Vous êtes sur la page 1sur 5

Civil Engineer

Oil & Gas C ivil Engineering & C onstruction Services


C areer Level 5+ years of experience

Muhammad Usman
KSA C e ll #: +966-554629830/ +966-504487674,
Current Address: Old Indian villa, Street No. 18, KhobarJanubia,.Saudi Arabia
Home Country Cont.# : +92-3365604191(During Vacations)
E-mail : engr.malikusman@gmail.com

Summary:
I am working as a Civil Engineer since 5+ Years in Oil & Gas construction sector and have acquired
comprehensive experience in project/construction management with multidisciplinary engineers.
During my tenure, I gained considerable experience in different aspects of project management &
executions. My extensive experience spans from small to large scale construction companies in the
Pakistan as well as in the Kingdom of Saudi Arabia.

Skills:
Field Supervision:-

Site HSE, Survey Analysis,PCC & RCC Structures, Lay-outconformities, Geotechnical Works,
Borehole drillings,Conductorpipefixings, Oil & Gas Plant Civil Construction
works,Officebuildingconstructions,Erecting SteelStructure, Asphalt & Concrete Pavements,Civil
demolition Works, Supervision & Billings of Sub-contracts,

Analytical:-

WorkEstimates & Proposals, Quantity Survey, Material requests, Engineering drawing reviews, Red
marking of drawings, Site technical queries, Review or preparations of work procedures, Procurement
& logistic coordination, Liaison with clients for technical issues, Preparation of progress reportsetc.

QA/QC inspections &monitoring:-

Participating in reviews of quality management plan& ITPs of the company, Review of sub-
contractor’s quality plans. Inspection of civil works as per ITP, Quality supervision at various on-
going work,Managing of material receiving &testing reports, Essential document &record keeping.

CAREER HISTORY
Company :- S.A. KENTZ
(From Nov. 2014 to date)

KENTZ is an Ireland based Multinational Company; working in KSA for various Oil & Gas and Petro
Chemical projects of ARAMCO & SABIC respectively.

Current Project:

INSTALL SCADA SYSTEMS AT SAOO FIELDS - Saudi Arabia

Project Scope :

The purpose of this project is to support SAUDI ARAMCO’s objective of maximizing profitability
through optimizing reservoir management to maintain Arabian Light Crude production by installing
Supervisory Control and Data Acquisition (SCADA) systems for crude oil wells in North and South
Ghawar Area that includes Abqaiq, Ain Dar, Shedgum and Uthmaniyah fields.

1
Civil Engineer
Oil & Gas C ivil Engineering & C onstruction Services
C areer Level 5+ years of experience

As a CIVIL SUPERITENDENT:

Planning of the Project :

1- Preparatory meeting with the Construction Manager to agree detailed program covering all
aspects of the progression of the Project before construction on site begins.
2- Allocation of specified tasks to Project Engineer.

Project under construction:

1- Discussion and proper assessment of problems encountered by staff on site.


2- Ensuring that the method of work is up to date, efficient and in accordance with Company and
Client’s safety policies and H&S requirements.

Monitoring Performance:

1- Ensuring that all of the construction and installation shall be as per planning and within
specified budget.
2- Investigation and accountability for any deviations from budget Man-hours.
3- Ensuring that the control and exporting procedures are operated correctly on all site.

Organization on Site:

1- To ensure that construction organization is adequate and also every staff is fully aware about
their role and responsibilities.
2- Maintaining good relationship with clients.
3- Reporting to Construction Manager, on all aspects of construction in a detail and at intervals
determined by him.
4- Always ensuring compliance with the functional authority of the Construction Manager.
5- Giving advice to the Project Manager related to any desirable changes in the method of work
or on work practice and control.
6- Ensuring that work practices and installation meet the required quality standards.
7- Completely familiarize with the plan of execution, planned hours, material ratios as per
B.O.M.
8- Ensuring that daily histogram in maintained on all site happenings.
9- Ensuring that transport, tools, plant and equipment are maintained in proper working order.
10- Ensuring that every work shall be executed within the scope of our contract.
11- Ensuring that all dayworks are signed on daily basis.
12- Ensuring that all supervisors and foreman are fully conversant with the program and ratios of
the specified work.

Company:- ABDULLA FOUAD CONTRACTING COMPANY


(Dec. 2011 to Nov. 2014)

Projects:

 Upgrading of Abu-Ali Plant SAUDIARAMCOJubail


 Bonattis.p.a Base Yard ,Abu Haidriyah (Asphalt Work, Area: 6500 sqm)
 Upgrade of Fire Station,Khurasaniya Plant, SAUDI ARAMCO.
 Restoration of Asphalt and concrete work in KEMYA LLDPE Sea water cooling (RTRP)
Header Replacement (KEMYA PLANT, SABIC)

2
Civil Engineer
Oil & Gas C ivil Engineering & C onstruction Services
C areer Level 5+ years of experience

 Installation of Berm of Pipeline 56 in dia , 23 km from Khurasaniya to Rastanura. SAUDI


ARAMCO
 Earthwork ,Asphalt Work and Associated concrete work at Various GOSP of AINDAR and
SHEDGUM PLANT, SAUDI ARAMCO.

Project Scope:

 Development of new WIP (Water Injection Pumping) system. New WIP system includes new
combustion gas turbines CGTs & Booster pumps at Abu Ali Plant, Jubail.
 Development of new Salt Water Disposal SWD Plant
 Development of Abu Haidriyah Base yard, Bonattis.p.a ,Jubail.
 Development of Fire station at Khurasaniya Plant.
 Scope includes construction of different RCC foundations with Pedestals to support
Mechanical structures and E&I equipment.
 Concrete flooring inside of the plant as per standards.
 Earth work, Asphalt work and Associated concrete works inside and outside of the plant.
.
As a PROJECT ENGINEER:

1- To manage the construction activities with civil-team for civil phase of works at sitein
accordanceof sow &specifications of work.
2- To mobilize the material, equipment or manpower as per site conditions and requirements as
well as respective coordination with HR, procurement, technical section, QA/QC department
etc.
3- Technical meetings with ARAMCO PMT regarding work progress, site constraints, punch list
activities or any change orders of additional job requirements. Liaisingwith local
subcontractors or suppliers and vetting of the physical accomplishment reports or invoices.
4- Raising site technical queries, review of IFC drawings &monitoring revisions, finalizing red
marked drawings for As-built.
5- Prepare new work proposals &estimates, updating the work schedule for adjustments
according to changing conditions. Review or prepare work procedures for required
6- Ensuring that all of the executed work is as per specifications and related standards.
7- Ensuring that foreman is fully conversant with planned schedule, method of work and IFC
drawings parameters.
8- Ensuring that every work is completing by considering H&SE requirement.
9- Good relationship with the client to expedite the progress of the work.
10- Updating the punch lists closures with client for final clearance.
11- Meetings with Civil Superintendent, CM to discussed detailed program of execution before
the start of work on site.
12- Ensuring that work practices and installation meet the required quality standards.
13- Advising several site issues to management along with their remedial steps to nullify the
effects in progress of the Project.

Company:- ECHO WEST INTERNATIONAL PVT. LTD.


(Sep. 2010 to Dec. 2011)

Project:
Reconstruction of DHQ Complex, Bagh-AJK
Project Scope:

 Reconstruction of complete District comprises of Municipality services and Government


offices including judiciary system, Health and Education system which were damaged due to
earth quake effects (2005).

3
Civil Engineer
Oil & Gas C ivil Engineering & C onstruction Services
C areer Level 5+ years of experience

As a SITE ENGINEER:

1. Site management including proper logistic management in coordination with procurement and
quality control department.
2. Inspection of all activities according to Drawings.
3. Planning at site to meet the planned progress.
4. Ensuring to comply with all Quality standards during execution at site.
5. Preparing daily Progress reports (Progress, Target vs. actual)
6. Coordination with QC to proceed Project as per ITP.
7. Maintaining Health and Safety standards to assure the basic protection of complete staff at
site.
8. To prepare the estimates for quantities and costs of civil works involved.
9. Assuring that the survey done at site is as per IFC drawings parameters (cross checking).

EDUCATION

BACHELOR OF CIVIL ENGINEERING

BSc. Civil Engineering from University of Engineering and TechnologyTaxila ,Pakistan (passed in
2010 with overall 83 percent)
_________________________________________________________________________________

COURSE FIELD TRAINING :

 Survey Camp (Abbottabad 2009) 15 Days


 Internship in Civil Office which includes: 30 Days
i) Construction of parking shed and watch towers
ii) Reading drawings of Structure
iii) Estimation of Civil Quantities and bar bending schedule of parking shed.

FINAL YEAR PROJECT:

“Design and Seismic Analysis of overhead water tank (square and circular) & their Cost Comparison”
Main Aspects:
 Analysis,
 Design,
 Estimation of Civil Quantities,
 Bar bending Schedule, BOQ (Cost comparison)

COMPUTER SKILLS:

 MICROSOFT OFFICE (WORD,EXCEL,POWERPOINT)


 AutoCAD (2D,3D,3D Studio Max) at Excellent level
 STAAD Pro
 ETAB
 SAP
 SAFE
 Primavera (Basic knowledge)

4
Civil Engineer
Oil & Gas C ivil Engineering & C onstruction Services
C areer Level 5+ years of experience

_______________________________________________________________________________

HSE TRAININGS
*Emergency First Aid
*Task Risk Assessment
*Work Permit (Receiver)

ACHIEVEMENTS:
 Company has awarded me “MAN OF THE DIVISION AFCC- 2012” due to my hard
working, team work and sincerity to the assigned jobs.
 Got Appreciation certificate from SENIOR MANAGER E&PM PROJECT SITES,
JUBAIL at KEMYA PLANT, SABIC.
_________________________________________________________________________________

PERSONAL INFORMATION:

Marital Status: Single


Nationality: Pakistani
Province: Punjab
N.I.C No. 37101-8291225-1
Passport No. BC- 2852252
Religion: Islam
DOB: Aug27, 1988
Saudi Driv.License: Yes
Skype ID : malik_usman3
___________________________________________________________________________

EXTRA CURRICULAR ACTIVITIES:

 Playing Cricket and badminton


 Net Surfing.
___________________________________________________________________________

REFERENCES:

 Will be provided on demand.

Vous aimerez peut-être aussi