Vous êtes sur la page 1sur 26

FORCE MAINS:

NOT TO BE FORGOTTEN
ASSETS

WEFTEC 10 Bryon Livingston, P.E. – Black & Veatch


New Orleans, Louisiana Alireza Parhami, P.E. – Black & Veatch
October 2–6, 2010 Stacy Gallick – Johnson County Wastewater
Force Mains: Not-to-be-forgotten assets

Introduction

z Force Mains in a Collection System


z Overview of Johnson County’s System
z Coordination With Asset Management Plan
z System for Evaluating Force Mains

B&V Livingston | 2 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Force Mains in the Collection System


– Not Like the Other Pipelines

z No Access like Manholes in the Gravity System


z No Periods of Low Flow to Inspect or Maintain
z No Excess Capacity or Redundant Pipeline to Take
Out of Service
z Failure Can Create Dramatic Consequences
z Sink Holes
z Not Just Overflows
z Pressurized System

B&V Livingston | 3 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Catastrophic Events

“Failed Sewer Causes Street To Collapse” – St. Louis 2009 “This is Break No. 5” – Richmond, ON 2002

““Sewage Flowing Directly to Lake - Can’t Save 3 Homes” – Muskegon, 2007

B&V Livingston | 4 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Many Factors Impact Service Life of a Pipe


Soil
Characteristics
External Loads
Soil
Temperature Traffic
External Corrosion
Overburden

Contraction
Loads

Internal Corrosion

Water Characteristics

Bedding Condition and Material


Leakage
Movement
Design and Construction Practices

B&V Livingston | 5 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Johnson County Wastewater –


Asset management plan

z 2008 Developed Asset Management Plan


z Completed A Basic “Level 1” Review Of Most
Facilities
z Process Identified The Need For Additional
Information On Force Mains
z Force Mains Not The Typical Asset In The
Collection System

B&V Livingston | 6 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Background information

z Johnson County Wastewater (JCW) Serves


Communities In Northeast Johnson County Kansas
z System Contains 40 Miles Of Force Mains
z Sizes Vary From 4” To 42”
z Materials Primarily Ductile And Cast Iron With Some
PVC, HDPE And PCCP

B&V Livingston | 7 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Service area

z Serves 500,000
Customers
z Multiple Sewer
Districts
z 32 Lift Stations
z 2,100 Miles Of
Collection System
z 60 mgd Treatment
Capacity

B&V Livingston | 8 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

JCW’s asset management plan

z Established Process For Management Of Assets


– Treatment Plants, Lift Stations, Collection
System
z Established Rating And Terminology
z Identified Force Mains Required Unique Process

When Establishing an Asset Management Plan – Remember


to Allow For Modifications Based on Better Data

B&V Livingston | 9 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Asset management - method to


manage force mains
z Recognized Lack Of Data On Force Mains
z Actual Location Of Pipe In The Alignment
z Condition Of The Pipe
z Required Procedure To Prioritize And Establish
Methods For Collecting Data For Condition
Assessment
z Consistent With Existing Process
z Recognized Force Mains Require A Unique
Procedure

B&V Livingston | 10 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Force main procedure

z Inspection Prioritization Based On Risk Analysis


z Provide Procedure For Collection Of Data
Routinely And By Inspection
z Compatible With Asset Management Plan
Methodology
z Develop A Priortization Matrix That Is Flexible And
Easy To Use

B&V Livingston | 11 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Prioritization matrix

z Based Upon Risk Analysis Process


z Probability Of Failure (POF)
z Consequence Of Failure (COF)
z POF X COF = RISK
z Modified To Include Redundancy
z POF X COF X REDUNDANCY = Business Risk
Exposure

B&V Livingston | 12 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Factors for probability of failure

z Pipe Length
z Pipe Material
z Pipe Age
z Pipe Break Data
z Multiple Material In Pipeline

B&V Livingston | 13 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Probability of failure factors

Each
Parameter is
Weighted

Ratings
Established For
Each
Parameter

B&V Livingston | 14 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Factors for consequence of failure

z Pipe Diameter
z Pipe Alignment
z Pipe Physical Location
z No Manholes To Locate Pipeline
z Estimated Duration Of Service Interruption
z Land Use Adjacent To Pipeline

B&V Livingston | 15 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Consequence of failure factors

Each
Parameter is
Weighted

Ratings
Established For
Each
Parameter

B&V Livingston | 16 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Priority ranking results

POF x COF x
Redundancy =
Business Risk
Ranking

B&V Livingston | 17 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Force main inspection priorities

z Provide A Numerical Ranking Based On Business


Risk Exposure
z Method Allows Adjusting Of Weighting On Factors
To Meet Specific Concerns
z Revised in the Future Based on Data Collected

B&V Livingston | 18 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Inspection and condition assessment


procedure
z Develop A Standard Approach For Inspection Procedures
z Inspection Plan
z Evaluate Leak Detection
z Conduct Testing And Inspection
z Evaluate Data To Complete Condition Assessment
z Identify Inspection Technologies For Various Pipe Materials
z Ductile And Cast Iron
z PVC And HDPE
z Pre-stressed Concrete Cylinder Pipe (PCCP)

B&V Livingston | 19 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Relationship to asset management plan

z Builds Upon Level 1 Assessment Data


z Establishes Priorities For Force Mains Inspections
z Results Of Condition Assessment Compatible With
Existing Plan
z Provides The Condition Of The Pipe For Managing
As An Asset In Future Planning

B&V Livingston | 20 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Capital planning with results

B&V Livingston | 21 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Implementation of procedure

z Determine Priority Inspection From Matrix


Evaluation
z Collect Data And Conduct Inspection Of Pipeline
z Complete Condition Assessment Based On Field
Data
z Prioritize Pipeline For Rehabilitation Or
Replacement

B&V Livingston | 22 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Collection of data

z Implement Data Collection In Operation Work


Orders
z Following Form Developed From Review Of Several
Utilities
z Simple Is Better
z Complete Inspections Of Priority Pipelines
z Update Gis Information From Gathering Efforts

B&V Livingston | 23 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Work order data


collection

B&V Livingston | 24 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Force Mains: Not-to-be-forgotten assets

Conclusions

z Force Mains Require Unique Procedure In The


Asset Management Plan
z Condition Assessment Is A Difficult Task
z Prioritization of Pipelines Results in Better
Management of Assets

B&V Livingston | 25 WEFTEC 10 New Orleans, Louisiana October 2–6, 2010


Questions?
Bryon Livingston, P.E.
Email: livingstonb@bv.com

Stacy Galick
WEFTEC 10 Email: stacy.gallick@jcw.org
New Orleans, Louisiana
Alireza Parhami, P.E.
October 2–6, 2010
Email: parhamia@bv.com

B&V Livingston | 26 October 2–6, 2010