Vous êtes sur la page 1sur 2

Yarway Narvik Desuperheaters

PED/ATEX - Operating and Safety Instructions

Before installation these instructions must be fully read and understood

!! Read all warning labels fitted to the DSH* Installation


before operation or maintenance !!
Never open, dismantle or modify the assembly 1. Place the DSH* with the gasket onto the
whilst under pressure/temperature or other mounting flange and insert the nozzle
hazardous conditions. carefully into the branch pipe.
2. Ensure that the spray nozzle assembly is
Warning pointed with the direction of the steam flow
For safety reasons, it is important to take the before tightening the mounting bolts.
following precautions before you start work 3. Installation may be vertical or horizontal
on the DSH*: piping (use support in case of heavy weight),
1. Read all labels fitted to the DSH* and but the direction of water injection should
this sheet before installation, operation always be with the steam flow.
or maintenance. 4. When there are positive shut-off
2. Use DSH* for the intended purpose (according components in the water supply (including
contract/specification). electric actuators) then a safety relief
3. Remove the DSH* carefully from its valve, of an approved type, should be fitted
packaging, lifting by means of straps (heavy (see example in the IOM**).
weight) around the body. 5. Connection of electrical supplies and/or
4. Do not use the water inlet connection, yoke, air piping should be in accordance with
actuator or any of its accessories for lifting. the manufacturer’s instruction manual.
5. For installation of the DSH* use gaskets 6. Verify and adjust, if necessary, set
and bolting material in accordance with the points for air filter regulator and valve
relevant piping code (ASME/ B31.1 or EN) and positioner, following the manufacturer’s
free of ‘forces, moments and torques’. recommendations.
6. Additional mounting/modifications on DSH’s* 7. When satisfactory co-ordination between
are not allowed without approval from Yarway. signals and temperature are attained,
7. The line must be depressurized, drained, adjustment of the set point can be made
vented and cooled down before installation. and the system transferred to automatic
8. Handling of all DSH’s*, actuators and operation.
accessories must be carried out by personnel 8. Ensure easy access of the operating
trained in all aspects of manual, mechanical mechanism (actuator, positioner,
handling/lifting techniques and standard hand wheels, etc.) if applicable.
safety procedures, in case of doubt, consult
your Supervisor and/or safety officer. Category
9. Yarway does not accept liability for site work
performed under supervision of others. DSH’s* are manufactured in accordance with
10. Each DSH’s* water supply line should 2014/68/EC.
be protected with its own strainer with a
maximum element perforation size of 0.1 mm. Pressure/temperature limits are indicated:
11. Insulate the DSH* in accordance with # on the DSH* nameplate
plant requirements. # design code: ASME B16.34, EN 12516 or
12. Please, follow the procedure as detailed in ASME B31.1
the IOM**. # on the actuator name plate
13. The surface temperature as defined
in 2014/34/EC Annex II 2.2.1.2 of the Note
Desuperheater is a function of the system DSH* = Desuperheater
it is built into. When installed, the surface IOM** = Installation, Operation and
temperature cannot be controlled by the Maintenance manual
manufacturer.

www.pentair.com/valves © 2012 Pentair plc. All Rights Reserved. VCOSI-03351-EN 15/12


Yarway Narvik Desuperheaters
PED/ATEX - Operating and Safety Instructions

Final inspection Selection


Ensure that DSH’s* material of construction
Yarway DSH’s* have been tested, degreased, and pressure/temperature limits shown on the
dried and prepared according to service identification plate and according to the suitable
application. This should be carried out in code for the process conditions. If in doubt,
accordance with the relevant Yarway’s IOM** contact Yarway or your local representative.
and available upon request by: Yarway via our
website: www.pentair.com/valves Service life
Expected service life may vary upon condition of
State of delivery / Storage / service. Check unit at least once per 8000 hours
Selection / Service life or longer intervals based upon site experience.

State of delivery Spare parts


Yarway’s DSH’s* are delivered with protection
and tested according applicable QPF (Quality Use only genuine Yarway components.
Planning Form). Particular care should be All DSH’s* are identified by an identification
exercised when removing the DSH* from number, stamped on the identification plate.
its packaging and your special attention is Use this number when ordering spare parts.
required to check carefully that no damage has
occurred to flange faces, threading, actuators, Note
connecting pipes, etc. before installation. Check DSH* = Desuperheater
out IOM** - instructions before proceeding. IOM** = Installation, Operation and
Maintenance manual
Storage
For short term storage, up to 6 months, no
additional preservation is necessary. Retain
the DSH* in its original packaging in a clean,
dry indoor location. For long term storage, use
only a dry indoor location. Follow instructions
given in the IOM** before placing the DSH* into
service, replace stem packing and inspect other
components to ensure correct functioning.

PENTAIR VALVES & CONTROLS


www.pentair.com/valves

All Pentair trademarks and logos are owned by Pentair plc. All other brand or product names are trademarks or registered marks of their respective owners.
Because we are continuously improving our products and services, Pentair reserves the right to change product designs and specifications without notice.
Pentair is an equal opportunity employer. © 2016 Pentair plc. All rights reserved.

Vous aimerez peut-être aussi