Vous êtes sur la page 1sur 2

D016

Inspection Department Inspection Date: 10/06/2018


Issue Date: 22/6/2018
RADIOGRAPHY Report No : RT-001/2018
INSPECTION REPORT
Sheet No : 1 OF 2

Description of Omission from scope of work:


Client:QARUN Project HAMRA NE-02 inspection work ordered

Objects
Material: Carbon Steel Drawing No.:
Inspected:
Subcontractor: Part of work :
(if applicable) Subcontracted Thickness: 4” sch80

Surface Conditions: Surface Temperature:


Ref. Procedure Specification Acceptance
/ Rev.:API 1104 Criteria:API 1104
Technique Description Equipment and Materials
Min. source-to-object Distance: Radiographic Source :
Max. Distance from source side Source Size :
of object to the film : Source Energy : 11 Ci
Sensitivity Requirements: Film Brand :
Density Requirements : Film Designation :
Density Variations : ACCEPT REJECT Film Processing : Manual Automatic
Exposure Arrangement : SWE DWE/SWV DWE/DWV Lead Screens : Front Back None
No. of Films/Cassette : Screen Thickness : Front Back
Film Size : IQI Type : Wire Hole

S. Joint Welder Type of


Interval Diameter Location Result Remarks
NO NO. NO. Defect

1 0-10 Acc.
2 3 10-25 4" M4 Acc.
3 25-0 Acc.
4 0-10 Reshoot
5 15 10-25 4" L ACC.
6 25-0
M4 Reshoot
7 0-10 S.I @10-15 Rej.rep.
8 25 10-25 4" Acc.
M4 Acc.
9 25-0

AUTHORITY
Name Signature Level Date

EMC NDE Examiner II

Client Inspector

Inspection Department

RADIOGRAPHY
INSPECTION REPORT
D016

REPORT NO. [ 1 ] HAMRA NE 02 PAGE [ 2 ] OF [ 2 ]


S. Joint Welder Type of
Interval Diameter Location Result Remarks
No No. No. Defect

10 0-10 L.O.F @ 2-3 Rej.


11 10-25 L.O.F @15-20 Rej.
35 4" M4 Acc.
12 25-0
13 0-10 Acc.
14 40 10-25 4" M4 Acc.
15 25-0 S.I @25-0 Rej.

AUTHORITY
Name Signature Level Date
EMC NDE Examiner II

Client Inspector

Vous aimerez peut-être aussi