Vous êtes sur la page 1sur 19

Bitte decken Sie die schraffierte Fläche mit einem Bild ab.

Please cover the shaded area with a picture.


(24,4 x 13,2 cm)

Integrated Safety –
Connect and Protect.

www.continental-automotive.com Passive Safety & Sensorics


Bitte decken Sie die schraffierte Fläche mit einem Bild ab.
Please cover the shaded area with a picture.
(24,4 x 7,6 cm)

Continental’s Energy Management System


April 24, 2018
Chassis & Safety Division
Continental Temic Electronics (Phils.), Inc.
www.continental-corporation.com Plant Calamba
Title of the Presentation
No. Contents
1
Energy Policy
2
Energy Management Team – Plant Calamba
3
Energy Baseline Data Chart
4
Energy Efficiency Programs
5
Strategic Planning
6
ISO 50001 Training
7.
Energy Day & BEE Launching
8
ISO 50001 Awarding
9
Consumption & Specific Energy

April 24, 2018

Edgar I. Bondoc, Facilities & EnM Manager


1. Energy Policy

April 24, 2018


4

Edgar I. Bondoc, Facilities & EnM Manager


2. Energy Management Team - Plant Calamba

April 24, 2018


5

Edgar I. Bondoc, Facilities & EnM Manager


3. Energy Baseline Data Chart

April 24, 2018


6

Edgar I. Bondoc, Facilities & EnM Manager


4.1. Energy Efficiency Programs
ENERGY AVOIDANCE OF
ITEM
ENERCON PROGRAMS SAVINGS CO2 SUPPORTING PICTURES
NO.
(kWh / Year) (tons)

Installation of FCU at MSS office, Clinic and


Dentist room in order to turn-off AHU5A and
AHU5B
.

1 1,004,001 472

Installation of ducted type FCU at Matlab in order


to turn-off AHU2-4. Turn-off Booster Fan 2C and
replaced with FFU’s

2 Installation of FCU’s in offices & meeting rooms. 395,937 186

Turning off AHU's & installation of FCU's at HR,


3 63,638 30
Controlling & Training Rooms

April 24, 2018


7

Edgar I. Bondoc, Facilities & EnM Manager


4.2. Energy Efficiency Programs
ENERGY AVOIDANCE
ITEM
ENERCON PROGRAMS SAVINGS OF CO2 SUPPORTING PICTURES
NO.
(kWh / Year) (tons)

Installation of VFD for Chilled Water Booster Pumps &


4 407,633 192
Condenser Pumps

Shutting off of Chillers units during no production operation


days

Improve cooling water treatment to reduce condenser approach


5 temperature to below 6 °C 1,935,179 910
Increase chilled water setting from 11 to 12 °C

Increase space temperature set point in air-conditioned areas


from 21-24°C to 24-27°C

6 Increase chilled water temperature set point from 9C to 11C 61,756 29

April 24, 2018


8

Edgar I. Bondoc, Facilities & EnM Manager


4.3. Energy Efficiency Programs
AVOIDANCE OF
ITEM ENERGY SAVINGS
ENERCON PROGRAMS CO2 SUPPORTING PICTURES
NO. (kWh / Year)
(tons)

Vacuum cleaner of IPTE router is always ON.


Automate control to turn on only when spindle is
running or cutting. (1.5kva

7 48,116 23

Automate oven time controls, (Connector pre-bake


oven – 10kva

8 Installation of LED tubes at ADMIN/Common Area 107,439 50

April 24, 2018


9

Edgar I. Bondoc, Facilities & EnM Manager


4.4. Energy Efficiency Programs
AVOIDANCE OF
ITEM ENERGY SAVINGS
ENERCON PROGRAMS CO2 SUPPORTING PICTURES
NO. (kWh / Year)
(tons)

Replacement of Conventional Ballast to Electronic


9 Ballast at Warehouse/ Facilities Area & Phase 1 & 2 121,773 57
production area

Replacement of emergency lights at production area


except those on emergency exit doors with the
10 86,760 41
existing ceiling lighting fixtures connected to UPS
supply

Replacement of 215 pcs. 2 x 22W LED tubes into 9W


11 242,378 114
LED bulb at Hallways

April 24, 2018


10

Edgar I. Bondoc, Facilities & EnM Manager


4.5. Energy Efficiency Programs
AVOIDANCE OF
ITEM ENERGY SAVINGS
ENERCON PROGRAMS CO2 SUPPORTING PICTURES
NO. (kWh / Year)
(tons)

Replacement of Fluorescent tubes to LED tubes


12 270,768 127
(Building 2 and Ph1)

Replacement of 2,500 pcs. Existing 2 x 36 W


13 fluorescent lamp into 2 x 16 W LED tubes @ 3,148,465 1,480
Production areas of B2 & Phase 2

14 Installation of 700kWp Solar PV System 918,147 432

April 24, 2018


11

Edgar I. Bondoc, Facilities & EnM Manager


5. Strategic Planning

April 24, 2018


12

Edgar I. Bondoc, Facilities & EnM Manager


6. ISO 50001 Training

April 24, 2018


13

Edgar I. Bondoc, Facilities & EnM Manager


7. Energy Day & BEE Launching

April 24, 2018


14

Edgar I. Bondoc, Facilities & EnM Manager


8. ISO 50001 Awarding

April 24, 2018


15

Edgar I. Bondoc, Facilities & EnM Manager


9. Consumption & Specific Energy

April 24, 2018


16

Edgar I. Bondoc, Facilities & EnM Manager


Thank you
for your attention!

April 24, 2018


17

Edgar I. Bondoc, Facilities & EnM Manager


April 24, 2018
18

Edgar I. Bondoc, Facilities & EnM Manager


SensePlanAct Space for Sender Information
Confidential

Vous aimerez peut-être aussi