Vous êtes sur la page 1sur 7

Method Statement for the Dubai International Airport Passenger

ALECFO-IES205
Dismantling of Joinery Units in Hermes Building – Fit-Out of Dubai Duty Free Areas
MSS-001
Area in Concourse B Concourse B

MSS No.: IES205-MSS-001

Dubai International Airport Passenger Building Rev. No.: 00


Fit-Out of Dubai Duty Free Area – Concourse B
Date: 22-JANUARY-2015

METHOD STATEMENT
FOR
DISMANTLING OF JOINERY UNITS IN HERMES AREA AT CONCOURSE B

Client: Consultant: Contractor:


DUBAI DUTY FREE RETAIL CONCEPTS DESIGN AL JABER L.E.G.T ENGINEERING
P.O. Box 54354 P.O. Box 214976 AND CONTRACTING (ALEC) L.L.C
Dubai, U.A.E. Dubai, U.A.E. P.O Box 27639,
Dubai, U.A.E

1
Method Statement for the Dubai International Airport Passenger
ALECFO-IES205
Dismantling of Joinery Units in Hermes Building – Fit-Out of Dubai Duty Free Areas
MSS-001
Area in Concourse B Concourse B

INDEX
1. Purpose
2. Scope
3. References
4. Definitions & Abbreviations
5. Equipment’s
6. Procedure
6.1 Preliminary Activities / Approvals
6.2 Construction Activities
7. Supervision
8. Risk and control
9. Attachments
9.1 Sequence of work
9.2 Form work layout
9.3 Risk Assessment

Contract Authorization

Design Manager: QA/QC Manager: Safety Manager: Project Manager:

2
Method Statement for the Dubai International Airport Passenger
ALECFO-IES205
Dismantling of Joinery Units in Hermes Building – Fit-Out of Dubai Duty Free Areas
MSS-001
Area in Concourse B Concourse B

1.0 PURPOSE
This Method Statement provides the control sequence for the Dismantling of Display Furniture & Joiner Works for Hermes Area of
Duty Free Areas Concourse C in order to achieve compliance with the Contract Specifications and Drawings.
2.0 SCOPE
• Materials
• Application
• Inspection & Testing
• Final Approvals
• Risk Management
3.0 REFERENCES
3.1 Contract Drawings
4.0 DEFINITIONS AND ABBREVIATIONS
4.1 Client DUBAI DUTY FREE (DDF)
4.2 Consultant RETAIL CONCEPTS DESIGN (RCD)
4.3 Contractor AL JABER L.E.G.T ENGINEERING AND CONTRACTING (ALEC)
4.4 PM ALEC Project Manager
4.5 CM Construction Manager
4.6 DM Design Manager
4.7 SE Site Engineer
4.8 QCM QA/QC Manager
4.9 SM Safety Manager
4.10 LS Surveyor
4.11 LM Logistic Manager
4.12 MEP MEP Coordinator
4.13 ITP Inspection & Test Plan
4.14 MSS Method Statement Submittal
4.15 PQP Project Quality Plan
4.16 SCR Site Clarification Request

3
Method Statement for the Dubai International Airport Passenger
ALECFO-IES205
Dismantling of Joinery Units in Hermes Building – Fit-Out of Dubai Duty Free Areas
MSS-001
Area in Concourse B Concourse B

4.17 NCR Non-conformance Report


4.18 SD Approved Shop Drawing
4.19 CD Contract Drawing Issued for Construction
4.20 CL Check List
4.21 RA Risk Assessment
4.22 MRS Material Reference Schedule
4.23 IR Inspection Request
4.24 FM Foreman
4.25 SO Safety Officer
4.26 QCE Quality Control Engineer
4.27 DF&JW Display Furniture & Joinery Works

Responsible Person Controlling Document


5.0 Equipment’s
1) General toolbox
2) Drilling Machine
3) Titter
4) Scaffolding and Jacks
5) Hydraulic Pallet Trolley
6.0 PROCEDURE
6.1 General
1. All service’s isolated and made safe data, electricity CM
CRM
2. Ensure all constraints on operations have been identified and precautions are
taken and also appropriate area access has been obtained which is attached is the
risk assessment

3. Ensure all safety requirements specific to the task are identified and SM/QA/QCM
implemented.

4
Method Statement for the Dubai International Airport Passenger
ALECFO-IES205
Dismantling of Joinery Units in Hermes Building – Fit-Out of Dubai Duty Free Areas
MSS-001
Area in Concourse B Concourse B

4. All necessary equipment, personnel and other services required for the works
to be arranged and proper water, lighting, power to be ensured.

5. Ensure that all the retained finishes are protected in the demolition area. SM/QA/QCM
6. Ensure that work area is clear and safe.

6.2 Pre-construction
1. Ensure that Employee inductions and tool Box talks for discussing risks
assessment and identification and control measures of hazards are implemented. SM/CM SPECS/PQP

2. Area where the dismantling of joinery units takes place to be adequately


barricaded.

3. Safe access scaffold and working platform will be provided by the scaffold
department for the dismantling of joinery units with proper access ladder.

4. Only workers directly involved with work will be allowed in the area and warning
+ signs will be placed around the working area.

Responsible Person Controlling Document


7.0 Supervision
1. Constant supervision shall be provided during all dismantling activities by site
engineer. SE/CM/QCE SPECS/PQP

2. QCE

5
Method Statement for the Dubai International Airport Passenger
ALECFO-IES205
Dismantling of Joinery Units in Hermes Building – Fit-Out of Dubai Duty Free Areas
MSS-001
Area in Concourse B Concourse B

The site engineer and the foreman will be directly responsible for the dismantling
activities on site and the construction manager will have the overall responsibility,
however this is not a full time site appointment. The work will done through
specialist sub-contractor, and his senior supervision will be available on site as long
as this activity is ongoing.
8.0 Risk and Control SE/CM/QCE
1) Occupational and health assessment of activities will be carried out on entire
course of the job.

2) Environment controls (Dust and noise control) will be in place.

3) First aid facilities will be made available in the site.

4) Emergency procedures are in place and are communicated to the personnel ITL
employed at site.

Detailed risk assessment will be done & all possible hazards will be
identified.
In addition to the weekly tool box talks, Daily safety task instruction
meeting / daily safety training will be done before the
commencement of each shift and each new task.
All Vehicles will have valid licenses and passes before entering the
site.
PPE shall be issued to all personnel, this shall be job specific and will CM/SE
include but it is not limited to
Full body harness
Polycarbonate safety helmet
Safety Boots
Safety Harness
Hand Protection
Eye protection

6
Method Statement for the Dubai International Airport Passenger
ALECFO-IES205
Dismantling of Joinery Units in Hermes Building – Fit-Out of Dubai Duty Free Areas
MSS-001
Area in Concourse B Concourse B

Hearing Protection
Hi Viz vest with company logo
Gloves
Coverall for labours

Welfare facilities shall be provided, including chilled drinking water.

9.0 Attachments
1.0 Risk assessment RA
2.0 Sequence of the Work
3.0 Are H Layout
4.0 Photographs for the block required to be demolished