Académique Documents
Professionnel Documents
Culture Documents
Source of
S. No Name Village Loan 1st inst (US$) 2nd inst (US$)
Financing
33 Zar Bano Sultan abad 500 $ MFI HU 167 $ +5% 167 $ +5%
34 Shamim Akhter Sultan abad 500 $ MFI HU 167 $ +5% 167 $ +5%
Note:
1 Repayment includes service charges @ 5 % of principal amount on flat charge basis
2 The loan amount will be disbursed/collected in equivalent Pak Rupees on the prevailing
currency exchange rate.
3 The service charges are used contributing towards facilitating procurement of input/beehives,
transportation, support serrvices, monitoring, disbursement and collection of loans
urn Schedule
3rd inst (US$) 4th inst (US$) 5th inst (US$) Total Amount (US$)
put/beehives,
2010 Credit & Enterprise Development (CED) Expected Honey Productio
Mircofinance Initiative at the University of Houston (MFI UH)
d honey forecast
Total
416
256
MFi UH Status of Loan Recovery a
Cash Total
Received Per kg Amount 1st Inst 2nd Inst Default
Received Received
honey (kg) US$ US$ US$ US$ US$
US$ US$
26.5 3.63 96 25 121 121 0 229
0 3.63 0 25 25 25 0 325
27 3.63 96 50 146 146 0 554
Recoverable US$ Recovery
to date % to date
350 0.43
350 0.09
700 21
MFI UH Flood Status September 2010
Number of
Number of
Beehives
S. No Name Village Region Loan US$ Beehives
Damaged by
Before Floods
Floods
1 Zar Bano Sultanabad Gilgit 500 13 7
2 Shamim Sultanabad Gilgit 500 8 4
Total 1000 21 11
Honey US $ Grants
production required
40 742
22 424
62 1,166