#4 @ 9 in. C/C
#3 @ 9 in. C/C
#4 @ 9 in. C/C
#3 @ 9 in. C/C
#4 @ 9 in. C/C
DEPTH = 5 in
#3 @ 9 in. C/C
Weight
Dia. Length No. No.3 No.4 No.5 No.6
Shorter Bottom 3 2.27 10 13
3 2.27 10 13
Longer Bottom 3 4.19 5 12
3 4.19 5 12
Shorter Top 4 0.96 19 18
3 0.78 19 8
Longer Top 4 1.60 10 16
4 1.25 10 12
Shorter Hangers 3 1.22 2 1
Longer Hangers 3 2.42 0 0
Total weight in kgs: 61 49 0 0 G.Total= 110
Volume of Concrete = 45.72 Cft Dry vol. = 77.4 Unit Unit Rate Amount
Steel (40), Cost per kg = 40 Rs. Cement= 8.9 Bags @ 400.00 3540
Steel (60), Cost per kg = 72 Rs. Sand = 22.1 Cft @ 15.00 332
Concrete per Cft = 250.00 Rs. Aggregate 44.3 Cft @ 100.00 4426
Total Cost of Slab = 19350 Rs. Steel = 110.0 Kgs @ 72.00 7920
Total Material Cost = 16218