Académique Documents
Professionnel Documents
Culture Documents
ITEM
DESCRIPTION UNIT
NO.
1 PROPOSED BUILDING
I. Detailed Engineering Design lot
Estimated Direct Cost (EDC)
Materials
Detailed Engineering Design lot
TOTAL ITEM - I
TOTAL ITEM - II
III. SOIL POISONING sq.m.
Estimated Direct Cost (EDC)
Materials
Soil Treatment sq.m.
Subtotal
Total Estimated Direct Cost
Indirect Cost (IDC)
Overhead, Contingency, & Miscellaneous
Contractor Profit
VAT
Total Indirect Cost
TOTAL ITEM - IV
V. EARTHWORKS cu.m.
A. Excavation Works cu.m.
Estimated Direct Cost (EDC)
Labor
Foreman m-d
Heavy Equipment Operator m-d
Laborer m-d
Subtotal
Equipment Rental
Backhoe unit
Fuel, Oil, Lubricant , etc.,
Subtotal
Sub-Total - A
Sub-Total - B
Sub-Total - C
D. Earth fill w/ Compaction cu.m
Estimated Direct Cost (EDC)
Materials
Mixed Gravel cu.m
Subtotal
Labor
Foreman m-d
Heavy Equipment Operator m-d
L. E. Operator m-d
Laborer m-d
Subtotal
Equipment Rental
Road Grader unit
Vibratory Roller unit
Plate Compactor unit
Fuel, Oil, Lubricants, etc.
Subtotal
Sub-Total - D
TOTAL ITEM - V
TOTAL ITEM - VI
VII. REINFORCED STEEL WORKS kgs
Estimated Direct Cost (EDC)
Materials
10mmø x 6m kgs
12mmø x 6m kgs
16mmø x 6m kgs
20mmø x 6m kgs
25mmø x 6m kgs
28mmø x 6m kgs
# 16 G.I. Tie wire kgs
Subtotal
Labor
Foreman m-d
Steelman m-d
Laborer m-d
Subtotal
Equipment Rental
Bar Bender unit
Bar Cutter unit
Subtotal
Foreman m-d
Carpenter m-d
Laborer m-d
Subtotal
Equipment Rental
STEEL PIPE SCAFFOLDINGS lot
Subtotal
Sub-Total - A
Sub-Total - B
TOTAL ITEM - IX
X. ARCHITECTURAL FINISHES lot
A. Tile Works sq.m
Estimated Direct Cost (EDC)
Materials
600mm x 600mm Granite Tiles pcs
600mm x 600mm Ceramic Tiles pcs
Tile grout bags
Tile Adhesive bags
Portland Cement bags
Washed Sand cum
Subtotal
Labor
Foreman m-d
Mason m-d
Laborer m-d
Subtotal
Total Item - A
Total Item - B
Total Item - C
Total Item - D
Total Item - D
TOTAL ITEM - X
XI MECHANICAL WORKS
A. ACU INSTALLATION lot
Estimated Di+B267:B303rect Cost (EDC)
Material
ACU Ceiling Mounted 3HP
ACU Wall Mounted 2HP inverter
Subtotal
Foreman m-d
Electrician m-d
Laborer m-d
Subtotal
Sub-Total -A
B. Elevator Installation lot
Estimated Direct Cost (EDC)
Materials
Elevator System (800 kg Capacity) Set
Subtotal
Labor
Foreman m-d
Mechanic m-d
Labrer m-d
Subtotal
Sub-Total -B
C. Generator Installation lot
Estimated Direct Cost (EDC)
Materials
Generator Set (165 kva) with ATS and Wiring unit
Generator Housing lot
Subtotal
Labor m-d
Foreman m-d
Mechanic m-d
Carpenter m-d
Labrer
Subtotal
Sub-Total -C
D. Fire Alarm System Installation
Estimate Direct Cost (EDC)
Materials
Sprinkler head set
Fire Alarm Bell set
Smoke Detecto set
Fire Alarm Manual Pull Station set
Fire Alarm Control Panel unit
Dry Stand Pipe set
10 HP Fire Pump / Cetrifugal set
2 HP Jockey Pump / Vertical set
Fire Extiguisher pcs
Fire Hose Cabinet pcs
Fire Hose Double Jacket pcs
Fire Angle Vslve pcs
Siamese Twin Valve pcs
Electrical tape roll
2.0 mm2 TW roll
15 mmǿ PVC Pipe pcs
15 mmǿ PVC Coupling pcs
15 mmǿ PVC Locknut & Bushing pcs
2"ǿ GI Pipe pcs
1 1/2"ǿ GI Pipe pcs
1"ǿ GI Pipe pcs
2"ǿ x 1 1/2 GI Tee Reducer pcs
1 1/2 x 1 GI Tee Reducer pcs
1/2"ǿ GI elbow Reducer pcs
Cistern Tank Accessories lot
Subtotal
Labor m-d
Foreman m-d
Electrian m-d
Plumber m-d
Labrer
Subtotal
Total Estimated Direct Cost
Sub-Total -D
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
Php.
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
Php.
7%
8%
12%
Php.
Php.
MATERIAL Php.
LABOR COST Php.
TOTAL COST Php.
ITEM DESCRIPTION TOTAL ITEM COST DAYS WT.% COST PER DAY
1 PROPOSED BUILDING
A DETAILED ENGINEERING DESIGN Php days %
B ENGINEERING FIELD OFFICE Php days %
C SOIL POISONING Php days %
D CONSTRUCTION SAFETY AND HEALTH Php days %
E EARTHWORKS Php days %
F CONCRETE WORKS Php days %
G REINFORCED STEEL WORKS Php days %
H FORMS AND SCAFFOLDINGS Php days %
I MASONRY WORKS Php days %
J ARCHITECTURAL FINISHES Php days %
K PLUMBING WORKS Php days %
L ELECTRICAL WORKS Php days %
M MECHANICAL WORKS Php days %
N AUXILARIES Php days %
TOTAL COST Php days %
TOTAL DIRECT COST Php %