4 Inspection of Sliding Door (Passenger Door) AMM 52-12-01, 6-2
5 Test of Jettison Crew Door AMM 52-11-01,5-1
6 Inspection of Crew Door AMM 52-11-01,6-2
7 Inspection of Lateral Cargo Hold Door AMM 52-31-01,6-1
8 Inspection of Rear Cargo Hold Door AMM 52-32-01, 6-1
Total working hours: 9hrs (8:00 am – 17:00 pm)
Date: 04/06/2018
Sl.No. Task Carried Out Reference
1 Check of Main Rotor Hub AMM 65-11-00, 6-1 2 Check of Fuel System AMM 28-21-01, 5-2 3 Cleaning of Lower Fairing AMM 53-51-00,6-2 4 Check of Hydraulic System AMM 29-11-00,5-1 5 Inspection of Skid AMM 32-11-00,6-1
Total working hours: 9hrs (8:00 am – 17:00 pm)
Date: 05/06/2018
Sl.No. Task Carried Out Reference
1 Installation of Main Rotor Hub AMM 62-21-00, 4-2
2 Inspection of Pitch Change Link- Rotor Control AMM 62-33-00, 6-1
3 Scissor Installation and Inspection AMM 62-33-00,6-2
4 Removal of Belt-Driven Hydraulic Pump AMM 29-11-01,4-1
5 Inspection of Belt-Driven Hydraulic Pump AMM 29-11-01,6-1
6 Lubrication of Swash Plate AMM 62-32-00,3-1
7 Functional Test of hydraulic System AMM 29-11-00,5-2
Total working hours: 9hrs (8:00 am – 17:00 pm)
Date: 06/06/2018
Sl.No. Task Carried Out Reference
1 Removal of MGB/Engine Coupling AMM 63-11-00,4-1 2 Cleaning and check of MGB/Engine Coupling AMM 63-11-00,6-1 3 Replacement of Collective Spring AMM 76-12-04,4-2 4 Lubrication of Tail Rotor Drive Shaft AMM 65-11-00,3-1
Total working hours: 9hrs (8:00 am – 17:00 pm)
Date: 07/06/2018
Sl.No. Task Carried Out Reference
1 Installation of Lower Fairing-Cowling AMM 53-51-00,4-2 2 Installation of MGB/Engine Coupling AMM 63-11-00,4-2 Installation of Forward Shaft Section-Tail Rotor Drive 3 Shaft AMM 65-11-00,4-2 Installation of Center Shaft Section-Tail Rotor Drive 4 Shaft AMM 65-11-00,4-4 5 Check of Starter/Generator AMM 24-31-01,6-1 6 Carried Out SB EC 130-05-016 7 Condition and Continuity Check- Fire Detector AMM 26-11-00,6-2 8 Installation of Air Intake Cowling AMM 53-51-00,4-3 9 Inspection of Flexible Coupling MGB/Engine Coupling AMM 63-11-00,6-1