Date: 30/05/2018

Sl.No. Task Carried Out Reference


1 Removal of Main Rotor Blades AMM 62-11-00, 4-1
2 Removal of Tail Rotor Hub AMM 64-21-00, 4-1
3 Disassembly of Tail Rotor Hub AMM 64-21-00, 4-3
4 Removal of Horizontal Stabilizer AMM 51-11-00, 4-1
5 Removal of Tail Rotor Hub Fairing AMM 64-21-00, 4-5
6 Check Drainage of Upper Housing of Rotor Mast AMM 62-31-00, 6-2
7 Draining of TGB AMM 12-10-00, 3-1
8 Removal of Lower Fairing AMM 53-51-00, 4-2
9

Total working hours: 9hrs (8:00 am – 17:00 pm)

Date: 31/05/2018

Sl.No. Task Carried Out Reference


1 Blade Pin Touchup AMM 62-11-00, 4-1
2 Removal of Main Rotor Hub AMM 62-21-00, 4-1
3 Cleaning and Inspection of Tail Rotor AMM 64-21-00, 6-3

Total working hours: 9hrs (8:00 am – 17:00 pm)

Date: 01/06/2018

Sl.No. Task Carried Out Reference


1 Disassembly and Check of Main Rotor Hub AMM 62-21-00, 4-3B
2 Inspection Criteria of Rotor Brake AMM 63-51-00, 6-2
3 Check of Seats AMM 25-21-01, 6-2

Total working hours: 9hrs (8:00 am – 17:00 pm)


Date: 02/06/2018

Sl.No. Task Carried Out Reference


1 Removal of TGB AMM 65-21-00, 4-1
Removal of Forward Shaft Section- Tail Rotor Drive
2 Shaft AMM 65-11-00,4-1
3 Removal of Center Shaft Section- Tail Rotor Drive Shaft AMM 65-11-00,4-3
4 Removal of Rear Shaft Section- Tail Rotor Drive Shaft AMM 51-11-00, 4-5
5 Inspection of Main Rotor Blade AMM 62-11-00, 6-1
6 Inspection of Windshield AMM 56-11-00, 6-1
7 Inspection of MGB Mount and Suspension Bars AMM 63-32-00,6-3

Total working hours: 9hrs (8:00 am – 17:00 pm)

Date: 03/06/2018

Sl.No. Task Carried Out Reference


Inspection of Forward Shaft Section- Tail Rotor Drive
1 Shaft AMM 65-11-00, 6-1
Inspection of Center Shaft Section- Tail Rotor Drive
2 Shaft AMM 65-11-00, 6-2

3 Inspection of Rear Shaft Section- Tail Rotor Drive Shaft AMM 65-11-00, 6-3

4 Inspection of Sliding Door (Passenger Door) AMM 52-12-01, 6-2

5 Test of Jettison Crew Door AMM 52-11-01,5-1

6 Inspection of Crew Door AMM 52-11-01,6-2

7 Inspection of Lateral Cargo Hold Door AMM 52-31-01,6-1

8 Inspection of Rear Cargo Hold Door AMM 52-32-01, 6-1

Total working hours: 9hrs (8:00 am – 17:00 pm)


Date: 04/06/2018

Sl.No. Task Carried Out Reference


1 Check of Main Rotor Hub AMM 65-11-00, 6-1
2 Check of Fuel System AMM 28-21-01, 5-2
3 Cleaning of Lower Fairing AMM 53-51-00,6-2
4 Check of Hydraulic System AMM 29-11-00,5-1
5 Inspection of Skid AMM 32-11-00,6-1

Total working hours: 9hrs (8:00 am – 17:00 pm)

Date: 05/06/2018

Sl.No. Task Carried Out Reference


1 Installation of Main Rotor Hub AMM 62-21-00, 4-2

2 Inspection of Pitch Change Link- Rotor Control AMM 62-33-00, 6-1

3 Scissor Installation and Inspection AMM 62-33-00,6-2

4 Removal of Belt-Driven Hydraulic Pump AMM 29-11-01,4-1

5 Inspection of Belt-Driven Hydraulic Pump AMM 29-11-01,6-1

6 Lubrication of Swash Plate AMM 62-32-00,3-1

7 Functional Test of hydraulic System AMM 29-11-00,5-2

Total working hours: 9hrs (8:00 am – 17:00 pm)

Date: 06/06/2018

Sl.No. Task Carried Out Reference


1 Removal of MGB/Engine Coupling AMM 63-11-00,4-1
2 Cleaning and check of MGB/Engine Coupling AMM 63-11-00,6-1
3 Replacement of Collective Spring AMM 76-12-04,4-2
4 Lubrication of Tail Rotor Drive Shaft AMM 65-11-00,3-1

Total working hours: 9hrs (8:00 am – 17:00 pm)


Date: 07/06/2018

Sl.No. Task Carried Out Reference


1 Installation of Lower Fairing-Cowling AMM 53-51-00,4-2
2 Installation of MGB/Engine Coupling AMM 63-11-00,4-2
Installation of Forward Shaft Section-Tail Rotor Drive
3 Shaft AMM 65-11-00,4-2
Installation of Center Shaft Section-Tail Rotor Drive
4 Shaft AMM 65-11-00,4-4
5 Check of Starter/Generator AMM 24-31-01,6-1
6 Carried Out SB EC 130-05-016
7 Condition and Continuity Check- Fire Detector AMM 26-11-00,6-2
8 Installation of Air Intake Cowling AMM 53-51-00,4-3
9 Inspection of Flexible Coupling MGB/Engine Coupling AMM 63-11-00,6-1

Total working hours: 9hrs (8:00 am – 17:00 pm)

Date: 08/06/2018

Sl.No. Task Carried Out Reference


1 Installation of Rear Shaft Section-Tail Rotor Drive Shaft AMM 65-11-00,4-6

2 Installation Belt- Driven Hydraulic Pump AMM 29-11-01,4-1

3 Installation of Starter/Generator AMM 24-31-00,4-1

4 Installation of Tail Gear Box AMM 65-21-00, 4-2

5 Engine Mount Belt

6 Erosion EMM 72-00-32-801

7 Installation of Horizontal Stabilizer AMM 55-11-00, 4-1

Total working hours: 9hrs (8:00 am – 17:00 pm)


Date: 09/06/2018

Sl.No. Task Carried Out Reference


1 Assembly of Tail Rotor Hub AMM 64-21-00, 4-4

2 Draining of Fuel System AMM 12-10-00, 3-2

3 Installation of Tail Rotor Hub AMM 64-21-00,4-2

Total working hours: 9hrs (8:00 am – 17:00 pm)