Vous êtes sur la page 1sur 3

REPUBLIC OF THE PHILIPPINES CLIENT: PROVINCIAL GOVERNMENT OF LANAO DEL NORTE

PROVINCIAL GOVERNMENT OF LANAO DEL NORTE

PROJECT: METRO ILIGAN REGIONAL INFRASTRUCTURE CONSULTANT: PACIFIC CONSULTANT INTERNATIONAL in association with
DEVELOPMENT PROJECT (MIRIDP) FILIPINAS DRAVO CORP. (FDC)
PROVINCIAL ROAD PROJECT SUSTAINABLE ECOSYSTEMS INTERNATIONAL CORPORATION
PH - P191 (SUSTEC)

SEGMENT 1B: (FATIMA - TAGOLOAN - BALOI ROAD) CONTRACTOR: HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO. LTD.

WORKSHEET FOR COMPRESSIVE STRENGTH OF CONCRETE CYLINDER


(AASHTO T 22)

Tested by: Date Tested:


(Name / Designation) Load Dial Calibration Factor: None

Compressive Strength Type of


Load Dial Corrected Breakage
Concrete Mix Concrete Cylinder Tested (Mpa)
Lab. Ref. Date Reading Load
Part of Structure Required at (Cone/
REMARKS
No. Sampled Result
Slump W / C Weight Height Diameter Area Age 28 Days Shear/
Class (days) (kN) (kN) (min.) Columnar)
(mm) Ratio (gm.) (cm.) (cm.) (cm2)

12/21/08 12/30/08 13256 30.2 15.12 179.553 9.00 325 18.10


12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00

Submitted by: Noted by:

LLOYD R. PONCE ROMULO C. CASTAÑEDA


Materials Engineer II Materials Engineer II
Contractor Consultant
REPUBLIC OF THE PHILIPPINES CLIENT: PROVINCIAL GOVERNMENT OF LANAO DEL NORTE
PROVINCIAL GOVERNMENT OF LANAO DEL NORTE

PROJECT: METRO ILIGAN REGIONAL INFRASTRUCTURE CONSULTANT: PACIFIC CONSULTANT INTERNATIONAL in association with
DEVELOPMENT PROJECT (MIRIDP) FILIPINAS DRAVO CORP. (FDC)
PROVINCIAL ROAD PROJECT SUSTAINABLE ECOSYSTEMS INTERNATIONAL CORPORATION
PH - P191 (SUSTEC)

SEGMENT 2: (LINAMON - MATUNGAO - PANTAO-RAGAT ROAD) CONTRACTOR: HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO. LTD.

WORKSHEET FOR COMPRESSIVE STRENGTH OF CONCRETE CYLINDER


(AASHTO T 22)

Tested by: Date Tested:


(Name / Designation) Load Dial Calibration Factor: None

Compressive Strength Type of


Load Dial Corrected Breakage
Concrete Mix Concrete Cylinder Tested (Mpa)
Lab. Ref. Date Reading Load
Part of Structure Required at (Cone/
REMARKS
No. Sampled Result
Slump W / C Weight Height Diameter Area Age 28 Days Shear/
Class (days) (kN) (kN) (min.) Columnar)
(mm) Ratio (gm.) (cm.) (cm.) (cm2)

12/21/08 12/30/08 13256 30.2 15.12 179.553 9.00 325 18.10


12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00

Submitted by: Noted by:

LLOYD R. PONCE ROMULO C. CASTAÑEDA


Materials Engineer II Materials Engineer II
Contractor Consultant
REPUBLIC OF THE PHILIPPINES CLIENT: PROVINCIAL GOVERNMENT OF LANAO DEL NORTE
PROVINCIAL GOVERNMENT OF LANAO DEL NORTE

PROJECT: METRO ILIGAN REGIONAL INFRASTRUCTURE CONSULTANT: PACIFIC CONSULTANT INTERNATIONAL in association with
DEVELOPMENT PROJECT (MIRIDP) FILIPINAS DRAVO CORP. (FDC)
PROVINCIAL ROAD PROJECT SUSTAINABLE ECOSYSTEMS INTERNATIONAL CORPORATION
PH - P191 (SUSTEC)

SEGMENT 3: (KAUSWAGAN - DELABAYAN - MUNAI ROAD) CONTRACTOR: HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO. LTD.

WORKSHEET FOR COMPRESSIVE STRENGTH OF CONCRETE CYLINDER


(AASHTO T 22)

Tested by: Date Tested:


(Name / Designation) Load Dial Calibration Factor: None

Compressive Strength Type of


Load Dial Corrected Breakage
Concrete Mix Concrete Cylinder Tested (Mpa)
Lab. Ref. Date Reading Load
Part of Structure Required at (Cone/
REMARKS
No. Sampled Result
Slump W / C Weight Height Diameter Area Age 28 Days Shear/
Class (days) (kN) (kN) (min.) Columnar)
(mm) Ratio (gm.) (cm.) (cm.) (cm2)

12/21/08 12/30/08 13256 30.2 15.12 179.553 9.00 325 18.10


12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00
12/21/08 12/30/08 0 9.00

Submitted by: Noted by:

LLOYD R. PONCE ROMULO C. CASTAÑEDA


Materials Engineer II Materials Engineer II
Contractor Consultant