Dear Mr. Nezar,
We refer to the above subject and Project and with reference to the Project BID revised
documents received from your side and scope of work required. We are pleased to enclose
here with the subject offer.
We will be happy to be given the chance to meet with you for any necessary explanations of
the offer particulars.
We are keen to demonstrate our capability and ability to carry out this project work and
continue our intended long-term business relationship.
Best regards,
C.R. No.: 41292 – P.O. Box: 37269, Doha, Qatar – Tel:+974 44649172 – Fax:+974 44649206 Page | 1
MechaTronics ﻣﻴﻜﺎﺗﺮﻭﻧﻴﻜﺲ
Electromechanical Contractor W.L.L ﻡ.ﻡ.ﻟﻤﻘﺎﻭﻻﺕ ﺍﻟﻜﻬﺮﺑﺎء ﻭﺍﻟﻤﻴﻜﺎﻧﻴﻜﺎﺫ
Qatar، Doha، P.O. Box 37269 C.R. No. 41292 41292 .ﺕ. ﺱ37269 .ﺏ. ﺹ، ﺍﻟﺪﻭﺣﺔ،ﻗﻄﺮ
Tel.+(974) 44649172 Fax. +(974) 44649206 +974 44649206 : ﻑ+974 44649172 : ﺕ
B‐ Scope of work:
Supply and install of the MEP works for the above mentioned project as per the tender
drawings, received specifications, and as detailed in below.
Electrical Vendor List.
Item Item Description Origin Series / Model Scope
Europe/ ABB, MEM or Supply & Install
1 Power Panels
India approved equal
Oman Cable or Supply & Install
2 LV CABLES & WIRES Oman
approved equal
ICMS, Exmet, Supply & Install
3 Cable Tray & Trunking Qatar/ UAE Pioneer or approved
equal
SMARTr or Supply & Install
4 GI Conduit Singapore
approved equal
Clipsal, Decoduct or Supply & Install
5 PVC Conduit UAE
approved equal
Italy / Scame, Katko or Supply & Install
6 Isolators
Finland approved equal
Contactum, MEM, Supply & Install
7 Wiring Devices UAE / UK Deta or approved
equal
8 Lighting Fixture Install only
Legrand, Leviton Supply & Install
9 Telephone & Data (Outlet only) Europe
or approved equal
Canada/ Mircom, Zeta or Supply & Install
10 Fire Alarm System
USA approved equal
Intelon, Linel or Supply & Install
11 Access Control System UAE/USA approved equal
C.R. No.: 41292 – P.O. Box: 37269, Doha, Qatar – Tel:+974 44649172 – Fax:+974 44649206 Page | 2
MechaTronics ﻣﻴﻜﺎﺗﺮﻭﻧﻴﻜﺲ
Electromechanical Contractor W.L.L ﻡ.ﻡ.ﻟﻤﻘﺎﻭﻻﺕ ﺍﻟﻜﻬﺮﺑﺎء ﻭﺍﻟﻤﻴﻜﺎﻧﻴﻜﺎﺫ
Qatar، Doha، P.O. Box 37269 C.R. No. 41292 41292 .ﺕ. ﺱ37269 .ﺏ. ﺹ، ﺍﻟﺪﻭﺣﺔ،ﻗﻄﺮ
Tel.+(974) 44649172 Fax. +(974) 44649206 +974 44649206 : ﻑ+974 44649172 : ﺕ
HVAC Vendor List
Item Item Description Origin Series / Model Scope
GCC Beta Supply &
GCC Betecad
Install
1 Air Outlet Qatar KMC
or approved equal
Plumbing and drainage Vendor List
Item Item Description Origin Series / Model Scope
GCC Hepworth Supply & Install
1 Drainage Pipes UPVC
or approved equal
UK CRANE Supply & Install
UK Hattersaly
2 Plumbing valves
Eu/India Pegler
or approved equal
Kuwait Adasani Supply & Install
3 PPR Pipes
or approved Equal
4 Drainage accessories Excluded
C.R. No.: 41292 – P.O. Box: 37269, Doha, Qatar – Tel:+974 44649172 – Fax:+974 44649206 Page | 3
MechaTronics ﻣﻴﻜﺎﺗﺮﻭﻧﻴﻜﺲ
Electromechanical Contractor W.L.L ﻡ.ﻡ.ﻟﻤﻘﺎﻭﻻﺕ ﺍﻟﻜﻬﺮﺑﺎء ﻭﺍﻟﻤﻴﻜﺎﻧﻴﻜﺎﺫ
Qatar، Doha، P.O. Box 37269 C.R. No. 41292 41292 .ﺕ. ﺱ37269 .ﺏ. ﺹ، ﺍﻟﺪﻭﺣﺔ،ﻗﻄﺮ
Tel.+(974) 44649172 Fax. +(974) 44649206 +974 44649206 : ﻑ+974 44649172 : ﺕ
FIRE Protection Vendor List
Item Item Description Origin Series / Model Scope
Oman Aljazeera Supply & Install
India Jindal
1 Firefighting Pipes (GI steel ‐ ERW)
India Surya
or approved equal
UAE Firex Supply & Install
2 Fire extinguisher
or approved equal
USA Kidde Supply & Install
3 FM200 system
or approved equal
India National Supply & Install
4 Grooved Fitting
or approved equal
USA Globe Supply & Install
5 Sprinkler EU/Asian Rapidrop
or approved equal
C‐ Important Notes:
Mechatronics shall have safe, clean & clear storage area to store its equipment and
material by main contractor. Mechatronics will provide the lock and store keeper.
Mechatronics shall have staff & labor free usage of the premises facilities including
those of the main contractor during the wok period (free water and electricity
consumption, air-conditioned Site office areas, toilets, Lifts, fork lift, Site cranes, etc).
Mechatronics will provide its staff with desks and laptops as needed.
Our prices are based on attached BOQ and copper prices per ton as per our offer
mention date and we have the right to claim for the related items cost difference if the
price increases along the construction order release.
Mechatronics did not receive any approved drawing stamped by Kahramma or Civil
defense and our budgetary price based on received drawings.
Mechatronics offer based on above mention vendor list since we are not received
project vendor list for existing building so, if any conflict between both brands for
interface. We will change to existing brand with extra cost to be considering as variation
order.
Lighting Fixtures considered as installation only.
Telephone & Data system considered as outlets only and any other active or passive
components such as racks, switches, server or PABX are excluded.
TAB work for Existing Work and Tie in from land lord are excluded.
C.R. No.: 41292 – P.O. Box: 37269, Doha, Qatar – Tel:+974 44649172 – Fax:+974 44649206 Page | 4
MechaTronics ﻣﻴﻜﺎﺗﺮﻭﻧﻴﻜﺲ
Electromechanical Contractor W.L.L ﻡ.ﻡ.ﻟﻤﻘﺎﻭﻻﺕ ﺍﻟﻜﻬﺮﺑﺎء ﻭﺍﻟﻤﻴﻜﺎﻧﻴﻜﺎﺫ
Qatar، Doha، P.O. Box 37269 C.R. No. 41292 41292 .ﺕ. ﺱ37269 .ﺏ. ﺹ، ﺍﻟﺪﻭﺣﺔ،ﻗﻄﺮ
Tel.+(974) 44649172 Fax. +(974) 44649206 +974 44649206 : ﻑ+974 44649172 : ﺕ
Firefighting: considered this project is fit out project (zone control station, landing
valves, risers and fire hose cabinets) already existing, and Mechatronics are going to
execute work on entire site sprinklers network and connect with zone control station.
Sprinklers: considered K-factor 5.6 sprinklers.
Firefighting Pipes: considered ERW Black steel pipes Sch.40.
FM 200 Gases: considered only 4 rooms (30 KG Each).
Plumbing: project considered fit out project (waste stacks, soil stacks, vent stacks, core
toilets, cold and hot water source with shut off valves and central water heater) to be
existing and mechatronics are going to work on entire site like (new pantries, drainage
of Fan coil units).
Plumbing valves: considered to be ball or gate valves (thermostatic valves, mixers or
balancing valves are out of scope).
Plumbing pipes: based on PP-R pipes for hot and cold water and PVC pipes for drain.
Sanitary fixtures & Electric water heaters: out of scope.
ACMV: project considered fit out project (FAHUs, VAVs, chilled water risers, Fresh air
duct, Chilled water tie in valves and Exhaust air fans with duct for core toilets) to be
existing and mechatronics are going to work on entire site like (Fan coil units c/w
hookups, duct work for FCUs, insulation of FCUs duct, chilled water pipes and
insulation, distributing of fresh air duct after VAV connection, Air outlets and Volume
dampers).
Chilled Water Pipes: considered Black Steel ERW pipes Sch.40.
Chilled Water Insulation: considered fiber glass 50mm thickness with 64 kg/m3
density.
Duct Material: Considered to be GI not fire rated.
Duct Insulation: considered fiber glass 25mm thickness with 24 kg/m3 density
Exhaust Air Fans: Out of scope.
Electrical Rooms AC: served by FCUs not CRAC units.
VAV Box: out of scope.
Mechatronics offer not included Civil defense approval fees or any authority fees
Mechatronics offer not consider MEP design work of designer fees
D‐ Completion, Maintenance & Warranty:
The warranty period for all our system and equipment shall be 400 days from the date
of successful test and commission.
C.R. No.: 41292 – P.O. Box: 37269, Doha, Qatar – Tel:+974 44649172 – Fax:+974 44649206 Page | 5
MechaTronics ﻣﻴﻜﺎﺗﺮﻭﻧﻴﻜﺲ
Electromechanical Contractor W.L.L ﻡ.ﻡ.ﻟﻤﻘﺎﻭﻻﺕ ﺍﻟﻜﻬﺮﺑﺎء ﻭﺍﻟﻤﻴﻜﺎﻧﻴﻜﺎﺫ
Qatar، Doha، P.O. Box 37269 C.R. No. 41292 41292 .ﺕ. ﺱ37269 .ﺏ. ﺹ، ﺍﻟﺪﻭﺣﺔ،ﻗﻄﺮ
Tel.+(974) 44649172 Fax. +(974) 44649206 +974 44649206 : ﻑ+974 44649172 : ﺕ
The day to day maintenance, regular wear and tear and/or defects that may arise due to
mishandling of equipment / system is excluded.
E‐ Facilities Provided by Others:
The Following Facilities shall be provided, free of charge, for the completion of our
scope of work:
Adequate and stable Electrical Power / Water Supply required for
Testing & Commissioning. (Flushing & Pressure Testing of pipes)
Cranes and hoists as required for installations and
Loading/Unloading of MEP materials/equipment.
On-site Security.
On-site Temp. Power supply and potable water.
Sufficient MEP storage Area. Shelved, shaded and weather
protected.
Unrestrained access to site areas and related gate passes and
permissions.
Steel Cutting, Wall Chiseling, Chasing as required for MEP
penetrations.
Staff & labor free usage of the premises facilities including those of
the main contractor during the wok period (free water and electricity
consumption, air-conditioned, toilets, Lifts, fork lift, Site cranes, etc.).
Removals of project scrap material.
F‐ Standard Exclusions:
High Voltage Works.
Material offloading.
Builders’ Works including equipment foundation, Plinths, ceiling or wall openings,
cutting, patching, manholes, concrete, excavations, backfilling, digging, protections,
sleeves other than PVC for Mechanical & Electrical Opening Sealants whether fire
sealing (Fire Stop)of openings in fire walls, or Ordinary Sealants and finishes after
installation for any MEP opening.
Architectural Louvers and Air inlets/outlets at the building Façade/Elevation or where
specific Architectural/Aesthetic considerations are to be accounted.
Mirrors or any other architectural object of the likes.
Channel Gratings, Manhole Covers, Inertia bases, Floating Floors, or any structural
vibration Restraint/control.
Underground Pipe / Cable Protection (Ducts and Sleeves or special protection for road
crossing and concrete encasement).
C.R. No.: 41292 – P.O. Box: 37269, Doha, Qatar – Tel:+974 44649172 – Fax:+974 44649206 Page | 6
MechaTronics ﻣﻴﻜﺎﺗﺮﻭﻧﻴﻜﺲ
Electromechanical Contractor W.L.L ﻡ.ﻡ.ﻟﻤﻘﺎﻭﻻﺕ ﺍﻟﻜﻬﺮﺑﺎء ﻭﺍﻟﻤﻴﻜﺎﻧﻴﻜﺎﺫ
Qatar، Doha، P.O. Box 37269 C.R. No. 41292 41292 .ﺕ. ﺱ37269 .ﺏ. ﺹ، ﺍﻟﺪﻭﺣﺔ،ﻗﻄﺮ
Tel.+(974) 44649172 Fax. +(974) 44649206 +974 44649206 : ﻑ+974 44649172 : ﺕ
G‐ Mobilization period:
14 working days; starting from your order and down payment.
H‐ Execution Period:
Execution Period shall be 9 continuous working Months from down payment
based on civil work to be complete.
C.R. No.: 41292 – P.O. Box: 37269, Doha, Qatar – Tel:+974 44649172 – Fax:+974 44649206 Page | 7
MechaTronics ﻣﻴﻜﺎﺗﺮﻭﻧﻴﻜﺲ
Electromechanical Contractor W.L.L ﻡ.ﻡ.ﻟﻤﻘﺎﻭﻻﺕ ﺍﻟﻜﻬﺮﺑﺎء ﻭﺍﻟﻤﻴﻜﺎﻧﻴﻜﺎﺫ
Qatar، Doha، P.O. Box 37269 C.R. No. 41292 41292 .ﺕ. ﺱ37269 .ﺏ. ﺹ، ﺍﻟﺪﻭﺣﺔ،ﻗﻄﺮ
Tel.+(974) 44649172 Fax. +(974) 44649206 +974 44649206 : ﻑ+974 44649172 : ﺕ
I‐ Payment terms:
1. 40% advanced payment.
2. Payments during project duration against work progress & monthly payment
statements.
3. 100% at startup & commissioning.
J‐ Prices:
For the performance of MEP Work for the above mentioned project as per Scope of
work shown above, Mechatronics shall be Budgetary a Total of: QRs 13,000,000 /-
(Only Thirteen million Qatari Riyals).
Note: kindly consider +/- 10% surplus from total project budget
K‐ Delay:
We shall be compensated for any works stoppage due to Force Majeure the actual
losses shall be calculated by us and submitted for your approval.
We shall not be responsible for the delay caused to our works and /or the project
completion by any third parties and/or due to delays in payments.
We reserve the right to claim all the damages caused due to such delays.
L‐ Validity:
This offer is valid for one month from the date of issuing it.