Reference No. 180818-EFTL-TAB ( Mr. Talal Al Baker ) Subject : Additonal Civil Works
Date : 26-Aug-18
TOTAL
ITEM DESCRIPTION UNIT RATE QTY. UNIT
(QAR.)

Making of holes on walls for exhaust fans for


bathrooms including pvc pipe and replastering of
A
broken area only. Any external plaster is not
included.

1 Ground Floor N/A 3 Nos 240.00


2 First Floor N/A 5 Nos 400.00
3 Master Bath N/A 2 Nos 160.00
4 Penthouse N/A 2 Nos 160.00
5 Kitchen, Driver, Maid Room N/A 3 Nos 240.00
Additional blockworks for boundary wall on right side
B including coping beam and plaster on both sides and N/A 1 Lot 5,418.00
top

C Plastering of 3 External Shafts at right side N/A 1 Lot 6,056.25

Cutting of walls and replaster for DB transfer at


D N/A 1 Lot 816.00
ground floor

E Cutting of rearside canopy slab N/A 1 Lot 3,200.00

Right side ramp & stairs civil work(includes


F excavation for wall footing, blockworks, backfill & N/A 1 Lot 10,520.00
compaction, concrete, reinforcement & formworks)
G Additional Blockworks and Plaster Works

1 Ground Floor

Lift Area

Blockworks N/A 1 Lot 1,889.54


Plaster N/A 1 Lot 1,147.22
Lintel N/A 1 Lot 393.75

Al Sadd, Al Waab Street, Building No.38 , P.O.BOX: 39290, Doha – Qatar


Tel: + 974 4436 2525 Fax: +974 4427 9327 www.adsqatar.com Page 1 of 2
ADS/EFTL/TAB/QUO/07 : REV.02

American Design Source


2 First Floor
Lift Area
Blockworks N/A 1 Lot 1,189.61
Plaster N/A 1 Lot 722.26
Lintel N/A 1 Lot 393.75
Master Bathroom
Blockworks N/A 1 Lot 2,646.00
Plaster N/A 1 Lot 567.00
3 Penthouse
Lift Area
Blockworks N/A 1 Lot 1,100.15
Plaster N/A 1 Lot 785.82
Lintel N/A 1 Lot 393.75

Chipping of wall for shifting of 50mm electrical


conduit and replastering of wall(shifting of conduit N/A 1 Lot 350.00
will be done by electrical contarctor)
TOTAL: 38,789.10
Discount : -789.10
Final Amount after discount : 38,000.00
Notes :
1 Garbage disposal is not included. ADS can do but will charge owner per trip.
2 Only the items above are covered in thos quotation. Any additional works will be billed separately.

CONDITION OF QUOTATION

1. Payment terms: In cash or check.


2. 50% down payment and balance payment when 90% of the job is finished
3. Delivery & installation: 30-45 days as long as the site permits.
4. Price Valid for 10 days only.

With Regards,

AMERICAN DESIGN SOURCE CUSTOMER'S SIGNATURE

Al Sadd, Al Waab Street, Building No.38 , P.O.BOX: 39290, Doha – Qatar


Tel: + 974 4436 2525 Fax: +974 4427 9327 www.adsqatar.com Page 2 of 2

Vous aimerez peut-être aussi