Académique Documents
Professionnel Documents
Culture Documents
CULVER
TO SIRA
CH : 58/10
DETAILS T
PROPOSED
TO MADAKASIRA
CH : 58/000
00
CHAINAGE
58/300
58/2
SIZE
2.0 x 1.5
TYPE
BOX CULV
00
W
PROPOSAL ERT
RO
CH :
0
NEW CONSTR
58/ 3
UCTION
CH : 57/90
ROW ROW ROW
ROW ROW
ROW ROW
00
W
ROW
CH :
ROW
RO
58/4
ROW
0
CH : 57/80
ROW ROW
CULVER
T
00
DETAILS ROW ROW
CH :
PROPOSED
W
ROW
58/5
CHAINAGE
RO
ROW
57/710 ROW
SIZE
0
6.0 x 2.0
ROW ROW ROW ROW
TYPE
ROW ROW
CH : 57/70
CH :
BOX CULV ROW
ERT
W
MD:CH : 58/087
N ROW ROW
ROW ROW
/199
ROW ROW
ROW ROW ROW
7/975
ROW ROW ROW
RO
H : 58
W ROW ROW ROW
ROW ROW
:5
ROW
ROW
END:C
ROW
ST:CH
ROW ROW
ROW ROW
ROW
ROW
ROW
ROW
RO
W
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-01
1 IN 100
TO SIRA
TO MADAKASIRA CULVERT
PROPOSED
0
DETAILS
0
CH : 58/500
CH : 58/60
CH : 58/70
CH : 58/80
CH : 58/90
CH : 59/00
CHAINAGE 58/900
SIZE 2.0 x 1.5
TYPE BOX CULVERT
PROPOSAL NEW CONSTRUCTION
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 58+500 TO 59+000)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-02
1 IN 100
TO SIRA
TO MADAKASIRA
0
CH : 59/00
CH : 59/10
CH : 59/20
CH : 59/30
CH : 59/40
CH : 59/60
0
CH : 59/50
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW OW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW OW
CULVERT
ALIGNMENT PLAN DETAILS PROPOSED
CHAINAGE 59/600
SIZE 2.0 x 1.5
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-03
1 IN 100
0
00
TO SIRA
CH : 59/40
00
CH : 59/60
CH : 59/70
CH : 59/8
TO MADAKASIRA
CH : 59/9
0
00
CH : 59/50
CH : 60/0
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
CULVERT
DETAILS PROPOSED
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 59+500 TO 60+000)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-04
1 IN 100
T
TYPE BOX CULVER
N
CONSTRUCTIO
PROPOSAL NEW
TO SIRA
0
0
0
0
0
0
TO MADAKASIRA
CH : 60/60
CH : 60/50
CH : 60/40
CH : 60/30
CH : 60/20
CH : 60/10
0
CH : 60/00
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ALIGNMENT PLAN
CULVERT
DETAILS PROPOSED
500(i)
CHAINAGE 60/
SIZE 2.0 x 1.5
T
TYPE BOX CULVER
CONSTRU CTION
PROPOSAL NEW
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 60+000 TO 60+500)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-05
1 IN 100
DETAILS PROPOSED
CHAINAGE 60/500(ii)
SIZE 2.0 x 1.5
TO SIRA
TO MADAKASIRA TYPE
BOX CULVERT
/400
PROPOSAL NEW
CONSTRUC TION
/500
0
0
CH : 6
CH : 60/90
ROW
/600
ROW
0
CH : 6
ROW
CH : 60/800
ROW
/700
0
ROW
ROW ROW
CH : 6
ROW
ROW ROW
ROW
0
ROW ROW
CH : 6
ROW
ROW ROW
ROW
CH
ROW ROW ROW
ROW ROW
ROW
: 61
ROW
ROW ROW ROW
ROW
ROW
ROW ROW
ROW ROW
/00
ROW ROW
ROW ROW
ROW
0
ROW ROW
ROW
0/851
ROW ROW
ROW
ROW ROW
ROW
0/697
ROW
MID:CH : 60/774
ROW
ROW ROW
CH : 6
ROW
ROW
ROW ROW
ROW ROW ROW
ST:CH : 6
CULVERT
END:
DETAILS PROPOSED
CHAINAGE 60/500(i)
SIZE 2.0 x 1.5
ALIGNMENT PLAN
TYPE
BOX CULVERT
PROPOSAL NEW
CONSTRUCTION
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 60+500 TO 61+000)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-06
1 IN 100
CH : 61/600
CH : 61/500
CH : 61/400
TO SIRA
CH : 61/300
00
CH : 61/200
TO MADAKASIRA
CH : 61/1
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
CH : 61/
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ALIGNMENT PLAN
000
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 61+000 TO 61+500)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-07
1 IN 100
TO MADAKASIRA TO SIRA
00
CH : 62/000
CH : 61/900
CH : 61/800
CH : 61/700
CH : 61/600
CH : 61/500
CH : 61/400
CH : 62/1
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ST:CH : 62/090
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 61+500 TO 62+000)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-08
1 IN 100
TO SIRA
CH : 62/200
RO
TO MADAKASIRA
W
0
/3 0
0
: 62
RO
2/10
W
CH
ROW ROW 0
ROW
80
6
ROW ROW
RO
ROW /
62
CH :
ROW
W
:
RO
ROW
ROW
CH
W
00
ROW
W
RO
00
2/4
RO
W
62/0
W
RO RO
:6
W
6
RO
CH
RO ROW
W
W ROW ROW
ROW ROW
:
W
RO
H
ROW
RO
W ROW
00
C
RO
ROW /8
34
RO
ROW
W
RO W
RO
W
W
00
0
MID:CH : 62/2
W
/50
RO RO
61/9
W RO W
W RO
RO
: 62
RO
W
00
0
RO RO
W
W W W
9
W
RO RO 7 /
:
2/0
62
CH
RO
H
RO
H:
W W
RO
W
C
W RO
H:6
RO
RO C
W
RO RO
W
W W
/37
W
RO RO
W RO
ST:C
W RO
W
RO
: 62
0
RO
OW
W
60
RO W R
RO
W
W
2/
H
RO
D:C
W
:6
W
RO
W RO
CH
EN
RO
W
ROW
RO
W
RO
W
ALIGNMENT PLAN
RO
W
W
RO RO
W
RO
W
W
RO
W
RO
RO
W
ROW
RO
W
W
RO
G
IN
RO
ert
IST
ulv
W
9
EX
1.2
/05
bc
---
W
35
X
sla
---
RO
.2
---
S
AL Rcc
1
GE
IL
---
TA
SIZ INA
RO
---
DE
W
A
CH
E
W
OS
MAIN CHAINAGE
PR E
P
RO
OP
TY
(METRES)
RO
W
W
RO
PROPOSED LEVEL
RO
(METRES)
W
W
RO
RO
GROUND LEVEL
W
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-09
1 IN 100
ROW
ROW
CH : 62/
500 TO SIRA
TO MADAKASIRA
ROW
ROW
ROW
ROW
CH : 63/000
100
CH : 62/900
CH : 62/800
/
CH : 62/700
CH : 63
ROW
ROW
00
63/2
ROW ROW ROW
ROW ROW ROW
ROW
CH :
ROW ROW ROW ROW
ROW
W : 62/600
CH
RO ROW
ROW
W
ROW ROW
RO
ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW ROW ROW ROW ROW
ROW
ROW
ROW
ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW
ROW
ROW
ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ST: CH : 62/892
END: CH : 62/905
ROW
MID: CH : 62/899
ST: CH : 63/031
ROW ROW
ROW
END: CH : 62/832
MID: CH : 62/816
ROW
ST: CH : 62/800
ROW
ROW ROW
/085
ROW
ROW
DET
40
AILS
CHA
: 63
EXISTING INAG EXIS
3/1
DETAILS E TING
SIZE 35/71
CHAINAGE 35/059 8 PRO
POSE
TYPE
: 6
1.2 X D
MID: CH
SIZE 1.2 X 1.2 1.2 63/30
PRO Rcc sl 0
TYPE Rcc slab culvert POSA
L ab cu 1.2 X
lvert 1.2
: CH
--- Wide
PROPOSAL ------------ ning Rcc sl
ab cu
lvert
0
END
/26
ALIGNMENT PLAN
: 63
CH
ST:
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 62+500 TO 63+000)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-10
1 IN 100
TO MADAKASIRA TO SIRA
CH : 63/300
CH : 63/200
/400
100
CH : 63/
CH : 63
0
/50
ROW
000
ROW ROW
ROW
ROW ROW ROW
: 63
ROW ROW
ROW ROW
63/
ROW ROW
CH
ROW ROW ROW
ROW ROW
00
ROW
:
RO ROW
ROW
63/6
W ROW
C
ROW ROW
ROW ROW
RO ROW ROW
ROW
ROW ROW
W ROW
ROW
CH :
ROW
ROW ROW
ROW
ROW
RO ROW
ROW
ROW
ROW
ROW
ROW
W ROW ROW
ROW
ROW
ROW
PROPOSED
ROW
RO ROW
ROW
ROW
RO
MID: CH : 63/291
EXISTING
W
W ROW
ROW
DETAILS
ST: CH : 63/260
W
ROW
ROW
63/300 ROW
35/718
RO
ROW
END: CH : 63/140
RO RO RO
W
3/398
ROW
3
RO
W
ROW
1.2 X 1.2 rt
W
ROW
Rcc slab culve
RO
W
/085
: 63/32
RO
RO SIZE
441
RO ROW
rt
Rcc slab culve
ROW
W W RO
W
ROW
ROW
ROW
1
TYPE
W
RO
ROW
/03
Widening
RO W
ROW
ROW
PROPOSAL
RO
W W
ROW
H : 63/
RO
6
H : 63
ROW
ROW
ROW
ROW
/484
W
RO
RO
63
ST: CH :
W
RO
W
ROW
ROW
ROW
RO
W
ROW
END: CH
ROW
W
RO
H:
RO ROW
W ROW
RO
W
ROW
MID: C
: 63
W
RO
MID: C
W
RO
C
ROW
ROW
W
RO
ST:
: CH
W
ST: CH : 6 2/905
/89 9
2
9
END
CH 2/8
:6
6 2
MIDD: CH
4
:
/67
8
/69
:
: 63
EN
22
: 63
3/7
CH
: CH
:6
ST:
MID
CH
D:
EN
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-11A
1 IN 100
TO SIRA
TO MADAKASIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 63+000 TO 63+500)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-11B
1 IN 100
71
64/1
TO SIRA
4 /1 0 0 / 1 0 7
TO MADAKASIRA
:
: CH
6 4 /0 4 1
CH : 63/700
CH : 6: CH : 64
CH : 63/600
END: CH : 4/044
MID: CH : 63/972
END
CH : 63/500
CH : 64/000
ST: CH : 630/904
00
CH : 63/8
/400
CH : 64/000
ST: CH : 6
0
MID
CH : 63/9
C H : 63
ROW
ROW ROW
ROW
ROW ROW
ROW ROW ROW
ROW ROW ROW
ROW
ROW ROW ROW
ROW ROW
ROW ROW
ROW ROW ROW ROW
ROW
ROW
ROW ROW
ROW
ROW ROW ROW
ROW ROW ROW
ROW ROW
ROW ROW ROW ROW ROW
ROW
ROW ROW ROW
ROW ROW
ROW ROW
ROW
ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW ROW ROW
MID: CH : 63/698
ST: CH : 63/674
63/722
: 63/441
END: CH : 63/484
8
: 63/39
END: CH :
MID: CH
ST: CH
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 63+500 TO 64+000)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-12
1 IN 100
TO SIRA
TO MADAKASIRA
4
3/90
CH : 6 3/972
4/000
H:6
END: CH : 64/171
ST: CH : : 64/041
CH : 64/400
MID: CH : 64/107
6
64/044
CH : 64/300
C
531
CH :
0
/000
ST:
4/50
CH : 64/200
: 64/
CH : 64/100
MID:
END: CH
4
CH : 6
CH : 6
H
ST: C
ROW
ROW ROW ROW ROW
ROW ROW ROW
ROW ROW ROW
ROW ROW
ROW ROW
ROW ROW
ROW
ROW
ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW
ROW ROW
ROW ROW ROW ROW
ROW ROW
ROW ROW
ROW
ROW
ROW
ROW ROW ROW
ROW ROW ROW
ST: CH : 64/413
4/466
/518
ALIGNMENT PLAN
MID: CH : 6
H : 64
END: C
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 64+000 TO 64+500)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-13
1 IN 100
TO MADAKASIRA TO SIRA
CH : 64/400
4/572
26
0
4/53
4/613
4/50
5/0
9
ST: CH : 64/954
MID: CH : 64/9
762
H:6
CH : 6
MID: CH : 64/722
CH : 6
END: CH : 6
CH : 65/000
81
END: CH : 6
CH : 64/900
/600
4/
ST: CH : 64/6
ST: C
CH : 64/800
END: CH : 6
0
MID:
CH : 64
CH : 64/70
ROW ROW ROW
ROW
ROW
ROW ROW
ROW
ROW ROW
ROW ROW ROW
ROW
ROW ROW ROW ROW
ROW
ROW ROW
ROW
ROW ROW ROW
ST: CH : 64/413
4/46 6
ROW ROW ROW
ROW
ROW ROW ROW ROW
ROW ROW
/518
ROW ROW
ROW ROW
MID: CH : 6 ROW ROW
ROW ROW ROW
H : 64
END: CH : 64/890
MID: CH : 64/874
ST: CH : 64/858
END: C
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 64+500 TO 65+000)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-14
1 IN 100
TO SIRA
TO MADAKASIRA
1
/ 15
35
CH : 65
/1
H
5
0
6
8
M D: C
/20
11
:
5/
EN
: 65
:6
:
ID
H
00
CH
C
W
RO
:
1
ST
5/
W
RO
9
RO
6
/30
/33
:
W
/372
RO
CH
6
: 65
: 65
OW
/02
: 65
405
RO W
RO
5
CH
W
CH
W
RO
:6
990
END : 65/400
W
RO RO
: CH
: 65/
W OW
ST:
CH
R
CH 00
/
W
RO
4
W
RO
:6
MID
:
MI : 65/0
W
954
RO
D
RO
: CH
W
EN
W W
RO RO
00
/
CH
W
: 64
W
RO
RO
:
CH
65/5
D
W
W RO
RO ROW
CH
0
W ROW
RO
W
CH :
RO
/90
ST:
00
RO RO
W W ROW
RO
4
65/6
ROW ROW
H:6
ROW ROW
W DET
RO AIL
S ROW
ROW
CH :
C
CHA EXI
INA STIN ROW
W SIZE GE G ROW
RO
RO
W 5/36
2 ROW 6
TYP PRO ROW
E 1.2m /
RO
Dia POS ROW -5
W
PRO Sing 65/4 ED ROW
POS
AL le ro
w pip
00 Km ROW
W
RO
Wid e cu 1.2m ROW
enin lvert Dia
RO g ROW
W
W
RO ROW
ROW
OW
DET ROW
AIL
S
RO CHA EXI
W INA STIN
SIZE GE G
RO 5/61 ROW
W 2
TYP 1.2m PRO
890
E Dia
PRO POS
POS Sing 65/6 ED
le ro
: 64 874
AL w pip 00
64/
RO Wid e cu 1.2m
enin lver
Sing Dia
W
858
g t
le
/
pipe row
: 64
culv
RO ert
:
/
W
: CH
C H
H
END
D:
C
I
ST:
M
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-15A
1 IN 100
TO SIRA
TO MADAKASIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-15B
1 IN 100
TO SIRA
TO MADAKASIRA
ST: CH : 65/815
END: CH : 66/176
MID: CH : 65/995
CH : 65/700
CH : 65/600
CH : 65/800
CH : 66/200
CH : 65/900
CH : 66/100
CH : 66/000
CH : 65/500
5/6
K m- ROW
ROW ROW ROW ROW ROW ROW ROW
ROW 5/8
ROW ROW
ROW
ROW
Km- ROW ROW ROW ROW ROW ROW
ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
DETAILS EXISTING
EXISTING PROPOSED PROPOSED
DETAILS CHAINAGE 6/05
7
CHAINAGE 5/612
65/600
SIZE
1.2m Dia
65/900 ALIGNMENT PLAN
SIZE 1.2m Dia 1.2m Dia 1.2m Dia
Single row TYPE Three row pipe culv
ert Three row
TYPE Single row pipe culvert pipe culvert
PROPOSAL Wid pipe culvert
ening
PROPOSAL Widening
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 65+500 TO 66+000)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-16
1 IN 100
TO MADAKASIRA TO SIRA
END: CH : 66/176
MID: CH : 65/995
CH : 66/500
CH : 66/400
CH : 66/300
CH : 66/200
PROPOSED
CH : 66/100
CH : 66/000
DETAILS EXISTING
66/300
75
CHAINAGE 6/2 1.2m Dia
SIZE 1.2m Dia Three row
vert
Three row pipe cul pipe culvert
ing
PROPOSAL Widen
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 66+000 TO 66+500)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-17
1 IN 100
RO
W
TO SIRA
TO MADAKASIRA
RO
W
0
/20
RO
: 67
W
CH
RO
W
RO
W
RO
W
ED
4 14
OS
RO
67/
OP
W
ia
200
:
PR
mD
RO
CH
6 7/
1. 2
W
:
ND E
RO
rt
W
e
ulv
ING
ec
pip
0
IST
0
Dia
/1
row
W
14
EX
RO
ing
67
7/2
m
gle
1. 2
den
:
Sin
W
E
ILS
CH
Wi
AG
RO
TA
AIN
AL
W
DE
RO
E
OS
CH
PE
SIZ
OP
TY
W
PR
RO
W
500
RO
6/55
W
66/
RO
00
W
RO
H:6
/0
:
943
6/641
CH
W
6
RO
ROW
0
W
ST: C
66/
RO
6/60
CH
W
RO
/732
CH : 6
W
:
RO
W
W
: CH
RO
RO
6
42
900
ROW
CH :
/700
H : 66
: 66/7
ROW
D
W W
RO
MID:
ROW RO
66/
I
W
M
RO
CH : 66/800
6
W
RO ROW W
CH : 6
W
RO
CH :
RO
END: C
ST: CH
RO
W ROW
W
ROW RO W
RO
ROW ROW W
RO
t
lver
ROW ROW W
ROW RO
e cu
ING
ROW ROW
ROW
pip
ROW
IST
W
ROW RO
Dia
--
row
ROW
71
ROW
----
EX
ROW ROW ROW
7/0
ROW
1.2m
gle
----
W
RO
Sin
ROW
----
E
ILS
AG
ROW
L -
TA
AIN
SA
ROW
DE
ROW
E
CH
PO
PE
SIZ
ROW
TY
PRO
ROW ROW
ROW ROW ROW
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-18A
1 IN 100
TO SIRA
TO MADAKASIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-18B
1 IN 100
9 00 TO MADAKASIRA TO SIRA
6/
3
94
:6 DETAILS EXISTING PROPOSED
RO
6/
CH
W
:6
SIZE 1.2m Dia 1.2m Dia
CH
RO
CH : 67/600
W TYPE Single row pipe culvert
CH : 67/500
ID
PROPOSAL Widening
END: CH : 67/144
0
M
RO PROPOSED
CH : 67/400
DETAILS EXISTING
/00
W
67/400
CH : 67/300
CHAINAGE 7/406
RO
: 67
RO 1.2m Dia 1.2m Dia
W
CH : 67/200
W SIZE
Three row
00
TYPE Three row pipe culvert pipe culvert
CH
RO
RO
CH : 67/1
W W PROPOSAL Widening
RO RO
W W ROW ROW ROW
ROW ROW
ROW
RO ROW
RO W ROW ROW
W ROW ROW
ROW ROW ROW
ROW ROW ROW ROW
RO ROW ROW ROW ROW ROW
W ROW ROW ROW ROW ROW
ROW ROW ROW ROW
ROW ROW ROW ROW
RO ROW
W ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW
ROW ROW ROW
ROW
ROW ROW
ROW ROW
DETAILS EXISTING
CHAINAGE 7/071
1.2m Dia
ALIGNMENT PLAN
SIZE
TYPE Single row pipe culvert
---
PROPOSAL ------------
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 67+000 TO 67+500)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-19
1 IN 100
TO SIRA
CH : 67/500
CH : 68/000
TO MADAKASIRA
CH : 67/600
CH : 67/900
CH : 67/700
CH : 67/800
ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROW
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 67+500 TO 68+000)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-20
1 IN 100
RO
W
W
RO
TO SIRA
RO
TO MADAKASIRA
W
RO
RO
W
W
RO
0
/30
ROW
: 6 8
W
CH
RO
W
RO
00
W
/4
RO
RO
: 68
W
00
CH
/2
RO
W
: 68
W
ROW
RO
RO W
W
RO RO
CH
W
RO
W
W
RO
RO
W
RO
W
RO
W
ED
W
OS
RO
0
OP
RO
/10
W
PR
W
RO
RO
300
68/
W
ia culv ert
mD
8
e
1.2 row pip
W
G
6
TIN
RO
RO
W o
IS Tw
0
RO
EX
:
/50
W
CH
0 rt
D
S /14 lve
ET INA
RO
I L 8
Dia ipe cu
68
TA
CH
W
A
RO
DE GE 2m
IL
A p
:
A
W
N 1. w
S
AI or
o
SI PE
CH
CH
RO
ZE
Tw
RO
TY
g
63
G
nin
EX
W
E
E
SIZ ide
RO
PR
8/4
IS
W
W
8/
E
TI
O
P
68
TY AL
PO
6
N
RO
1.
4
OS
G
:
W
2
SA
OP
m
RO
RO
00
Th den
CH
PR
D wp
W
r
W
ia
e
ST:
e r ng
W
RO
8/0
o
i
W
i
RO
ip
PR 600
ec
RO
W
6
RO
ul
O
W
68 m D w pip
W
PO
ve
:
/
rt
7
SE
1. ree r rt
CH
49
2 o
RO
Th ulve
D
RO
c
W
/
W
ia e
68
RO
W
W
H:
RO
RO
W
C 0
D:
RO
60
W
I
W
1 /
RO
RO
W
M 53 68
RO
W
RO
W
8/ :
:6 CH
RO
W
W
RO
W
RO
58
RO
H
W
RO
C 6
D: 8/
W
RO
W
EN :6
W
RO
W
RO
H
:C
RO
W
ST
W
RO
W
RO
RO
W
00
0
W
72
7
RO
8/
8/
: 6
:6
CH
CH
RO
W
:
ID
M
RO
RO
W
3
78
RO
8/
RO
W
:6
H
ALIGNMENT PLAN RO
00
RO
C
W
D:
8
8/
EN
:6
RO RO
W W
RO CH
W
W
RO
W W
RO RO
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 68+000 TO 68+500)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-21A
1 IN 100
TO SIRA
TO MADAKASIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-21B
1 IN 100
TO MADAKASIRA TO SIRA
END: CH : 68/783
MID: CH :68/720
ST: CH :68/658
DETAILS EXISTING PROPOSED
/500
CH : 69/100
CH : 68/900
CH : 68/600
SIZE 1.2m Dia 1.2m Dia
CH : 68/800
CH : 68/700
CH : 68
ROW
END: CH : 68/531
H : 68/
CH : 69/000
DETAILS
69/000
CHAINAGE 9/035
1.2m Dia
SIZE 1.2m Dia
Three row pipe
MID: C
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 68+500 TO 69+000)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-22
1 IN 100
600
TO SIRA
TO MADAKASIRA
C H : 69/
9/100
500
8
: 69/38
MID: CH : 69/331
CH : 69/
9/200
CH : 6
3
:69/27
400
ROW
ROW ROW
0
ROW ROW
CH : 6
CH : 69/30
CH : 69/
ROW ROW
C
ROW ROW
ST: CH
R OW
:
ROW
D
ROW ROW ROW
EN
ROW ROW ROW
ROW
ROW ROW ROW
ROW ROW ROW ROW
ROW ROW ROW ROW
ROW ROW ROW
ROW
ROW ROW ROW
ROW ROW
ROW ROW
ROW ROW ROW
9/000
ROW ROW
ROW
ROW
ROW ROW ROW ROW ROW
ROW SED
PROPO
ROW
ROW ROW
ROW ING 69/600
EXIST
CH : 6
S
ROW ROW DETAIL ia
ROW ROW 625 1.2m D pe
ROW AGE 9/ row pi
CHAIN ia Two
1.2m D culvert
SIZE culvert
w pipe
Two ro
TYP E g
Widenin
SAL
PROPO
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 69+000 TO 69+500)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-23
1 IN 100
TO SIRA
TO MADAKASIRA
0
CH : 69/700
CH : 69/80
900
600
DETA
ILS
CHA EXIS
/
INAG TING
CH : 69
CH : 69/
SIZE E 10
/050
PROP
500
1.2m OSED
8
000
: 69/ 38
PROP Three 0
OSAL row p 1.2m
ipe cu
CH : 69/
Wide lvert Dia
ROW ROW
ning Three
70/
ROW ROW
pipe c row
ROW ROW
ROW
400
ROW ulvert
ROW ROW
:
ROW
END: CH
CH
CH : 69/
ROW ROW
ROW ROW ROW ROW ROW ROW
ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW W
ROW
ROW ROW RO
ROW
ROW ROW W
ROW
ROW RO
ROW ROW
ROW
MID: CH : 69/748
ROW W
ROW RO
ROW W
RO
9/838
58
ROW W
RO
ROW
3
ST: CH : 69/6
SED
ROW
PROPO
ST: CH :69/94
ROW
91
G W
EXISTIN 69/600 RO
END: CH : 6
R OW S
DETAIL ia
: 69/9
GE 9/62
5 1.2m D pe
A IN A o row pi
CH ia Tw
1.2m D
8
ert culvert
SIZE pipe culv
/03
Two row
TYPE g
Widenin
ALIGNMENT PLAN
CH
: 70
SAL
PROPO
MID:
CH
CHA
INA
D:
SIZE GE
EN
TYP
E
PRO
POS
AL
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for up gradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 69+500 TO 70+000)
PRADESH ROAD AND BUILDING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-24
1 IN 100
TO MADAKASIRA TO SIRA
ALIGNMENT PLAN
MP
SU
L
EL
W
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 70+000 TO 70+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-25A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-25B
1 IN 100
TO MADAKASIRA TO SIRA
er
rm o
sf
an
Tr
l
el
W
P
M
g
SU
in
ild
Bu
L
h
Arc
EL
W
er
m
or
sf
an
Tr
ALIGNMENT PLAN
p
m
g
Su
in
ld
0
i
Bu
1/
-1
Km
l
ta
pi
os
H
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 70+500 TO 71+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-26A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-26B
1 IN 100
TO MADAKASIRA TO SIRA
ter
Shel
Bus
ALIGNMENT PLAN
Well
Wet
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 71+000 TO 71+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-27
1 IN 100
TO MADAKASIRA TO SIRA
Well
Wet
er
er sform
sform Tran
ing Tran
Build
/2 rmer
Kanva Fashions (P) Ltd,. -12 Tran
sfo
er
Shelt
Bus HM
Sump
Sump
ing
Build
ell
Wet
W
ALIGNMENT PLAN
ERT
ING
bridge
CULV
EXIST
9
11/574
---
1.0 x 6.
--------
Minor
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 71+500 TO 72+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-28
1 IN 100
TO MADAKASIRA TO SIRA
END: CH : 72/311
g
din
Buil
rmer squ
e
nsfo Mo
Tra
g
din
Buil g
din
Buil
et
Toil
/2
12 - rmer
HM Tra
nsfo
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 72+000 TO 72+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-29
1 IN 100
TO MADAKASIRA TO SIRA
g
ildin
Bu
g e
ildin squ
Bu Mo
g
ildin
Bu
ilet
To
r
elte
ssh
Bu
Check Dam
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 72+500 TO 73+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-30
1 IN 100
TO MADAKASIRA TO SIRA
rd
Ya rd
Ya
C
AC
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 73+000 TO 73+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-31
1 IN 100
TO MADAKASIRA TO SIRA
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 73+500 TO 74+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-32
1 IN 100
TO MADAKASIRA TO SIRA
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 74+000 TO 74+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-33
1 IN 100
TO MADAKASIRA TO SIRA
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 74+500 TO 75+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-34
1 IN 100
END: CH : 75/154
TO MADAKASIRA TO SIRA
DETAILS EXISTING PROPOSED
CHAINAGE 15/354
75/200
SIZE 2 x 5.0 x 2.0 1 X 10.4m
TYPE Rcc Slab Culvert Minor Bridge
PROPOSAL Reconstruction
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 75+000 TO 75+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-35
1 IN 100
TO MADAKASIRA TO SIRA
MID: CH : 75/721
END: CH : 75/757
DETAILS EXISTING
CHAINAGE 16/166
ALIGNMENT PLAN
SIZE 1.2m Dia
TYPE Single row Pipe
PROPOSAL Widening
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 75+500 TO 76+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-36
1 IN 100
TO MADAKASIRA TO SIRA
PROPOSAL Widening
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-37A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-37B
1 IN 100
TO MADAKASIRA TO SIRA
MID: CH : 77/046
DETAILS EXISTING PROPOSED
CHAINAGE 17/285 77/200
SIZE 1.2m Dia 2.0 x 2.0m
TYPE Single row Pipe culvert BOX CULVERT
PROPOSAL Reconstruction
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 76+500 TO 77+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-38
1 IN 100
TO MADAKASIRA TO SIRA
OSED
P RO P
0
77/50
.0m
2.0 2
x
T
LVER
X CU
cu lv ert BO
e
r ow Pip
Single g
Build
in g
Build
in
ing
ing Build
Build
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 77+500 TO 78+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-40
1 IN 100
TO MADAKASIRA TO SIRA
ing
ild
Bu
ing
ing
ing
ild
ild
ild
Bu
Bu
Bu
g in
ild
Bu
ing
ild
Bu
g in
ild
Bu
ing
ild
ing
Bu
ild
Bu
ALIGNMENT PLAN
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 78+000 TO 78+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-41A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-41B
1 IN 100
TO MADAKASIRA TO SIRA
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-42A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 78+500 TO 79+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-42B
1 IN 100
TO MADAKASIRA TO SIRA
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 79+000 TO 79+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-43
1 IN 100
TO MADAKASIRA TO SIRA
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-44A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-44B
1 IN 100
TO MADAKASIRA TO SIRA
CH : 80/200
CH : 80/100
300
CH : 80/000
CH : 80/
00
12
534
4
CH : 80/
500
MID: CH :80/6
0/
CH : 80/600
ST: CH :8
CH : 80/
ROW ROW ROW
ROW ROW
ROW ROW
ROW
ROW ROW ROW ROW
ROW ROW ROW
ROW ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW ROW
MID: CH : 80/231
ST: CH : 80/189
74
END: CH : 80/2
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for (HIGHWAY ENGINEER) V.S (CH : 80+000 TO 80+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING Sira in the State of Karnataka (55Km). APPROVED BY T.M.V
(TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-45
1 IN 100
MID: CH : 80/811
END: CH :80/838
TO MADAKASIRA TO SIRA
CH : 81/000
12
0/534
END: CH :80/690
ST: CH : 80/784
CH : 80/900
500
MID: CH :80/6
CH : 80/800
CH : 80/600
CH : 80/700
ST: CH :8
CH : 80/
ROW
ROW
ROW ROW
ROW
ROW ROW
ROW ROW ROW ROW
ROW ROW ROW
ROW
ROW
ROW ROW
ROW ROW ROW
ROW
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for (HIGHWAY ENGINEER) V.S (CH : 80+500 TO 81+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING Sira in the State of Karnataka (55Km). APPROVED BY T.M.V
(TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-46
1 IN 100
CH : 81/200
TO MADAKASIRA TO SIRA
0 0
CH : 81/3
CH : 81/100
0
CH : 81/40
00
CH : 81/000
CH : 81/5
0
CH : 81/60
INT PO
STARTING
ROW
ROW ROW
ROW
Km: 81/600
ROW ROW
ROW ROW ROW Flexible Pavem
ent
ROW
ADMIN BUILDING B
ROW ROW ROW ROW A
ROW ROW ROW
ROW ROW ROW
ROW ROW
ROW Existing
HM-1
ROW ROWroad
R OW ROW
ROW
Rigid
B
Pavement A
MID: CH : 81/222
END: CH : 81/256
19.0m x 24.0m
/187
ST: CH : 81
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
ALIGNMENT PLAN
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for (HIGHWAY ENGINEER) V.S (CH : 81+000 TO 81+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING Sira in the State of Karnataka (55Km). APPROVED BY T.M.V
(TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-47
1 IN 100
TO MADAKASIRA TO SIRA
MID: CH :82/023
ST: CH : 82/006
CH : 81/500
CH : 81/600
CH : 81/700
CH : 81/800
CH : 81/900
CH : 82/000
STARTING POINT
Km: 81/600
Flexible Pavement B A
ROW ROW ROW ROW
ADMIN BUILDING ROW ROW ROW ROW
Footpath ROW ROW ROW ROW ROW
HM-1
ROW ROW ROW Existing
ROW HM-2
road ROW ROW ROW ROW ROW ROW ROW ROW ROW
Rigid CC Retaining wall
B Pavement A
Canopy
19.0m x 24.0m
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for (HIGHWAY ENGINEER) V.S (CH : 81+500 TO 82+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING Sira in the State of Karnataka (55Km). APPROVED BY T.M.V
(TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-48
1 IN 100
TO MADAKASIRA TO SIRA
/023
CH : 82/600
2/ 006
END: CH :82/041
END: CH : 82/366
MID: CH : 82/348
ST: CH : 82/330
CH : 82/500
MID: CH :82
ST: CH : 800
CH : 82/100
CH : 82/200
CH : 82/400
/0
CH : 82/300
CH : 82
ROW
ROW ROW
ROW
ROW ROW ROW ROW ROW ROW
ROW
RO W ROW
ROW
ROW ROW ROW ROW ROW
ROW
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for (HIGHWAY ENGINEER) V.S (CH : 82+000 TO 82+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING Sira in the State of Karnataka (55Km). APPROVED BY T.M.V
(TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-49
1 IN 100
CH : 82/800
TO MADAKASIRA TO SIRA
CH : 82/700
900
CH : 82/600
CH : 82/
CH : 82/500
0
0
3/0
:8
ROW ROW ROW ROW
ROW
CH
ROW
ROW
ROW ROW
ROW ROW ROW ROW
ROW ROW
ROW ROW
00
ROW
3/1
ROW ROW
RO W ROW
ROW
:8
ROW
CH
ROW
2/843
ST: CH :82/726
W
RO
ST: C H :82/960
/960
MID: CH : 8
00
3/2
12
W W
RO
H : 82
RO
:83/0
:8
ALIGNMENT PLAN
CH
C
3
/06
END:
W
: CH
W RO
TIO
N RO
: 83
UC
TR S
MID
ON C T
ER EW
LV N
CU
: CH
L
SA OX
PRO
P O B
x2
.0 OWR
PE 2.0
END
TY /1 85
E 83 SED
SIZ AG
E PO
AIN PRO T
CH S VER
TA
IL
CU
L W
DE RO
OW
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for (HIGHWAY ENGINEER) V.S (CH : 82+500 TO 83+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING Sira in the State of Karnataka (55Km). APPROVED BY T.M.V
(TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-50
1 IN 100
TO MADAKASIRA TO SIRA
PR
OP
OS
TY AL
PE ----
SIZ --
E Rcc -----
CH Sla
AIN 6.0 bC
AG x2 ulv
DE E .0 ert
TA 23/
ILS 772
EX
IS
CU TING
LV
ER
T
ROW
CH : 83/000
CH : 83/100 ROW
CH : 83/200
CH : 83/300
ROW
CH : 83/400
CH : 83/500
ROW
CH : 83/600
ROW ROW ROW ROW ROW ROW
RO W ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW
R OW ROW ROW ROW ROW ROW
ROW PROPOSAL NEW CON
STRUCTION ROW
TYPE
ROW ROW
BOX CULVERT
ROW
END: CH : 83/063
ROW
:83/012
DETAILS PROPOSED
CULVERT
H
MID: C
ST: CH
EN D : C
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-51A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-51B
1 IN 100
RO
W
TO MADAKASIRA TO SIRA
RO
W
RO
W
00
4/4
RO
: 8
W
CH
RO
W
RO
W
RO
W
0
/30
RO
PRO
POS
AL 4
TYP -----
:8
W
E -----
-
SIZE
CHA
Rcc
Slab
Culv CH
RO
INA 6.0 x ert
GE 2.0
DET 23/7
AIL 72
W
S
EXI
STIN
C G
ULV
RO
ERT
W
224
RO
/
: 84
W
CH
0 D:
20 EN
RO
/
84 :
W
CH
W
RO
3/500
W
3/600
CH : 8
RO
0 0
W
/1
9
RO
84
/03
3/700
ROW
CH : 8
:
4
CH
R OW
H :8
3/855
W
ROW
3/800
CH : 8
4/000
RO
W
:C
ROW RO
MID
CH : 83/900
ST: CH :8
ROW CH : 8
CH : 8
ROW ROW
W
RO W
RO
ROW ROW
ROW ROW
ROW ROW
ROW ROW W
ROW RO
ROW
ROW
ROW ROW
ROW
ROW ROW
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-52A
1 IN 100
0
90
3/
:8
TO MADAKASIRA
CH TO SIRA
RO
W
84/514
CH : 84/500
9
0
RO
/03
ST: CH :
00
W
CH : 84/400
4/
RO
:84
4
:8
W
: 84/22
CH
CH : 84/300
CH
RO
W
00
D:
CH : 84/200
ROW
MI
RO
84/1
H
ROW
W
C
RO ROW
W
:
CH :
D
ROW
EN
ROW
RO ROW ROW
W
ROW
ROW ROW
ROW
RO
W ROW
ROW
ROW ROW
ROW
ROW
ROW ROW
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for (HIGHWAY ENGINEER) V.S (CH : 84+000 TO 84+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING Sira in the State of Karnataka (55Km). APPROVED BY T.M.V
(TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-53
1 IN 100
TO MADAKASIRA TO SIRA
/ 514
CH : 85/100
END: CH : 84/709
MID: CH : 84/612
CH : 85/000
CH : 84/900
/200
/500
CH : 84/800
ST: CH : 84
CH : 84/700
CH : 84/600
CH : 85
CH : 84
MID: CH : 85/129
ST: CH : 85/002
2 X 9.6
CHAINAGE
84/705
DETAILS
PROPOSED
CULVERT
EN
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-54A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-54B
1 IN 100
TO MADAKASIRA TO SIRA
CH : 85/100
CH : 85/200
MID: CH : 85/607
CH : 85/000
ST: CH : 850/409
300
00
CH : 85/7
CH : 85/
40
CH : 85/600
CH : 85/500
C H : 85/
ROW ROW ROW ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW ROW ROW
MID: CH : 85/129
5/002
END: CH : 85/255
ST: CH : 8
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-55A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-55B
1 IN 100
TO MADAKASIRA TO SIRA
W
RO
000
W
RO
CH : 86/
900
W
RO
5/800 805
W
CH : 85/
RO
CH : 8 CH :85/
W
RO
0
ROW
/10
ROW
MID: CH : 85/607
ST: CH : 850/409
: 86
END
00
ROW ROW
CH : 85/7
CH
40
CH : 85/600
CH : 85/500
CH : 85/
W
RO
ROW
ROW
ROW ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW OW R
/001
ROW
5/876
MID: CH : 86
ROW
ROW
ST: CH : 8
ROW ROW
6
ROW ROW ROW W
RO
/12
ROW
: 86
CH
D:
EN
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-56A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO:AP/MDS/AL-56B
1 IN 100
TO MADAKASIRA TO SIRA
CH : 86/100
CH : 86/200
CH : 86/300
CH : 86/400
0
CH : 86/500
6/ 00 8
CH :
ROW
ROW ROW
ROW ROW ROW
END: CH : 86/126
RO
W
1
/00
RO
: 86
W
CH
ALIGNMENT PLAN
D: MI
6
87 /
85 :
H C
T: S
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for (HIGHWAY ENGINEER) V.S (CH : 86+000 TO 86+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING Sira in the State of Karnataka (55Km). APPROVED BY T.M.V
(TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-57
1 IN 100
TO MADAKASIRA TO SIRA
CH : 87/000
CH : 86/500
CH : 86/900
CH : 86/800
CH : 86/600
CH : 86/700
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for (HIGHWAY ENGINEER) V.S (CH : 86+500 TO 87+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING Sira in the State of Karnataka (55Km). APPROVED BY T.M.V
(TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-58
1 IN 100
TO MADAKASIRA TO SIRA
CH : 87/400
CH : 87/500
CH : 87/300
CH : 87/100
CH : 87/000
CH : 87/200
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for (HIGHWAY ENGINEER) V.S (CH : 87+000 TO 87+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING Sira in the State of Karnataka (55Km). APPROVED BY T.M.V
(TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-59
1 IN 100
TO MADAKASIRA TO SIRA
CH : 87/900
CH : 87/800
CH : 88/000
CH : 87/700
CH : 87/600
CH : 87/500
CH : 87/400
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-60
1 IN 100
TO MADAKASIRA TO SIRA
CH : 88/000
CH : 88/500
CH : 88/100
CH : 88/400
CH : 88/200
CH : 88/300
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-61
1 IN 100
TO MADAKASIRA TO SIRA
CH : 88/400
CH : 88/500
CH : 88/600
CH : 88/800
CH : 88/700
CH : 88/900
CH : 89/000
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
MID: CH : 88/825
ST: CH : 88/807
END: CH : 88/842
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for (HIGHWAY ENGINEER) V.S (CH : 88+000 TO 88+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING Sira in the State of Karnataka (55Km). APPROVED BY T.M.V
(TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-62
1 IN 100
TO MADAKASIRA TO SIRA
CH : 89/400
CH : 89/300
CH : 89/500
CH : 89/200
CH : 89/100
CH : 89/000
ROW ROW ROW ROW ROW ROW
ROW ROW ROW
ROW ROW
ROW ROW ROW ROW ROW
ROW ROW
ROW ROW ROW
ROW
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-63
1 IN 100
TO MADAKASIRA TO SIRA
CH : 89/600
CH : 89/700
00
00
CH : 89/8
CH : 89/900
CH : 89/5
CH : 90/000
ROW
ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW ROW ROW
ROW ROW ROW
ROW ROW ROW
ROW ROW
ROW
ROW
ROW
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY D.P
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for (HIGHWAY ENGINEER) V.S (CH : 89+500 TO 90+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING Sira in the State of Karnataka (55Km). APPROVED BY T.M.V
(TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-64
1 IN 100
g
TO MADAKASIRA TO SIRA
k
ildin
tan
rd
ter
Bu
Ya
Wa
0
t e
-3/
Toil
ing
Km
ild
Bu
d
Pon
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN AND PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 90+000 TO 90+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-65
1 IN 100
TO MADAKASIRA TO SIRA
ding
Buil
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-66A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-66B
1 IN 100
TO MADAKASIRA TO SIRA
0
2/ -
Km
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-67A
1 IN 100
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LEGEND:-
EXISTING G.L/ROAD
PROPOSED ROAD
PAVED SHOULDER
EARTHEN SHOULDER
BUILD UP AREA
TO MADAKASIRA TO SIRA
ll
We
Dry
ALIGNMENT PLAN
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 91+500 TO 92+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-68
1 IN 100
TO MADAKASIRA TO SIRA
/4 -0
HM
ple
Tem
ing
Build
ple
Tem ple
Tem
ple ing
Tem Build
ing
Build
ing
Build
g
ldin
Bui
ing
Build
ing
Build
ing
Build
ing
Build Building
Building
ing
Build
ing
Build
g
ldin
Bui ing
ldin
g Build
Bui
g ing ld
ldin Bui
Bui
g
ldin
Bui
ing
g Build
g ldin
ldin Bui
Bui
ing
g Build
ldin
Bui
g
ldin
Bui
ing
Build
g
ldin
Bui
ing ing
Build
g Build
g ldin
ldin g Bui
Bui ing ldin
ing Build ing Bui
Build ing Build
Build g
ldin
Bui
ing
g Build
ldin g
Bui ldin
Bui
g
ldin
Bui
ing g
ldin
Build Bui
ing
Build
ing g g
ldin
Build ldin Bui
Bui
g
ldin
Bui ing
Build
ing ing
g Build Build
ldin
Bui
ing ing
Build Build
g
ldin
Bui
ing ld
Bui
ALIGNMENT PLAN
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 92+000 TO 92+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-69A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-69B
1 IN 100
Acc
ing ld
Bui
TO SIRA
g ing ld g
g g ldin Bui ldin
ldin
g ldin ldin Bui Bui
Bui g Bui Bui
TO MADAKASIRA
ldin
Bui
ing ld
Bui
g
ldin
g Bui ple
ldin
g Bui Tem
ldin g ldin
g
Bui ldin Bui
Bui g
g ldin
ldin Bui
Bui
g g
g ldin ldin
g ing ldin Bui Bui
ldin g ld Bui
Bui ldin Bui
Bui
g
ldin
g g Bui
ldin g ldin
Bui ldin Bui
g g Bui
g ldin ing ldin
ldin Bui ld Bui
Bui Bui g
ldin
Bui
g g ing ld
ing ldin ldin g Bui
Bui
ld g Bui Bui ldin
g ldin Bui
g ldin Bui
ldin Bui
Bui
g
ldin
Bui
g
ldin
Bui
g
ldin
Bui
ingld
Bui
k
Bun
rol
Pet
Acc
g
ldin
Bui
Acc
ing g g
ld g ldin ldin
Bui ldin Bui Bui
Bui
g
ldin
Bui
g
g ldin
ldin Bui
Bui
ALIGNMENT PLAN
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 92+500 TO 93+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-70A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-70B
1 IN 100
TO MADAKASIRA TO SIRA
g
ildin
Bu
ing ild
Bu
g g
ildin ildin
Bu Bu g
ildin
Bu ool
Sch
g
ildin
Bu ool
Sch
r
elte
s sh
Bu
m
roo
tar
Mo
ll
We
Dry
g
ildin
Bu llege
Co p
Sum
g
ildin
Bu llege
Co
ll
we
Dry
p
Sum
ALIGNMENT PLAN
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 93+000 TO 93+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-71A
1 IN 100
TO MADAKASIRA TO SIRA
p
Sum
ple
Tem
g
ildin
Bu
ool t
Hu
Sch
p
Sho
ple
Tem
g g
ildin ildin
Bu Bu
g
ildin
Bu
C
AC
le
mp
Te
ALIGNMENT PLAN
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 93+500 TO 94+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-72A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-72B
1 IN 100
TO MADAKASIRA TO SIRA
ALIGNMENT PLAN
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 94+000 TO 94+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-73A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-73B
1 IN 100
TO MADAKASIRA TO SIRA
ell
W
Dry
ALIGNMENT PLAN
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 94+500 TO 95+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-74A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-74B
1 IN 100
TO MADAKASIRA TO SIRA
ALIGNMENT PLAN
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 95+000 TO 95+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-75A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-75B
1 IN 100
TO MADAKASIRA TO SIRA
ALIGNMENT PLAN
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 95+500 TO 96+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-76A
1 IN 100
TO MADAKASIRA TO SIRA
Building
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-77A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-77B
1 IN 100
TO MADAKASIRA Building
TO SIRA
Building
Building
Building
Building
ALIGNMENT PLAN
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 96+500 TO 97+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-78A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-78B
1 IN 100
TO MADAKASIRA TO SIRA
ing
Build
ing
ing Build
Build
ing
Build
g in
Build ing
Build
ing
ing Build
Build
ing
Build
ing
Build
ct o ry ALIGNMENT PLAN
t Fa
CLIENT :
GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT
Scen
Consultancy Services for Project Management including
Preparation of Detailed Project Report of Selected
CONSULTANT :- RESPONSIBILITY SIGN TITLE :
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-79A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-79B
1 IN 100
TO MADAKASIRA TO SIRA
ALIGNMENT PLAN
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 97+500 TO 98+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-80A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-80B
1 IN 100
TO MADAKASIRA TO SIRA
ALIGNMENT PLAN
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 98+000 TO 98+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-81A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-81B
1 IN 100
TO MADAKASIRA TO SIRA
c
Ac
ell
W
Dry
ALIGNMENT PLAN
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 98+500 TO 99+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-82A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 98+500 TO 99+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-82B
1 IN 100
TO MADAKASIRA TO SIRA
Buliding
Buliding
Building
Building
Building
Building
Building
Building
Building
Building
Dry Well
Building
ALIGNMENT PLAN
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 99+000 TO 99+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-83A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PROFILE
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 99+000 TO 99+500)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-83B
1 IN 100
TO MADAKASIRA TO SIRA
Building
Building
Building
Acc
Building
Building
Old Building
Building
Building Building
Building
Building
Building House
Temple
Tiled
Acc
Shops
Building
Building Building
ALIGNMENT PLAN
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected
Stretches / Corridors of National Highways/ State Roads DRAWN BY T.V
AND HIGHWAYS
CHECKED BY
PLAN
Highways) in the State of Andhra Pradesh for upgradation
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for
(HIGHWAY ENGINEER) V.S (CH : 99+500 TO 100+000)
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
0 INITIAL SUBMISSION 18-APR-2017 DEPARTMENT NH WING APPROVED BY T.M.V
Sira in the State of Karnataka (55Km). (TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-84A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-84B
1 IN 100
TO MADAKASIRA TO SIRA
Acc
Transformer
Building
Building
Building
Building
Building Building
Km-8/0
Hut
Building
Building
Building
ALIGNMENT PLAN
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-85A
1 IN 100
TO MADAKASIRA TO SIRA
MAIN CHAINAGE
(METRES)
PROPOSED LEVEL
(METRES)
GROUND LEVEL
(METRES)
HORIZONTAL
ALIGNMENT
VERTICAL
ALIGNMENT
LONGITUDINAL SECTION
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/AL-85B
1 IN 100
2 2
1 1
2 2
1 1
TYPICAL CROSS SECTION FOR CUTTING THE HIGH EMBANKMENT PORTION ALONG
NEW ALIGNMENT/REALIGNMENT (TCS - 02)
2 2
1 1
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/TCS - 01
1 : 75
2
2 1
1
2
1
2 2
1 1
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/TCS - 02
1 : 75
2 2
1 1
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/TCS - 03
1 : 75
TO MADAKASIRA TO SIRA
PRADESH ROAD AND BUILDING to Two/Four Lane with Paved Shoulder Configuration for AT Km 71+080
0 INITIAL SUBMISSION 07-ARP-2017 APPROVED BY T.M.V
DEPARTMENT NH WING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) - (TEAM LEADER)
Sira in the State of Karnataka (55Km).
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/STR/RC-MB - 02
1 : 100
TO MADAKASIRA TO SIRA
PRADESH ROAD AND BUILDING to Two/Four Lane with Paved Shoulder Configuration for
0 INITIAL SUBMISSION 07-ARP-2017 DEPARTMENT NH WING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
APPROVED BY T.M.V AT Km 81+428
(TEAM LEADER)
HALF PLAN AT BOTTOM Sira in the State of Karnataka (55Km).
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/STR/RC-MB - 04
1 : 100
TO MADAKASIRA TO SIRA
CLIENT :
HALF PLAN AT TOP CONSULTANT :- RESPONSIBILITY SIGN TITLE :
GOVERNMENT OF INDIA Consultancy Services for Project Management including
PLAN MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected DRAWN BY D.P GENERAL ARRANGEMENT DRAWING
AND HIGHWAYS Stretches / Corridors of National Highways/ State Roads
FOR
CHECKED BY P.K
GOVERNMENT OF ANDHRA Highways) in the State of Andhra Pradesh for up gradation (BRIDGE ENGINEER)
HALF PLAN AT BOTTOM PRADESH ROAD AND BUILDING to Two/Four Lane with Paved Shoulder Configuration for
APPROVED BY
AT Km 83+600
0 INITIAL SUBMISSION 07-ARP-2017 DEPARTMENT NH WING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) - T.M.V
(TEAM LEADER)
Sira in the State of Karnataka (55Km).
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/STR/RC-MB - 05
1 : 100
TO MADAKASIRA TO SIRA
CLIENT :
HALF PLAN AT TOP CONSULTANT :- RESPONSIBILITY SIGN TITLE :
GOVERNMENT OF INDIA Consultancy Services for Project Management including
PLAN MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected DRAWN BY D.P GENERAL ARRANGEMENT DRAWING
AND HIGHWAYS Stretches / Corridors of National Highways/ State Roads
FOR
CHECKED BY P.K
GOVERNMENT OF ANDHRA Highways) in the State of Andhra Pradesh for up gradation (BRIDGE ENGINEER)
HALF PLAN AT BOTTOM PRADESH ROAD AND BUILDING to Two/Four Lane with Paved Shoulder Configuration for
APPROVED BY
AT Km 83+890
0 INITIAL SUBMISSION 07-ARP-2017 DEPARTMENT NH WING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) - T.M.V
(TEAM LEADER)
Sira in the State of Karnataka (55Km).
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/STR/RC-MB - 06
1 : 100
TO MADAKASIRA TO SIRA
PRADESH ROAD AND BUILDING to Two/Four Lane with Paved Shoulder Configuration for
0 INITIAL SUBMISSION 07-ARP-2017 DEPARTMENT NH WING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) - APPROVED BY T.M.V AT Km 84+706
(TEAM LEADER)
Sira in the State of Karnataka (55Km).
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/STR/RC-MB - 07
1 : 100
TO MADAKASIRA TO SIRA
PRADESH ROAD AND BUILDING to Two/Four Lane with Paved Shoulder Configuration for
HALF PLAN AT BOTTOM 0 INITIAL SUBMISSION 07-ARP-2017 DEPARTMENT NH WING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
APPROVED BY
(TEAM LEADER)
T.M.V AT Km 85+125
Sira in the State of Karnataka (55Km).
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/STR/RC-MB - 08
1 : 100
TO MADAKASIRA TO SIRA
HALF PLAN AT BOTTOM PRADESH ROAD AND BUILDING to Two/Four Lane with Paved Shoulder Configuration for AT Km 93+641
INITIAL SUBMISSION 07-ARP-2017 APPROVED BY T.M.V
0 DEPARTMENT NH WING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) - (TEAM LEADER)
Sira in the State of Karnataka (55Km).
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/STR/RC-MB - 10
1 : 100
TO MADAKASIRA TO SIRA
PRADESH ROAD AND BUILDING to Two/Four Lane with Paved Shoulder Configuration for
0 INITIAL SUBMISSION 07-ARP-2017 DEPARTMENT NH WING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) -
APPROVED BY T.M.V AT Km 94+029
(TEAM LEADER)
HALF PLAN AT BOTTOM Sira in the State of Karnataka (55Km).
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/STR/RC-MB - 11
1 : 100
OF ROADWAY
SECTION 2-2
SECTION 1-1
NOTES :
DETAIL A PLAN
DETAIL D
DETAIL OF GUARD STONE @ 1m C/C
DETAIL - C
SECTION 2-2
SECTION 1-1
NOTES :
DETAIL A
PLAN
DETAIL D
DETAIL OF GAURD STONE @ 1m C/C
DETAIL - C
PRADESH ROAD AND BUILDING Lane with Paved Shoulder Configuration for Package-1: WITH CUSHION
0 INITIAL SUBMISSION 17-APR-2017 (i)Madakasira - Rolla (AP/Karnataka border) - Sira in the APPROVED BY T.M.V
DEPARTMENT NH WING (TEAM LEADER)
State of Karnataka (55Km).
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/STR/NC & RC-BOX-02
1 : 100
OF ROADWAY
SECTION 2-2
SECTION 1-1
NOTES :
DETAIL A
PLAN
DETAIL - C
SECTION 2-2
SECTION 1-1
NOTES :
DETAIL A
PLAN
DETAIL D
DETAIL OF GAURD STONE @ 1m C/C
DETAIL - C
SECTION 1 - 1
SECTION 3 - 3
SECTION 4 - 4 (MIN HEIGHT)
PLAN
PRADESH ROAD AND BUILDING to Two/Four Lane with Paved Shoulder Configuration for WALL BELOW 6m)
0 INITIAL SUBMISSION 17-APR-2017 APPROVED BY T.M.V
DEPARTMENT NH WING Package-1: (i)Madakasira - Rolla (AP/Karnataka border) - (TEAM LEADER)
Sira in the State of Karnataka (55Km).
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/STR/NC & RC-BOX-07
1 : 100
2
SECTION 1-1
PLAN
STOP
TO HINDUPUR
TO MADAKASIRA
STO
P
S-2
ROW ROW ROW ROW ROW ROW ROW ROW
ROW
ROW ROW ROW
ROW ROW ROW
W
S-23 S-1 CH S-16
RO
S-3 : 57 S-25
/70
0
W
RO
W
RO
W
S-23/24
RO
Diagonal marking
W
S-2
RO
W
RO
W
RO
W
RO
W
RO
W
CH
RO
: 57
/80
W
0
RO
W
S-25 RO
W
RO
W
RO
W
RO
W
S-16/17
RO
W
RO
W
RO
A
SIR
TO
JUNCTION AT KM 57/700
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected DRAWN BY D.P
Stretches / Corridors of National Highways/ State Roads
AND HIGHWAYS
JUNCTION IMPROVEMENT
Highways) in the State of Andhra Pradesh for upgradation CHECKED BY
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for (HIGHWAY ENGINEER) V.S PLAN AT Km : 57/700
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
ROW ROW
0 INITIAL SUBMISSION DEPARTMENT NH WING Sira in the State of Karnataka (55Km). APPROVED BY T.M.V
(TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/JUN - 01
1 IN 125
S-16 S-25
S-23
TO SIRA TO MADAKASIRA
STOP
S-23/24
Diagonal marking in
advance of divisional island
S-25
TO MADAKASIRA
JUNCTION AT KM 62/700
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected DRAWN BY D.P
Stretches / Corridors of National Highways/ State Roads
AND HIGHWAYS
JUNCTION IMPROVEMENT
Highways) in the State of Andhra Pradesh for upgradation CHECKED BY
GOVERNMENT OF ANDHRA to Two/Four Lane with Paved Shoulder Configuration for (HIGHWAY ENGINEER) V.S PLAN AT Km : 62/700
PRADESH ROAD AND BUILDING Package-1: (i) Madakasira - Rolla (AP/Karnataka border) -
ROW ROW
0 INITIAL SUBMISSION DEPARTMENT NH WING Sira in the State of Karnataka (55Km). APPROVED BY T.M.V
(TEAM LEADER)
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/JUN - 02
1 IN 125
0
0
65/0
S-16
CH : 65/100
CH :
ROW
ROW
S-25 ROW
ROW
ROW
ROW
ROW S-2 ROW
ROW S-2 ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW ROW ROW
ROW ROW
ROW
ROW ROW
ROW S-16
ROW ROW
ROW
ROW
ROW S-25
ROW
ROW AKA
RNAD
ROW RO
ROW
P TO KA
W
OWR STO
TO M S-23
ADA S-3 0
KAS 5/20
ROW
IR A : 6
CH
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
0
65/30
ROW
CH :
ROW
/17
S-16
ROW
JUNCTION AT KM 65/150 ROW
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/JUN - 03
1 IN 125
TO MADAKASIRA
ROW
ROW
S-16/17
ROW
ROW
CH : 68/200
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
Diagonal marking in
advance of divisional island
ROW
ROW
CH : 68/300
S-23/24
RO
RO
W
S-3 S-23
S-25 W RO
ROW
ROW ROW
S-2ROW RO W ROW ROW ROW ROW ROW ROW
S-16 ROW
STOP
ROW TO KARNADAKA
ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
IRA
CH : 68/400
TO S
CH : 68/500
ROW
JUNCTION AT KM 68/350
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/JUN - 04
1 IN 125
S-25 ROW ROW ROW
S-16
ROW
ROW
ROW ROW
ROW ROW ROW
ROW ROW ROW
ROW ROW
ROW ROW ROW
ROW
ROW
ROW
ROW ROW ROW ROW
S-23
ROW ROW
S-3
ROW
ROW
ROW
ROW
ROW ROW
Diagonal marking in ROW
CH : 70/300
RO
W ROW
advance of divisional island
CH : 7
S-1 ROW
RO
W S-23/24
RO ROW
0/200
W
ROW
S-25
RO
W
CH :
ROW
S-16
CH
RO
RO
7
W
W
0/10
: 70
RO /40 TO MA
DAKA
0
W 0 SIRA
W
RO
S-25
RO
W
W
RO
S-16/17 OW
W
R
RO
CH
:7
W
0/
RO
50
0
W
A RO
R
SI
TO
JUNCTION AT KM 70/350
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/JUN - 05
1 IN 125
AM
S-16/17
PUR
NDA
AKA
L
NEE
TO
TO SIRA S-2
STO
P
S-25 S-16
TO MADAKASIRA
JUNCTION AT KM 71/600
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/JUN - 06
1 IN 125
TO
SIRA
A
AK ASIR
TO MAD
S-3
S-25
JUNCTION AT KM 83/500
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/JUN - 07
1 IN 125
A
IR
AS
DAK
MA
TO
g in
TO S l m arkin l island
IRA ona iona
Diag of divis
nce
S-16 adva
S-25
JUNCTION AT KM 86/050
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/JUN - 08
1 IN 125
TO KA SIRA
ROW
S-16 SIR ADA
A T OM ROW
RO ROW
W
g in
S-25
l m arkin l island ROW
ona iona
RO
Diag of divis
W ROW
RO nce ROW
adva
W
ROW
ROW
ROW
RO
W ROW S-16
ROW
RO ROW ROW
W ROW
ROW S-25
RO ROW ROW
ROW
W
ROW ROW
ROW ROW ROW ROW
RO
W ROW
ROW
CH : 9
RO ROW
W
ROW
ROW S-23
0/700
C
ROW
H:
ROW
ROW
91
ROW
ROW
/00
S-1 ROW
ROW
ROW
CH : 9
0
ROW
0/800
ROW
CH : 90/90
ROW
ROW
ROW
0
JUNCTION AT KM 90/850
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/JUN - 09
1 IN 125
IRA
DAKAS
TO MA
ROW
S-16 ROW
TO S ROW
IRA ROW
S-25 ROW
ROW
ROW ROW
ROW ROW
ROW ROW ROW
ROW ROW
ROW ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW S-16
ROW S-25
CH : 9
S-3 ROW
CH : 94/600
ROW ROW
ROW
S-1
CH : 94/700
ROW
5
ROW W
/000
CH : 94/800
W
RO
RO
W
W
RO RO
900
RO W
W RO
RO
W
W
RO
RO W
W RO
RO
W
JUNCTION AT KM 94/800
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/JUN - 10
1 IN 125
S-16
ROW S-25
W
RO
W
RO
RO
W
W
RO RO
W
W W
ROW RO RO
RO
W
ROW ROW W
ROW RO
ROW
ROW ROW S-16
W
RO W
RO
CH
ROW ROW
ROW ROW ROW ROW
C
:
RO
H:
96/
W
ROW
S-25
96
200
RO
W ROW
/60
ROW
0
RO
W S-23 ROW
ROW ROW
ROW
ROW
CH : 96
ROW
ROW
CH :
RO
W
S-1
/300
96/5
CH : 96/400
RO
RO
00
W
W
RO
RO
W
RO
W
S-25
W
RO
RO
W
W
RO RO
W
W
RO
RO
W
W
RO
W
RO
JUNCTION AT KM 96/400
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/JUN - 11
1 IN 125
S-16 S-25
ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW
ROW ROW
ROW ROW
S-3 ROW
ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW S-16
ROW ROW ROW ROW ROW S-1 ROW
S-25
ROW
CH : 97/500
CH : 97/900
W
CH : 97/800
RO
CH : 97/700
ROW
ROW W
RO
ROW
W
RO
ROW
CH : 97/600
ROW W
RO
ROW
ROW
ROW
JUNCTION AT KM 97/700
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/JUN - 12
1 IN 125
CLIENT : CONSULTANT :- TITLE :
RESPONSIBILITY SIGN
GOVERNMENT OF INDIA Consultancy Services for Project Management including
MINISTRY OF ROAD TRANSPORT Preparation of Detailed Project Report of Selected Stretches DRAWN BY D.P
AND HIGHWAYS / Corridors of National Highways / State Roads (Approved GENERAL ARRANGEMENT DRAWING
Highways) in
the State of Andhra Pradesh for up gradation to Two/Four CHECKED BY P.K
FOR
GOVERNMENT OF ANDHRA (BRIDGE ENGINEER)
WIDENING OF SINGLE ROW PIPE
PRADESH ROAD AND BUILDING Lane with Paved Shoulder Configuration for Package-1:
0 INITIAL SUBMISSION 17-APR-2017 DEPARTMENT NH WING
(i)Madakasira - Rolla (AP/Karnataka border) - Sira in the APPROVED BY T.M.V CULVERT
(TEAM LEADER)
State of Karnataka (55Km).
SCALE
REV. DESCRIPTION OF REVISIONS DATE DWG NO: AP/MDS/STR/WC-PIPE-01 1 : 100
Note:
1. All dimensions are in 'mm' & Levels are in 'm' Unless mentioned otherwise.
2. Longitudinal slope of pipe shall match with the existing pipe but shall not be
less than 1:1000.
3. All pipes for new construction shall be of NP4 class type conforming to IS
458-2003.
4. Pipes shall be jointed by external flush joint as per IS 458-2003.
5. IF there is any discrepancy in levels the same should be reported to the site
engineer during construction. This drawing shall be read in conjuction with
relevant highway drawings.
6. FRL & Camber/Super elevation at particular location shall be verified with the
highway drawing. Discrepancy, if any, is to be immediately brought into the
notice of engineer for necessary modification in the drawing.
7. Length of each pipe has been considered as 2.5m. smaller pipe of 1.25m length
has been proposed at the end to meet the requirement of part length of pipe.
8. For pipe bedding compacted granular material has been provided as per the
specification of IRC : SP: 13-2004.
9. Specification of concrete mixes:
I) Leveling : M10
10. II) Head Walls : M20
11. Check the invert levels before execution.
12. Check flow Direction of culvert before execution.Anydiscrepancy please
inform.
13. In case of black cotton soils concrete craddle bedding shall be provided as per
IRC : SP: 13-2004.
1. All dimensions are in 'mm' & Levels are in 'm' Unless mentioned otherwise.
2. Longitudinal slope of pipe shall match with the existing pipe but shall not be
less than 1:1000.
3. All pipes for new construction shall be of NP4 class type conforming to IS
458-2003.
4. Pipes shall be jointed by external flush joint as per IS 458-2003.
5. IF there is any discrepancy in levels the same should be reported to the site
engineer during construction. This drawing shall be read in conjuction with
relevant highway drawings.
6. FRL & Camber/Super elevation at particular location shall be verified with the
highway drawing. Discrepancy, if any, is to be immediately brought into the
notice of engineer for necessary modification in the drawing.
7. Length of each pipe has been considered as 2.5m. smaller pipe of 1.25m length
has been proposed at the end to meet the requirement of part length of pipe.
8. For pipe bedding compacted granular material has been provided as per the
specification of IRC : SP: 13-2004.
9. Specification of concrete mixes:
I) Leveling : M10
10. II) Head Walls : M20
11. Check the invert levels before execution.
12. Check flow Direction of culvert before execution.Anydiscrepancy please
inform.
13. In case of black cotton soils concrete craddle bedding shall be provided as per
IRC : SP: 13-2004.
1. All dimensions are in 'mm' & Levels are in 'm' Unless mentioned otherwise.
2. Longitudinal slope of pipe shall match with the existing pipe but shall not be less than 1:1000.
3. All pipes for new construction shall be of NP4 class type conforming to IS 458-2003.
4. Pipes shall be jointed by external flush joint as per IS 458-2003.
5. IF there is any discrepancy in levels the same should be reported to the site engineer during construction. This drawing shall be read
in conjuction with relevant highway drawings.
6. FRL & Camber/Super elevation at particular location shall be verified with the highway drawing. Discrepancy, if any, is to be
immediately brought into the notice of engineer for necessary modification in the drawing.
7. Length of each pipe has been considered as 2.5m. smaller pipe of 1.25m length has been proposed at the end to meet the requirement
of part length of pipe.
8. For pipe bedding compacted granular material has been provided as per the specification of IRC : SP: 13-2004.
9. Specification of concrete mixes:
I) Leveling : M10
10. II) Head Walls : M20
11. Check the invert levels before execution.
12. Check flow Direction of culvert before execution.Anydiscrepancy please inform.
13. In case of black cotton soils concrete craddle bedding shall be provided as per IRC : SP: 13-2004.