Académique Documents
Professionnel Documents
Culture Documents
Unit
Item No. Description Unit Qty
Material
A. GENERAL REQUIREMENTS
1.00 Mobilization & Demobilization lot 1.00
2.00 Temporary Facilities (Barracks Rental)/Board Up lot 1.00
3.00 Cleaning & Disposal (daily) lot 1.00
4.00 Security Services lot 1.00
5.00 Safety Requirement lot 1.00
6.00 Power and Water Consumption lot 1.00
7.00 As-Built lot 1.00
1.06 Pinlights ( T&B-1pc.) - 7watts, with Clear Glass diffuser set/s 5.00 750.00
7.00 Painting
7.01 Doors and Jambs - Spray finished (lacquer type) set/s 5.00 850.00
7.02 Ceilings m² 51.35 140.00
7.03 Cornice lm 63.00 88.00
7.04 Baseboard lm 37.50 88.00
7.05 ACU Moulding lm 9.00 88.00
7.06 Wall Painting (Non Accent)-Premix m² 140.00 140.00
8.00 Amenities
Bedbox (60" x 75") w/ side table on top Laminate, w/
8.01 1/2" Phenolic Board,incl angular support - Plain Paint set/s 5.00 8,500.00
Finish
8.02 Dresser Mirror & Frame set/s 5.00 1,800.00
8.03 Dresser Counter set/s 5.00 2,000.00
8.04 Dresser Chair (OSM) set/s 5.00
Headboard w/ fabric (Using Uratex Foam & German
8.05 set/s 5.00 3,500.00
Leatherette incl. canvass image)
8.06 Push Cart (OSM) set/s 5.00
9.00 T & B
9.01 Water Closet incl Accessories (OSM-Labor Only) set/s 5.00
9.02 Lavatory incl accessories (OSM-Labor Only) set/s 5.00
9.03 Bidet (OSM-Labor Only) sets 5.00
9.04 Shower Head LED w/ mixer (OSM-Labor Only) sets 5.00
9.05 Tissue Holder (OSM) Labor Only pc/s 5.00
9.06 6mm thk Mirror @ T & B sets 5.00 1,550.00
9.07 Waterproofing works, elastomeric (6 coats) sq.m 14.60 350.00
9.08 Ceiling exhaust (OSM-Labor Only) rm 5.00
9.09 Lavatory Faucet (OSM-Labor Only) set 5.00
9.10 S/S floor drain (OSM-Labor Only) set 5.00
9.11 Grab Bar ( OSM ) (Labor Only) pc 5.00
Unit
Item No. Description Unit Qty
Material
I. PREMIUM ROOMS 7
1.00 Ceiling Works
Gypsum Board on Metal Frame (Main Room + Ante
1.01 m² 69.65 468.00
Room)
1.02 1/4" thk Hardiflex on Metal Frame (T&B) m² 12.60 488.00
Drop Ceiling -Paint Finish w/ 2" x 2" Good Lumber for
1.03 set/s 7.00 5,000.00
Ceiling Design
1.04 Lighting Fixture - Drop light, 7W set/s 7.00 3,000.00
Pinlights ( Mainroom-2pcs ) and ( Foyer-1pc ) - 3watts,
1.05 set/s 7.00 650.00
with Frosted Glass diffuser
1.06 Pinlights ( T&B-1pc.) - 7watts, with Clear Glass diffuser set/s 7.00 750.00
7.00 Painting
7.01 Doors and Jambs - Spray finished (lacquer type) set/s 7.00 850.00
7.02 Ceilings m² 69.65 140.00
7.03 Cornice lm 93.80 88.00
7.04 Baseboard lm 58.10 88.00
7.05 ACU Moulding lm 12.60 88.00
7.06 Wall Painting (Non Accent)-Premix m² 225.12 140.00
8.00 Amenities
Bedbox (60" x 75") w/ side table on top Laminate, w/
8.01 1/2" Phenolic Board,incl angular support - Plain Paint set/s 7.00 8,500.00
Finish
8.02 Dresser Mirror & Frame set/s 7.00 1,800.00
8.03 Dresser Counter set/s 7.00 2,000.00
8.04 Dresser Chair (OSM) set/s 7.00
Headboard w/ fabric (Using Uratex Foam & German
8.05 set/s 7.00 3,500.00
Leatherette incl. canvass image)
8.06 Push Cart (OSM) set/s
9.00 T & B
9.01 Water Closet incl Accessories (OSM-Labor Only) set/s 7.00
9.02 Lavatory incl accessories (OSM-Labor Only) set/s 7.00
9.03 Bidet (OSM-Labor Only) sets 7.00
9.04 Shower Head LED w/ mixer (OSM-Labor Only) sets 7.00
9.05 Tissue Holder (OSM) Labor Only pc/s 7.00
9.06 6mm thk Mirror @ T & B sets 7.00 1,550.00
9.07 Waterproofing works, elastomeric (6 coats) sq.m 20.44 350.00
9.08 Ceiling exhaust (OSM-Labor Only) rm 7.00
9.09 Lavatory Faucet (OSM-Labor Only) set 7.00
9.10 S/S floor drain (OSM-Labor Only) set 7.00
9.11 Grab Bar ( OSM ) (Labor Only) pc 7.00
Unit
Item No. Description Unit Qty
Material
II. Deluxe Rooms 3
1.00 Ceiling Works
Gypsum Board on Metal Frame (Main Room + Ante
1.01 m² 37.98 468.00
Room)
1.02 1/4" thk Hardiflex on Metal Frame (T&B) m² 6.48 488.00
Drop Ceiling -Paint Finish w/ 2" x 2" Good Lumber for
1.03 set/s 3.00 5,000.00
Ceiling Design
1.04 Lighting Fixture - Drop light, 7W set/s 3.00 3,000.00
Pinlights ( Mainroom-2pcs ) and ( Ante room-1pc ) -
1.05 set/s 9.00 650.00
3watts, with Frosted Glass diffuser
1.06 Pinlights ( T&B-1pc.) - 7watts, with Clear Glass diffuser set/s 3.00 750.00
7.00 Painting
7.01 Doors and Jambs - Spray finished (lacquer type) set/s 6.00 850.00
7.02 Ceilings m² 39.60 140.00
7.03 Cabinet set/s 3.00 1,500.00
7.04 Baseboard lm 39.60 88.00
7.05 ACU Moulding lm 5.40 88.00
7.06 Wall Painting (Non Accent)-Premix m² 95.04 140.00
8.00 Amenities
Bedbox (60" x 75") w/ side table on top Laminate, w/
8.01 1/2" Phenolic Board,incl angular support - Plain Paint set/s 3.00 8,500.00
Finish
8.02 Dresser Mirror & Frame set/s 3.00 1,800.00
8.03 Dresser Counter set/s 3.00 2,000.00
8.04 Dresser Chair (OSM) set/s 3.00
8.05 Closet Cabinet set/s 3.00 3,500.00
Headboard,incl canvass image wall & Ceiling,LED strip
8.06 set/s 3.00 15,000.00
light
8.07 Ledge set/s 3.00 650.00
8.09 Push Cart (OSM) set/s
9.00 T & B
9.01 Water Closet incl Accessories (OSM-Labor Only) set/s 3.00
9.02 Lavatory incl accessories (OSM-Labor Only) set/s 3.00
9.03 Bidet (OSM-Labor Only) sets 3.00
9.04 Shower Head LED w/ mixer (OSM-Labor Only) sets 3.00
9.05 Tissue Holder (OSM) Labor Only pc/s 3.00
9.06 6mm thk Mirror @ T & B sets 3.00 1,550.00
9.07 Waterproofing works, elastomeric (6 coats) sq.m 10.08 350.00
9.08 Ceiling exhaust (OSM-Labor Only) rm 3.00
9.09 Lavatory Faucet (OSM-Labor Only) set 3.00
9.10 S/S floor drain (OSM-Labor Only) set 3.00
9.11 Grab Bar ( OSM ) (Labor Only) pc 3.00
Unit
Item No. Description Unit Qty
Material
D. HALLWAY
Ceiling Works
1.0 Gypsum Ceiling w/ metal studs sq.m 67.20 468.00
3.0 Ultra Slim Square Pinlight (LED) 4"- 6 Watts Warmwhite pcs 28.00 850.00
Floor Finishes
1.0 500 x 500 Carpet Tiles (OSM) sq.m
Wall Finishes
1.0 Wall Paper (OSM) sq.m
2.0 1 x 1 solid wood door accent paint finish lm 90.00 128.00
3.0 Room Signage (OSM) rms
Painting works
1.0 Ceilings sq.m 67.20 140.00
2.0 Walls sq.m 248.16 140.00
3.0 Cornice lm 103.40 88.00
4.0 Center Moulding lm 206.80 88.00
5.0 Baseboard lm 89.90 88.00
E. TRADEWORKS
Plumbing & Sanitary Works, Incl Tapping Point
(Plumbing and Sanitary, Hot & Cold Water Line - PPR,
1.0 Installation of all fixtures, conrete coring, Bracket and room 15.00 20,000.00
supports, valves and accessories, Aircon Drain for 9 Split
Type Unit Aircons, etc.)
Unit
Item No. Description Unit Qty
Material
Electrical Works, Incl. Tapping Point (wires, cables,
conduit, outlets, switches, sub-feeder lines, installation
2.0 of RCP, USB Port w/ plates & speaker surround with room 15.00 30,000.00
platform), 2 - Fire Alarm (tap to nearest existing), wirings
for hallway pinlights , etc.
F. Others
Elevator façade
1.00 Granite red alphi (See actual specs installed) sq.m 9.80 6,800.00
Restoration of ceiling (if needed) @ kitchen & Rentable
2.00 sq.m 43.20 680.00
space
10.00 Doors and Jambs - Spray finished (lacquer type) set/s 2.00 2,000.00
Unit
Item No. Description Unit Qty
Material
DIRECT COST
Profit
Admin
General Requirements
TOTAL AMOUNT VAT INCLUSIVE
Cost per room 15
Prepared By:
Date: 1/25/2017
ural Works,Wet Works,
- 275,000.00 275,000.00
120,000.00 - 120,000.00 120,000.00
60,000.00 - 60,000.00 60,000.00
30,000.00 - 30,000.00 30,000.00
10,000.00 - 10,000.00 10,000.00
25,000.00 - 25,000.00 25,000.00
20,000.00 - 20,000.00 20,000.00
10,000.00 - 10,000.00 10,000.00
- - -
- - -
80.00 17,371.20 8,272.00 25,643.20
- - -
- - -
- - -
- - -
98.00 11,520.00 8,820.00 20,340.00
- - -
- - -
132.00 9,408.00 8,870.40 18,278.40
132.00 34,742.40 32,757.12 67,499.52
68.00 9,099.20 7,031.20 16,130.40
68.00 18,198.40 14,062.40 32,260.80
68.00 7,911.20 6,113.20 14,024.40
1/25/2017