EXISTING CONCRETE STRUCTURE
REPORT REFERENCE: NR170359
REPORT ISSUE STATUS
01 [oscenterz7 2017] fra [env By [Ann gd [Res Lf
Issue Date Description | Prepared By — | Checked By —_| Approved By
REPORT FOR EXISTING CONCRETE
‘STRUCTURE
Proposed IMO Project
‘At Dubai Marina
= Dubai Emirate
rtrd - ei
seinen a SS enn reemtt Sa
Detar ‘Sharh
PO,Borcosse PO, Boe iH6
Tel 9071 25500042 Tet 14971 48864054 Tel 4871 8950857
Fae: 97 25800008 Fac: 90714 8864869 Fax 9871 853(gp 3) dell ad ae pally lal
‘AL HAT & AL MUKADDAM
For Geotechnical Works (L.L.C.)
TABLE OF CONTENTS
1. INTRODUCTION
2. FIELD WORKS
3. TEST RESULTS
TEST METHOD
BS 1881 Part 202
Jou REF _NRITOR [eave _osSePTeMaER DOT
‘PROPOSED MMO PROJECT
'AT DUBATWaRINA-DUBA
{EXISTING CONCRETE STRUCTURE(p93) Syall yaad Lect puially yglall
ALHAT& ALMUKADDAM [seen wnivaae [eure ce coraenao7
For Geotechnical Works (L:L.C.) | [raosecrsame PROPOSED uno mRoxecT
PROUECT LOCATION AT DUGAINARINA-DUBA
[EXISTING CONCRETE STRUCTURE
4.0. INTRODUCTION
Upon the request of M/s. “ZETAS Zemin Teknolojisi A.S.", non destructive testing works using
“SCHMIDT HAMMER’ were carried out at the site of the proposed IMMO project at Dubai Marina -
Dubai
‘The testing procedures adopted during this test are those specified in the British Standards reference
BS 1881 P Part 202: "Surface Hardness measurements by the rebound hammer”
2.0 FIELD WORKS
Field works commenced on 26" of December 2017 and was completed on the same day. A total of
six (6) piles were tested at the above mentioned site. Test locations were selected on site by the
contractor's Engineer supervision. Moreover, the tests were conducted horizontally
| 2 | PIA76-CL1 42.0+7.100
3
P1A-81-CL1 . 40.0 + 7.000
P1A61-CL1 . 40.0 + 7.000
P1A-53-CL1 38.0 +6.900
P1BT 48.0 +7.400
Note: The Schmidt Hammer is classed as an indirect test as it does not give a direct measurement of the
strength of the material. It simply gives an indication based on surface properties.
‘We appreciate the opportunity to be of assistance to you on this project. If you have further need of our
services, or if you have any enquiries regarding the results presented here in this report, please feel
{ree to contact our office at any time.