Vous êtes sur la page 1sur 3

VIDHYADEEP INSTITUTE OF ENGINEERING AND TECHNOLOGY, ANITA,

KIM
DIPLOMA ENGINEERING COLLEGE
` Subject: TDP (Lab)
Subject Code: 3340902 ELECTRICAL Semester-IV

Sr. Experiments Planned Actual Hrs/marks


No. Date Date
1 To study about different types of line support used for transmission and
distribution
2 To study about various types of insulator used for transmission and
distribution
3 To study about the different types of transmission line
4 To study about the different types of transmission system(HVAC,HVDC)
5 To study about the different types of distribution system
6 Study about the load dispatch center (LDC)
7 To study about earth tester
8 To study about the various equipment used in substation and their symbol
9 Study and visit of 11KV/440V pole mounted substation
10 To study different types of cables used in distribution system
11 Study about different methods for cable lying
12 Visit substation

H.O.D PRINCIPAL
VIDHYADEEP INSTITUTE OF ENGINEERING AND TECHNOLOGY, ANITA,
KIM
DIPLOMA ENGINEERING COLLEGE
` Subject: SSE&PQ (Lab)
Subject Code: 3360904 ELECTRICAL Semester-VI

Sr. List of Experiments


No.
1 Interpret the single line layout of GIS substation and its component.
2 TO study about touch potential and step potential
3 Study about the power quality and its terminology
4 Study the power quality standards
5 Study about the transient becomes in electrical power
6 To study about the voltage sag and its mitigation
7 Study and understand about harmonics in electrical power
8 Study about harmonics mitigation techniques
9 Brief study about the impulsive transient and oscilatory transient
10 Visit of substation

H.O.D PRINCIPAL
VIDHYADEEP INSTITUTE OF ENGINEERING AND TECHNOLOGY, ANITA,
KIM
DIPLOMA ENGINEERING COLLEGE
` Subject: INSTALLATION, COMMISSIONING AND MAINTENANCE
(Lab)
Subject Code: 3360901 ELECTRICAL Semester-VI

Sr. Experiments Date Checking Hrs/marks


No. Date
1 To understand use of following instrument megger, earth tester, clip-
on metre, phase sequence indicator, growler
2 To understand the use of following Bering puller tools, filler gauge,
different type of spanner screw driver
3 Prepare complete layout of wiring for installation of given machine with
specifications.
4 Prepare a test report of an electrical machine after
commissioning.
5 Perform various tests applied to insulating oil.
6 To prepare trouble shooting chart of 3 phase I.M
7 To prepare plate/pipe earthing as per IS 3043-1987.
8 Dismantle & trouble shooting of ceiling fan
9 To measure earth resistance of installation in building domestic
fitting
10 To measure installation resistance of winding /wiring installation &
write the procedure

H.O.D PRINCIPAL