construction. According to the la
much is Architect Guevarra entitled to collect? [A] 80% [B] 90% [C] 100% [D] 85%
Situation D: An architect specifies a particular material for a project that will be sourced from a foreign sup
Everything is going as scheduled until the contractor reports to the client that he will not be able to finish t
project as scheduled since the material needed and to be supplied by the foreign supplier is still not at the
and delivery has been apparently delayed. There is an upcoming event and the building will not be ready
for the scheduled activity. it will have to be cancelled and the client is very unhappy due to the projected h
financial loss. Whose fault it is? [A] Architect for specifying a product that is not available in the local mark
The contractor for not informing the client and architect about the delay before it become critical. [C] The e
organizer for scheduling events before the building was finished. [D] Nobody's fault, it's something nobody
wanted
Situation E: Three siblings decided to form their own architectural firm. One is an architect, another is an e
and the last is an interior designer. How much is should be the architectural composition of the corporatio
50% [B] 60% [C] 75% [D] 80%
Refer to question number 887, What kind of business organization they will form? [A] Single proprietorshi
Corporation [C] Conglomeration [D] Partnership
Refer to question number 887, Where should they register their business? [A] SEC [B] DTI [C] City Hall [D
Refer to question number 887, If they are to apply for a business permit, where should they go? [A] SEC [
[C] City hall [D] BIR
Situation F: Ana wants to build a rest house in her lot at Tagaytay. She talked with her friend, Arch. A, abo
project. Ana's daughter also recommended Interior designer B to the mom. However, while browsing a ma
she learned about Architect C, who happens to be an interior designer at the same time. what is the best
for her to select the designers? [A] Select Architect A, since a friend [B] Comparative selection [C] Design
competition [D] All of them
Refer to question number 891, Why is is best to select architect C? [A] She can get a discount in ID servic
She can best interpret the architectural drawings for the interior design [C] it's not best to choose architec
you dont know her [D] Popularity
Refer to question number 891, If architect C will be compensated, how will she be compensated? [A] 10%
architects regular rate + 15% for ID's regular rate [B] 10% for architects regular rate + 10% for ID's regula
10% for architects regular rate + 12% for ID's discount rate [D] MDPE

Situation G: A contractor has a son who was born in the philippines but was raised and educated in New Y
son john, is a licensed architect in new york. Upon his father's prodding, arch. John returned to the philipp
be with his father. however, instead of joining his father's firm, he decided to set up his own firm. the son's
submitted drawing to the OBO for bldg. permit but the drawings were rejected, what went wrong? [A] John
is not registered with DTI/SEC [A] Arch. john is not allowed to practice architecture in the philippines [C] b
Architect john is an american [D] because architect john did not pay "suhol" to the OBO

Refer to question number 893, What can be done to remedy the problem? [A] hire a local architect to sign
seal for him [B] determine if a reciprocity agreement exist between the philippines and new york [C] Pass
Board exams in the philippines [D] The most effective way to finish government problems is what we call "
Refer to question number 893, What can be done to IMMEDIATELY remedy the problem? [A] hire a local
to sign and seal for him [B] determine if a reciprocity agreement exist between the philippines and new yo
Pass the Board exams in the philippines [D] The most effective way to finish government problems is wha
"suhol"
Situation H: Architect casia was commissioned by his friend as the architect for a townhouse project. He w
specifically asked to prepare brochures for the marketing of the project. What type of service did arch. Ca
rendered for the project? [A] Regular Design Services [B] Pre Design Services [C] Construction Services
Construction Services
Refer to question number 897, for helping his friend market the project, what type of compensation should
architect casia recieve? [A] MDPE [B] Professional Fee + expense [C] Lumpsum/Fixed Fee [D] PCC
Situation I: Architect A is a principal architect of an architectural firm. Architect B and C are junior partners
they are in charge of the design team. However, it is still architect A who signs and seals all the drawings.
Recently, they hired architects D and E, both RLA's, to be in charge of the production team. what is the po
for Architect's D and E? [A] Draftsman [B] Junior Architect [C] Junior Partner [D] Teaboy/Coffee Boy/Xerox
manager
Refer to question number 899, who is liable for the drawings under the law? [A] Arch. A [B] Arch B and C [
A, B and C [D] Company
Refer to question number 899, who owns the majority of shares in the company? [A] Architect A [B] Archit
and C [C] Investors [D] Sponsors
Situation J: a lot has a depth of 30m and a frontage of 15m facing northeast. It has a 20m RROW with 1.5
sidewalk at both sides. The left side of the lot is a school building while at the right is an office mid rise bui
Located in the middle part of the intended facade of your project is a post. the site is still vacant and there
water connection yet. Where do you apply for a temporary/permanent water connection? [A] Barangay Ch
[B] DPWH [C] OBO [D] MWSS
Refer to question number 902, who do you approach to have the post removed? [A] Meralco [B] DPWH [C
[D] Napocor
Situation K: as per clients request, the architect made some revisions. Since time is of the essence, he de
not to coordinate with the engineering consultants. After pouring, he discovered that a beam is set lower t
required headroom clearance/ what is the lesson learned? [A] Always coordinate with the consultants and
engineers [B] being the "boss" other allied practitioners should adjust their design to conform with yours [C
Nothing to be learned, the architect is the supreme ruler of construction [D] Note: Sometimes the answer
already there: use your CS!)
Under BP 344, walks should have _________ turn/groove in order to guide the blind [A] 45 degrees [B] 60
degrees [C] 90 degrees [D] 180 degrees
Under the accessibility code, what is the maximum height of handrails? [A] 0.80 [B] 0.85 [C] 0.90 [D] 1.00
As per BP 344, the minimum clearance of a table from the floor considering the handicapped [A] 0.54 [B]
0.74 [D] 0.84
As per BP 344, what is the minimum width of stairs? [A] 0.90 [B] 0.70 [C] 0.75 [D] 0.80
As Per BP 344, if there are 50 of less occupants, what is the minimum stair width? [A] 0.75 [B] 0.90 [C] 1.1
1.20
How much is the architect renumerated for basic services? [A] 8% [B] 9% [C] 10% [D] 12%
The architects fee for repetitive housing (3rd unit) [A] 60% [B] 40% [C] 30% [D] 10%
When is the first payment for an architect [A] First Payment [B] Acceptance fee [C] Preliminary fee [D] Firs
Paycheck
what among the following should the architect's fee NOT be based? [A] PCC [B] Contractors Fee [C] Clien
Profile Directory [D] None of the above
After all of the contract documents have been given to the owner, how much is the liability from the reman
professional fee? [A] 5% [B] 10% [C] 15% [D] 0%
A client hires an architect to prepare the plans and corresponding documents for his project. However, aft
completion of all plans and documents, the client changes his mind and decided not to impelement the pla
construction. How much is the architect compensated? [A] 85% [B] 60% [C] 75% [D] 35%
Who is the responsible for the fee of an additional full-time supervisor at the project? [A] Contractor [B] Ow
Architect [D] Subcontractor
Situation L: A newspaper editor approaches an architect for an interview: is it okay to ask to be paid for th
interview? [A] No [B] Yes [C] It matters, take it if the newspaper editor give hand you the money [D] It does
matter
Refer to question number 917, is it ethical to endorse a product? [A] No [B] Yes [C] It really matters, if they
give money, then why not? [D] It does not matter

A clients wants your design to be the same with another architect, what should you do? [A] It really depen
the negotiations [B] Dont do it [C] Do it for the sake of professional growth [D] Do if for free, no offense, no

A 5th year architecture student is asked and contacted by his aunt to designa 2 storey residence for her.
student finished preparing all the architectural plans, he ask his professor to sign and seal it. The professo
agrees to do it for a sum of P6000. is there anything wrong with this practice? if yes, who is liable? what is
case if ever? [A] Client is legible for asking a student to make the drawings [B] Architect is liable for break
Produlent Act Rule [C] the student is liable because he is not liable to make any architectural drawings un
finishes his/her studies [D] All of them are liable
it is the first phase in the Architect's regular service [A] Contract [B] Schematic Phase [C] Design Develop
Phase [D] Contract Document Phase
Before submitting sketches to a client, what must the architect do first? [A] Sign a service agreement [B] D
the image board for presentation [C] take a cigarette break [D] Enjoy the time with the client
For specialized allied services, what is the aesthetic designing of the space of a structure? [A] Aesthetic d
[B] Interior Design [C] Furniture design [D] Acoustic design

What is the primary power of an Architect over the contractor during construction [A] follow contractors ord
just watch things happening in the side [C] to supervise [D] to look and see if the labors are working fine

What do you call the action of construction manager in the contract document phase wherein he organize
packages of various trades [A] Assembly of bid packages [B] Preparation of bid packages [C] Checking of
packages [D] None of the above
What is UAP's responsibility as IAPOA [A] To lead the public [B] to lead the government [C] To lead the
organization [D] To lead the world
What is RA 9266? [A] Architecture law of 2004 [B] Architecture Law of 2005 [C] Architecture Law of 2006 [
Architecture Law of 2007
What is a successful architect [A] High Profile [B] Many projects due to low fees [C] Popularity wise [D] go
workmanship and ethical
How do you apply for a zoning exception? [A] Bribery [B] city council / Sangunian bayan [C] Supreme cou
Senate of the house
Under PD 957 for medium to high density subdivisions, what is the area of parks and playgrounds? [A] 1.
[B] 1.5 Hec [C] 2.0 Hec [D] 2.5 Hec
Under PD 1185, what is the exit width for business and mercantile? [A] 1.00 [B] 1.10 [C] 1.20 [D] 1.30
Under Fire code what is the minimum width of stairs? [A] 0.60 [B] 0.70 [C] 0.75 [D] 0.60
Under NBC, what is the minimum width of stairs? [A] 0.60 [B] 0.70 [C] 0.75 [D] 0.60
Under BP 344, what is the minimum width of stairs? [A] 0.60 [B] 0.70 [C] 0.75 [D] 0.60
Under FCP, what is the minimum height of fire exit window from the floor? [A] 0.72 [B] 0.82 [C] 0.92 [D] 1.0
Under FCP, what is the minimum door width for a nursing institution? [A] 1.00 [B] 1.10 [C] 1.20 [D] 1.30
What is the fire rating for a hotel room door? [A] 1.5 hours [B] 30 minutes [C] 1 hour [D] 20 minutes
What is the width for a zebra crossing? [A] 1.50 meters [B] 2.00 meters [C] 3.00 meters [D] 3.50 meters
What insurance borne by the contractor will cover injuries, deaths, and other unwanted incidents at the sit
Contingencies [B] Life insurance [C] Mortgage fund [D] Social Security System
What is fire code of the philippines? [A] PD 9514 [B] BP 1096 [C] BP 344 [D] RA 545
It is a zone wherein only non combustible materials are allowed to be used as a construction material [A]
resistive zone [B] moderate [C] Restrictive zone [D] High restrictive zone
What is not covered by fire regulation? [A] unrestricted fire zone [B] Critically declared zone [C] Environme
Zone [D] Twilight zone
What agency has jurisdiction over the quality of effluent from septic tanks? [A] DENR [B] Local Governme
DOH [D] DILG
What is now allowed by RA 9266 which was not allowed in RA 545? [A] Corporate Practice [B] Sole
Proprietorship [C] Experience before graduation [D] Signing of plans by an architect not prepared by him
Under RA 9266, can a RLA perform ID services on a small project? [A] Yes [B] No [C] Yes, provided there
consent from PRBoA [D] Yes, if personal matter
In construction, what is usually awarded as a subcontractor by the contractor or the client and not part of t
general contract? [A] Waterproofing [B] Tiling [C] Plumbing [D] HVAC
What is given to the client by the contractor after all the work is done, to ensure a properly, functional and
building? [A] post construction evaluation [B] Building operations manual [C] "blow out" celebration party f
completion of work [D] Headaches
Who should be held responsible for damages/accidents at site? [A] Architect [B] Contractor [C] Owner [D]
Machines
Situation M: A truck hit a meralco post, cutting the cables. Two blocks away, the light become intermittent
then appliances explode. There is a power outage. Why are the light intermittent? [A] Termittent Supply [B
Sudden power surge [C] Out of power supply [D] All of the above
Refer to question number 950, why did the appliacens explode? [A] Termittent Supply [B] Sudden power s
Out of power supply [D] All of the above
Refer to question number 950, What is needed to prevent the explosion or damages to appliances? [A] Te
Supply [B] Sudden power surge [C] Cut of power supply [D] All of the above
Refer to question number 950, Who will be liable for this act? [A] Meralco for putting post in that area [B] T
Driver [C] Owner [D] Engineers [E] The meralco post itself [F] A and B [G] B and C [D] C and D
Possible problem that may occur that may arise due to too much number of employees [A] Hunger Strike
Boycott [C] Financial Problems [D] Consequent number of rallies
It is required if the lot owner intends to abut the building to his property line if that side of the lot has an ex
neighbor [A] Shear wall [B] Firewall [C] Retaining Wall [D] Bearing wall
An Architect refuses to give the original plan to the owner, why? [A] the owner is entitled only to the bluepr
The architect's work is protected by PD 49, Intelletctual property law [C] In order to prevent the owner from
making duplicates and or constructing in his knowledge [D] All of the above
What kind of documents can you see in the jobsite? I. Plans II. Specifications III. [A] A and B [B] B and C [
and B [D] A, B, and C
Based on NSO standards, how much number of population should a place have before it is categorized a
barangay? [A] 5,000 [B] 7,500 [C] 10,000 [D] 15,000
These are the other functions of an architect [A] PM [B] Fabricator [C] Manufacturer [D] Supplier
A person found preparing architectural plans without the necessary license if guilt of what? [A] Stealing [B
Plunder [C] Fraud [D] Perjury
In specs writing, how do you prefer to money? [A] How many [B] How much [C] Amount [D] Volume

When should building operations manual (BOM) be submitted to the owner by the contractor? [A] 30 days
issuance of certificate of occupancy [B] as soon as the building is finished and ready for occupancy [C] As
as the owner ask for it and all billings are paid [D] Does not really matter as long as the building is usable

Cosidering office space, what is the minimum clearance of a service zone so as not to obstruct hallways b
2 work units? [A] 0.60 [B] 0.80 [C] 1.00 [D] 1.20
Considering office space, what is the minimum width that will also serve as access from the work unit to th
[A] 1.00 [B] 1.20 [C] 1.40 [D] 1.60
What is preferred to control the movement of people inside a building? [A] Limit access to 4 [B] Well lighte
hallway and stair [C] Busy Kitchen [D] 600mm Doors
what do you call the raised edge at the sidewalk? [A] Zocalo [B] Gutter [C] Curb [D] None of the above
What is between 2 lots and is intended only for pedestrians? [A] Corridor [B] Walkway [C] Alley [D] Sidewa
What type of street is used for pedestrians, animals and bikers? [A] Sidewalk [B] Narrow Lane [C] Main Ar
Alley

In a 15 storey highrise building situated within a through lot with a frontage of 20meters facing a major roa
15meters depth. The rear of the lot faces a service road. The front and side has a setback of 8meters and
5meters respectively. What is the minimum number of fire exits? [A] 2 main exits including the service sta
provide 3 exits from ground to 8th floor, and 2 exits from 9th to 15th floor [C] provide 2 exits as per minimu
the code [D] check first the number of occupant load before installing the number of fire exits in the buildin

When can an architect do design concepts parallel to the other designing architects? [A] during design
competitions [B] before project is conceived [C] during design development [D] during contest or events
What is not usually employed by the owner in comissioning a small project? [A] Referral [B] Design Comp
[C] Direct Hiring [D] It depends on the taste of the owner
In what instance does several architect submit a design proposal at the same time? [A] Referral [B] Desig
Competition [C] Direct Hiring [D] Design Expositions and Exhibitions
A client commissions you for a project. Since the client has a hardware, he insisted that he should be the
supply the materials and delivers them to the jobsite. The contractor uses them and installs the same. Eve
is fine until you noticed that the materials being used are substandard and does not follow the specificatio
you prepared. This angers you and you refused to sign the Contractor's billing. The contractor complains
owner and stops all work. the owner is angry too because of the work stoppage and feels insulted by you.
everybody is angry and everything grinds to a halt. Who shall say sorry first? [A] Architect [B] Owner [C]
Contractor [D] This is all out war, to the supreme court!
What is the minimum habitable area? [A] 6 sqm [B] 8 sqm [C] 3 sqm [D] 4 sqm
Grab bar for disabled (height in mm) [A] 600 [B] 700 [C] 800 [D] 1000
Basic function of a door [A] Swing in / Swing Out [B] Means of access [C] Fire safety [D] Opening
A building is arcaded if it is open on [A] One Side [B] Two Sides [C] All Sides [D] No sides
Allowable projection for the signage if the building is NOT arcaded [A] 0.90 [B] 1.00 [C] 1.10 [D] 1.20
Allowable projection for the signage if the building is arcaded [A] 0.90 [B] 1.00 [C] 1.10 [D] 1.20
Who adopts the land use plan when HLURB already approved it? [A] Office of the mayor [B] Sanguniang
Panglunsod [C] Sanguniang Kabataan [D] Kagawad
What is being planned by HLURB? [A] Housing development (CLUP) [B] Urban Land use map [D]
Comprehensive land use map [D] None of the above
After passing the Sanggunian, who implements it? [A] NHA [B] DPWH [C] OBO [D] Congressman
What is the meaning of R3 in residential zone? [A] Medium Density [B] High Density [C] General Density [
Density
What is meant by R2 in residential zone? [A] Medium Density [B] High Density [C] General Density [D] Lo
Density
Seek permit from DENR when: [A] Dynamite Fishing [B] Cutting large Trees [C] Providing Coral Reef rese
Saving present rainforest
Drawings, Specifications, Budgetary Cost, models, furnished by an architect are called [A] Construction
Documents [B] Architect's proposal [C] Personal Documents [D] Owner Documents
What is the purpose of Bill of materials? [A] Bidding [B] Loan [C] Construction Guide [D] Reference of Cos
Which is not a structural plan? [A] Foundation Plan [B] Schedule of beams [C] Floor Framing Plan [D] Roo
Framing Plan
What are needed for the application of building permit? [A] TCT [B] Construction Drawings [C] Specificatio
Survey Plan [E] All of the above
you were commissioned to do a master plan, what to do first? [A] Study existing laws [B] Survey the locat
Coordinate with local government unit for tracing history [D] Direct all apartment heads
Responsibilities of an architect: when he/she conducts the checking of materials and works done if in adh
with the specification [A] Job site management [B] Project supervision [C] Quantity Surveying [D] Full time
supervision
After a change of use (renovation) of the building, what should be secured? [A] Fire inspection certificate
Certificate of occupancy [C] Certificate of completion [D] Certificate of final payment
A permit secured prior to the commencement of a project [A] Excavation permit [B] building permit [C] EC
Sidewalk permit
A permit secured to the occupancy of the building [A] Fire inspection certificate [B] Certificate of occupanc
Certificate of completion [D] Occupancy Permit
What are the qualification of someone who wishes to take LEA? [A] Filipino Citizen [B] Architecture gradu
Completed the Diversified training experience logbook [D] All of the above
after how many days can a contractor stop work if the architects approval for the change of work is delaye
10 days [B] 15 days [C] 30 days [D] 120 days
Under PD 957, how many shall be the maximum number of rowhouses? [A] 15 [B] 20 [C] 10 [D] 5
What is the minimum RROW for access to interior lots? [A] 3m [B] 4m [C] 5m [D] 6m
Which of the following is not a part of RROW? [A] Curb [B] Sidwalk [C] Yard [D] Carriegeway
It is the maximum height of a party wall [A] 2.0m [B] 2.5m [C] 3.0m [D] 4.0m
height of ceiling at 5th floor with natural ventilation [A] 2.40m [B] 2.10m [C] 2.70m [D] 3.00m
If the residential condominium units are to be airconditioned, what shall be the minimum distance in mete
between the finished floor line and the finished ceiling line? [A] 2.40 (if 2nd floor) [B] 2.70 (if 4th floor) [C] 2
(succeeding storeys) [D] 1.80 (for mezzanine)
As per NBC, the minimum width of a exit doorway? [A] 1.50 [B] 1.80 [C] 2.00 [D] 1.20
What is the minimum dimension of a kitchen? [A] 2.00 x 3.00 [B] 1.50 x 3.00 [C] 1.50 x 1.50 [D] 2.00 x 2.0

In a sidewalk with a width of 1.80 meters, how many elderly people can walk side by side? [A] 1 [B] 2 [C] 3
What is the width of a walkway access for the physically challenge in a parking area? [A] 1.20 [B] 1.40 [C]
[D] 1.30

Situation N: Allan, a 5th year architecture student was asked by his aunt and uncle to prepare architectura
for their dream house. Both parents mutually agreed on their contract stipulations as well as the contract p
However, since Allan is still not licensed, he asked his professor, Arch. Luna to sign and seal his work. Arc
obliges asks and receives a signing fee. Is there something illegal in this situation? if yes, what is it? [A] Y
Estafa [B] Yes, violation of Intellectual property rights [C] None, because everybody involves mutually agr
eveidenced by their contract [D] Yes, Procurement act was broken
Refer to question number 1006, who is liable for this illegal act? [A] Allan [B] Parents [C] Arch. Luna [D] Al
them
Refer to question number 1007, who is liable for this unprofessional and scandalous act? [A] Allan [B] Arc
[C] Parents [D] All of them
A group newly licensed architects and their friends wanted to put up a architectural firm. How many % of t
population should be owned by the architects? [A] 25% [B] 50% [C] 75% [D] 100%
An architect, an engineer and an interior designer, who are all siblings are planning to set up a company.
many % will be the architect's share? [A] 75% [B] 60% [C] 40% [D] 90%
What is the unit per area per occupant of a conference room? [A] 1.00 sqm [B] 1.20 sqm [C] 1.40 sqm [D]
sqm

What is the unit per area per occupant of a classrom room? [A] 1.50 sqm [B] 1.70 sqm [C] 2.00 sqm [D] 1
What is the unit per area per occupant of a office building? [A] 18.60 sqm [B] 20.00 sqm [C] 22.40 sqm [D
sqm
A passage though or around a wall constructed as required for an occupancy separation, protected by an
automatic closing fire door and leading to an area of refuge in the same building or an approximately the s
level in the adjacet building (D.K. Ching p. 91) [A] Means of Egress [C] Exit Acess [D] Harizontal Exit
The lowest temperature at which a combustible liquid will give of sufficient vaport to igntie momentarily wh
exposed to flame (D.K. Ching p. 88) [A] Ignition Point [B] Flash Point [C] Intumescent Paint [D] Liquid Fille
Column
A rating of the amount of smoke an interior finish material can produce when it burns. Materials having a s
developed rating above 450 are not permitted to be used in buildings (D.K. Ching p. 88) [A] Fire resistanc
[B] Flame Spread Rating [C] Smoke Developed Rating [D] Spray on Fire Proofing
The time in a hours a material of assembly can be expected to withstand exposure to fire without collapsin
developing any openings which permit the passage of flame or hot gases, or exceeding a speficied tempe
on the side away from the fire (D.K. Ching p. 88) [A] Fire resistance rating [B] Flame Spread Rating [C] Sm
Developed Rating [D] Spray on Fire Proofing
A mixture of mineral fibers and an inorganic binder, applied by air pressure with a spray gun to provide a t
barrier to the heat of a fire (D.K. Ching p. 88) [A] Intumescent Paint [B] Liquid Filled Column [C] Spray on
Fireproofing [D] Draft Stop
A coating that, when exposed to the heat of a fire, swells to form a thick insulating layer of inert gas bubbl
retards flame spread and combustion (D.K. Ching p. 88) [A] Intumescent Paint [B] Liquid Filled Column [C
on Fireproofing [D] Draft Stop
A hollow structural steel column filled with water to increase its fire resistance of exposed to flame, the wa
absorbs heat, rises by convection to remove the heat and is replaced with cooler water from a storage tan
city water main (D.K. Ching p. 88) [A] Intumescent Paint [B] Liquid Filled Column [C] Spray on Fireproofin
Draft Stop
A zone of a city within which certain construction types or prohibited because of fire hazards present in the
(D.K. Ching p. 89) [A] Fire Area [B] Fire Zone [C] Fire Trap [D] Fire Hazard
An area of a building enclosed by fire rated construction capable of controlling the spread of fire (D.K. Chi
89) [A] Fire Area [B] Fire Zone [C] Fire Trap [D] Fire Hazard
Classfication for a fire assembly having a 3 hour fire resistance rating for protecting openings in 3 hour or
fire walls and occupancy separations (D.K. Ching p. 89) [A] Class A [B] Class B [C] Class C [D] Class D [E
E
Classfication for a fire assembly having a 3/4 hour fire resistive rating for protecting openings in exterior w
subject to light or moderate fire exposure from outside the building (D.K. Ching p. 89) [A] Class A [B] Clas
Class C [D] Class D [E] Class E

Classification for a fire assembly having a 3/4 hour fire resistive rating for protecting openings in 1 hour w
corridors and hazardous areas (D.K. Ching p. 89) [A] Class A [B] Class B [C] Class C [D] Class D [E] Clas
Classification for a fire assembly havinga 1 hour or 1 1/2 hour fire resistive rating for protecting openings i
or 2 hour fire separations, exit stairways and vertical shafts (D.K. Ching p. 89) [A] Class A [B] Class B [C]
[D] Class D [E] Class E
Classification for a fire assembly havinga 3/4 hour fire resistive rating for protecting openings in exterior w
subject to severe fire exposure from outside the building (D.K. Ching p. 89) [A] Class A [B] Class B [C] Cla
Class D [E] Class E

A door assembly, including all required hardware, anchorage, frames, sills, and having the required fire re
rating for its location and use (D.K. Ching p. 89) [A] Panic Hardware [B] Fire Window [C] Fire Door [D] Fire
A window assembly, including all required hardware, anchorage, frames, sills and having the required fire
resistance ratings for its location and use (D.K. Ching p. 89) [A] Panic Hardware [B] Fire Window [C] Fire
Transom Window
A vent designed to open automatically in the event of fire in order to remove smoke and heat from a buildi
(D.K .Ching p. 89) [A] Smoke Vent [B] Smoke Damper [C] Fusible Link [D] Spark Arrester
A damper tat closes an air duct automatically in the event of fire to restrict the passage of fire and smoke.
Required where a duct penetrates fire wall, fire rated shaft, or other fire separation (D.K .Ching p. 89) [A] S
Vent [B] Smoke Damper [C] Fusible Link [D] Spark Arrester
An open space established to prevent the spread of fire from a building, a group of buildings or an area of
another (D.K. Ching p. 89) [A] Fire Zone [B] Fire Break [C] Fire Area [D] Fire Separation

Any floor, wall or roof ceiling construction having the required fire resistance rating to confine the spread o
(D.K. Ching p. 89) [A] Fire Assembly [B] Fire Separation [C] Occupancy Separation [D] Distance Separatio
A vertical or horizontal construction having the required fire resistance rating to prevent the spread of fire
one occupancy to another in a mixed used building (D.K. Ching p. 89) [A] Fire Assembly [B] Fire Separatio
Occupancy Separation [D] Distance Separation

The separation required between an exterior wall of a building and a property line, the center line of an ad
street or public space, or the exterior wall of an adjacent building, all measured at right angles to the exter
(D.K. Ching p. 89) [A] Fire Assembly [B] Fire Separation [C] Occupancy Separation [D] Distance Separatio
A fire rated partition dividing an enclosed attic space of combustible construction or the concealed space
a suspended ceiling and a wood frame floor above (D.K. Ching p. 89) [A] Fire Assembly [B] Draft Stop [C]
Protected Opening [D] Fire Separation
The assembly of fire door, fire window, or fire damper, including all required hardware, anchorage, frames
sills (D.K. Ching p. 89) [A] Fire Assembly [B] Draft Stop [C] Protected Opening [D] Fire Separation
An opening in a wall, floor or roof-ceiling construction that is fitted with a fire assembly having the required
resistance for its location and use (D.K. Ching p. 89) [A] Fire Assembly [B] Draft Stop [C] Protected Openi
Fire Separation
A fire assembly that may remain in an open position and will close automatically if subjected to an increas
temperature or actuated by a smoke detector (D.K. Ching p. 89) [A] Protected Opening [B] Fire Door [C]
Automatic Closing Fire Assembly [D] Self Closing Assembly
A fire assembly that is normally kept in a closed position and is equipped with an approved device to insu
closing and latching after having been opened for use (D.K. Ching p. 89) [A] Protected Opening [B] Fire D
Automatic Closing Fire Assembly [D] Self Closing Assembly
A continuous path of travel from any point in a building to the outside ground level (D.K. Ching p. 91) [A]
Harizontal Exit [B] Exit Discharge [C] Means of Egress [D] Exit Access
That portion of a means of egress that leads to an exit. Building codes specift the maximum distance of tr
an exit and the minimum distance between exits when two or more are required (D.K. Ching p. 91) [A] Ha
Exit [B] Exit Discharge [C] Means of Egress [D] Exit Access
The portion of a means of egress that leads from an exit to an exit court or public way (D.K. Ching p. 91) [
Harizontal Exit [B] Exit Discharge [C] Means of Egress [D] Exit Access
A means of egress connecting to a required exit or exit court with a public way. Having no openings other
required exits and enclosed bt fire resistive construction as required for the walls, floors, and ceiling of the
building served (D.K. Ching p. 91) [A] Exit Corridor [B] Exit Passageway [C] Exit Door [D] Exit Stairway
A door providing access to a means of egress, swinging in the direction of exit travel, and usually equippe
panic bar (D.K. Ching p. 91) [A] Exit Corridor [B] Exit Passageway [C] Exit Door [D] Exit Stairway
A passageway serving as a required exit. Enclosed by walls of fire resistive construction. Building codes l
length of dead end corridors (D.K. Ching p. 91) [A] Exit Corridor [B] Exit Passageway [C] Exit Door [D] Ex
Stairway
A stairway leading to an exit passageway, an exit court, or public way. Enclosed by fire resistive construct
self closing fire doors that swing in the direction of exit travel (D.K. Ching p. 91) [A] Exit Corridor [B] Exit
Passageway [C] Exit Door [D] Exit Stairway
An exit stairway down an outside wall of a building. Constructed to the same standards as an interior exit
(D.K. Ching p. 91) [A] Fire Escape [B] Exterior Exit [C] Exterior Exit Balcony [D] Exit Court
A street, alley or similar parcel of land open to the sky and deeded, dedicated or otherwise permanently
appropriated for the free passage and use of the general public (D.K. Ching p. 91) [A] Fire Escape [B] Ext
Exit [C] Exterior Exit Balcony [D] Public Way
An exit door opening directly to an exit court of public way (D.K. Ching p. 91) [A] Fire Escape [B] Exterior
Exterior Exit Balcony [D] Exit Court
A landing or porch projecting from the wall of a building and serving as a required means of egress (D.K.
91) [A] Fire Escape [B] Exterior Exit [C] Exterior Exit Balcony [D] Exit Court

An enclosed and protected path of escape for the occupants of a building in the event of fire, leading from
access to an exit discharge (D.K. Ching p. 91) [A] Area of refuge [B] Exit [C] Well [D] Smokeproof enclosu
An area affording safety from fire or smoke coming from the area which escape is made (D.K. Ching p. 91
Area of refuge [B] Exit [C] Well [D] Smokeproof enclosure
A shaft for air, light, stairs or an elevator. Extending vertically through the floors of a building (D.K. Ching p
Area of refuge [B] Exit [C] Well [D] Smokeproof enclosure
The enclosing of an exit stairway by walls of fire resistive construction. Accesible by a vestibule or by an o
exterior balcony, and ventilated by natural or mechanical means to limit the peentration of smoke and hea
Ching p. 91) [A] Area of refuge [B] Exit [C] Well [D] Smokeproof enclosure
A water pipe extending vertically through a building to supply firehoses at every floor (D.K. Ching p. 90) [A
Standpipe [B] Hydrant [C] Siamese [D] Stack Vent
A fire invoking ordinary combustible materials, as wood, paper, cloth one which the quenching or cooling e
water is of primary importance (D.K. Ching p. 90) [A] Class A Fire [B] Class B Fire [C] Class C Fire [D] Cla
Fire
Apparatus for automatically extinguishing fires in a building, consisting of a system of pipes in or below, th
ceilings, connected to a suitable water supply and supplied with valves or sprinkler heads (D.K. Ching p. 9
Deluge System [B] Fire Detection System [C] Sprinkler System [D] Fire Alarm System
A sprinkler system having sprinkler heads open at all times, through which water flow is controlled by a va
operated by a heat, or smoke sensing device (D.K. Ching p. 90) [A] Deluge System [B] Fire Detection Sys
Sprinkler System [D] Fire Alarm System
A fire involving flammable liquids, as gasoline, oil and grease. Must be extinguished by excluding air and
inhibiting the release of combustible vapors (D.K. Ching p. 90) [A] Class A Fire [B] Class B Fire [C] Class
[D] Class D Fire
A dry pipe sprinkler system through which water flow is controlled by a valve operated by fire detection de
more sensitive than those in the sprinkler heads. (D.K. Ching p. 90) [A] Pre Action System [B] Automatic F
Extinguishing System [C] Wet Pipe System [D] Dry Pipe System
A fire involving live electrical equipment, which requires a non conducting extinguishing medium (D.K. Ch
90) [A] Class A Fire [B] Class B Fire [C] Class C Fire [D] Class D Fire
A system of devices and equipment which automatically detects a fire and discharges an approved fire
extinguishing agent onto or in the area of fire (D.K. Ching p. 90) [A] Pre Action System [B] Automatic Fire
Extinguishing System [C] Wet Pipe System [D] Dry Pipe System
A fire involving certain combustible metals, as magnesium or sodium, which requires a non reactive, heat
absorbing extinguishing medium (D.K. Ching p. 90) [A] Class A Fire [B] Class B Fire [C] Class C Fire [D] C
Fire
A sprinkler system containing water at sufficient pressure to provide an immediate, continuous discharge
sprinkler heads that open automatically in the event of fire (D.K. Ching p. 90) [A] Pre Action System [B] Au
Fire Extinguishing System [C] Wet Pipe System [D] Dry Pipe System
A sprinkler system containing pressurized air that is released when a sprinkler head opens in the event of
Allowing the water to flow through the piping and out the opened nozzle (D.K. Ching p. 90) [A] Pre Action
[B] Automatic Fire Extinguishing System [C] Wet Pipe System [D] Dry Pipe System

A standpipe contanining water under pressure and fitted with fire hoses for emergency use by building oc
(D.K. Ching p. 90) [A] Dry Standpipe [B] Dry Pipe System [C] Wet Standpipe [D] Wet Pipe System

A standpipe contaning no water and used by fire department to connect fire hoses to a fire hydrant or pum
truck (D.K. Ching p. 90) [A] Dry Standpipe [B] Dry Pipe System [C] Wet Standpipe [D] Wet Pipe System
An upright pipe with one or more nozzles or spouts for drawing water from a main, especially for fighting f
Also called as fireplug (D.K. Ching p. 90) [A] Fire Hose [B] Fire Hydrant [C] Siamese [D] Fire Pump
A pipe fitting installed close to the ground on the exterior of a building. Providing two or more connections
which the fire department can pump water to a standpipe or sprinkler system (D.K. Ching p. 90) [A] Fire H
Fire Hydrant [C] Siamese [D] Fire Pump
A portable apparatus for putting out a small fire by ejecting pressurized water or special chemicals, classif
according to the type of fire it is able to extinguish (D.K. Ching p. 90) [A] Fire Extinguisher [B] Pre Action S
[C] Deluge System [D] Standpipe System