SCHEDULE OF SLAB
PARALLEL TO SHORT SPAN PARALLEL TO LONG SPAN
SCHEDULE OF BEAMS
SCHEDULE OF COLUMNS
FLOOR LINE
FLOOR LINE
FLOOR BEAM
FLOOR LINE
SLAB ON GRADE
"Y"
"Y"
NOTES:
1.) SPLICING SHOULD BE LOCATED
@ MID-HEIGHT OF COLUMN
2.) "Y"- CLOSER SPACING OF COLUMN
TIES PER SET AS SPECIFIED