Académique Documents
Professionnel Documents
Culture Documents
----------------------------------------------------------------------------------------------------------------
Where,
Ps = Allowable shear capacity [included with corrosion allowance (total : 0 mm)] Ft = Applied working tension
----------------------------------------------------------------------------------------------------------------
= -6120 + (4 x 306/(1730/1000))
= -5412 kg -53064
N
(Fs1 / Ps)5/3 + (Ft1 / Pt)5/3= 0.016 ( It's OK!!
----------------------------------------------------------------------------------------------------------------
CHECKED BY SEISMIC DATA
= -6120 + (4 x 306/(1730/1000))
= -5412 kg -53064
N
(Fs1 / Ps)5/3 + (Ft1 / Pt)5/3= ( It's OK!! )
0.016
----------------------------------------------------------------------------------------------------------------
LOAD CASE SUMMARY
Base shear force (Fs)
Hydro Test, Condition : 408 kg 5 kN
Max. moment (M)
Wind, operating
Hydro condition:
Test, Condition : 306 kg-m 2 kN-m
Weight
Operating
Hydro Test,weight
Condition : : 7344 kg 60 kN
----------------------------------------------------------------------------------------------------------------
CHECKED BY WIND DATA
Fs = 4000 N (Hydro Test, operating condition)
Fs1= 1000 N ( Fs1 = Fs / n)
Ps= 15000 N
Ft= 0 N (Wind, operating condition), when 'Ft' less than zero(0)
Ft1= 0 N ( Ft1 = Ft / n )
Pt= 35000 N
Ft= -W + (4M/BCD)
= -6120 + (4 x 306/(1730/1000))
= -5412 kg -53064 N
(Fs1 / Ps)5/3 + (Ft1 / Pt)5/3= 0.016 ( It's OK!! )
----------------------------------------------------------------------------------------------------------------
N/mm2
N/mm2
N
mm