a) f’c=280kg/cm2
b) f’c=350kg/cm2
a) Solución
f’c=280kg/cm2
As=3Φ3/4” =3x2.85=85.55cm2 Φ=1.91cm
β1 =0.85
d’=4cm
fs’=4280 kg/cm2
si fs’>fy ⇒ As’ esta en fluencia por tanto fs 𝐟𝐬’= fy
a =11.76cm
6(11.76 − (0.85) ∗ 4)
fs’ =
11.76
fs’ = 4.26tn/cm2
Mn=26.32 tn-m
b) Solución
350kg/cm2 β=0.80
(As−As’)fs (25.35−8.55)4200
a = 0.85∗f’c∗b = 0.85∗235∗25
= 14.13
6(a−bd’) 6(14.13−0.80(4))
fs’= = =4.64tn/cm2
a 14.13
➢ Calculo de (a)
0.85 *f’c*b*a2(As’- As ∗ fy)a-6 As’B1*d’= 0
a =14.31
6(14.31 − (0.80) ∗ 4)
fs’ =
14.31
fs’ = 4.66tn/cm2
➢ Calculo del momento nominal(Mn)
a
➢ Mn=( As fy-As’fs’)(d-2)+ As’ ∗ fs’(d-d’)
14.13
➢ Mn=[25.35*(4.2)-8.55*(4.2 )](30- )+ 8.55∗ 4.2(30-4)
2
➢ Mn=25.52 tn-m
➢ Calculo de la cuantía
As
ꝭ=
bd
25.35
ꝭ =30∗25
ꝭ =0.0338
➢ Calculo de la cuantía balanceada(ʆb).
ꝭ b=0.85∗ β∗f’c
Fy
6000
∗ 6000+fy
(0.85)(280) 6000
ꝭ b=0.85 ∗ 6000+4200
4200
ꝭ b=0.0283
−6000ꝭd+√(6000∗ꝭd)2+20400∗f’c∗ꝭd2𝛽1
a=
1.70∗ f’c
−6000(0.0338)(30)+√(6000∗0.0338∗30)2+20400∗280∗0.0338∗302 ∗0.85
a=
1.70∗ 280
a=15.77
Mn=20.75tn-m
➢ Calculo de la cuantía.
As
ꝭ=bd
25.35
ꝭ=30∗25
ꝭ=0.0338
ꝭb=0.85∗ β1∗f’c
Fy
6000
∗ 6000+fy
(0.80)(350) 6000
ꝭb=0.85 ∗ 6000+4200
4200
ꝭb=0.0333
➢ Calculo de (a)
−6000(0.0338)(30)+√(6000∗0.0338∗30)2+20900∗350∗0.0338∗302∗0.80
a=
1.70∗ 280
a=14.17cm
14.17
Mn=0.85*(0.350)(0.25)*14.17(30- )
2
Mn=29.15tn-m
➢ Relaciones
M(350) 24.15tn−m
= =1.16
M(380) 20.75tn−m
a) pre dimensionamiento.
L 16 1.78+1.33
= 9 =1.78 h= =1.58 h=1.60m
9 2
L 16
= =1.33
12 12
H 1.6 0.8+1.07
= =0.8 b= =0.935m= 1m
2 2 2
2 2
∗ H=3 ∗ 1.6 =1.07
3
b) metrado de cargas.
Carga muerta(WD)
Peso propio =4.4tn/m(1.6x0.30) =1.15tn/m
➢ Carga ultima(wu).
1.4Wu
1.4(1.15) =1.61tn/m
1.4(8) =11.12tn
➢ Hallando “d”
Φ =1” =2.54cm
Φ=3/8” =0.95cm
r =4+0.95 + 2.54/2
r=6.22cm
d=h-r=150-6.22=143.78
Se sabe que:
Es 2x106 kg/cm2
n=Ec= =10.08
15000∗√fc
As
ꝭ= …………….(1)
bd
k=-Pn+√(Pn)2 + 2(Pn)……………………..(2)
k
j=1-3 ………………………………………………………(3)
despejando k
3−k
j= 3
3j = 3-k
K = 3-3j
K = 3(1-j)………………………………………………………….(4)
K = 3(1-j)
2
−Pn+√(Pn) +2Pn
-j = 3
−1
2
−Pn+√(Pn) +2Pn
j = 1- 3
……………………………….(5)
As √ As 2 As
−( )+ (( )n) +2( ) n
Bd Bd Bd
j = 1- 3
………………………(6)
sabemos que:
M 2x106
Fs= n= =10.08= 10
jdAs 15000√175
Hallamos fs
fs=0.4 * fy
fs=0.40(4200)
fs=1680kg/cm2
Remplazando:
71x 105𝑘𝑔/𝑐𝑚2
1680= 2
As √ As As
−( )+ (( )n) +2( ) n
Bd Bd Bd
143.78∗(1− )∗As
3
As=33.86cm2
33.86
Cantidad de varillas= = 6.67 = 7 varillas de 1”
5.07
a) dimensionamiento.
L 8 0.89+0.67
= =0.89 h= =0.78 h=0.8m = 80cm
9 9 2
L 8
= =0.67
12 12
H 0.8 0.4+0.53
= =0.4 b= = 0.42m = 40 cm
2 2 2
2 2
∗ H= 3 ∗ 0.8 =0.53
3
b) metrado de cargas.
Carga muerta(WD)
Peso propio =2.4tn/m3*(0.8m*0.40m) =0.768ton/m
➢ Carga ultima(wu).
WU=1.4WD
WU=1.4(0.768tn/m) =1.08tn/m
WU=1.08tn/m
PU=1.4(Pd) + 1.7 (Pl)
PU=1.4(30tn) + 1.7 (27tn)=8.79tn
PU=8.79tn
d=73.78cm
As=5.93cm2
Verificación:
As
ꝭ=b∗d
5.93
ꝭ=40∗73.78
ꝭ=0.002
0.7∗√175
ꝭmin = 4200
= 0.0022
14
ꝭmin =4200 = 0.0022
Asmin = 0.0022*40cm*73.78cm =6.49 =6.5 cm2
Asmin = 6.5cm2 (Condición no cumple)
Mn=2087821.68 kg-cm
Mn=20.87 tn-m
16.06 ≤ 0.9 (20.87) =18.78………………..ok!