300250
rot
‘CORREL / NIB TO SUPPOAT:
NON-TOWER SLAB.
3500
[EXPANSION GAP ” TOWER SLAB
L
T12@ 1000/6
MAIN BARS.
16
T10@ 1000/6 TO MATCH WITH
HORIZONTAL TIES OF WALL.
:WALL VERTICALS BARS
Ni
[B/(CORBEL REINF. PROVIDED BY
STRUCTURAL CONSULTANTS.
‘CONST. JOINT
f ‘CAST THE WALL UPTO FROM THIS
LEVEL USING DOKA JUMP FORM
| tr2a T1010 Be PROVIDED AS
“BYLL-OUT BARS
20 ig
roo
|
—t
“ORBEL PORTION
7
‘ep
JIS FILL UP THIS AREA WITH SOME MATERIAL
|] SUGGESTION FOR MATERIAL TO BE USED
|| FORFILLING UP THE AREA CAPABLE OF
Ha — 1 stoPpinc THe CONCRETE REQUIRED)
(CAST THE WALL UPTO THIS LEVEL
USING DOKA JUMP FORM
TALL CONCRETE ARE FMC OF M0 GRADE,
QUERIES:
1. TS THE METHOD SHOWN FEASIBLE
DRAWING ALRIGHT.
{& SHRINKAGE,
‘THE PORTION,
‘& NEW CONCRETE,
2. IF YES, PROCESS OF CASTING AS INDICATED INTHE
43, TYPE OF CONCAETE TO 8€ USED TO PREVENT CREEP
4, ISITPOSSIBLE TO USE SHOTCRETE FOR CASTING
5. MAKING SURE OF PROPER BONDING BETWEEN OLD
6, CONSTRUCTION JOINTS TREATMENTS (F REQUIRED)
CONCRETE TO BE POURED FROM HERE
{5-T12 PULL-OUT BARS BENT TO SHAPE
2 NIB/CORBEL TO BE CASTED WITH
PART OF THE WALL
{18MM THK. SHUTTERING
6716
NIB/CORBEL TO BE CASTED WITH PART OF THE WALL
LATER ON WHEN DOKA SYSTEM HAS JUMPED ABOVE.
THE CORBEL LEVEL USING LOCAL SHUTTERING.