Vous êtes sur la page 1sur 1
300250 rot ‘CORREL / NIB TO SUPPOAT: NON-TOWER SLAB. 3500 [EXPANSION GAP ” TOWER SLAB L T12@ 1000/6 MAIN BARS. 16 T10@ 1000/6 TO MATCH WITH HORIZONTAL TIES OF WALL. :WALL VERTICALS BARS Ni [B/(CORBEL REINF. PROVIDED BY STRUCTURAL CONSULTANTS. ‘CONST. JOINT f ‘CAST THE WALL UPTO FROM THIS LEVEL USING DOKA JUMP FORM | tr2a T1010 Be PROVIDED AS “BYLL-OUT BARS 20 ig roo | —t “ORBEL PORTION 7 ‘ep JIS FILL UP THIS AREA WITH SOME MATERIAL |] SUGGESTION FOR MATERIAL TO BE USED || FORFILLING UP THE AREA CAPABLE OF Ha — 1 stoPpinc THe CONCRETE REQUIRED) (CAST THE WALL UPTO THIS LEVEL USING DOKA JUMP FORM TALL CONCRETE ARE FMC OF M0 GRADE, QUERIES: 1. TS THE METHOD SHOWN FEASIBLE DRAWING ALRIGHT. {& SHRINKAGE, ‘THE PORTION, ‘& NEW CONCRETE, 2. IF YES, PROCESS OF CASTING AS INDICATED INTHE 43, TYPE OF CONCAETE TO 8€ USED TO PREVENT CREEP 4, ISITPOSSIBLE TO USE SHOTCRETE FOR CASTING 5. MAKING SURE OF PROPER BONDING BETWEEN OLD 6, CONSTRUCTION JOINTS TREATMENTS (F REQUIRED) CONCRETE TO BE POURED FROM HERE {5-T12 PULL-OUT BARS BENT TO SHAPE 2 NIB/CORBEL TO BE CASTED WITH PART OF THE WALL {18MM THK. SHUTTERING 6716 NIB/CORBEL TO BE CASTED WITH PART OF THE WALL LATER ON WHEN DOKA SYSTEM HAS JUMPED ABOVE. THE CORBEL LEVEL USING LOCAL SHUTTERING.

Vous aimerez peut-être aussi