Vous êtes sur la page 1sur 2

Quality Procedure: Document Number:

IN-QA-FORM-01
Armstrong Engineering Change Owner:
Management Design
AS Plant: Revision:
Engineering Change Note
India 00

1. Purpose

1.1 Purpose

The ECN is released to relevant departments when an engineering change is implemented by


the design department.

2. ECN Format:

Drawing No
Description
Reason for Change

Approvals Name Comments Date


Product Design
Vendor Management
Supply Chain
Manufacturing
Quality
Marketing

Detailed Description of Change

Amended/New Drawings

Date: 12/08/14 1 of 2
Quality Procedure: Document Number:
IN-QA-FORM-01
Armstrong Engineering Change Owner:
Management Design
AS Plant: Revision:
Engineering Change Note
India 00

Drawing No/Rev Description

Obsolete Drawings
Drawing No/Rev Description

3. Related Documents:

3.1 xx

4. Document Approval

4.1 Document Approval

Section Name, Department Date Signature

Prepare Navin K, VD. 7/11/2014

Review

Approve

5. Document Control

5.0 Document Revisions

Section Release/Amendment summary Issue Date

x.0

x.0

Date: 12/08/14 2 of 2

Vous aimerez peut-être aussi