Vous êtes sur la page 1sur 37

MINCONSULT SDN BHD.

PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 0 3 / 0 7/ 2017


DAY : MONDAY

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 1 1 4 1 4 4 1 1 1
TOTAL 22
NO. Working NO. Working NO. Working
Excavator 5 4 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 1 Generator 1 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Slope formation at CH 900
Filling earth CH 1500 -CH 1650

ROAD : Persiaran Kota Puteri 3


Formwork wall concrete tray ch 2100 pkp 3

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad.
MATERIAL DELIVERED :
VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 0 4 / 0 7/ 2017


DAY : Tuesday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 1 1 4 1 4 6 1 1 1
TOTAL 24
NO. Working NO. Working NO. Working
Excavator 5 4 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 1 Generator 1 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Slope formation at CH 900
Filling earth CH 1500 -CH 1650

ROAD : Persiaran Kota Puteri 3


Formwork wall concrete tray ch 2100

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :
VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 0 5 / 0 7/ 2017


DAY : Wednesday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 7 1 1 1
TOTAL 23
NO. Working NO. Working NO. Working
Excavator 5 4 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 1 Generator 1 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Slope formation at CH 900
Filling earth CH 1500 -CH 1650
Excavate for sewerage for CH 1100-CH 1300

ROAD : Persiaran Kota Puteri 3


Formwork wall concrete tray ch 2100

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :
Crusher run 250 ton
Quary dust 150 ton
VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 0 6 / 0 7/ 2017


DAY : Thursday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 2 4 1 4 7 1 1 1
TOTAL 22
NO. Working NO. Working NO. Working
Excavator 5 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 1 Generator 1 1
Bulldozer Lorry 4 4 Vibrator 2 1
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Slope formation at CH 900
Filling earth CH 1500 -CH 1650
Excavate and installation sewer pipe 450mm dia. 24m for CH 1100-CH 1300

Technical discussion with Mr Moorty KTA-existing level sewer at pump station and clearence height sewer pipe with syabas
pipe 800mm dia. At CH 1300

ROAD : Persiaran Kota Puteri 3


Casting wall concrete tray ch 2100
Briefing with en Izan (ssp2-sg harmoni) and en Azmi regarding protection pipe at 2100 pipeline

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :
Concrete G25N -9m3
VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 0 7 / 0 7/ 2017


DAY : Friday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 2 4 1 4 7 1 1 1
TOTAL 22
NO. Working NO. Working NO. Working
Excavator 5 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 1 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Slope formation at CH 900
Filling earth CH 1500 -CH 1650
Excavate and installation sewer pipe 450mm dia. for CH 1100-CH 1300
Work pending because raining day

ROAD : Persiaran Kota Puteri 3


Erecting and install wall concrete tray ch 2000

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :
Concrete G25N -9m3
VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 0 8 / 0 7/ 2017


DAY : Saturday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 2 4 1 4 7 1 1 1
TOTAL 22
NO. Working NO. Working NO. Working
Excavator 5 4 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Slope formation at CH 900
Filling earth CH 1500 -CH 1650
Excavate and installation sewer pipe 450mm dia. for CH 1100-CH 1300
Checking level for existing pipe syabas 800mm dia,box culvert 3000mmx2700mm and sewer pipe with contractor

ROAD : Persiaran Kota Puteri 3


Installation BRC A10 and formwork wall concrete tray ch 2000

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :
Concrete G25N -9m3
VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 1 0 / 0 7/ 2017


DAY : Monday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 2 4 1 4 7 1 1 1
TOTAL 22
NO. Working NO. Working NO. Working
Excavator 5 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 1 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Slope formation at CH 900
Filling earth CH 1500 -CH 1650
Excavate and installation sewer pipe 450mm dia. for CH 1100-CH 1300

ROAD : Persiaran Kota Puteri 3


casting wall concrete tray ch 2000 and
casting back drop at MH10 PKP 1 ch1300

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :
Concrete G25N -9m3
VISITOR/REMARKS :
went to IWK Gombak discussion about Permit to work joint to existing ppump station section 12-(2.00-5.30pm)
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 1 1 / 0 7/ 2017


DAY : Tuesday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 8 1 2 1
TOTAL 25
NO. Working NO. Working NO. Working
Excavator 5 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Slope formation at CH 900
Filling earth CH 1500 -CH 1650
Excavate and installation sewer pipe 450mm dia. for CH 1100-CH 1300

ROAD : Persiaran Kota Puteri 3


Installation BRC A10 and formwork wall concrete tray ch 2000

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :
VISITOR/REMARKS :
went to minconsult office discussion regarding level at PKP 1 suit to existing main road problem -2.00-5.30pm
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 1 2 / 0 7/ 2017


DAY : Wednesday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 8 1 2 1
TOTAL 25
NO. Working NO. Working NO. Working
Excavator 5 4 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1 1
Bulldozer Lorry 4 4 Vibrator 2 1
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Slope formation at CH 900
Filling earth CH 1500 -CH 1650
Excavate and installation sewer pipe 450mm dia until manhole MHC1. for CH 1200

ROAD : Persiaran Kota Puteri 3


Casting concrete tray at CH 2000
Install A10 and formwork at ch 1900 to joint with existing roadside drain

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :
Concrete G25N -7m3
VISITOR/REMARKS :
discussion with Ir Moorthy regarding sewer level at CH 1200 pkp 1 at KTA office (2.00-5.30 pm)
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 1 3 / 0 7/ 2017


DAY : Thursday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 1 1 4 1 4 8 1 2 1
TOTAL 27
NO. Working NO. Working NO. Working
Excavator 5 4 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1 1
Bulldozer Lorry 4 4 Vibrator 2 1
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Slope formation at CH 900
Filling earth CH 1500 -CH 1650
Excavate and installation sewer pipe 450mm dia until manhole MHC1. for CH 1200
Survey for manhole MH 3 to excavate
Apply permit to enter existing pump station at secton 12.GBK181 to IWK gombak
filling earth at pipe culvert ch -A130

ROAD : Persiaran Kota Puteri 3


Casting concrete tray at CH 2000
Install A10 and formwork at ch 1900 to joint with existing roadside drain
Touch up road shoulder at ch 2000
PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :
sewer pipe 450mm diameter 44 units
concrete G25N-6m3
VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 1 4 / 0 7/ 2017


DAY : Friday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 8 1 2 1
TOTAL 25
NO. Working NO. Working NO. Working
Excavator 5 4 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Slope formation at CH 900
Filling earth CH 1500 -CH 1650
Casting back drop at MH 10(CH1300)

ROAD : Persiaran Kota Puteri 3


Install A10 and formwork at ch 1900 to joint with existing roadside drain
Formation road shoulder at ch 2000

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :
sewer pipe 450mm diameter 44 units
VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 1 5 / 0 7/ 2017


DAY : Saturday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 8 1 2 1
TOTAL 25
NO. Working NO. Working NO. Working
Excavator 4 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1 1
Bulldozer Lorry 4 4 Vibrator 2 1
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
1 Excavator bucket damage because of rock
Mobilize sewer pipe culvert and quary dust into ch MH 3 until MH 5
Excavate and installation sewer pipe 450mm dia until manhole MHC1. for CH 1200
excavate for manhole MH 3
1 bachoe to repair=1/2 day

ROAD : Persiaran Kota Puteri 3


Casting drainage wall at ch 1900
Touch up road shoulder at ch 2000

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :
concrete G25N 6m3

VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 1 7 / 0 7/ 2017


DAY : Monday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 8 1 2 1
TOTAL 25
NO. Working NO. Working NO. Working
Excavator 4 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
1 Excavator bucket damage because of rock
Excavate and installation sewer pipe 450mm dia MH3 until manhole MHC4. for CH -100(70m)
Stop at 4.30pm.because of rock.need to use breaker first

ROAD : Persiaran Kota Puteri 3


install BRC and formwork drainage wall at ch 1900
Touch up road shoulder at ch 2000

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :

VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 1 8 / 0 7/ 2017


DAY : Tuesday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 1 1 4 1 4 8 1 2 1
TOTAL 27
NO. Working NO. Working NO. Working
Excavator 4 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Excavate and formating slope no 7
Hacking hard material and installation sewer pipe 450mm dia MH3 until manhole MHC4. for CH -430(70m)
Filling earth at CH 1650
survey level for slope no 6 CH 900

ROAD : Persiaran Kota Puteri 3


install BRC and formwork drainage wall at ch 1900

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :

VISITOR/REMARKS :
meeting 162unit -went to Syabas get approval at 3 pm
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 1 9 / 0 7/ 2017


DAY : Wednesday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 8 1 2 1
TOTAL 25
NO. Working NO. Working NO. Working
Excavator 4 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Excavate and formating slope no 7
Hacking hard material and installation sewer pipe 450mm dia MH3 until manhole MHC4. for CH -430(70m)
Filling earth at CH 1650

ROAD : Persiaran Kota Puteri 3


install BRC and formwork drainage wall at ch 1900
Touch up road shoulder at ch 2000

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :

VISITOR/REMARKS :
meeting 176unit
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 2 0 / 0 7/ 2017


DAY : Thursday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 8 1 2 1
TOTAL 25
NO. Working NO. Working NO. Working
Excavator 4 4 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Excavate and formating slope no 7
Hacking hard material and installation sewer pipe 450mm dia MH3 until manhole MHC4. for CH -430(70m)
Filling earth at CH 1650

ROAD : Persiaran Kota Puteri 3


Casting drainage wall at ch 1900
Touch up road shoulder at ch 2000

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :
concrete G25N 9m3

VISITOR/REMARKS :
meeting 101 unit at 10 am
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 2 1 / 0 7/ 2017


DAY : Friday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 8 1 2 1
TOTAL 25
NO. Working NO. Working NO. Working
Excavator 4 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Excavate and formating slope no 7
Hacking hard material and installation sewer pipe 450mm dia MH3 until manhole MHC4. for CH -430(70m)
Filling earth at CH 1650

ROAD : Persiaran Kota Puteri 3


re install formwork drainage wall at ch 1900
Touch up road shoulder at ch 2000

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :

VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 2 2 / 0 7/ 2017


DAY : Saturday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 8 1 2 1
TOTAL 25
NO. Working NO. Working NO. Working
Excavator 4 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Trimming slope ch 900
Backfill at ch 1650 update level RL 36.00m
Excavation and installation sewerage work 70m manhole 3- delay because of rock materials

ROAD : Persiaran Kota Puteri 3


Instalation half round glass wear at drain.
Backfill shoulder road

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :

VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 2 4 / 0 7/ 2017


DAY : Monday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 8 1 2 1
TOTAL 25
NO. Working NO. Working NO. Working
Excavator 4 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Trimming slope ch 900
Backfill at ch 1650 update level RL 36.00m
Excavation and installation sewerage work 70m manhole 3- delay because of rock materials

ROAD : Persiaran Kota Puteri 3


Instalation half round glass wear at drain.
Backfill shoulder road

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :

VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 2 5 / 0 7/ 2017


DAY : Tuesday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 8 1 2 1
TOTAL 25
NO. Working NO. Working NO. Working
Excavator 4 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Trimming slope ch 900
Backfill at ch 1650 update level RL 36.00m
Excavation and installation sewerage work 70m manhole 3- delay because of rock materials

ROAD : Persiaran Kota Puteri 3


Instalation half round glass wear at drain.
Backfill shoulder road

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :

VISITOR/REMARKS :
Site Meeting at PKNS time 1100-1400
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 2 6 / 0 7/ 2017


DAY : Wednesday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 8 1 2 1
TOTAL 25
NO. Working NO. Working NO. Working
Excavator 4 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Trimming slope ch 900
Backfill at ch 1650 update level RL 36.00m
Excavation and installation sewerage work 50m manhole 4- delay because of rock materials

ROAD : Persiaran Kota Puteri 3


Instalation strut at drain.
Backfill shoulder road

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :

VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 2 7 / 0 7/ 2017


DAY : Thursday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 7 1 2 1
TOTAL 24
NO. Working NO. Working NO. Working
Excavator 4 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Trimming slope ch 900
Backfill at ch 1650 update level RL 36.00m
Excavation and installation sewerage work 50m manhole 5

ROAD : Persiaran Kota Puteri 3


Instalation strut at drain.
Backfill shoulder road

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :

VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 2 8 / 0 7/ 2017


DAY : Friday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 7 1 2 1
TOTAL 24
NO. Working NO. Working NO. Working
Excavator 4 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Trimming slope ch 900
Backfill at ch 1650 update level RL 36.00m
Excavation and installation sewerage work 50m manhole 5

ROAD : Persiaran Kota Puteri 3


Instalation strut at drain.
Backfill shoulder road

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :
intermidiate drain and berm drain bucket bucket

VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 2 9 / 0 7/ 2017


DAY : Saturday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 8 1 2 1
TOTAL 25
NO. Working NO. Working NO. Working
Excavator 4 3 Motor Grader Diesel Tank
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Trimming slope ch 900
Backfill at ch 1650 update level RL 36.00m
1 excavator bucket broken
Excavation and installation sewerage work 50m manhole 5

ROAD : Persiaran Kota Puteri 3


Instalation strut at drain.
Backfill shoulder road

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :

VISITOR/REMARKS :
MINCONSULT SDN BHD.
PEMBINAAN JALAN LINGKARAN PERSIARAN KOTA PUTERI 1 DAN PERSIARAN KOTA PUTERI 3 SERTA KERJA-
KERJA INFRASTRUKTUR YANG BERKAITAN DI KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR
DARUL EHSAN.

LOCATION : KOTA PUTERI DATE: 3 1 / 0 7/ 2017


DAY : Monday

WEATHER
8 9 10 11 12 13 14 15 16 17 18 19 20
Working Time :
Raining Time:

Compactor Operator
Excavator Operator

B/Pusher Operator
Backhoe Operator
PERSONNEL

Bitumen Wrapper
Pile Rig Operator
Project Manager

Shovel Operator

General Labour
Crane Operator

Security Guard
Site Engineer

Store Keeper
Lorry Driver

Drain Layer
Motograder
Bar Bender

Brick Layer
Supervisor

Pipe Layer
Technician
Chainman
Site Agent

Carpenter

Concretor

Mechanic
Foreman
Surveyor

Welder
NO 1 3 4 1 4 7 1 2 1
TOTAL 24
NO. Working NO. Working NO. Working
Excavator 4 3 Motor Grader Diesel Tank 1 1
MACHINERY

Tracked shovel Backhoe 1 1 Water Pump 1


Wheeler shovel Back Pusher 2 2 Generator 1
Bulldozer Lorry 4 4 Vibrator 2
Mobile Crane Compactor 1 1 Concrete Mixture 1

SUMMARY OF WORKS EXECUTED


ROAD : Persiaran Kota Puteri 1
Trimming slope ch 900
Backfill at ch 1650 update level RL 36.00m
1 excavator bucket broken
Excavation and installation sewerage work 50m manhole 5

ROAD : Persiaran Kota Puteri 3


Instalation strut at drain.
Backfill shoulder road

PE & SSU :

No Activity

Resident Engineer, Minconsult Contractor's Representative.


Name : Mohd Faizal bin Mohd Saad. Name : Firdaus bin Mazlan.
MATERIAL DELIVERED :

VISITOR/REMARKS :

Vous aimerez peut-être aussi