Process Group Knowledge Area Process Attribute

Closing Procurement Close Procurements Inputs


Executing HR Acquire Project Team Inputs
Executing HR Acquire Project Team Inputs
Executing HR Acquire Project Team Tools/Tech's
Executing HR Acquire Project Team Tools/Tech's
Executing HR Acquire Project Team Tools/Tech's
Executing HR Acquire Project Team Tools/Tech's
Executing HR Acquire Project Team Tools/Tech's
Executing HR Acquire Project Team Outputs
Executing HR Acquire Project Team Outputs
Executing HR Acquire Project Team Outputs
Closing Integration Close Project Inputs
Closing Procurement Close Procurements Inputs
Closing Procurement Close Procurements Tools/Tech's
Closing Procurement Close Procurements Tools/Tech's
Closing Procurement Close Procurements Tools/Tech's
Closing Procurement Close Procurements Outputs
Closing Procurement Close Procurements Outputs
Executing HR Acquire Project Team Inputs
Closing Integration Close Project Inputs
Closing Integration Close Project Inputs
Closing Integration Close Project Tools/Tech's
Closing Integration Close Project Tools/Tech's
Closing Integration Close Project Tools/Tech's
Closing Integration Close Project Outputs
Closing Integration Close Project Outputs
Closing Integration Close Project Outputs
Planning Scope Collect Requirements Tools/Tech's
Planning Scope Collect Requirements Tools/Tech's
Planning Scope Collect Requirements Tools/Tech's
Planning Scope Collect Requirements Tools/Tech's
Planning Scope Collect Requirements Tools/Tech's
Planning Scope Collect Requirements Tools/Tech's
Planning Scope Collect Requirements Tools/Tech's
Planning Scope Collect Requirements Tools/Tech's
Planning Scope Collect Requirements Tools/Tech's
Planning Scope Collect Requirements Tools/Tech's
Planning Scope Collect Requirements Tools/Tech's
Planning Scope Collect Requirements Outputs
Planning Scope Collect Requirements Outputs
Executing Procurement Conduct Procurements Inputs
Executing HR Develop Project Team Inputs
Executing Integration Direct and Manage Project Inputs
Planning Scope Collect Requirements Inputs
Initiating Integration Develop Project Charter Outputs
Executing Communications Manage Communications Inputs
Executing Procurement Conduct Procurements Inputs
Executing Procurement Conduct Procurements Inputs
Executing Procurement Conduct Procurements Inputs
Executing Procurement Conduct Procurements Inputs
Executing Procurement Conduct Procurements Inputs
Executing Procurement Conduct Procurements Inputs
Executing Procurement Conduct Procurements Inputs
Executing Procurement Conduct Procurements Tools/Tech's
Executing Procurement Conduct Procurements Tools/Tech's
Executing Procurement Conduct Procurements Tools/Tech's
Executing Procurement Conduct Procurements Tools/Tech's
Executing Procurement Conduct Procurements Tools/Tech's
Executing Procurement Conduct Procurements Tools/Tech's
Executing Procurement Conduct Procurements Tools/Tech's
Executing Procurement Conduct Procurements Outputs
Executing Procurement Conduct Procurements Outputs
Executing Procurement Conduct Procurements Outputs
Executing Procurement Conduct Procurements Outputs
Executing Procurement Conduct Procurements Outputs
Executing Procurement Conduct Procurements Outputs
Monitoring/Controlling Communications Control Communications Inputs
Monitoring/Controlling Communications Control Communications Inputs
Monitoring/Controlling Communications Control Communications Inputs
Monitoring/Controlling Communications Control Communications Inputs
Monitoring/Controlling Communications Control Communications Tools/Tech's
Monitoring/Controlling Communications Control Communications Tools/Tech's
Monitoring/Controlling Cost Control Costs Inputs
Executing Integration Direct and Manage Project Outputs
Monitoring/Controlling Communications Control Communications Outputs
Monitoring/Controlling Communications Control Communications Outputs
Executing HR Manage Project Team Inputs
Monitoring/Controlling Communications Control Communications Outputs
Monitoring/Controlling Communications Control Communications Tools/Tech's
Monitoring/Controlling Cost Control Costs Inputs
Executing Integration Direct and Manage Project Outputs
Monitoring/Controlling Cost Control Costs Inputs
Monitoring/Controlling Cost Control Costs Tools/Tech's
Monitoring/Controlling Cost Control Costs Tools/Tech's
Monitoring/Controlling Cost Control Costs Tools/Tech's
Monitoring/Controlling Cost Control Costs Tools/Tech's
Monitoring/Controlling Cost Control Costs Tools/Tech's
Monitoring/Controlling Cost Control Costs Tools/Tech's
Monitoring/Controlling Procurement Control Procurements Inputs
Monitoring/Controlling Cost Control Costs Outputs
Executing HR Manage Project Team Outputs
Monitoring/Controlling Cost Control Costs Outputs
Monitoring/Controlling Cost Control Costs Outputs
Executing Stakeholder Manage Stakeholder Engagement Inputs
Monitoring/Controlling Cost Control Costs Outputs
Monitoring/Controlling Procurement Control Procurements Inputs
Monitoring/Controlling Procurement Control Procurements Inputs
Monitoring/Controlling Procurement Control Procurements Inputs
Monitoring/Controlling Quality Control Quality Inputs
Monitoring/Controlling Risk Control Risks Inputs
Monitoring/Controlling Procurement Control Procurements Tools/Tech's
Monitoring/Controlling Procurement Control Procurements Tools/Tech's
Monitoring/Controlling Procurement Control Procurements Tools/Tech's
Monitoring/Controlling Procurement Control Procurements Tools/Tech's
Monitoring/Controlling Procurement Control Procurements Tools/Tech's
Monitoring/Controlling Procurement Control Procurements Tools/Tech's
Monitoring/Controlling Procurement Control Procurements Tools/Tech's
Monitoring/Controlling Scope Control Scope Inputs
Executing Stakeholder Manage Stakeholder Engagement Outputs
Monitoring/Controlling Procurement Control Procurements Outputs
Monitoring/Controlling Procurement Control Procurements Outputs
Executing Stakeholder Manage Stakeholder Engagement Inputs
Monitoring/Controlling Procurement Control Procurements Outputs
Monitoring/Controlling Quality Control Quality Inputs
Monitoring/Controlling Quality Control Quality Inputs
Monitoring/Controlling Scope Validate Scope Inputs
Monitoring/Controlling Quality Control Quality Inputs
Monitoring/Controlling Quality Control Quality Inputs
Monitoring/Controlling Quality Control Quality Inputs
Monitoring/Controlling Quality Control Quality Inputs
Monitoring/Controlling Quality Control Quality Tools/Tech's
Monitoring/Controlling Quality Control Quality Tools/Tech's
Monitoring/Controlling Quality Control Quality Tools/Tech's
Monitoring/Controlling Quality Control Quality Tools/Tech's
Monitoring/Controlling Quality Control Quality Outputs
Monitoring/Controlling Quality Control Quality Outputs
Monitoring/Controlling Quality Control Quality Outputs
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Inputs
Executing Quality Perform Quality Assurance Outputs
Monitoring/Controlling Quality Control Quality Outputs
Monitoring/Controlling Quality Control Quality Outputs
Executing Quality Perform Quality Assurance Inputs
Monitoring/Controlling Quality Control Quality Outputs
Monitoring/Controlling Risk Control Risks Inputs
Monitoring/Controlling Integration Monitor and Control Project Work Outputs
Monitoring/Controlling Time Control Schedule Inputs
Monitoring/Controlling Risk Control Risks Tools/Tech's
Monitoring/Controlling Risk Control Risks Tools/Tech's
Monitoring/Controlling Risk Control Risks Tools/Tech's
Monitoring/Controlling Risk Control Risks Tools/Tech's
Monitoring/Controlling Risk Control Risks Tools/Tech's
Monitoring/Controlling Risk Control Risks Tools/Tech's
Monitoring/Controlling Communications Control Communications Outputs
Monitoring/Controlling Communications Control Communications Outputs
Monitoring/Controlling Risk Control Risks Outputs
Monitoring/Controlling Risk Control Risks Outputs
Executing Quality Perform Quality Assurance Inputs
Monitoring/Controlling Risk Control Risks Outputs
Monitoring/Controlling Time Control Schedule Inputs
Monitoring/Controlling Cost Control Costs Outputs
Monitoring/Controlling Time Control Schedule Inputs
Monitoring/Controlling Time Control Schedule Inputs
Monitoring/Controlling Time Control Schedule Inputs
Monitoring/Controlling Time Control Schedule Tools/Tech's
Monitoring/Controlling Time Control Schedule Tools/Tech's
Monitoring/Controlling Time Control Schedule Tools/Tech's
Monitoring/Controlling Time Control Schedule Tools/Tech's
Monitoring/Controlling Time Control Schedule Tools/Tech's
Monitoring/Controlling Time Control Schedule Tools/Tech's
Monitoring/Controlling Time Control Schedule Tools/Tech's
Monitoring/Controlling Procurement Control Procurements Outputs
Monitoring/Controlling Time Control Schedule Outputs
Monitoring/Controlling Cost Control Costs Outputs
Monitoring/Controlling Time Control Schedule Outputs
Monitoring/Controlling Time Control Schedule Outputs
Monitoring/Controlling Communications Control Communications Inputs
Monitoring/Controlling Time Control Schedule Outputs
Monitoring/Controlling Scope Control Scope Inputs
Monitoring/Controlling Scope Control Scope Inputs
Monitoring/Controlling Quality Control Quality Outputs
Monitoring/Controlling Scope Control Scope Inputs
Monitoring/Controlling Scope Control Scope Tools/Tech's
Monitoring/Controlling Risk Control Risks Outputs
Monitoring/Controlling Procurement Control Procurements Outputs
Monitoring/Controlling Scope Control Scope Outputs
Monitoring/Controlling Scope Control Scope Outputs
Monitoring/Controlling Cost Control Costs Inputs
Monitoring/Controlling Scope Control Scope Outputs
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Inputs
Monitoring/Controlling Time Control Schedule Outputs
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Inputs
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Tools/Tech's
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Tools/Tech's
Monitoring/Controlling Scope Control Scope Outputs
Monitoring/Controlling Quality Control Quality Outputs
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Outputs
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Outputs
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Tools/Tech's
Monitoring/Controlling Procurement Control Procurements Inputs
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Outputs
Planning Scope Create WBS Tools/Tech's
Planning Scope Create WBS Outputs
Planning Scope Create WBS Tools/Tech's
Monitoring/Controlling Quality Control Quality Inputs
Planning Scope Create WBS Inputs
Planning Scope Create WBS Inputs
Planning Scope Create WBS Inputs
Planning Scope Create WBS Inputs
Planning Scope Create WBS Outputs
Planning Time Define Activities Tools/Tech's
Planning Time Define Activities Tools/Tech's
Planning Time Define Activities Outputs
Planning Time Define Activities Outputs
Planning Time Define Activities Outputs
Planning Time Define Activities Tools/Tech's
Monitoring/Controlling Risk Control Risks Inputs
Planning Time Define Activities Inputs
Planning Time Define Activities Inputs
Planning Time Define Activities Inputs
Planning Scope Define Scope Tools/Tech's
Planning Scope Define Scope Tools/Tech's
Planning Scope Define Scope Tools/Tech's
Planning Scope Define Scope Outputs
Planning Scope Define Scope Tools/Tech's
Monitoring/Controlling Time Control Schedule Inputs
Planning Scope Define Scope Inputs
Planning Scope Define Scope Inputs
Initiating Stakeholder Identify Stakeholders Inputs
Planning Scope Define Scope Outputs
Monitoring/Controlling Scope Control Scope Inputs
Planning Cost Determine Budget Inputs
Planning Cost Determine Budget Inputs
Planning Cost Determine Budget Inputs
Planning Cost Determine Budget Inputs
Planning Cost Determine Budget Inputs
Planning Cost Determine Budget Inputs
Planning Cost Determine Budget Inputs
Planning Cost Determine Budget Inputs
Planning Cost Determine Budget Tools/Tech's
Planning Cost Determine Budget Tools/Tech's
Planning Cost Determine Budget Tools/Tech's
Planning Cost Determine Budget Tools/Tech's
Planning Cost Determine Budget Outputs
Planning Cost Determine Budget Outputs
Planning Cost Determine Budget Tools/Tech's
Planning Cost Determine Budget Outputs
Initiating Integration Develop Project Charter Tools/Tech's
Initiating Integration Develop Project Charter Inputs
Initiating Integration Develop Project Charter Inputs
Initiating Integration Develop Project Charter Inputs
Initiating Integration Develop Project Charter Inputs
Initiating Integration Develop Project Charter Inputs
Initiating Integration Develop Project Charter Tools/Tech's
Planning Scope Collect Requirements Inputs
Planning Scope Define Scope Inputs
Planning Integration Develop Project Management Plan Inputs
Planning Integration Develop Project Management Plan Inputs
Planning Integration Develop Project Management Plan Inputs
Planning Integration Develop Project Management Plan Inputs
Planning Integration Develop Project Management Plan Outputs
Planning Integration Develop Project Management Plan Tools/Tech's
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Inputs
Executing HR Develop Project Team Inputs
Executing HR Develop Project Team Inputs
Executing HR Develop Project Team Tools/Tech's
Executing HR Develop Project Team Tools/Tech's
Executing HR Develop Project Team Tools/Tech's
Executing HR Develop Project Team Tools/Tech's
Executing HR Develop Project Team Tools/Tech's
Executing HR Develop Project Team Tools/Tech's
Executing HR Develop Project Team Tools/Tech's
Executing HR Develop Project Team Outputs
Executing HR Develop Project Team Outputs
Planning Time Develop Schedule Tools/Tech's
Planning Time Develop Schedule Tools/Tech's
Planning Time Develop Schedule Tools/Tech's
Planning Time Develop Schedule Tools/Tech's
Planning Time Develop Schedule Tools/Tech's
Planning Time Develop Schedule Tools/Tech's
Planning Time Develop Schedule Tools/Tech's
Planning Time Develop Schedule Tools/Tech's
Planning Time Develop Schedule Outputs
Planning Time Develop Schedule Outputs
Planning Time Develop Schedule Outputs
Planning Time Develop Schedule Outputs
Planning Time Develop Schedule Outputs
Monitoring/Controlling Integration Monitor and Control Project Work Inputs
Planning Time Develop Schedule Inputs
Planning Time Develop Schedule Inputs
Planning Time Develop Schedule Inputs
Planning Time Develop Schedule Inputs
Planning Time Develop Schedule Inputs
Planning Time Develop Schedule Inputs
Planning Time Develop Schedule Inputs
Planning Time Develop Schedule Inputs
Planning Time Develop Schedule Inputs
Planning Time Develop Schedule Inputs
Planning Time Develop Schedule Inputs
Planning Time Develop Schedule Inputs
Planning Time Develop Schedule Outputs
Monitoring/Controlling Integration Perform Integrated Change Control Inputs
Executing Integration Direct and Manage Project Tools/Tech's
Executing Integration Direct and Manage Project Outputs
Executing Integration Direct and Manage Project Inputs
Executing Integration Direct and Manage Project Inputs
Executing Integration Direct and Manage Project Inputs
Executing Integration Direct and Manage Project Tools/Tech's
Executing Integration Direct and Manage Project Tools/Tech's
Executing Integration Direct and Manage Project Outputs
Monitoring/Controlling Risk Control Risks Outputs
Executing Integration Direct and Manage Project Outputs
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Outputs
Planning Time Estimate Activity Durations Tools/Tech's
Planning Time Estimate Activity Durations Tools/Tech's
Planning Time Estimate Activity Durations Tools/Tech's
Planning Time Estimate Activity Durations Tools/Tech's
Planning Time Estimate Activity Durations Tools/Tech's
Planning Time Estimate Activity Durations Outputs
Planning Time Estimate Activity Durations Tools/Tech's
Monitoring/Controlling Scope Validate Scope Inputs
Planning Time Estimate Activity Durations Inputs
Planning Time Estimate Activity Durations Inputs
Planning Time Estimate Activity Durations Inputs
Planning Time Estimate Activity Durations Inputs
Planning Time Estimate Activity Durations Inputs
Planning Time Estimate Activity Durations Inputs
Planning Time Estimate Activity Durations Inputs
Planning Time Estimate Activity Durations Inputs
Planning Time Estimate Activity Durations Inputs
Planning Time Estimate Activity Durations Outputs
Planning Time Estimate Activity Resources Tools/Tech's
Planning Time Estimate Activity Resources Tools/Tech's
Planning Time Estimate Activity Resources Tools/Tech's
Planning Time Estimate Activity Resources Tools/Tech's
Planning Time Estimate Activity Resources Outputs
Planning Time Estimate Activity Resources Outputs
Planning Time Estimate Activity Resources Tools/Tech's
Planning Scope Collect Requirements Inputs
Planning Time Estimate Activity Resources Inputs
Planning Time Estimate Activity Resources Inputs
Planning Time Estimate Activity Resources Inputs
Planning Time Estimate Activity Resources Inputs
Planning Time Estimate Activity Resources Inputs
Planning Time Estimate Activity Resources Inputs
Planning Time Estimate Activity Resources Inputs
Planning Time Estimate Activity Resources Outputs
Planning Scope Collect Requirements Inputs
Planning Scope Collect Requirements Inputs
Planning Cost Estimate Costs Inputs
Planning Cost Estimate Costs Inputs
Planning Cost Estimate Costs Inputs
Planning Cost Estimate Costs Inputs
Planning Cost Estimate Costs Inputs
Planning Cost Estimate Costs Tools/Tech's
Planning Cost Estimate Costs Tools/Tech's
Planning Cost Estimate Costs Tools/Tech's
Planning Cost Estimate Costs Tools/Tech's
Planning Cost Estimate Costs Tools/Tech's
Planning Cost Estimate Costs Tools/Tech's
Planning Cost Estimate Costs Tools/Tech's
Planning Cost Estimate Costs Tools/Tech's
Planning Cost Estimate Costs Tools/Tech's
Planning Cost Estimate Costs Outputs
Planning Cost Estimate Costs Outputs
Planning Cost Estimate Costs Outputs
Planning Cost Estimate Costs Tools/Tech's
Planning Scope Create WBS Inputs
Planning Time Define Activities Inputs
Planning Scope Define Scope Inputs
Planning Cost Determine Budget Inputs
Planning Risk Identify Risks Inputs
Planning Risk Identify Risks Inputs
Planning Risk Identify Risks Inputs
Planning Risk Identify Risks Inputs
Planning Risk Identify Risks Inputs
Planning Risk Identify Risks Inputs
Planning Risk Identify Risks Inputs
Planning Risk Identify Risks Inputs
Planning Risk Identify Risks Tools/Tech's
Planning Risk Identify Risks Tools/Tech's
Planning Risk Identify Risks Tools/Tech's
Planning Risk Identify Risks Tools/Tech's
Planning Risk Identify Risks Tools/Tech's
Planning Risk Identify Risks Tools/Tech's
Planning Risk Identify Risks Outputs
Planning Risk Identify Risks Tools/Tech's
Planning Integration Develop Project Management Plan Tools/Tech's
Initiating Stakeholder Identify Stakeholders Tools/Tech's
Initiating Stakeholder Identify Stakeholders Inputs
Initiating Stakeholder Identify Stakeholders Inputs
Initiating Stakeholder Identify Stakeholders Inputs
Initiating Stakeholder Identify Stakeholders Tools/Tech's
Initiating Stakeholder Identify Stakeholders Tools/Tech's
Initiating Stakeholder Identify Stakeholders Outputs
Executing Communications Manage Communications Outputs
Planning Time Develop Schedule Inputs
Monitoring/Controlling Integration Monitor and Control Project Work Inputs
Executing Communications Manage Communications Inputs
Executing Communications Manage Communications Inputs
Executing Communications Manage Communications Tools/Tech's
Executing Communications Manage Communications Tools/Tech's
Executing Communications Manage Communications Tools/Tech's
Executing Communications Manage Communications Tools/Tech's
Executing Communications Manage Communications Tools/Tech's
Executing Communications Manage Communications Outputs
Executing Communications Manage Communications Outputs
Executing Communications Manage Communications Outputs
Executing HR Manage Project Team Outputs
Planning Time Estimate Activity Durations Inputs
Executing HR Manage Project Team Inputs
Executing HR Manage Project Team Inputs
Executing HR Manage Project Team Inputs
Monitoring/Controlling Scope Validate Scope Outputs
Executing HR Manage Project Team Inputs
Executing HR Manage Project Team Tools/Tech's
Executing HR Manage Project Team Tools/Tech's
Executing HR Manage Project Team Tools/Tech's
Executing HR Manage Project Team Tools/Tech's
Monitoring/Controlling Time Control Schedule Outputs
Executing HR Manage Project Team Outputs
Executing HR Manage Project Team Outputs
Executing HR Manage Project Team Outputs
Executing Stakeholder Manage Stakeholder Engagement Outputs
Planning Time Estimate Activity Resources Inputs
Planning Cost Estimate Costs Inputs
Executing Stakeholder Manage Stakeholder Engagement Inputs
Executing Stakeholder Manage Stakeholder Engagement Inputs
Executing Stakeholder Manage Stakeholder Engagement Tools/Tech's
Executing Stakeholder Manage Stakeholder Engagement Tools/Tech's
Executing Stakeholder Manage Stakeholder Engagement Tools/Tech's
Executing Stakeholder Manage Stakeholder Engagement Outputs
Monitoring/Controlling Scope Control Scope Outputs
Executing Stakeholder Manage Stakeholder Engagement Outputs
Executing Stakeholder Manage Stakeholder Engagement Outputs
Monitoring/Controlling Integration Monitor and Control Project Work Outputs
Monitoring/Controlling Integration Monitor and Control Project Work Tools/Tech's
Planning Cost Estimate Costs Inputs
Monitoring/Controlling Integration Monitor and Control Project Work Inputs
Monitoring/Controlling Integration Monitor and Control Project Work Inputs
Monitoring/Controlling Integration Monitor and Control Project Work Inputs
Monitoring/Controlling Procurement Control Procurements Inputs
Monitoring/Controlling Integration Monitor and Control Project Work Inputs
Monitoring/Controlling Integration Monitor and Control Project Work Inputs
Monitoring/Controlling Integration Monitor and Control Project Work Tools/Tech's
Monitoring/Controlling Integration Monitor and Control Project Work Tools/Tech's
Monitoring/Controlling Integration Monitor and Control Project Work Outputs
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Outputs
Monitoring/Controlling Integration Monitor and Control Project Work Outputs
Monitoring/Controlling Risk Control Risks Inputs
Monitoring/Controlling Integration Perform Integrated Change Control Outputs
Monitoring/Controlling Integration Perform Integrated Change Control Tools/Tech's
Planning Risk Identify Risks Inputs
Executing Communications Manage Communications Inputs
Monitoring/Controlling Integration Monitor and Control Project Work Outputs
Monitoring/Controlling Integration Perform Integrated Change Control Inputs
Monitoring/Controlling Integration Perform Integrated Change Control Inputs
Monitoring/Controlling Integration Perform Integrated Change Control Tools/Tech's
Monitoring/Controlling Integration Perform Integrated Change Control Tools/Tech's
Monitoring/Controlling Integration Perform Integrated Change Control Outputs
Monitoring/Controlling Integration Perform Integrated Change Control Outputs
Monitoring/Controlling Integration Perform Integrated Change Control Outputs
Planning Risk Identify Risks Inputs
Planning Risk Perform Qualitative Risk Analysis Inputs
Planning Risk Perform Qualitative Risk Analysis Inputs
Planning Risk Perform Qualitative Risk Analysis Inputs
Planning Risk Perform Qualitative Risk Analysis Inputs
Planning Risk Perform Qualitative Risk Analysis Tools/Tech's
Planning Risk Perform Qualitative Risk Analysis Tools/Tech's
Planning Risk Perform Qualitative Risk Analysis Tools/Tech's
Planning Risk Perform Qualitative Risk Analysis Tools/Tech's
Planning Risk Perform Qualitative Risk Analysis Tools/Tech's
Planning Risk Perform Qualitative Risk Analysis Tools/Tech's
Planning Risk Perform Qualitative Risk Analysis Outputs
Executing Quality Perform Quality Assurance Outputs
Planning Risk Identify Risks Inputs
Planning Risk Identify Risks Inputs
Executing Quality Perform Quality Assurance Inputs
Executing Quality Perform Quality Assurance Inputs
Executing Quality Perform Quality Assurance Inputs
Executing Quality Perform Quality Assurance Tools/Tech's
Executing Quality Perform Quality Assurance Tools/Tech's
Executing Quality Perform Quality Assurance Tools/Tech's
Monitoring/Controlling Integration Perform Integrated Change Control Inputs
Executing Quality Perform Quality Assurance Outputs
Executing Quality Perform Quality Assurance Outputs
Planning Risk Perform Qualitative Risk Analysis Inputs
Planning Risk Perform Quantitative Analysis Inputs
Planning Risk Perform Quantitative Analysis Inputs
Planning Risk Perform Quantitative Analysis Inputs
Planning Risk Perform Quantitative Analysis Inputs
Planning Risk Perform Quantitative Analysis Inputs
Planning Risk Perform Quantitative Analysis Outputs
Planning Risk Perform Quantitative Analysis Tools/Tech's
Planning Risk Perform Quantitative Analysis Tools/Tech's
Planning Risk Perform Quantitative Analysis Tools/Tech's
Planning Communications Plan Communications Management Inputs
Planning Communications Plan Communications Management Inputs
Planning Communications Plan Communications Management Inputs
Planning Risk Perform Quantitative Analysis Inputs
Planning Communications Plan Communications Management Outputs
Planning Communications Plan Communications Management Tools/Tech's
Planning Communications Plan Communications Management Tools/Tech's
Planning Communications Plan Communications Management Tools/Tech's
Planning Communications Plan Communications Management Tools/Tech's
Planning Communications Plan Communications Management Tools/Tech's
Planning Communications Plan Communications Management Outputs
Planning Cost Plan Cost Management Inputs
Planning Cost Plan Cost Management Inputs
Planning Cost Plan Cost Management Inputs
Planning Communications Plan Communications Management Inputs
Planning Cost Plan Cost Management Tools/Tech's
Planning Cost Plan Cost Management Tools/Tech's
Planning Cost Plan Cost Management Tools/Tech's
Planning Cost Plan Cost Management Outputs
Planning HR Plan Human Resources Management Inputs
Planning HR Plan Human Resources Management Inputs
Planning HR Plan Human Resources Management Inputs
Planning Cost Plan Cost Management Inputs
Planning HR Plan Human Resources Management Tools/Tech's
Planning HR Plan Human Resources Management Tools/Tech's
Planning HR Plan Human Resources Management Tools/Tech's
Planning HR Plan Human Resources Management Tools/Tech's
Planning HR Plan Human Resources Management Tools/Tech's
Planning HR Plan Human Resources Management Outputs
Planning Procurement Plan Procurement Management Inputs
Planning Procurement Plan Procurement Management Inputs
Planning Procurement Plan Procurement Management Inputs
Planning Procurement Plan Procurement Management Inputs
Planning Procurement Plan Procurement Management Inputs
Planning Procurement Plan Procurement Management Inputs
Planning Procurement Plan Procurement Management Inputs
Planning Procurement Plan Procurement Management Inputs
Planning HR Plan Human Resources Management Inputs
Planning Procurement Plan Procurement Management Outputs
Planning Procurement Plan Procurement Management Tools/Tech's
Planning Procurement Plan Procurement Management Tools/Tech's
Planning Procurement Plan Procurement Management Tools/Tech's
Planning Procurement Plan Procurement Management Tools/Tech's
Planning Procurement Plan Procurement Management Outputs
Planning Procurement Plan Procurement Management Outputs
Planning Procurement Plan Procurement Management Outputs
Planning Procurement Plan Procurement Management Outputs
Planning Procurement Plan Procurement Management Outputs
Monitoring/Controlling Scope Validate Scope Outputs
Planning Quality Plan Quality Management Inputs
Planning Quality Plan Quality Management Inputs
Planning Quality Plan Quality Management Inputs
Planning Quality Plan Quality Management Inputs
Planning Quality Plan Quality Management Inputs
Planning Procurement Plan Procurement Management Inputs
Planning Quality Plan Quality Management Outputs
Planning Quality Plan Quality Management Tools/Tech's
Planning Quality Plan Quality Management Tools/Tech's
Planning Quality Plan Quality Management Tools/Tech's
Planning Quality Plan Quality Management Tools/Tech's
Planning Quality Plan Quality Management Tools/Tech's
Planning Quality Plan Quality Management Tools/Tech's
Planning Quality Plan Quality Management Tools/Tech's
Planning Quality Plan Quality Management Tools/Tech's
Planning Quality Plan Quality Management Outputs
Planning Quality Plan Quality Management Outputs
Planning Quality Plan Quality Management Outputs
Planning Quality Plan Quality Management Outputs
Planning Risk Plan Risk Management Inputs
Planning Risk Plan Risk Management Inputs
Planning Risk Plan Risk Management Inputs
Planning Risk Plan Risk Management Inputs
Planning Risk Plan Risk Management Inputs
Planning Quality Plan Quality Management Inputs
Planning Risk Plan Risk Management Tools/Tech's
Planning Risk Plan Risk Management Tools/Tech's
Planning Risk Plan Risk Management Tools/Tech's
Planning Risk Plan Risk Management Outputs
Planning Risk Plan Risk Management Inputs
Planning Risk Plan Risk Responses Inputs
Planning Risk Plan Risk Responses Outputs
Planning Risk Plan Risk Responses Tools/Tech's
Planning Risk Plan Risk Responses Tools/Tech's
Planning Risk Plan Risk Responses Tools/Tech's
Planning Risk Plan Risk Responses Tools/Tech's
Planning Risk Plan Risk Responses Outputs
Planning Time Plan Schedule Management Tools/Tech's
Planning Time Plan Schedule Management Tools/Tech's
Planning Time Plan Schedule Management Tools/Tech's
Planning Time Plan Schedule Management Outputs
Planning Time Plan Schedule Management Inputs
Planning Time Plan Schedule Management Inputs
Planning Risk Plan Risk Responses Inputs
Planning Time Plan Schedule Management Inputs
Planning Scope Plan Scope Management Inputs
Planning Scope Plan Scope Management Inputs
Planning Scope Plan Scope Management Inputs
Planning Time Plan Schedule Management Inputs
Planning Scope Plan Scope Management Tools/Tech's
Planning Scope Plan Scope Management Tools/Tech's
Planning Scope Plan Scope Management Outputs
Planning Scope Plan Scope Management Outputs
Planning Stakeholder Plan Stakeholder Management Inputs
Planning Stakeholder Plan Stakeholder Management Inputs
Planning Stakeholder Plan Stakeholder Management Inputs
Planning Scope Plan Scope Management Inputs
Planning Stakeholder Plan Stakeholder Management Outputs
Planning Stakeholder Plan Stakeholder Management Tools/Tech's
Planning Stakeholder Plan Stakeholder Management Tools/Tech's
Planning Stakeholder Plan Stakeholder Management Tools/Tech's
Planning Stakeholder Plan Stakeholder Management Outputs
Planning Stakeholder Plan Stakeholder Management Inputs
Planning Time Sequence Activities Inputs
Planning Time Sequence Activities Inputs
Planning Time Sequence Activities Inputs
Planning Time Sequence Activities Inputs
Planning Time Sequence Activities Inputs
Planning Time Sequence Activities Tools/Tech's
Planning Time Sequence Activities Tools/Tech's
Planning Time Sequence Activities Tools/Tech's
Planning Time Sequence Activities Outputs
Planning Time Sequence Activities Inputs
Planning Time Sequence Activities Outputs
Executing HR Manage Project Team Inputs
Monitoring/Controlling Scope Validate Scope Outputs
Planning Time Sequence Activities Inputs
Monitoring/Controlling Scope Validate Scope Inputs
Monitoring/Controlling Scope Validate Scope Inputs
Monitoring/Controlling Scope Validate Scope Inputs
Monitoring/Controlling Scope Validate Scope Tools/Tech's
Monitoring/Controlling Scope Validate Scope Tools/Tech's
Monitoring/Controlling Scope Validate Scope Outputs
Planning Procurement Plan Procurement Management Outputs
Monitoring/Controlling Integration Perform Integrated Change Control Inputs
Value
Project Management Plan
Enterprise Environmental Factors
Organizational Process Assets
Pre-assignment
Negotiation
Acquisition
Virtual Teams
Multi-criteria Decision Analysis
Project Staff Assignments
Resource Calendars
Project Management Plan Updates
Project Management Plan
Procurement Documents
Procurement Audits
Procurement Negotiations
Records Management System
Closed Procurements
Organizational Process Assets Updates
HR Management Plan
Accepted Deliverables
Organizational Process Assets
Expert Judgment
Analytical Techniques (regression and trend analysis)
Meetings
Final Product
Service or Result Transition
Organizational Process Assets Updates
Interviews
Focus Groups
Facilitated Workshops
Group Creativity
Group Decision Making Techniques
Questionaires & Surveys
Observations
Prototypes
Benchmarking
Context Diagrams
Document Analysis
Requirements Documentation
Requirements Traceability Matrix
Procurement Management Plan
HR Management Plan
Project Management Plan
Stakeholder Register
Project Charter
Communications Management Plan
Procurement Documents
Source Selection Criteria
Seller Proposals
Project Documents
Make-or-buy Decisions
Procurement Statement of Work
Organizational Process Assets
Bidder Conference
Proposal Evaluation Techniques
Independent Estimates
Expert Judgment
Advertising
Analytical Techniques
Procurement Negotiations
Selected Sellers
Agreements
Resource Calendars
Change Requests
Project Management Plan Updates
Project Documents Updates
Project Communications
Issue Log
Work Performance Data
Organizational Process Assets
Information Management Systems
Meetings
Work Performance Data
Change Requests
Project Management Plan Updates
Organizational Process Assets Updates
HR Management Plan
Project Documents Updates
Expert Judgment
Project Funding Requirements
Work Performance Data
Organizational Process Assets
Earned Value Management
Forecasting
To-complete Performance Index (TCPI)
Performance Reviews
Project Management Software
Reserve Analysis
Work Performance Data
Costs Forecasts
Change Requests
Project Management Plan Updates
Organizational Process Assets Updates
Stakeholder Management Plan
Project Documents Updates
Procurement Documents
Agreements
Approved Change Requests
Work Performance Data
Work Performance Data
Contract Change Control System
Procurement Performance Reviews
Inspections and Audits
Performance Reporting
Payment Systems
Claims Administration
Records Management System
Work Performance Data
Change Requests
Project Management Plan Updates
Organizational Process Assets Updates
Communications Management Plan
Project Documents Updates
Quality Metrics
Quality Checklists
Work Performance Data
Approved Change Requests
Deliverables
Project Documents
Organizational Process Assets
Seven Basic Quality Tools
Statistical Sampling
Inspection
Approved Change Requests Review
Quality Control Measurements
Validated Changes
Verified Deliverables
Work Performance Data
Change Requests
Project Management Plan Updates
Organizational Process Assets Updates
Quality Management Plan
Project Documents Updates
Risk Register
Work Performance Reports
Work Performance Data
Risk Reassessment
Risk Audits
Variance and Trend Analysis
Technical Performance Measurement
Reserve Analysis
Meetings
Work Performance Information
Change Requests
Project Management Plan Updates
Organizational Process Assets Updates
Process Improvement Plan
Project Documents Updates
Project Schedule
Work Performance Information
Project Calendars
Schedule Data
Organizational Process Assets
Performance Reviews
Project Management Software
Resource Optimization Techniques
Modeling Techniques
Leads and Lags
Schedule Compression
Scheduling Tool
Work Performance Information
Schedule Forecasts
Change Requests
Project Management Plan Updates
Organizational Process Assets Updates
Project Management Plan
Project Documents Updates
Requirements documentation
Requirements Traceability Matrix
Work Performance Information
Organizational Process Assets
Variance Analysis
Work Performance Information
Change Requests
Project Management Plan Updates
Organizational Process Assets Updates
Project Management Plan
Project Documents Updates
Issue Log
Work Performance Information
Project Documents
Information Management Systems
Meetings
Work Performance Information
Change Requests
Project Management Plan Updates
Organizational Process Assets Updates
Expert Judgment
Project Management Plan
Project Documents Updates
Decomposition
Scope Baseline
Expert Judgment
Project Management Plan
Project Scope Statement
Requirements documentation
Enterprise Environmental Factors
Organizational Process Assets
Project Documents Updates
Decomposition
Rolling Wave Planning
Activity List
Activity Attributes
Milestone List
Expert Judgment
Project Management Plan
Scope Baseline
Enterprise Environmental factors
Organizational Process Assets
Product Analysis
Alternatives Generation
Facilitated Workshops
Project Scope Statement
Expert Judgment
Project Management Plan
Requirements Documentation
Organizational Process Assets
Project Charter
Project Documents Updates
Project Management Plan
Scope Baseline
Activity Cost Estimates
Basis of Estimates
Project Schedule
Resource Calendars
Risk Register
Agreements
Organizational Process Assets
Cost Aggregation
Reserve Analysis
Historical Relationships
Funding Limit Reconciliation
Cost Baseline
Project Funding Requirements
Expert Judgment
Project Documents Updates
Expert Judgment
SOW
Business Case
Agreements
Enterprise Environmental Factors
Organizational Process Assets
Facilitation Techniques
Project Charter
Project Charter
Outputs from other processes
Enterprise Environmental Factors
Organizational Process Assets
Project Charter
Project Management Plan
Facilitation Techniques
Project Management Plan
Project Staff Assignments
Resource Calendars
Interpersonal Skills
Training
Team-building Activities
Ground Rules
Colocation
Recognition and Rewards
Personnel Assessment Tools
Team Performance Assessments
Enterprise Environmental Factors Updates
Schedule Network Analysis
Critical Path Method
Critical Chain Method
Resource Optimization Techniques
Modeling Techniques
Leads and Lags
Schedule Compression
Scheduling Tool
Schedule Baseline
Project Schedule
Schedule Data
Project Calendars
Project Management Plan Updates
Project Management Plan
Activity List
Activity Attributes
Project Schedule Network Diagrams
Activity Resource Requirements
Resource Calendars
Activity Duration Estimates
Project Scope Statement
Risk Register
Project Staff Assignments
Resource Breakdown Structure
Enterprise Environmental factors
Organizational Process Assets
Project Documents Updates
Project Management Plan
Expert Judgment
Project Documents Updates
Approved Change Requests
Enterprise Environmental Factors
Organizational Process Assets
PM Information Systems
Meetings
Deliverables
Change Requests
Project Management Plan Updates
Work Performance Information
Analogous Estimating
Parametric Estimating
Three-point Estimating
Group Decision Making Techniques
Reserve Analysis
Activity Duration Estimates
Expert Judgment
Project Management Plan
Activity List
Activity Attributes
Activity Resource Requirements
Resource Calendars
Project Scope Statement
Risk Register
Resource Breakdown Structure
Enterprise Environmental Factors
Organizational Process Assets
Project Documents Updates
Alternative Analysis
Pub’d Estimating Data
Bottom-up Estimating
Project Management Software
Activity Resource Requirements
Resource Breakdown Structure
Expert Judgment
Scope Management Plan
Activity List
Activity Attributes
Resource Calendars
Risk Register
Activity Cost Estimates
Enterprise Environmental factors
Organizational Process Assets
Project Documents Updates
Requirements Management Plan
Stakeholder Management Plan
Scope Baseline
Project Schedule
Risk Register
Enterprise Environmental Factors
Organizational Process Assets
Analogous Estimating
Parametric Estimating
Bottom-up Estimating
Three-point Estimating
Reserve Analysis
Cost of Quality
Project Management Software
Vendor Bid Analysis
Group Decision Making Techniques
Activity Cost Estimates
Basis of Estimates
Project Documents Updates
Expert Judgment
Scope Management Plan
Schedule Management Plan
Scope Management Plan
Cost Management Plan
Scope Baseline
Activity Cost Estimates
Activity Duration Estimates
Stakeholder Register
Project Documents
Procurement Documents
Enterprise Environmental Factors
Organizational Process Assets
Documentation Reviews
Information Gathering Techniques
Checklist Analysis
Assumptions Analysis
Diagramming Techniques
SWOT Analysis
Risk Register
Expert Judgment
Expert Judgment
Expert Judgment
Procurement Documents
Enterprise Environmental Factors
Organizational Process Assets
Stakeholder Analysis
Meetings
Stakeholder Register
Project Documents Updates
Schedule Management Plan
Work Performance Information
Enterprise Environmental Factors
Organizational Process Assets
Comm. Technology
Comm. Models
Communication Methods
Information Management Systems
Performance Reporting
Project Communications
Project Management Plan Updates
Organizational Process Assets Updates
Project Documents Updates
Schedule Management Plan
Project Staff Assignments
Team Performance Assessments
Issue Log
Work Performance Information
Organizational Process Assets
Observations and Conversation
Project Performance Appraisals
Conflict Management
Interpersonal Skills
Change Requests
Project Management Plan Updates
Enterprise Environmental Factors Updates
Organizational Process Assets Updates
Project Documents Updates
Schedule Management Plan
Cost Management Plan
Change Log
Organizational Process Assets
Communication Methods
Interpersonal Skills
Management Skills
Issue Log
Change Requests
Project Management Plan Updates
Organizational Process Assets Updates
Project Documents Updates
Expert Judgment
HR Management Plan
Schedule Forecasts
Cost Forecasts
Validated Changes
Work Performance Reports
Enterprise Environmental Factors
Organizational Process Assets
PM Information Systems
Meetings
Deliverables
Change Requests
Project Management Plan Updates
Work Performance Reports
Project Documents Updates
Expert Judgment
Risk Management Plan
Work Performance Reports
Change Requests
Enterprise Environmental Factors
Organizational Process Assets
Meetings
Change Control Tools
Approved Change Requests
Change Log
Project Management Plan Updates
Cost Management Plan
Scope Baseline
Risk Register
Enterprise Environmental Factors
Organizational Process Assets
Risk Probability and Impact Assessment
Probability and Impact Matrix
Risk Data Quality Assessment
Risk Categorization
Risk Urgency Assessment
Expert Judgment
Project Documents Updates
Project Documents Updates
Quality Management Plan
HR Management Plan
Quality Metrics
Quality Control Measurements
Project Documents
Quality Management and Control Tools
Quality Audits
Process Analysis
Change Requests
Project Management Plan Updates
Organizational Process Assets Updates
Risk Management Plan
Risk Management Plan
Cost Management Plan
Risk Register
Enterprise Environmental Factors
Organizational Process Assets
Project Documents Updates
Data Gathering and Representation Techniques
Quantitative Risk Analysis and Modeling Techniques
Expert Judgment
Stakeholder Register
Enterprise Environmental Factors
Organizational Process Assets
Schedule Management Plan
Project Documents Updates
Comm. Requirements Analysis
Comm. Technology
Comm. Models
Communication Methods
Meetings
Communications Management Plan
Project Charter
Enterprise Environmental Factors
Organizational Process Assets
Project Management Plan
Expert Judgment
Analytical Techniques
Meetings
Cost Management Plan
Activity Resource Requirements
Enterprise Environmental Factors
Organizational Process Assets
Project Management Plan
Org. Charts and Position Descriptions
Networking
Org. Theory
Expert Judgment
Meetings
Human Resources Management Plan
Requirements Documentation
Risk Register
Activity Resource Requirements
Project Schedule
Activity Cost Estimates
Stakeholder Register
Enterprise Environmental Factors
Organizational Process Assets
Project Management Plan
Project Documents Updates
Make-or-buy Analysis
Expert Judgment
Market Research
Meetings
Procurement Management Plan
Procurement Statement of Work
Procurement Documents
Source Selection Criteria
Make-or-buy decisions
Change Requests
Stakeholder Register
Risk Register
Requirements Documentation
Enterprise Environmental Factors
Organizational Process Assets
Project Management Plan
Project Documents Updates
Cost-Benefit Analysis
Cost of Quality
Seven Basic Quality Tools
Benchmarking
Design of Experiments
Statistical Sampling
Additional Quality Planning Tools
Meetings
Quality Management Plan
Process Improvement Plan
Quality Metrics
Quality Checklists
Project Charter
Project Communications
Stakeholder Register
Enterprise Environmental Factors
Organizational Process Assets
Project Management Plan
Analytical Techniques
Expert Judgment
Meetings
Risk Management Plan
Project Management Plan
Risk Register
Project Documents Updates
Strategies for Negative Risks or Threats
Stategies for Positive Risks or Opportunities
Contingent Response Strategies
Expert Judgment
Project Management Plan Updates
Expert Judgment
Analytical Techniques
Meetings
Schedule Management Plan
Enterprise Environmental factors
Organizational Process Assets
Risk Management Plan
Project Charter
Project Charter
Enterprise Environmental factors
Organizational Process Assets
Project Management Plan
Expert Judgment
Meetings
Scope Management Plan
Requirements Management Plan
Stakeholder Register
Enterprise Environmental Factors
Organizational Process Assets
Project Management Plan
Project Documents Updates
Expert Judgment
Meetings
Analytical Techniques
Stakeholder Management Plan
Project Management Plan
Activity List
Activity Attributes
Milestone List
Project Scope Statement
Enterprise Environmental factors
Precedence Diagramming Method (PDM)
Dependency Determination
Leads and Lags
Project Schedule Network Diagrams
Organizational Process Assets
Project Documents Updates
Work Performance Reports
Project Documents Updates
Schedule Management Plan
Requirements documentation
Requirements Traceability Matrix
Verified Deliverables
Inspection
Group Decision Making Techniques
Accepted Deliverables
Change Requests
Work Performance Reports
SOW
Business Case
Agreements
Enterprise Environmental Factors
Organizational Process Assets
Process Group Knowledge Area Process Attribute
Initiating Integration Develop Project Charter Inputs
Initiating Integration Develop Project Charter Tools/Tech's
Initiating Integration Develop Project Charter Outputs
Planning Integration Develop Project Management Plan Inputs
Planning Integration Develop Project Management Plan Tools/Tech's
Planning Integration Develop Project Management Plan Outputs
Executing Integration Direct and Manage Project Inputs
Executing Integration Direct and Manage Project Tools/Tech's
Executing Integration Direct and Manage Project Outputs
Monitoring/Controlling Integration Monitor and Control Project Work Inputs
Monitoring/Controlling Integration Monitor and Control Project Work Tools/Tech's
Monitoring/Controlling Integration Monitor and Control Project Work Outputs
Monitoring/Controlling Integration Perform Integrated Change Control Inputs
Monitoring/Controlling Integration Perform Integrated Change Control Tools/Tech's
Monitoring/Controlling Integration Perform Integrated Change Control Outputs
Closing Integration Close Project Inputs
Closing Integration Close Project Tools/Tech's
Closing Integration Close Project Outputs
Planning Scope Plan Scope Management Inputs
Planning Scope Plan Scope Management Tools/Tech's
Planning Scope Plan Scope Management Outputs
Planning Scope Collect Requirements Inputs
Planning Scope Collect Requirements Tools/Tech's
Planning Scope Collect Requirements Outputs
Planning Scope Define Scope Inputs
Planning Scope Define Scope Tools/Tech's
Planning Scope Define Scope Outputs
Planning Scope Create WBS Inputs
Planning Scope Create WBS Tools/Tech's
Planning Scope Create WBS Outputs
Monitoring/Controlling Scope Validate Scope Inputs
Monitoring/Controlling Scope Validate Scope Tools/Tech's
Monitoring/Controlling Scope Validate Scope Outputs
Monitoring/Controlling Scope Control Scope Inputs
Monitoring/Controlling Scope Control Scope Tools/Tech's
Monitoring/Controlling Scope Control Scope Outputs
Planning Time Plan Schedule Management Inputs
Planning Time Plan Schedule Management Tools/Tech's
Planning Time Plan Schedule Management Outputs
Planning Time Define Activities Inputs
Planning Time Define Activities Tools/Tech's
Planning Time Define Activities Outputs
Planning Time Sequence Activities Inputs
Planning Time Sequence Activities Tools/Tech's
Planning Time Sequence Activities Outputs
Planning Time Estimate Activity Resources Inputs
Planning Time Estimate Activity Resources Tools/Tech's
Planning Time Estimate Activity Resources Outputs
Planning Time Estimate Activity Durations Inputs
Planning Time Estimate Activity Durations Tools/Tech's
Planning Time Estimate Activity Durations Outputs
Planning Time Develop Schedule Inputs
Planning Time Develop Schedule Tools/Tech's
Planning Time Develop Schedule Outputs
Monitoring/Controlling Time Control Schedule Inputs
Monitoring/Controlling Time Control Schedule Tools/Tech's
Monitoring/Controlling Time Control Schedule Outputs
Planning Cost Plan Cost Management Inputs
Planning Cost Plan Cost Management Tools/Tech's
Planning Cost Plan Cost Management Outputs
Planning Cost Estimate Costs Inputs
Planning Cost Estimate Costs Tools/Tech's
Planning Cost Estimate Costs Outputs
Planning Cost Determine Budget Inputs
Planning Cost Determine Budget Tools/Tech's
Planning Cost Determine Budget Outputs
Monitoring/Controlling Cost Control Costs Inputs
Monitoring/Controlling Cost Control Costs Tools/Tech's
Monitoring/Controlling Cost Control Costs Outputs
Planning Quality Plan Quality Management Inputs
Planning Quality Plan Quality Management Tools/Tech's
Planning Quality Plan Quality Management Outputs
Executing Quality Perform Quality Assurance Inputs
Executing Quality Perform Quality Assurance Tools/Tech's
Executing Quality Perform Quality Assurance Outputs
Monitoring/Controlling Quality Control Quality Inputs
Monitoring/Controlling Quality Control Quality Tools/Tech's
Monitoring/Controlling Quality Control Quality Outputs
Planning HR Plan Human Resources Management Inputs
Planning HR Plan Human Resources Management Tools/Tech's
Planning HR Plan Human Resources Management Outputs
Executing HR Acquire Project Team Inputs
Executing HR Acquire Project Team Tools/Tech's
Executing HR Acquire Project Team Outputs
Executing HR Develop Project Team Inputs
Executing HR Develop Project Team Tools/Tech's
Executing HR Develop Project Team Outputs
Executing HR Manage Project Team Inputs
Executing HR Manage Project Team Tools/Tech's
Executing HR Manage Project Team Outputs
Planning Communications Plan Communications Management Inputs
Planning Communications Plan Communications Management Tools/Tech's
Planning Communications Plan Communications Management Outputs
Executing Communications Manage Communications Inputs
Executing Communications Manage Communications Tools/Tech's
Executing Communications Manage Communications Outputs
Monitoring/Controlling Communications Control Communications Inputs
Monitoring/Controlling Communications Control Communications Tools/Tech's
Monitoring/Controlling Communications Control Communications Outputs
Planning Risk Plan Risk Management Inputs
Planning Risk Plan Risk Management Tools/Tech's
Planning Risk Plan Risk Management Outputs
Planning Risk Identify Risks Inputs
Planning Risk Identify Risks Tools/Tech's
Planning Risk Identify Risks Outputs
Planning Risk Perform Qualitative Risk Analysis Inputs
Planning Risk Perform Qualitative Risk Analysis Tools/Tech's
Planning Risk Perform Qualitative Risk Analysis Outputs
Planning Risk Perform Quantitative Analysis Inputs
Planning Risk Perform Quantitative Analysis Tools/Tech's
Planning Risk Perform Quantitative Analysis Outputs
Planning Risk Plan Risk Responses Inputs
Planning Risk Plan Risk Responses Tools/Tech's
Planning Risk Plan Risk Responses Outputs
Monitoring/Controlling Risk Control Risks Inputs
Monitoring/Controlling Risk Control Risks Tools/Tech's
Monitoring/Controlling Risk Control Risks Outputs
Planning Procurement Plan Procurement Management Inputs
Planning Procurement Plan Procurement Management Tools/Tech's
Planning Procurement Plan Procurement Management Outputs
Executing Procurement Conduct Procurements Inputs
Executing Procurement Conduct Procurements Tools/Tech's
Executing Procurement Conduct Procurements Outputs
Monitoring/Controlling Procurement Control Procurements Inputs
Monitoring/Controlling Procurement Control Procurements Tools/Tech's
Monitoring/Controlling Procurement Control Procurements Outputs
Closing Procurement Close Procurements Inputs
Closing Procurement Close Procurements Tools/Tech's
Closing Procurement Close Procurements Outputs
Initiating Stakeholder Identify Stakeholders Inputs
Initiating Stakeholder Identify Stakeholders Tools/Tech's
Initiating Stakeholder Identify Stakeholders Outputs
Planning Stakeholder Plan Stakeholder Management Inputs
Planning Stakeholder Plan Stakeholder Management Tools/Tech's
Planning Stakeholder Plan Stakeholder Management Outputs
Executing Stakeholder Manage Stakeholder Engagement Inputs
Executing Stakeholder Manage Stakeholder Engagement Tools/Tech's
Executing Stakeholder Manage Stakeholder Engagement Outputs
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Inputs
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Tools/Tech's
Monitoring/Controlling Stakeholder Control Stakeholder Engagement Outputs
Value
SOW, Business Case, Agreements, Enterprise Environmental Factors, Organizational Process Assets
Expert Judgment, Facilitation Techniques
Project Charter
Project Charter, Outputs from other processes, Enterprise Environmental Factors, Organizational Process Assets
Expert Judgment, Facilitation Techniques
Project Management Plan
Project Management Plan, Approved Change Requests, Enterprise Environmental Factors, Organizational Process Assets
Expert Judgment, PM Information Systems, Meetings
Deliverables, Work Performance Data, Change Requests, Project Management Plan Updates, Project Documents Updates
Project Management Plan, Schedule Forecasts, Cost Forecasts, Validated Changes, Work Performance Information, Enterprise
Expert Judgment, PM Information Systems, Meetings
Deliverables, Work Performance Reports, Change Requests, Project Management Plan Updates, Project Documents Updates
Project Management Plan, Work Performance Reports, Change Requests, Enterprise Environmental Factors, Organizational Pro
Expert Judgment, Meetings, Change Control Tools
Approved Change Requests, Change Log, Project Management Plan Updates, Project Documents Updates
Project Management Plan, Accepted Deliverables, Organizational Process Assets
Expert Judgment, Analytical Techniques (regression and trend analysis), Meetings
Final Product, Service or Result Transition, Organizational Process Assets Updates
Project Management Plan, Project Charter, Enterprise Environmental factors, Organizational Process Assets
Expert Judgment, Meetings
Scope Management Plan, Requirements Management Plan
Scope Management Plan, Requirements Management Plan, Stakeholder Management Plan, Project Charter, Stakeholder Regis
Interviews, Focus Groups, Facilitated Workshops, Group Creativity, Group Decision Making Techniques, Questionaires & Surve
Requirements Documentation, Requirements Traceability Matrix
Scope Management Plan, Project Charter, Requirements Documentation, Organizational Process Assets
Expert Judgment, Product Analysis, Alternatives Generation, Facilitated Workshops
Project Scope Statement, Project Documents Updates
Scope Management Plan, Project Scope Statement, Requirements documentation, Enterprise Environmental Factors, Organiza
Decomposition, Expert Judgment
Scope Baseline, Project Documents Updates
Project Management Plan, Requirements documentation, Requirements Traceability Matrix, Verified Deliverables, Work Perfo
Inspection, Group Decision Making Techniques
Accepted Deliverables, Change Requests, Work Performance Information, Project Documents Updates
Project Management Plan, Requirements documentation, Requirements Traceability Matrix, Work Performance Data, Organiz
Variance Analysis
Work Performance Information, Change Requests, Project Management Plan Updates, Project Documents Updates, Organizati
Project Management Plan, Project Charter, Enterprise Environmental factors, Organizational Process Assets
Expert Judgment, Analytical Techniques, Meetings
Schedule Management Plan
Schedule Management Plan, Scope Baseline, Enterprise Environmental factors, Organizational Process Assets
Decomposition, Rolling Wave Planning, Expert Judgment
Activity List, Activity Attributes, Milestone List
Schedule Management Plan, Activity List, Activity Attributes, Milestone List, Project Scope Statement, Enterprise Environment
Precedence Diagramming Method (PDM), Dependency Determination, Leads and Lags
Project Schedule Network Diagrams, Project Documents Updates
Schedule Management Plan, Activity List, Activity Attributes, Resource Calendars, Risk Register, Activity Cost Estimates, Enterp
Expert Judgment, Alternative Analysis, Pub’d Estimating Data, Bottom-up Estimating, Project Management Software
Activity Resource Requirements, Resource Breakdown Structure, Project Documents Updates
Schedule Management Plan, Activity List, Activity Attributes, Activity Resource Requirements, Resource Calendars, Project Sco
Expert Judgment, Analogous Estimating, Parametric Estimating, Three-point Estimating, Group Decision Making Techniques, R
Activity Duration Estimates, Project Documents Updates
Schedule Management Plan, Activity List, Activity Attributes, Project Schedule Network Diagrams, Activity Resource Requirem
Schedule Network Analysis, Critical Path Method, Critical Chain Method, Resource Optimization Techniques, Modeling Techniq
Schedule Baseline, Project Schedule, Schedule Data, Project Calendars, Project Management Plan Updates, Project Document
Project Management Plan, Project Schedule, Work Performance Data, Project Calendars, Schedule Data, Organizational Proces
Performance Reviews, Project Management Software, Resource Optimization Techniques, Modeling Techniques, Leads and La
Work Performance Information, Schedule Forecasts, Change Requests, Project Management Plan Updates, Project Documents
Project Management Plan, Project Charter, Enterprise Environmental Factors, Organizational Process Assets
Expert Judgment, Analytical Techniques, Meetings
Cost Management Plan
Cost Management Plan, HR Management Plan, Scope Baseline, Project Schedule, Risk Register, Enterprise Environmental Facto
Expert Judgment, Analogous Estimating, Parametric Estimating, Bottom-up Estimating, Three-point Estimating, Reserve Analys
Activity Cost Estimates, Basis of Estimates, Project Documents Updates
Cost Management Plan, Scope Baseline, Activity Cost Estimates, Basis of Estimates, Project Schedule, Resource Calendars, Risk
Cost Aggregation, Reserve Analysis, Expert Judgment, Historical Relationships, Funding Limit Reconciliation
Cost Baseline, Project Funding Requirements, Project Documents Updates
Project Management Plan, Project Funding Requirements, Work Performance Data, Organizational Process Assets
Earned Value Management, Forecasting, To-complete Performance Index (TCPI), Performance Reviews, Project Management S
Work Performance Information, Costs Forecasts, Change Requests, Project Management Plan Updates, Project Documents Up
Project Management Plan, Stakeholder Register, Risk Register, Requirements Documentation, Enterprise Environmental Factor
Cost-Benefit Analysis, Cost of Quality, Seven Basic Quality Tools, Benchmarking, Design of Experiments, Statistical Sampling, Ad
Quality Management Plan, Process Improvement Plan, Quality Metrics, Quality Checklists, Project Documents Updates
Quality Management Plan, Process Improvement Plan, Quality Metrics, Quality Control Measurements, Project Documents
Quality Management and Control Tools, Quality Audits, Process Analysis
Change Requests, Project Management Plan Updates, Project Documents Updates, Organizational Process Assets Updates
Project Management Plan, Quality Metrics, Quality Checklists, Work Performance Data, Approved Change Requests, Deliverab
Seven Basic Quality Tools, Statistical Sampling, Inspection, Approved Change Requests Review
Quality Control Measurements, Validated Changes, Verified Deliverables, Work Performance Information, Change Requests, Pr
Project Management Plan, Activity Resource Requirements, Enterprise Environmental Factors, Organizational Process Assets
Org. Charts and Position Descriptions, Networking, Org. Theory, Expert Judgment, Meetings
Human Resources Management Plan
HR Management Plan, Enterprise Environmental Factors, Organizational Process Assets
Pre-assignment, Negotiation, Acquisition, Virtual Teams, Multi-criteria Decision Analysis
Project Staff Assignments, Resource Calendars, Project Management Plan Updates
HR Management Plan, Project Staff Assignments, Resource Calendars
Interpersonal Skills, Training, Team-building Activities, Ground Rules, Colocation, Recognition and Rewards, Personnel Assessm
Team Performance Assessments, Enterprise Environmental Factors Updates
HR Management Plan, Project Staff Assignments, Team Performance Assessments, Issue Log, Work Performance Reports, Orga
Observations and Conversation, Project Performance Appraisals, Conflict Management, Interpersonal Skills,
Change Requests, Project Management Plan Updates, Project Documents Updates, Enterprise Environmental Factors Updates
Project Management Plan, Stakeholder Register, Enterprise Environmental Factors, Organizational Process Assets
Comm. Requirements Analysis, Comm. Technology, Comm. Models, Communication Methods, Meetings
Communications Management Plan, Project Documents Updates
Communications Management Plan, Work Performance Reports, Enterprise Environmental Factors, Organizational Process Ass
Comm. Technology, Comm. Models, Communication Methods, Information Management Systems, Performance Reporting
Project Communications, Project Management Plan Updates, Project Documents Updates, Organizational Process Assets Upda
Project Management Plan, Project Communications, Issue Log, Work Performance Data, Organizational Process Assets
Information Management Systems, Expert Judgment, Meetings
Work Performance Information, Change Requests, Project Management Plan Updates, Project Documents Updates, Organizati
Project Management Plan, Project Communications, Project Charter, Stakeholder Register, Enterprise Environmental Factors, O
Analytical Techniques, Expert Judgment, Meetings
Risk Management Plan
Risk Management Plan, Cost Management Plan, Quality Management Plan, HR Management Plan, Scope Baseline, Activity Co
Documentation Reviews, Information Gathering Techniques, Checklist Analysis, Assumptions Analysis, Diagramming Technique
Risk Register
Risk Management Plan, Scope Baseline, Risk Register, Enterprise Environmental Factors, Organizational Process Assets
Risk Probability and Impact Assessment, Probability and Impact Matrix, Risk Data Quality Assessment, Risk Categorization, Ris
Project Documents Updates
Risk Management Plan, Cost Management Plan, Schedule Management Plan, Risk Register, Enterprise Environmental Factors,
Data Gathering and Representation Techniques, Quantitative Risk Analysis and Modeling Techniques, Expert Judgment
Project Documents Updates
Risk Management Plan, Risk Register
Strategies for Negative Risks or Threats, Stategies for Positive Risks or Opportunities, Contingent Response Strategies, Expert Ju
Project Management Plan Updates, Project Documents Updates
Project Management Plan, Risk Register, Work Performance Data, Work Performance Reports
Risk Reassessment, Risk Audits, Variance and Trend Analysis, Technical Performance Measurement, Reserve Analysis, Meeting
Work Performance Information, Change Requests, Project Management Plan Updates, Project Documents Updates, Organizati
Project Management Plan, Requirements Documentation, Risk Register, Activity Resource Requirements, Project Schedule, Ac
Make-or-buy Analysis, Expert Judgment, Market Research, Meetings
Procurement Management Plan, Procurement Statement of Work, Procurement Documents, Source Selection Criteria, Make-o
Procurement Management Plan, Procurement Documents, Source Selection Criteria, Seller Proposals, Project Documents, Ma
Bidder Conference, Proposal Evaluation Techniques, Independent Estimates, Expert Judgment, Advertising, Analytical Techniq
Selected Sellers, Agreements, Resource Calendars, Change Requests, Project Management Plan Updates, Project Documents U
Project Management Plan, Procurement Documents, Agreements, Approved Change Requests, Work Performance Reports, W
Contract Change Control System, Procurement Performance Reviews, Inspections and Audits, Performance Reporting, Paymen
Work Performance Information, Change Requests, Project Management Plan Updates, Project Documents Updates, Organizati
Project Management Plan, Procurement Documents
Procurement Audits, Procurement Negotiations, Records Management System
Closed Procurements, Organizational Process Assets Updates
Project Charter, Procurement Documents, Enterprise Environmental Factors, Organizational Process Assets
Stakeholder Analysis, Expert Judgment, Meetings
Stakeholder Register
Project Management Plan, Stakeholder Register, Enterprise Environmental Factors, Organizational Process Assets
Expert Judgment, Meetings, Analytical Techniques
Stakeholder Management Plan, Project Documents Updates
Stakeholder Management Plan, Communications Management Plan, Change Log, Organizational Process Assets
Communication Methods, Interpersonal Skills, Management Skills
Issue Log, Change Requests, Project Management Plan Updates, Project Documents Updates, Organizational Process Assets U
Project Management Plan, Issue Log, Work Performance Data, Project Documents
Information Management Systems, Expert Judgment, Meetings
Work Performance Information, Change Requests, Project Management Plan Updates, Project Documents Updates, Organizati
ocess Assets

tional Process Assets

t Documents Updates
ce Information, Enterprise Environmental Factors, Organizational Process Assets

oject Documents Updates


Factors, Organizational Process Assets

Charter, Stakeholder Register


ues, Questionaires & Surveys, Observations, Prototypes, Benchmarking, Context Diagrams, Document Analysis

onmental Factors, Organizational Process Assets

d Deliverables, Work Performance Data

Performance Data, Organizational Process Assets

uments Updates, Organizational Process Assets Updates


nt, Enterprise Environmental factors, Organizational Process Assets

vity Cost Estimates, Enterprise Environmental factors, Organizational Process Assets


gement Software

urce Calendars, Project Scope Statement, Risk Register, Resource Breakdown Structure, Enterprise Environmental Factors, Organizational Pr
sion Making Techniques, Reserve Analysis

ctivity Resource Requirements, Resource Calendars, Activity Duration Estimates, Project Scope Statement, Risk Register, Project Staff Assig
hniques, Modeling Techniques, Leads and Lags, Schedule Compression, Scheduling Tool
Updates, Project Documents Updates
Data, Organizational Process Assets
g Techniques, Leads and Lags, Schedule Compression, Scheduling Tool
pdates, Project Documents Updates, Organizational Process Assets Updates

erprise Environmental Factors, Organizational Process Assets


Estimating, Reserve Analysis, Cost of Quality, Project Management Software, Vendor Bid Analysis, Group Decision Making Techniques

e, Resource Calendars, Risk Register, Agreements, Organizational Process Assets

Process Assets
ws, Project Management Software, Reserve Analysis
tes, Project Documents Updates, Organizational Process Assets Updates
prise Environmental Factors, Organizational Process Assets
nts, Statistical Sampling, Additional Quality Planning Tools, Meetings
Documents Updates
nts, Project Documents

Process Assets Updates


hange Requests, Deliverables, Project Documents, Organizational Process Assets

ation, Change Requests, Project Management Plan Updates, Project Documents Updates, Organizational Process Assets Updates
nizational Process Assets
ewards, Personnel Assessment Tools

Performance Reports, Organizational Process Assets

onmental Factors Updates, Organizational Process Assets Updates


rocess Assets

Organizational Process Assets


Performance Reporting
ational Process Assets Updates
onal Process Assets

uments Updates, Organizational Process Assets Updates


se Environmental Factors, Organizational Process Assets

Scope Baseline, Activity Cost Estimates, Activity Duration Estimates, Stakeholder Register, Project Documents, Procurement Documents, En
is, Diagramming Techniques, SWOT Analysis, Expert Judgment

nal Process Assets


nt, Risk Categorization, Risk Urgency Assessment, Expert Judgment

se Environmental Factors, Organizational Process Assets


s, Expert Judgment

sponse Strategies, Expert Judgment

Reserve Analysis, Meetings


uments Updates, Organizational Process Assets Updates
ments, Project Schedule, Activity Cost Estimates, Stakeholder Register, Enterprise Environmental Factors, Organizational Process Assets

e Selection Criteria, Make-or-buy decisions, Change Requests, Project Documents Updates


ls, Project Documents, Make-or-buy Decisions, Procurement Statement of Work, Organizational Process Assets
ertising, Analytical Techniques, Procurement Negotiations
dates, Project Documents Updates
rk Performance Reports, Work Performance Data
rmance Reporting, Payment Systems, Claims Administration, Records Management System
uments Updates, Organizational Process Assets Updates
rocess Assets

ocess Assets

nizational Process Assets Updates

uments Updates, Organizational Process Assets Updates


l Factors, Organizational Process Assets

Register, Project Staff Assignments, Resource

n Making Techniques

s Assets Updates
ocurement Documents, Enterprise Environmental Factor

tional Process Assets


Process Knowledge Area Process Group
Acquire Project Team HR Executing
Close Procurements Procurement Closing
Close Project Integration Closing
Collect Requirements Scope Planning
Conduct Procurements Procurement Executing
Control Communications Communications Monitoring/Controlling
Control Costs Cost Monitoring/Controlling
Control Procurements Procurement Monitoring/Controlling
Control Quality Quality Monitoring/Controlling
Control Risks Risk Monitoring/Controlling
Control Schedule Time Monitoring/Controlling
Control Scope Scope Monitoring/Controlling
Control Stakeholder Engagement Stakeholder Monitoring/Controlling
Create WBS Scope Planning
Define Activities Time Planning
Define Scope Scope Planning
Determine Budget Cost Planning
Develop Project Charter Integration Initiating
Develop Project Management Plan Integration Planning
Develop Project Team HR Executing
Develop Schedule Time Planning
Direct and Manage Project Integration Executing
Estimate Activity Durations Time Planning
Estimate Activity Resources Time Planning
Estimate Costs Cost Planning
Identify Risks Risk Planning
Identify Stakeholders Stakeholder Initiating
Manage Communications Communications Executing
Manage Project Team HR Executing
Manage Stakeholder Engagement Stakeholder Executing
Monitor and Control Project Work Integration Monitoring/Controlling
Perform Integrated Change Control Integration Monitoring/Controlling
Perform Qualitative Risk Analysis Risk Planning
Perform Quality Assurance Quality Executing
Perform Quantitative Analysis Risk Planning
Plan Communications Management Communications Planning
Plan Cost Management Cost Planning
Plan Human Resources Management HR Planning
Plan Procurement Management Procurement Planning
Plan Quality Management Quality Planning
Plan Risk Management Risk Planning
Plan Risk Responses Risk Planning
Plan Schedule Management Time Planning
Plan Scope Management Scope Planning
Plan Stakeholder Management Stakeholder Planning
Sequence Activities Time Planning
Validate Scope Scope Monitoring/Controlling
Develop Project Charter
Inputs: SOW, Business Case, Agreements, Enterprise Environmental Factors, Organizational Process Assets
Tools/Techniques: Expert Judgment, Facilitation Techniques
Outputs: Project Charter

Develop Project Management Plan


Inputs: Project Charter, Outputs from other processes, Enterprise Environmental Factors, Organizational Process Assets
Tools/Techniques: Expert Judgment, Facilitation Techniques
Outputs: Project Management Plan

Direct and Manage Project


Inputs: Project Management Plan, Approved Change Requests, Enterprise Environmental Factors, Organizational Process As
Tools/Techniques: Expert Judgment, PM Information Systems, Meetings
Outputs: Deliverables, Work Performance Data, Change Requests, Project Management Plan Updates, Project Documents U

Monitor and Control Project Work


Inputs: Project Management Plan, Schedule Forecasts, Cost Forecasts, Validated Changes, Work Performance Information, E
Tools/Techniques: Expert Judgment, PM Information Systems, Meetings
Outputs: Deliverables, Work Performance Reports, Change Requests, Project Management Plan Updates, Project Document

Perform Integrated Change Control


Inputs: Project Management Plan, Work Performance Reports, Change Requests, Enterprise Environmental Factors, Organiz
Tools/Techniques: Expert Judgment, Meetings, Change Control Tools
Outputs: Approved Change Requests, Change Log, Project Management Plan Updates, Project Documents Updates

Close Project
Inputs: Project Management Plan, Accepted Deliverables, Organizational Process Assets
Tools/Techniques: Expert Judgment, Analytical Techniques (regression and trend analysis), Meetings
Outputs: Final Product, Service or Result Transition, Organizational Process Assets Updates

Plan Scope Management


Inputs: Project Management Plan, Project Charter, Enterprise Environmental factors, Organizational Process Assets
Tools/Techniques: Expert Judgment, Meetings
Outputs: Scope Management Plan, Requirements Management Plan

Collect Requirements
Inputs: Scope Management Plan, Requirements Management Plan, Stakeholder Management Plan, Project Charter, Stakeho
Tools/Techniques: Interviews, Focus Groups, Facilitated Workshops, Group Creativity, Group Decision Making Techniques, Q
Outputs: Requirements Documentation, Requirements Traceability Matrix
Define Scope
Inputs: Scope Management Plan, Project Charter, Requirements Documentation, Organizational Process Assets
Tools/Techniques: Expert Judgment, Product Analysis, Alternatives Generation, Facilitated Workshops
Outputs: Project Scope Statement, Project Documents Updates

Create WBS
Inputs: Scope Management Plan, Project Scope Statement, Requirements documentation, Enterprise Environmental Factors
Tools/Techniques: Decomposition, Expert Judgment
Outputs: Scope Baseline, Project Documents Updates

Validate Scope
Inputs: Project Management Plan, Requirements documentation, Requirements Traceability Matrix, Verified Deliverables, W
Tools/Techniques: Inspection, Group Decision Making Techniques
Outputs: Accepted Deliverables, Change Requests, Work Performance Information, Project Documents Updates

Control Scope
Inputs: Project Management Plan, Requirements documentation, Requirements Traceability Matrix, Work Performance Dat
Tools/Techniques: Variance Analysis
Outputs: Work Performance Information, Change Requests, Project Management Plan Updates, Project Documents Update

Plan Schedule Management


Inputs: Project Management Plan, Project Charter, Enterprise Environmental factors, Organizational Process Assets
Tools/Techniques: Expert Judgment, Analytical Techniques, Meetings
Outputs: Schedule Management Plan

Define Activities
Inputs: Schedule Management Plan, Scope Baseline, Enterprise Environmental factors, Organizational Process Assets
Tools/Techniques: Decomposition, Rolling Wave Planning, Expert Judgment
Outputs: Activity List, Activity Attributes, Milestone List

Sequence Activities
Inputs: Schedule Management Plan, Activity List, Activity Attributes, Milestone List, Project Scope Statement, Enterprise Envir
Tools/Techniques: Precedence Diagramming Method (PDM), Dependency Determination, Leads and Lags
Outputs: Project Schedule Network Diagrams, Project Documents Updates

Estimate Activity Resources


Inputs: Schedule Management Plan, Activity List, Activity Attributes, Resource Calendars, Risk Register, Activity Cost Estimates
Tools/Techniques: Expert Judgment, Alternative Analysis, Pub’d Estimating Data, Bottom-up Estimating, Project Managemen
Outputs: Activity Resource Requirements, Resource Breakdown Structure, Project Documents Updates
Estimate Activity Durations
Inputs: Schedule Management Plan, Activity List, Activity Attributes, Activity Resource Requirements, Resource Calendars, P
Tools/Techniques: Expert Judgment, Analogous Estimating, Parametric Estimating, Three-point Estimating, Group Decision M
Outputs: Activity Duration Estimates, Project Documents Updates

Develop Schedule
Inputs: Schedule Management Plan, Activity List, Activity Attributes, Project Schedule Network Diagrams, Activity Resource
Tools/Techniques: Schedule Network Analysis, Critical Path Method, Critical Chain Method, Resource Optimization Techniques
Outputs: Schedule Baseline, Project Schedule, Schedule Data, Project Calendars, Project Management Plan Updates, Projec

Control Schedule
Inputs: Project Management Plan, Project Schedule, Work Performance Data, Project Calendars, Schedule Data, Organizatio
Tools/Techniques: Performance Reviews, Project Management Software, Resource Optimization Techniques, Modeling Techni
Outputs: Work Performance Information, Schedule Forecasts, Change Requests, Project Management Plan Updates, Project

Plan Cost Management


Inputs: Project Management Plan, Project Charter, Enterprise Environmental Factors, Organizational Process Assets
Tools/Techniques: Expert Judgment, Analytical Techniques, Meetings
Outputs: Cost Management Plan

Estimate Costs
Inputs: Cost Management Plan, HR Management Plan, Scope Baseline, Project Schedule, Risk Register, Enterprise Environm
Tools/Techniques: Expert Judgment, Analogous Estimating, Parametric Estimating, Bottom-up Estimating, Three-point Estim
Outputs: Activity Cost Estimates, Basis of Estimates, Project Documents Updates

Determine Budget
Inputs: Cost Management Plan, Scope Baseline, Activity Cost Estimates, Basis of Estimates, Project Schedule, Resource Calend
Tools/Techniques: Cost Aggregation, Reserve Analysis, Expert Judgment, Historical Relationships, Funding Limit Reconciliation
Outputs: Cost Baseline, Project Funding Requirements, Project Documents Updates

Control Costs
Inputs: Project Management Plan, Project Funding Requirements, Work Performance Data, Organizational Process Assets
Tools/Techniques: Earned Value Management, Forecasting, To-complete Performance Index (TCPI), Performance Reviews, P
Outputs: Work Performance Information, Costs Forecasts, Change Requests, Project Management Plan Updates, Project Do

Plan Quality Management


Inputs: Project Management Plan, Stakeholder Register, Risk Register, Requirements Documentation, Enterprise Environmen
Tools/Techniques: Cost-Benefit Analysis, Cost of Quality, Seven Basic Quality Tools, Benchmarking, Design of Experiments, Sta
Outputs: Quality Management Plan, Process Improvement Plan, Quality Metrics, Quality Checklists, Project Documents Updat
Perform Quality Assurance
Inputs: Quality Management Plan, Process Improvement Plan, Quality Metrics, Quality Control Measurements, Project Docu
Tools/Techniques: Quality Management and Control Tools, Quality Audits, Process Analysis
Outputs: Change Requests, Project Management Plan Updates, Project Documents Updates, Organizational Process Assets U

Control Quality
Inputs: Project Management Plan, Quality Metrics, Quality Checklists, Work Performance Data, Approved Change Requests,
Tools/Techniques: Seven Basic Quality Tools, Statistical Sampling, Inspection, Approved Change Requests Review
Outputs: Quality Control Measurements, Validated Changes, Verified Deliverables, Work Performance Information, Change

Plan Human Resources Management


Inputs: Project Management Plan, Activity Resource Requirements, Enterprise Environmental Factors, Organizational Proces
Tools/Techniques: Org. Charts and Position Descriptions, Networking, Org. Theory, Expert Judgment, Meetings
Outputs: Human Resources Management Plan

Acquire Project Team


Inputs: HR Management Plan, Enterprise Environmental Factors, Organizational Process Assets
Tools/Techniques: Pre-assignment, Negotiation, Acquisition, Virtual Teams, Multi-criteria Decision Analysis
Outputs: Project Staff Assignments, Resource Calendars, Project Management Plan Updates

Develop Project Team


Inputs: HR Management Plan, Project Staff Assignments, Resource Calendars
Tools/Techniques: Interpersonal Skills, Training, Team-building Activities, Ground Rules, Colocation, Recognition and Rewards,
Outputs: Team Performance Assessments, Enterprise Environmental Factors Updates

Manage Project Team


Inputs: HR Management Plan, Project Staff Assignments, Team Performance Assessments, Issue Log, Work Performance Repo
Tools/Techniques: Observations and Conversation, Project Performance Appraisals, Conflict Management, Interpersonal Skills
Outputs: Change Requests, Project Management Plan Updates, Project Documents Updates, Enterprise Environmental Facto

Plan Communications Management


Inputs: Project Management Plan, Stakeholder Register, Enterprise Environmental Factors, Organizational Process Assets
Tools/Techniques: Comm. Requirements Analysis, Comm. Technology, Comm. Models, Communication Methods, Meetings
Outputs: Communications Management Plan, Project Documents Updates

Manage Communications
Inputs: Communications Management Plan, Work Performance Reports, Enterprise Environmental Factors, Organizational P
Tools/Techniques: Comm. Technology, Comm. Models, Communication Methods, Information Management Systems, Perfor
Outputs: Project Communications, Project Management Plan Updates, Project Documents Updates, Organizational Process
Control Communications
Inputs: Project Management Plan, Project Communications, Issue Log, Work Performance Data, Organizational Process Asse
Tools/Techniques: Information Management Systems, Expert Judgment, Meetings
Outputs: Work Performance Information, Change Requests, Project Management Plan Updates, Project Documents Update

Plan Risk Management


Inputs: Project Management Plan, Project Communications, Project Charter, Stakeholder Register, Enterprise Environmental
Tools/Techniques: Analytical Techniques, Expert Judgment, Meetings
Outputs: Risk Management Plan

Identify Risks
Inputs: Risk Management Plan, Cost Management Plan, Quality Management Plan, HR Management Plan, Scope Baseline, A
Tools/Techniques: Documentation Reviews, Information Gathering Techniques, Checklist Analysis, Assumptions Analysis, Diag
Outputs: Risk Register

Perform Qualitative Risk Analysis


Inputs: Risk Management Plan, Scope Baseline, Risk Register, Enterprise Environmental Factors, Organizational Process Asse
Tools/Techniques: Risk Probability and Impact Assessment, Probability and Impact Matrix, Risk Data Quality Assessment, Risk
Outputs: Project Documents Updates

Perform Quantitative Analysis


Inputs: Risk Management Plan, Cost Management Plan, Schedule Management Plan, Risk Register, Enterprise Environmenta
Tools/Techniques: Data Gathering and Representation Techniques, Quantitative Risk Analysis and Modeling Techniques, Exper
Outputs: Project Documents Updates

Plan Risk Responses


Inputs: Risk Management Plan, Risk Register
Tools/Techniques: Strategies for Negative Risks or Threats, Stategies for Positive Risks or Opportunities, Contingent Response
Outputs: Project Management Plan Updates, Project Documents Updates

Control Risks
Inputs: Project Management Plan, Risk Register, Work Performance Data, Work Performance Reports
Tools/Techniques: Risk Reassessment, Risk Audits, Variance and Trend Analysis, Technical Performance Measurement, Reserve
Outputs: Work Performance Information, Change Requests, Project Management Plan Updates, Project Documents Update

Plan Procurement Management


Inputs: Project Management Plan, Requirements Documentation, Risk Register, Activity Resource Requirements, Project Sch
Tools/Techniques: Make-or-buy Analysis, Expert Judgment, Market Research, Meetings
Outputs: Procurement Management Plan, Procurement Statement of Work, Procurement Documents, Source Selection Crite
Conduct Procurements
Inputs: Procurement Management Plan, Procurement Documents, Source Selection Criteria, Seller Proposals, Project Docume
Tools/Techniques: Bidder Conference, Proposal Evaluation Techniques, Independent Estimates, Expert Judgment, Advertising,
Outputs: Selected Sellers, Agreements, Resource Calendars, Change Requests, Project Management Plan Updates, Project D

Control Procurements
Inputs: Project Management Plan, Procurement Documents, Agreements, Approved Change Requests, Work Performance R
Tools/Techniques: Contract Change Control System, Procurement Performance Reviews, Inspections and Audits, Performance
Outputs: Work Performance Information, Change Requests, Project Management Plan Updates, Project Documents Update

Close Procurements
Inputs: Project Management Plan, Procurement Documents
Tools/Techniques: Procurement Audits, Procurement Negotiations, Records Management System
Outputs: Closed Procurements, Organizational Process Assets Updates

Identify Stakeholders
Inputs: Project Charter, Procurement Documents, Enterprise Environmental Factors, Organizational Process Assets
Tools/Techniques: Stakeholder Analysis, Expert Judgment, Meetings
Outputs: Stakeholder Register

Plan Stakeholder Management


Inputs: Project Management Plan, Stakeholder Register, Enterprise Environmental Factors, Organizational Process Assets
Tools/Techniques: Expert Judgment, Meetings, Analytical Techniques
Outputs: Stakeholder Management Plan, Project Documents Updates

Manage Stakeholder Engagement


Inputs: Stakeholder Management Plan, Communications Management Plan, Change Log, Organizational Process Assets
Tools/Techniques: Communication Methods, Interpersonal Skills, Management Skills
Outputs: Issue Log, Change Requests, Project Management Plan Updates, Project Documents Updates, Organizational Proce

Control Stakeholder Engagement


Inputs: Project Management Plan, Issue Log, Work Performance Data, Project Documents
Tools/Techniques: Information Management Systems, Expert Judgment, Meetings
Outputs: Work Performance Information, Change Requests, Project Management Plan Updates, Project Documents Update
tional Process Assets

Organizational Process Assets

ates, Project Documents Updates

erformance Information, Enterprise Environmental Factors, Organizational Process Assets

pdates, Project Documents Updates

onmental Factors, Organizational Process Assets

cuments Updates

al Process Assets

n, Project Charter, Stakeholder Register


ion Making Techniques, Questionaires & Surveys, Observations, Prototypes, Benchmarking, Context Diagrams, Document Analysis
rocess Assets

ise Environmental Factors, Organizational Process Assets

x, Verified Deliverables, Work Performance Data

ments Updates

x, Work Performance Data, Organizational Process Assets

roject Documents Updates, Organizational Process Assets Updates

al Process Assets

onal Process Assets

tatement, Enterprise Environmental factors, Organizational Process Assets

ter, Activity Cost Estimates, Enterprise Environmental factors, Organizational Process Assets
ating, Project Management Software
nts, Resource Calendars, Project Scope Statement, Risk Register, Resource Breakdown Structure, Enterprise Environmental Factors, Orga
timating, Group Decision Making Techniques, Reserve Analysis

agrams, Activity Resource Requirements, Resource Calendars, Activity Duration Estimates, Project Scope Statement, Risk Register, Projec
e Optimization Techniques, Modeling Techniques, Leads and Lags, Schedule Compression, Scheduling Tool
ment Plan Updates, Project Documents Updates

chedule Data, Organizational Process Assets


chniques, Modeling Techniques, Leads and Lags, Schedule Compression, Scheduling Tool
ent Plan Updates, Project Documents Updates, Organizational Process Assets Updates

Process Assets

ster, Enterprise Environmental Factors, Organizational Process Assets


mating, Three-point Estimating, Reserve Analysis, Cost of Quality, Project Management Software, Vendor Bid Analysis, Group Decision M

chedule, Resource Calendars, Risk Register, Agreements, Organizational Process Assets


nding Limit Reconciliation

zational Process Assets


, Performance Reviews, Project Management Software, Reserve Analysis
Plan Updates, Project Documents Updates, Organizational Process Assets Updates

on, Enterprise Environmental Factors, Organizational Process Assets


Design of Experiments, Statistical Sampling, Additional Quality Planning Tools, Meetings
Project Documents Updates
easurements, Project Documents

nizational Process Assets Updates

pproved Change Requests, Deliverables, Project Documents, Organizational Process Assets


quests Review
ance Information, Change Requests, Project Management Plan Updates, Project Documents Updates, Organizational Process Assets Upda

ors, Organizational Process Assets

Recognition and Rewards, Personnel Assessment Tools

, Work Performance Reports, Organizational Process Assets


ement, Interpersonal Skills,
prise Environmental Factors Updates, Organizational Process Assets Updates

zational Process Assets


ation Methods, Meetings

l Factors, Organizational Process Assets


nagement Systems, Performance Reporting
s, Organizational Process Assets Updates
rganizational Process Assets

roject Documents Updates, Organizational Process Assets Updates

Enterprise Environmental Factors, Organizational Process Assets

ent Plan, Scope Baseline, Activity Cost Estimates, Activity Duration Estimates, Stakeholder Register, Project Documents, Procurement Doc
ssumptions Analysis, Diagramming Techniques, SWOT Analysis, Expert Judgment

rganizational Process Assets


a Quality Assessment, Risk Categorization, Risk Urgency Assessment, Expert Judgment

, Enterprise Environmental Factors, Organizational Process Assets


odeling Techniques, Expert Judgment

ties, Contingent Response Strategies, Expert Judgment

nce Measurement, Reserve Analysis, Meetings


roject Documents Updates, Organizational Process Assets Updates

Requirements, Project Schedule, Activity Cost Estimates, Stakeholder Register, Enterprise Environmental Factors, Organizational Process

ents, Source Selection Criteria, Make-or-buy decisions, Change Requests, Project Documents Updates
Proposals, Project Documents, Make-or-buy Decisions, Procurement Statement of Work, Organizational Process Assets
ert Judgment, Advertising, Analytical Techniques, Procurement Negotiations
nt Plan Updates, Project Documents Updates

ests, Work Performance Reports, Work Performance Data


s and Audits, Performance Reporting, Payment Systems, Claims Administration, Records Management System
roject Documents Updates, Organizational Process Assets Updates

Process Assets

zational Process Assets

tional Process Assets

ates, Organizational Process Assets Updates

roject Documents Updates, Organizational Process Assets Updates


Document Analysis
vironmental Factors, Organizational Process Asset

ment, Risk Register, Project Staff Assignments, R

Analysis, Group Decision Making Techniques


tional Process Assets Updates
uments, Procurement Documents, Enterprise Environmenta

rs, Organizational Process Assets

Vous aimerez peut-être aussi