Vous êtes sur la page 1sur 5

ENGINEERING STANDARDIZATION AND DESIGN CENTRE

NEWSLETTER
Engineering Standardization and web-based application as soon as
Design Centre possible, to host the Engineering
October 2009 United Nations Logistics Base Database in the near future. However,
Volume 2 Brindisi, Italy initially the ESDC will run both Lotus
esdc@unlb.org Notes and Sharepoint in parallel until
© 2009 ESDC the new system is functioning well with
all users being familiar with SharePoint.
LOTUS NOTES Only then will the beloved Lotus Notes
system vanish forever!

Inside the ESDC


What is Sharepoint?
vs. SharePoint is a web-based collaboration
and document management platform

1
LOTUS NOTES vs.
SHAREPOINT
SHAREPOINT from Microsoft. It can be used to host
web sites, access shared workspaces,
Who will win??? documents and specialized applications,
Who will win??? from within a browser.
One year after GROOVE
2 Was it worth the trouble? Pamela Treveri and Christian Henze

WELCOME to the second edition of the


The new INTEGRATED ESDC Newsletter. We will circulate
3 MISSION, HQ and CAMP
PLANNING TEMPLATES
this letter from time to time in order to
keep all engineers and friends updated
What has changed? on developments in the Engineering
Standardization and Design Centre.
Who is building my camp
4 in the future?
The new SOR Templates
One year after the introduction of the
first ever Engineering Database, we
are shifting away from Lotus Notes and Engineering SharePoint (Test Version)
developing a new web-based system.
The ESDC and Mission Windows SharePoint offers proper

4 Support
Eye to eye with UNSOA
Currently, the Engineering Database
consists of more than 5 GB of relevant
data and is growing perpetually. For this
collaboration and document
management functionality by means of
web portals, as well as browser-based
and MINURCAT reason, we don’t feel that Lotus Notes
management and administration. It
can serve as our database in the
allows creation of document libraries,
What is up in the ESDC?
5 foreseeable future. Therefore, the ESDC
has been testing new Systems to replace
Lotus Notes.
which are collections of files that can be
shared for collaborative editing.

One of the applications we tested was


Xythos. However, unfortunately it
failed to meet our primary requirements.
The new candidate now is SharePoint.
After having conducted a first
successful internal test, the ESDC
involved UNIFIL in order to receive
information about the connectivity and
download speed in the mission
environment, and the test proved SharePoint provides access and revision
successful. Therefore, we are now control for documents in a library (as
moving ahead and will shift to this new e.g. our future Standards Library).

1 . . . . . . . . . 3 please consider the environment before printing this newsletter


October 2009 ESDC-Newsletter

SharePoint includes web components In this regard, please note that the world, whatever the mission, online or
such as workspaces and dashboards, ESDC is very grateful to UNIFIL for offline, access to UN network or not. As
navigation tools, lists, alerts (including providing feedback for various new long you are traveling with your laptop
e-mail alerts), shared calendar, contact proposed software/systems and always you have unlimited access and receiving
lists and discussion boards. being pro-active users of all our tools! all updates where- and whenever you
SharePoint provides a single, integrated Special thanks also to UNLB CITS for are in reach of the internet.
location where users can efficiently developing new applications and
collaborate with team members, find providing daily support to suit ESDC
organizational resources, search for requirements!
experts and corporate information and
manage content and workflow. Its
platform of services provides the
following: ONE YEAR AFTER
• Collaboration
Allows teams to work together
GROOVE!
effectively, collaborate on and publish
documents, implement workflows, and Was it worth the trouble?
share information. The ESDC checked this system in
Pamela Treveri and Christian Henze UNLB, UNHQ, MINURCAT (Djamena
• Portals and Abeche) and recently in UNSOA
Create a personal MySite portal to share (Nairobi, Mombasa and Mogadishu)
One year after the introduction of the
information with others and personalize and it worked 100% of the time.
first ever Engineering Virtual
user experience and content of a Web
Workspaces using Groove software Therefore, we are now ready for the
site based on the user’s profile.
and the implementation of the ESDC next step and to upgrade to GROOVE
• Search COLLECTIVE we are taking stock. 2007 in order to link documents from
Quickly and easily find people, the Groove Workspace(s) directly to the
Firstly, we can say that the Groove
expertise, and content in applications. Engineering SharePoint.
Community has increased considerably.
• Content Management Almost all the Engineering Section staff Please get in contact with us for
Create and manage documents, records, from NYHQ have access to our upgrading your current Groove Version
and Web content. workspaces, likewise engineering staff to Version 2007. Once approved, some
• Process and Forms from different field missions. Currently, things have to be done by yourself
Create workflows and electronic forms the ESDC Workspace has more than 40 before you can benefit from this system:
to automate and streamline our staff members participating from more (1) set up your account and regularly
processes. than 20 different missions. use it at least every 60 days, preferably
Also, during this first year more people you open Groove whenever you start
• Intelligence your computer; (2) download the ESDC
have become familiar with the use of
Allows the user to easily access critical workspace and other relevant
Groove, realizing the benefits of such a
information and to analyze and view workspaces, if for the first time over
tool by addressing their needs and
data, and publish reports. night as the data transfer in missions is
receiving support from other missions
But, what makes SharePoint the best or the ESDC itself. In addition to the very low; (3) open the relevant
choice for Engineering??? Engineering Database that serves workspace(s) for you from time to time
missions as first source to download (especially before you travel to remote
There are some interesting and useful locations) in order to get the latest
data, the ESDC supported various
features in SharePoint that will mark a updates of all data.
missions by providing specific required
big difference in comparison with Lotus
data through extra workspaces.
Notes, making everything much easier
and faster: But, was it really such a good idea
and did we change something?
• Users can upload multiple The answer straight away is YES. Not
documents in one shot. only that we connected all mission
• It will be possible to send file links engineers at various locations around
in order to address users to specific the globe and easily exchanged tons of
data (this will have a significant important data and information. It
impact in the improvement of the turned out that the most important
“Mission, HQ and Camp Planning reason for being connected to the ESDC
Template(s)”). COLLECTIVE is that you have access
ESDC workspace (GROOVE)
to all workspace data at any place in the

2 . . . . . . . . . . 3 please consider the environment before printing this newsletter


October 2009 ESDC-Newsletter

provided all Engineering data required UNSOA. This is the reason that the
to plan a Mission HQ, Police HQ, Force Camp Planning Template has also been
HQ, Logbase, FPU- and Military camps made available as detached Trial Camp
including Level 1 and 2 Hospitals in Planning Template (V1-07) Version.
accordance with UN-DPKO guidelines.
On this basis, the new generation has
been updated and extended to the first
Integrated Mission Planning
Template (V1-07) providing all
required numbers in order to, e.g. better
plan our budget, standardize all design,
ESDC workspace (GROOVE)
prepare layout plans, organize suitable
However, even if users from 20 Field sites, order all required items from
Missions, UNLB and UNHQ are existing systems contracts/SDS or to
connected, UN staff are not using this prepare local systems contracts, etc.
excellent tool to the extent necessary
that every user would benefit in the
same way. Currently, the majority of
users from missions and UNHQ are
only using this tool in the moment they
are in need of something rather than
contributing and keeping themselves
regularly active in the workspace(s).
The big exceptions are users from
UNIFIL who are very active and ESDC Camp Planning Template V 1-070
provide useful data and information and
support our colleagues in other In contrast, the HQ Planning Template
missions. But the ESDC is confident unfortunately did not achieve the same
that more missions will follow the success mainly for the reasons that there
example of UNIFIL in the future are not so many HQs to plan as there are
especially if more users are connected. Camps. However, the new generation of
the HQ Planning Template has
In this regard, the ESDC strongly improved a lot and is now used even for
encourages all engineering staff to the planning of non green field options.
actively participate in our Groove Each Template (Camp and HQ) works
workspaces and those who have not yet independently within the Mission
gained access, to ask for it. Simply Planning Template and can also be used
ESDC Integrated Mission Planning Template V 1-07
forward the approval from your Chief solely for its intended purpose
Engineer to the ESDC. Depending on This new template consists of the disregarding any other template.
available licenses, we will request a already known Camp Planning
Groove Version 2007 account for you. In this context, the ESDC finally created
Template, the recently introduced HQ
the missing Engineering Part of the SDS
Planning Template and a newly
catalogue (Special Thanks to Lars
designed Budget Planning Template.
Hansen) and provided a link from the
Also, all feedback from missions has
The new integrated been implemented into the new
template in order to provide access to
information on tools and materials.
generation templates, which are much
MISSION, HQ & more advanced than their predecessors,
but still as easy to handle. The
CAMP PLANNING philosophy that complete and reliable
numbers have to be provided on the
TEMPLATES basis of either very limited (as e.g. from
the Security Council Resolution
What has changed? Document) or detailed information
proved to be the most efficient concept.
Christian Henze Currently, the Camp Planning Template
is the most sophisticated tool for the
The ESDC developed and released in
planning and design of Military- and
the past a merged Trial HQ and Camp
Planning Template (V1-06) that FPU camps and is being used by several
missions already, e.g. MINURCAT and SDS Catalogue Webpage [www.sds-catalogue.dpko.un.org]

3 please consider the environment before printing this newsletter . . . . . . . . . . . 3


October 2009 ESDC-Newsletter

Consequently, together with the In summary, all templates are important The complete design packages for the
implementation of the new web based tools to support Engineering Sections in erection of T-walls and the construction
database, the ESDC will be able to field missions to standardize and of generator retainer basins are currently
directly link every systems contract, improve their design, streamline assets ongoing and will be distributed as trial
amendment, layout plan, SOR/SOW, and equipment, provide easy access to versions in November.
specification, manual and drawing to information and expertise, and increase
In this regard, the ESDC is requesting
the future Engineering Sharepoint savings in costs and time.
all missions to provide feedback and to
which was impossible with Lotus Notes. use these design packages. All trial
All templates including respective Link versions will be periodically updated
folder are available as download in the and improved.
ESDC Workspace. In addition the Who is building my
templates are available in the current
Engineering Database (Lotus Notes) camp in the future?
and Mission Workspaces, e.g. UNSOA- The ESDC and
and MINURCAT Workspaces.
The new SOR Templates Mission Support
Paola De Mauro and Pamela Treveri
Eye to eye with UNSOA
The ESDC is developing a Standardized and MINURCAT
Statement of Requirements (SOR) for
outsourcing the construction of Paola De Mauro and Christian Henze
engineering installations in field
missions. This SOR will facilitate the In May 2009, the ESDC supported
quick and efficient implementation of MINURCAT* on the ground for four
urgently needed works where missions weeks.
need to be set up or expanded within [*The Security Council, by its resolution
critical time constraints in the face of 1778, approved the United Nations Mission
changing priorities and in the absence of in the Central African Republic and Chad
required expertise on the ground. (MINURCAT), in concert with the European
Union, of a multidimensional presence
The SOR for outsourcing construction intended to help create the security
works at this stage will cover basic conditions conducive to a voluntary, secure
camp installations such as: and sustainable return of refugees and
displaced persons.]
• the erection of prefabricated
Sunari Silva and Christian Henze, were
buildings (single, three and six
tasked to design the Detachement
module);
Integre de Securite (DIS) Police HQ,
• the erection of ablution units; Police Stations and Police Posts in East
• the construction of septic tanks and Chad, near the with Sudan.
soakage pits;
• the construction of security fencing The ESDC conducted assessments of
and lighting; several sites, e.g. Abeche, GozBeida
and Farchana in order to design the
• the construction of pathways/
Police HQ, six (6) Police Stations and
walkways;
thirteen (13) Police Posts, including
• the construction/erection of security
dormitory accommodation.
watchtowers;
• the erection of T-walls;
• the construction of generator retainer
basins.
The first design packages (prefabricated
buildings, ablution units, septic tanks
and soakage pits) have been released as
trial versions already and posted into the
Groove ESDC Workspace and the
Engineering Database awaiting
feedback from all missions and HQ.
ESDC HQ Planning Template V 1-07
Temporary Police HQ in Abeche, Chad

4 . . . . . . . . . . 3 please consider the environment before printing this newsletter


October 2009 ESDC-Newsletter

The ESDC developed five (5) concept logistics package consists of equipment and All this experience, working on the
designs for prefabricated structures and mission support services and aims to assist ground in Chad, Kenya and Somalia and
five (5) concept designs for permanent AMISOM in its mandate to support the contributing via the various workspaces
transitional governmental structures,
structures. Finally, as only the and the Engineering Database from our
implement a national security plan, train the
permanent option has been approved Somali security forces, and to assist in
office in UNLB gave us the chance to
and signed off by the Chadian creating a secure environment for the test and improve all our tools and
authorities, the ESDC also provided delivery of humanitarian aid.] templates on “real case” scenarios.
respective Specifications, Scope of
Work and Bill of Quantities for this Christian Henze (ESDC) together with
project. Christopher Herloff-Petersen (UNMIS)
and Andres Gomez-Jimenez (UNLB)
supported UNSOA for three months
What is up in the
(June until August) in order to design
the permanent option of the Mission HQ
ESDC?
and Force HQ in Mogadishu and the Pamela Treveri and Christian Henze
Logistics Support Base in Mombasa.
In the middle of our operation
supporting MINURCAT, we received
the sad news that the ‘father’ of the
ESDC will not continue as OIC
DIS 70man Police Station
Engineering anymore. We would like to
use this Newsletter to thank Russ Doran
In addition, the ESDC was involved in for bringing the ESDC into existence
assessing the suitability of a site and for his strong support and guidance.
within the Police Academy compound
to serve as the proposed dormitory Thank you Russ!
accommodation for 250 trainees. MHQ and Force HQ in Mogadishu, Somalia Also, our Deputy Chief, Sunari Silva,
Furthermore, the ESDC prepared the left the ESDC at the end of August, to
preliminary design of the camp layouts join the Facilities Management Service
in Bahai, Guereda, Koukou and Birao (FMS) at UNHQ in New York. We all
following UN Guidelines, Engineering wish her good luck and all the best for
Manuals, the HQ & Camp Planning her future career development, and
Templates and basic requirements would like to express special thanks for
provided by the Mission Engineers. her contribution to the great success of
the ESDC in its first 18 months.
Sunari, we are missing you!

Mombasa Support Base, Kenya

In addition, further important projects


such as e.g. the HQ construction in
Nairobi, the design of military camps in
Mogadishu, the Engineering Budget for
2009/10, the implementation of design
packages for various military camps
Koukou Camp Layout – Preliminary Design including Specifications, SOW and
Later in August, the ESDC adapted the BOQ, have been supported by using
proposed preliminary layouts to the (at ESDC tools and templates. The Three ladies of the ESDC: Sunari, Pamela and Paola

that time identified by GIS satellite


images/maps) sites/locations and
participated in the preparation of the
tender documents.
The second mission supported on the
ground was UNSOA*.
[*The United Nations Support Office for
AMISOM (UNSOA) is a field support
operation led by the United Nations Christian Henze and Sunari Silva in Chad
Department of Field Support (DFS). The UNSOA HQ in Nairobi, Kenya

3 please consider the environment before printing this newsletter . . . . . . . . . . . 5

Vous aimerez peut-être aussi