Vous êtes sur la page 1sur 3

Titolo Identificativo Rev.

Pagina Di
title document no. rev. page of

0553 T1MAYI 002


STCS 04 1 3
PGESCo No. Classe di
SYSTEM ARCHITECTURE 10069A-9-V06-MUSG-00033 Riservatezza 2
confidential class

Specification Name Appendix A item Volume N. Prodotto/Struttura


volume no. product/structure

10069A-9-3PS-MUSG-00001 3.01
Tipo doc. Codice EmittenteTeamcenter Ente Emittente Edizione in lingua Derivato da Rev.
doc. type teamcenter issuer code issued by language derived from rev.

DSP AUTV TVP/MTV


Commessa Progetto Cliente/Client
job no. project
WEST DAMIETTA
0553 Power Project Phase II
Converting existing Simple Cycle
EAST DELTA ELECTRICITY
to Combined Cycle 10069A-CP-106 PRODUCTION COMPANY (EDEPC) PGESCo
ELECT.SIGN D:De Paoli C:De Paoli A1:Cutarelli A2:Bima A3:- (20/05/2016)

Rev. Descrizione
rev. kind of revision

00 First Issue (preliminary)

01 REPLACED by document “STCS SYSTEM ARCHITECTURE” number 0553 F1 MAYI002

rev.0

02 GENERAL REVISION ACCORDING TO PGESCo COMMENTS BY TRANSMITTALS


NUMBERS: 10069A-G26-V06-00015 AND 10069A-G26-V06-00069

03 GENERAL REVISION ACCORDING TO PGESCo COMMENTS BY TRANSMITTALS


NUMBERS: 10066A-G26-V06-000155

04 GENERAL REVISION ACCORDING TO PGESCo COMMENTS BY TRANSMITTALS


NUMBERS: 10066A-G26-V06-00183
For Construction.

TP M. De Paoli G. Cutarelli C. Bima


04 I 16/05/1016
TVP/MTV IPI/PRE TVP/MTV

TP M. De Paoli G. Cutarelli C. Bima


03 I 04/02/1016
TVP/MTV IPI/PRE TVP/MTV

TP M. De Paoli G. Cutarelli C. Bima


02 I 11/11/2015
TVP/MTV IPI/PRE TVP/MTV

TP M. De Paoli G. Cutarelli C. Bima


01 I 16/10/2015
TVP/MTV IPI/PRE TVP/MTV

Rev Scopo Preparato Controllato Verificato Verificato Approvato Data


Approved.

rev. scope prepared checked verified verified Approved Date

Ansaldo Energia s.p.a. si riserva tutti i diritti su questo documento che non può essere riprodotto neppure parzialmente senza la sua autorizzazione scritta
Ansaldo Energia s.p.a. reserves all rights on this document that can not be reproduced in any part without its written consent
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no.
rev. page of
0553 T1MAYI002
West Damietta Power Project Phase II 04 2 3
Converting existing Simple Cycle to
Combined Cycle PGESCo No. Classe di Riservatezza
confidential class 2
10069A-9-V06-MUSG-00033

1. GENERAL
The present document covers the general architecture and interfaces of the steam turbine
Control System, Generator, Air Condenser and its auxiliaries (STCS) supplied by AEN for
Al Shabab Combined Cycle Power Plant Project 2 modules (for each module:
4GT+4HRSG+1ST).

The supplied control system will be configured in such a way to allow the completely
operation from Main Control Room by our control system operator interface.
It will be possible to perform high level commands and overview supervision from the DCS
system supplied by the Owner.

The STCS equipment for the turbine/generator and its auxiliaries units will be connected
to the DCS system (supplied by the Owner), with the following interfaces:
• Hardware interface (for main interlocks, protections, high level commands, remote
set points for ST governor).
• Redundant data link interface including the main data exchanging in order to
perform a plant overall monitoring by DCS. Our standard provides OPC protocol to
interface ST Control System with DCS.

The STCS is based on digital distributed control system.

STCS system architecture and its related equipment are shown in the follow picture.

Note:
The C-Net, Control Network internal Symphony Harmony Platform, is redundant connection
amongst HCU and it doesn’t connect through Ethernet box.

2. REFERENCE DOCUMENT
-F1MAYI002 STCS SYSTEM ARCHITECTURE
-F1MAYI033 STCS ETHERNET BOX CABINET LAYOUT AND WIRING DIAGRAM

Ansaldo Energia s.p.a. si riserva tutti i diritti su questo documento che non può essere riprodotto neppure parzialmente senza la sua autorizzazione scritta
Ansaldo Energia s.p.a. reserves all rights on this document that can not be reproduced in any part without its written consent
Progetto / Titolo Identificativo Rev. Pagina Di
Project / title document no.
rev. page of
0553 T1MAYI002
West Damietta Power Project Phase II 04 3 3
Converting existing Simple Cycle to
Combined Cycle PGESCo No. Classe di Riservatezza
confidential class 2
10069A-9-V06-MUSG-00033

Ansaldo Energia s.p.a. si riserva tutti i diritti su questo documento che non può essere riprodotto neppure parzialmente senza la sua autorizzazione scritta
Ansaldo Energia s.p.a. reserves all rights on this document that can not be reproduced in any part without its written consent

Vous aimerez peut-être aussi