vinodincr4  ESTIMATE AND PLANNING
Member 09/02/2007 12:25 AM

Join Date: Apr 2007
Posts: 8 How can we calculate the accurate manpower required aganist a particular job. For eg... How much
manpower is required for 100 ton steel structure fabrication? ....my question is whether any formula base
we have for this calculation. If any body have please reply.

Interested in this topic? By joining CR4 you can "subscribe" to 
this discussion and receive notification when new comments are added.
Join CR4, The Engineer's Place for News and Discussion!

Re: ESTIMATE AND PLANNING #1
Del the cat 09/02/2007 5:23 AM

Re: ESTIMATE AND PLANNING #3
chtank 09/02/2007 11:17 PM In reply to #1

Re: ESTIMATE AND PLANNING #5
Del the cat 09/03/2007 12:33 AM In reply to #3

#2
Anonymous  Re: ESTIMATE AND PLANNING
Poster 09/02/2007 10:59 PM

See every fabrication job have many factors ­ design, location, finishing, time frame etc. Any how find the
basic raw materials cost of the job. then count labour cost @ 30% ­ 40% of material cost, then calculate

http://cr4.globalspec.com/thread/11647/ESTIMATE­AND­PLANNING 1/5
10/29/2016 CR4 ­ Thread: ESTIMATE AND PLANNING
quantity of very skilled, skilled, semi skilled & unskilled man days. Now find local labour rates & divide
labour cost by man days, you will find the required man power +10%. Put it in a bar chart if possible.

MILTON SIKDER, CGM, TSHPL

If still doubts ­ miltonsikder@rediffmails.com

#4
cnpower  Re: ESTIMATE AND PLANNING
Guru 09/03/2007 12:11 AM

Its not a difficult job to work out, but it s really only a estimate work. you cannt calculate accurately it. it
depends on various conditions, machine, skill, knowledge and sites and region etc. you can find a budget
table in your region from local associaton.

and many software can be selected for it. for example exel or project etc.
 

Join Date: Sep 2006
Location: CHINA
Posts: 2958
Good Answers: 14

#6
Akram Husain  Re: ESTIMATE AND PLANNING
Member 09/03/2007 12:38 AM

Join Date: Aug 2007
Posts: 9
I believe you are talking about structural steel fabrication. Productivity depends on type ( Light steel ,
medium steel and Heavy steel ) region ( Europe, Asia, Arab world) and yes offcourse on the man­incharge
too.

Normally consider 60­70Mhrs /Ton for Light steel , 50­60Mhrs /Ton for medium steel and 20­40Mhrs /Ton
Heavy steel I am giving you the range to accomodate other factors like region and personnel performences.
These manhours are only for prefabrication works. For erection they will be different depending on various
factors like height , type of joints, location­ region, skill of manpower , etc.

Once you calculate the total Manhours then divide by 10hrs to get Mandays and thereafter calculate
Manpower by dividing Mandays by duration.

Ex Medium Steel T = 100Tons

Manhours = 100x50 = 5000Mhrs

Hrs Per Day = 10Hrs

Mandays = 500MDays

Available duration is 30 days

Manpower Required = 16.7 ay 18

Now you should be knowing how to allocate welders , fitters, fabricators , grinders , helpers , riggers ,
foremen , etc­ This will be Direct Manpower Only

http://cr4.globalspec.com/thread/11647/ESTIMATE­AND­PLANNING 2/5
10/29/2016 CR4 ­ Thread: ESTIMATE AND PLANNING
You could call me 00971504108 654

Akram

#7
AbdulWasay  Re: ESTIMATE AND PLANNING
Commentator 09/03/2007 12:55 AM

There is no set formulae to calculate man power required to weld 100 tons of steel, for there are many
variables: 1) Process of Welding, 2) Thickness or weight per foot of work piece 3) Design of Weld joints, 4)
Type of filler metal, 5) Position of Welding 6) Design of structure and whether any thermal treatment to
work piece or weld is required. If you have answer to the above variables, some one would definetly help
you by giving you the parameters of calculation. Mind you! If you want to weld steel structure in shop and
on the location at site and at hieght, would vary a lot by cost. You may get help for man­power estimating
Join Date: Aug 2007 from manual published by Gulf Publishing Company. Cost of welding varies country to country.
Posts: 98
Good Answers: 3

#8
Gordon Couger  Re: ESTIMATE AND PLANNING In reply to #7
Commentator 09/03/2007 1:38 AM

Join Date: Apr 2007
Posts: 55
Don't forget to allow for weather, unforeseeable problems, acts of war and God if you are bidding on the job
and it has a performance clause that makes you pay if you run over past the due date for the end of the job.

If your crew is used to to working in 30 C summers and you get 3 weeks of 40 C weather the productivity
drops through the floor. The same is true for a crew used to 40C in 50C weather or even worse. Two weeks
of thunderstorms will drive you mad as well.

Good Luck 

Gordon

#9
MUKULMAHANT  Re: ESTIMATE AND PLANNING
Guru 09/03/2007 1:41 AM

Depends on these:

How callous the original designer :­was he lazy ­and used only 2 or 3 Heavy Standard sections( fast
fabrication)­­­or was he absolutely a penny pincher­­ never overdesigned and used all kinds of
optimum/minimum sections(Slow Fab.)
How generously equipped was your fabshop? EOT cranes,Manipulators,rotators?
  How generous was intermediate storage in your fabshop floor?
How powerful your Gas Cutter/AirPlasma Cutter and were there enough of these with capable
Join Date: Dec 2006 operators?Were Consumables amply/readily issued
Location: Were there a good size mix of Powerful MIG/MAG, SMAW,TIG,Stick Weld sets?
Long.92E,Lat.26N Was there a Chaser/Despatcher/Expediter constantly monitoring at various stages of operation?
Posts: 1342
Good Answers: 14
No formulas possible ­­ If somebody tells you these are possible ­­take with a pinch of salt .

http://cr4.globalspec.com/thread/11647/ESTIMATE­AND­PLANNING 3/5
10/29/2016 CR4 ­ Thread: ESTIMATE AND PLANNING
#10
Pepper  Re: ESTIMATE AND PLANNING
Power­User 09/03/2007 4:42 PM

   
Welcome vinodincr4,
Join Date: Nov 2006
Location: South of Do you have within your organization staff who have performed the type of work you are bidding. They are
Alabama an invaluable resource even if their experience is not identical to the project at hand.
Posts: 196
I can't imagine competitively bidding work I have no experience in or access to someone who does. I do
enjoy stretching the envelope where I have just enough experience to grow into a new project.

Good luck

__________________
Believe none of what you hear......and only half of what you see.

#11
saca03142  Re: ESTIMATE AND PLANNING
Associate 09/03/2007 6:54 PM

Join Date: Jul 2007
Posts: 31
I recommend you using statistics, you may use a calculator or MS Excel, consider this, how much can an
employee produce per hour or day, once you havve the answer, devide 100 ton for the amount produce by
one person and that should tell you howmany employees you need.

Also, you need to consider age, experience physical strength or skill.

#12
Anonymous  Re: ESTIMATE AND PLANNING
Poster 09/03/2007 10:48 PM

'Berger Estimating manuals" used to carry ways to give you

answers based on detail or on general 'per sq. ft.` costs in the U.S.

There was man/hour data once you provided some construction details.

Re: ESTIMATE AND PLANNING #13
Anonymous 12/11/2009 3:40 AM
Poster

#14
johnk  Re: ESTIMATE AND PLANNING
Participant 08/24/2010 4:02 AM

Join Date: Aug 2010
Posts: 3
www.costeng.com people seem to be developing some interesting estimating software that provides
automatic access to manhour databases. I see they have modules for piping and I believe other disciplines
are 'in the wind'

http://cr4.globalspec.com/thread/11647/ESTIMATE­AND­PLANNING 4/5
10/29/2016 CR4 ­ Thread: ESTIMATE AND PLANNING
Register to Reply 14 comments
Back to top
Interested in this topic? By joining CR4 you can "subscribe" to 
this discussion and receive notification when new comments are added.
Join CR4, The Engineer's Place for News and Discussion!

Users who posted comments: Copy to Clipboard
AbdulWasay (1); Akram Husain (1); Anonymous Poster (3); chtank (1); cnpower (1); Del the cat (2); Gordon Couger (1); johnk (1); MUKULMAHANT (1); Pepper
(1); saca03142 (1)

Previous in Forum: Piezo electric   Next in Forum: power pack problem
You might be interested in: Wire Assembly Fabrication Services, Machine Design and Machine Fabrication Services, Fiberglass Fabrication Services

Advertisement

"Common sense is genius dressed in its working clothes." ­­ Ralph Waldo Emerson

All times are displayed in US/Eastern (EDT) (Register to change time zone)

© 2016 IEEE GlobalSpec. All rights reserved. Reproduction in whole or in part without permission is prohibited. The information contained on this site is by users for users and is provided for
information purposes only and does not constitute advice. Any views or opinions expressed by users are personal to them and do not represent the views or opinions of IEEE GlobalSpec. You
should check any information and use your own judgment or seek expert advice before doing or not doing anything on the basis of what you read here. IEEE GlobalSpec does not verify or
warrant the accuracy or completeness of any information on this site and, to the extent permitted by law, IEEE GlobalSpec shall not be liable for any loss, damage or expense incurred by
reliance on it or for any dealings you have with users or other third parties that take place using or facilitated by this site.

Home   |   Site Map   |   Contact   |   Accessibility   |   Nondiscrimination Policy   |   Privacy & Opting Out of Cookies

http://cr4.globalspec.com/thread/11647/ESTIMATE­AND­PLANNING 5/5

Vous aimerez peut-être aussi