Vous êtes sur la page 1sur 7
PROJECT NAME : JOB CODE PLANT LOCATION OWNER'S NAME WESTERN LIBYA GAS PROJECT, DESERT PLANT 0-2465-20 ‘WAFA PLANTS, DESER' ‘AGIP GAS BV LIBYAN BRAN P.O. NO. : P.2153-201N-A ITEM NO. = ALL ITEM ITEM NAME? ‘SHELL & TUBE HEAT EXCHANGER (C.S) DOCUMENT TITLE : HYDROSTATIC & PNEUMATIC TEST PROCEDURE TEEUE PURPOSE. FA FO, FAB c RESULT CODE: ASLAN ae NEXT ISSUE STATUS: FA.FO, FLA: ¢ REEUBMISSIONDATE: Fear oi bene sate Svs love Sider Siteonner oi stenets satay uae Cort PADEPT, c ReOerT RELATED DEFT. ¢ eoP | Pauw 17] DATE: COMPANY JOB, CONTRACTOR JOB NO. COMPANY DOE NO Px S07 -L-A-O7B: PURCHASER 00. NO. is] a-L v/ | lols Tu Aglp Go BY Sowrepmntiog Fresno g oN BIB DAEKYUNG MACHINERY & ENGINEERING CO.,LTD. we ‘ara fee: 2 Fissna = st = E E = — REV. NO. DESCRIPTION APPROVED BY | _PREPO BY. ai FOR APPROVAL = Fier ceny Pa Brest SRT A} ce eit! J fate FL As BujT SH Ue ‘VENDOR NAME 2 OF 7 HYDROSTATIC & PNEUMATIC PO NOH peeeereetes TEST PROCEDURE nod YI ‘TABLE OF CONTENTS Paragraph itle 10 Soope 20 Responsibilities 30 Procedure 40 Leak Test for Reinforcement of Opening 5.0 Dry-up Procedure after Hydrostatic test 60 Exhibit 3 OF 7 HYDROSTATIC & PNEUMATIC OG NO cipeen erecta TEST PROCEDURE REV.NO. a 10 ‘Scope 20 21 22 3.0 3 32 33 334 33.2 333 34 “This procedure describes the control methods of pressure test ofthe pressure vessel fabricated in scoordance with “ASME Code See.W, Div.1” and “job. Specification”. Responsibilities “The Mfg Sect Manager shall be responsible for performing the pressure test in accordance with this procedure, ‘The QC Sect Manager shall be responsible for monitoring the pressure test and checking the test results Procedure ‘Checking of the material identification such as coded marking Hydrostatic test shall be a QC Hold Point. ‘The QC Inspector shall check and verify the identification marking on the equipment Hydro test pressures are indicated on the approved shop draining. Pressure Gages ‘Two dial-indicating pressure gages shall be used in testing vessels. One is connected dirootly to the highest location of the vessel for correct indication of the test pressure, The other one is connected where it will be visible to the operator throughout duration of the test and shall be used pressure & time chart for Heat Exchanger. Indicating pressure gages shall preferably have dials graduated over a range of about double the intended maximum test pressure, but in no case the range shall be less than 14 nor more than 4 times test pressure. ‘The gages shall be calibrated against a standard Dead-weight tester or a calibrated master gage atleast every 6 months or at any time there is reason to believe that they ae in error. (To be submit calibration certificate) ‘The pressure in the equipment shall be increased gradually until the required test pressure has been reached.

Vous aimerez peut-être aussi