BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
Sqm
A EARTHWORK Ratio 0.00
0.00
1 A1 Earthwork in excavation for foundations, plinth beams, cess pits 0.00
& trenches in all kinds of soil upto the required depth from the 0.00
existing ground level to the required line, level and grades in both 0.00
dry and wet conditions including shoring, strutting, bailing, 0.00
pumping out water from all sources, dressing of sides, ramming of 0.00
bottom and stacking the excavated material clear from the edges 0.00
of trenches upto a lead of 100m, with leads and lifts complete. 0.00
0.00
a) Upto 2m depth Cum 137.000 245.000 935.000 805.000 410.000 125.600 722.000 1380.000 169.000 85.000 7020.000 318.000 128.000 12479.60
pg 1 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
line, level and grades in both dry and wet conditions including 0.000 0.00
shoring, strutting, bailing, pumping out water from all sources, 0.000 0.00
dressing of sides and stacking the excavated material clear from 0.00
the edges of trenches upto a lead of 100m, with leads and lifts 0.00
complete. 0.00
0.00
a) Upto 2.0m depth Cum 0.00
0.000 0.00
5 A5 Back filling/filling in foundation and areas wherever 0.000 0.00
required below ground level in layers not exceeding 200mm in 0.000 0.00
depth and compacting it upto 90% proctor density by watering, 0.000 0.00
ramming consolidating, levelling and all measures and materials 0.000 0.00
required for proper execution 0.000 0.00
0.000 0.00
a) With selected excavated earth Cum 0.000 0.00
b) With selected earth brought from outside with a maximum 0.000 64.000 64.00
lead of 2 Km Cum 0.000 0.00
0.000 0.00
6 A6 Supplying and filling in plinth with approved river sand in 0.00
layers not exceeding 150 mm in depth and well compacting it 0.00
upto 70% relative density by watering, ramming consolidating, 0.00
levelling, and all materials and measures required to complete Cum 188.170 306.200 450.790 450.790 405.000 670.000 396.000 210.000 120.000 31.000 - 15.000 3227.95
this work 0.00
0.000 0.00
7 A7 Supplying and filling in plinth with earth approved by engineer 0.000 0.00
in layers not exceeding 150 mm in depth and compacting it upto 0.000 0.00
90% proctor density by watering, ramming, consolidating and 0.000 0.00
levelling, all materials and measures required to complete this 0.000 0.00
work. 0.000 0.00
0.000 0.00
a) With selected excavated earth Cum 0.00
b) With selected earth brought from outside with a maximum 0.000 0.00
lead of 2 Km Cum 940.000 1530.000 2255.000 2255.000 2025.000 2233.000 1978.000 1000.000 600.000 154.000 1000.000 75.000 16045.00
0.000 0.00
8 A8 Supplying and filling well graded gravel of particle size 0.000 0.00
3mm to 20mm around storage tanks to required compaction in 0.000 0.00
layers not exceeding 200mm thick using approved gravel as 0.000 0.00
pg 2 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
pg 3 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
b) P.C.C 1:2:4 Cum 236.250 84.875 125.300 125.300 118.125 41.300 109.000 95.000 35.000 8.000 5300.000 75.000 10.000 6363.15
0.000 0.00
2 B2 Providing and laying PCC 1:3:6 in sunken floors of bath and 0.000 0.00
toilet in other floors using 20mm and downsize graded 0.000 0.00
crushed stone aggregates with minimum cement content, 0.000 0.00
maximum water cement ratio as per IS:456 - 2000 and OPC43 / 0.000 0.00
53 grade machine mixed, mechanically vibrated and cured 0.000 0.00
properly, including formwork if required and levelled for laying of 0.000 0.00
floor finish, all materials and labour complete in all respects. Cum 0.000 0.00
0.000 0.00
3 B3 Providing and laying in situ reinforced cement concrete with 0.000 0.00
cement, sand and 20mm down size graded crushed stone 0.000 0.00
aggregates / gravel with a minimum cement content & maximum 0.000 0.00
water cement ratio as per IS:456-2000 in all types of structures 0.000 0.00
and machine mixed and providing pockets, construction joint, 0.00
expansion joint, contraction joint, openings, recesses, chamfering 0.00
etc, wherever required, vibrating, tamping, curing and rendering if 0.00
required to give a smooth / even surface,etc.(excluding the Cost of 0.000 0.00
Reinforcement and Shuttering) for all depths below Ground 0.000 0.00
Level and all heights above Ground level in any shape, size, 0.000 0.00
position, thickness, finish and all materials and measures to 0.000 0.00
complete the work required. 0.000 0.00
0.000 0.00
4 B4 M25 Grade of Concrete (UOS) 0.000 0.00
0.00
i) Below Ground level 0.000 0.00
0.000 0.00
a) Foundations / Pile caps Cum 12.000 24.000 162.000 118.000 50.000 15.000 90.000 110.000 60.000 27.000 75.000 743.00
b) Columns and Pedestals Cum 18.000 20.000 58.000 58.000 36.000 15.500 35.000 85.000 20.000 7.000 23.000 20.000 395.50
c) Plinth beams Cum 16.000 22.000 60.300 60.300 27.000 12.500 30.000 10.000 6.200 3.000 3.000 250.30
d) Raft Slab Cum - - 5.625 5.625 - 0.000 15.000 64.000 90.25
e) Retaining walls Cum 0.000 0.00
f) Service Tunnel Cum 0.000 0.00
g) Service Trenches Cum 70.000 115.000 0.000 115.000 300.00
h) Equipment foundations Cum 30.000 50.000 0.000 50.000 130.00
i) Staircase Cum 0.000 0.00
j) Sump/Lift pit/Lift machine room Cum - - 16.000 16.000 - 0.000 11.250 43.25
pg 4 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
pg 5 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
pg 6 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
0.00
2 D2 Supplying, providing and fabricating inserts such as 0.00
Plates, pipes, puddle flanges, angles, channels, anchor bolts, 0.00
including MS lugs etc. , transporting, erecting and installing the 0.00
embedded steel parts at all levels, including surface preparation, 0.000 0.00
setting material in concrete, templates, furnishing and all 0.000 0.00
handling, welding, bolting, drilling, cutting, jointing, etc. including 0.000 0.00
applying a coat of red oxide primer or zinc rich epoxy primer 0.000 0.00
supply of all nuts/lock nuts, washers, bolts, etc. complete with all 0.000 0.00
labour, materials, tools & tackles, equipment etc. complete as 0.000 0.00
per specifications, drawings and as directed 0.000 0.00
0.000 0.00
a) Mild steel Inserts MT 3.000 5.000 0.000 5.000 200.000 1.000 214.00
0.00
E MISCELLANEOUS 0.00
0.00
1 E1 Grouting of pockets with ordinary cement grout of cement 0.000 0.00
mortar 1:2 for thickness up to 25mm and with plain concrete for 0.000 0.00
thickness above 25mm with coarse aggregate 10mm nominal 0.000 0.00
size including curing, cleaning of pockets and all material and 0.000 0.00
measures required to complete this work. Cum 0.000 0.00
0.000 0.00
2 E2 Providing and laying non-shrinking cement grout such as 0.000 0.00
SHRINKOMP20 or approved equivalent under base plates 0.000 0.00
of machine frames, steel columns, etc., for grouts of thickness 0.000 0.00
shown in drawings and filling of pockets of foundations & 0.000 0.00
curing, cleaning out pockets, etc., complete and as per the 0.000 0.00
specifications and drawings. The non- shrinking grout shall 0.000 0.00
be laid as per manufacturer's specifications. Cum 0.00
0.000 0.00
3 E3 Providing and laying polySTREEN sheet of 25 mm thick above 0.000 0.00
ground level and approved make and quality as a expansion joint 0.000 0.00
filler material all material and labour etc.complete in all respects. Sqm 0.000 8000.000 8000.00
0.000 0.00
4 E4 Supplying and applying two component polysulfide sealant 0.000 0.00
conforming to IS:12118 - 1987 which is polysulphide based 0.000 0.00
pg 7 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
pg 8 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
pg 9 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
total weight of cover with frame not less than 38 kgs Nos. 0.00
0.00
15 E15 Providing and Fixing C.I cover with frame (medium duty) 0.00
455x610mm internal dimensions, confirming to IS 1726 -1991, 0.00
total weight of cover with frame not less than 144kgs Nos. 0.00
0.00
16 E16 Providing and Fixing C.I cover with frame (heavy duty) of 0.00
dia 560mm confirming to IS 1726 - 1991, total weight of 0.00
cover with frame not less than 208kgs Nos. 0.000 0.00
0.00
17 E17 Supplying and fixing in position poly-propylene rungs 0.00
confirming to ASTM D-4101 specification, is injection moulded 0.00
around a 12 mm IS 1786 - 1985 grade, Fe-415 steel 0.00
reinforcement bar of size 266x165x25mm thick for access in 0.00
water retaining structures including anchorage in wall to a 0.00
minimum of 136mm complete and as directed Nos. 0.00
0.00
18 E18 Supplying and fixing in position 450mm wide MS ladder, 0.000 0.00
made 50x50x6mm MS angle on side with 35x35x4 M.S angles 0.000 0.00
welded to the MS angles as rungs at every 200mm centres 0.000 0.00
vertically, on terrace for access to water tank including painting 0.00
with two coats of synthetic enamel paint over a coat of zinc 0.00
chromate primer, all materials and labour complete in all 0.00
respects. Kg 0.00
0.00
19 E19 Providing and Laying 150thk. Rubble soling base 0.00
in ground floor, including material, labour complete in all respects. Sqm. 315.000 500.000 - - 675.000 670.000 530.000 350.000 3040.00
0.00
20 E20 Providing and laying 750mm wide plinth protection all 0.00
around the building using 50mm to 75mm thk PCC 1:2:4 with 0.00
20mm and down stone aggregates, laid over firm compacted 0.00
ground and 75mm thk PCC 1:2:4 using 20mm down sized 0.00
aggregate with all material and labour complete. Sqm. 88.000 120.000 255.000 255.000 145.000 60.750 135.000 65.000 21.000 10.000 15.000 1169.75
0.000 0.00
21 E21 Providing and fixing 50mm thick anti-vibration pad of 0.000 0.00
approved brand coated with bitumen on all sides and laid on 0.000 0.00
pg 10 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
cement plaster 1:2 painted with a coat of bitumen as per 0.000 0.00
manufacture's specification under / between machine foundations 0.000 0.00
and flooring and all materials and measures to complete the work Sqm. 0.000 0.00
0.00
22 E22 Providing and fixing 25mm thick High Density cork of 0.00
approved make and best quality including cutting to required size 0.00
and shape at all levels, all material and labour etc. complete in all 0.00
respects. Sqm. 0.000 0.00
23 E23 Providing and fixing 300MM RR MASONRY IN cm 1:5 0.000 39300.000 39300.00
approved make and best quality including cutting to required size CUM
and shape at all levels, all material and labour etc. complete in all
respects.
F WATER PROOFING 0.000 0.00
0.000 0.00
1 F1 Providing and laying integral cement based treatment for 0.000 0.00
underground structure water proofing on horizontal surface 0.00
at all levels as directed by Engineer-in-Charge and consisting of : 0.000 0.00
0.000 0.00
a) First layer of 20mm thick approved and specified rough stone 0.000 0.00
slab over a 25mm thick base of cement mortar 1:3 (1cement : 3 0.000 0.00
coarses and) mixed with waterproofing compound conforming to 0.000 0.00
IS:2645-1975 in the recommended proportion. Joints sealed & 0.00
grouted with cement slurry mixed with water proofing compound 0.000 0.00
conforming to IS:2645 - 1975 in proportion recommended by the 0.000 0.00
manufacturer. 0.000 0.00
b) Second layer of 25mm thick cement mortar 1:3 (1cement : 3 0.000 0.00
coarse sand) mixed with water proofing compound in 0.00
recommended proportions. 0.000 0.00
c) Finishing top with stone aggregate of 10mm to 12mm nominal 0.000 0.00
size embedded in the cement mortar. Sqm 0.000 0.00
2 F2 Providing and laying integral cement based treatment for 0.000 0.00
underground structure water proofing on the vertical surface 0.000 0.00
by fixing specified stone slab 20mm thick with cement slurry 0.000 0.00
mixed with water proofing compound conforming to IS:2645-1975 0.000 0.00
in recommended proportion with a gap of 20mm (minimum) 0.000 0.00
pg 11 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
between stone slabs and the receiving surfaces and filling the 0.000 0.00
gaps with neat cement slurry mixed with water proofing 0.000 0.00
compound and finishing the exterior of stone slab with cement 0.000 0.00
mortar 1:4 (1 cement : 4 coarse sand) 20mm thick with neat 0.000 0.00
cement punning mixed with water proofing compound in 0.000 0.00
recommended proportion complete at all levels and as directed 0.000 0.00
by Engineer-in-charge. 0.000 0.00
0.000 0.00
a) Using rough kota stone Sqm 0.000 0.00
0.000 0.00
b) Using rough red sand stone Sqm 0.00
0.000 0.00
3 F3 Providing injection treatment to raft slab and beams, base slab of 0.000 0.00
lift pits, water tanks in the form of pressure grouting by injecting 0.000 0.00
cement slurry mixed with grout admixture CICO – Non shrink 0.000 0.00
polymer grouting compound or approved equivalent in the 0.000 0.00
required consistency through the prefixed GI nozzles in the 18mm 0.000 0.00
dia holes drilled along the construction joints and weak spots 0.000 0.00
found if any as per specialised agency recommendation under 0.000 0.00
pressure using grout pump including preparation of surface de- 0.000 0.00
watering, drilling hole using pneumatic hammer fixing of GI 0.000 0.00
nozzles and finally cutting projected nozzles and sealing of the GI 0.000 0.00
nozzles after injection operation is over with CICO NO : 3 . Non 0.000 0.00
shrink polymer grouting compound or approved equivalent, 0.000 0.00
finishing, curing, etc., as per manufacturer’s specification. Rate 0.00
shall include for cost of all materials, labour, equipments to be 0.000 0.00
employed etc., all complete and as directed. Sqm 0.00
0.000 0.00
4 F4 Providing and laying the following roof water proofing 0.000 0.00
treatment consisting of Sqm 0.000 0.00
0.000 0.00
a) First layer of cement concrete 1:3:6 with minimum thickness of 0.000 0.00
40mm. over base concrete laid to falls and slope of minimum 0.000 0.00
1:100 and finished smooth to receive water proofing membrane 0.000 0.00
b) Second part with one layer of 3mm thick polyester reinforced 0.000 0.00
modified bituminous waterproofing membrane including primer 0.000 0.00
pg 12 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
pg 13 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
pg 14 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
pg 15 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
pg 16 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
finish and finishing coat 6mm thk in CM 1:4 finished with steel 0.000 0.00
trowel at all levels to correct line and level with necessary 0.000 0.00
scaffolding, if any, and rounding off or champhering of corners, 0.00
cleaning of surface, raking out joints, roughening of 0.000 0.00
surface, chiselling the undulated surface wherever necessary and 0.000 0.00
curing, including making grooves, forming pattas, and drip moulds 0.000 0.00
etc.All materials and labour complete in all respects. Sqm 355.000 355.000 - - 500.000 360.000 610.000 370.000 285.000 66.000 - 2901.00
0.000 0.00
2 I2 Internal Plastering 0.000 0.00
Providing and applying 12mm cement plaster in CM 1:5 to walls 0.00
internally in single coat at all levels to correct line and level 0.000 0.00
including scaffolding, if any, and rounding off or champhering of 0.000 0.00
corners, cleaning of surface, raking out joints, roughening of 0.000 0.00
surface, chiselling the undulated surface wherever necessary and 0.000 0.00
curing, etc. all materials and labour complete in all respects Sqm 580.000 865.000 2675.000 1650.000 750.000 380.000 1450.000 570.000 220.000 61.000 600.000 9801.00
0.000 0.00
3 I3 Ceiling Plastering 0.000 0.00
Providing and applying 6mm cement plaster in CM 1:3 to the 0.000 0.00
ceilings in single coat at all levels to correct line and level 0.000 0.00
including scaffolding, if any, and rounding off or champhering of 0.000 0.00
corners, cleaning of surface, raking out joints, roughening of 0.000 0.00
surface, chiselling the undulated surface wherever necessary and 0.000 0.00
curing, etc. all materials and labour complete in all respects Sqm. 305.000 475.000 2148.000 1432.000 - 300.000 600.000 70.000 191.000 45.000 450.000 6016.00
0.000 0.00
4 I4 GROOVE IN CEMENT PLASTER 0.000 0.00
Forming groove of uniform size from 12x6mm upto 25x6mm in 0.000 0.00
external plastered surface as per approved pattern using wooden 0.000 0.00
battens nailed to under layer including removal of wooden batten, 0.000 0.00
repair to edges of plaster panel and finishing the groove as per 0.000 0.00
specification with water proofing compound. RM 350.000 500.000 324.000 650.000 250.000 60.000 2134.00
0.00
0.000 0.00
5 I5 Providing plaster band 75 to 150 mm wide and 0.000 0.00
12mm deep in Cement mortar 1:5 by means of timber battens or 0.000 0.00
metal strips, making good of broken edges and corners, at levels, 0.000 0.00
all materials and labour complete. Sqm. 350.000 500.000 324.000 650.000 250.000 60.000 2134.00
pg 17 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
0.000 0.00
0.000 0.00
J PAINTING 0.00
0.000 0.00
1 J1 External Painting 0.000 0.00
J1.1 Providing and applying two coats of water proof cement paint 0.000 0.00
over a coat of primer with brush to get an even and uniform 0.000 0.00
shade and thickness for all external walls at all heights and 0.000 0.00
levels and curing with water after application, all works including 0.000 0.00
labour, material and scaffolding complete. Sqm. 355.000 355.000 500.000 360.000 610.000 370.000 285.000 231.000 - 3066.00
0.00
J 1.2 Providing alluminium clading with all necessary sealents and 0.000 0.00
fixtures Sqm. 1260.000 840.000 800.000 2900.00
Internal Painting 0.000 0.00
2 J2 Providing and applying two coats of Plastic Emulsion 0.000 0.00
of approved manufacturer like Asian,Berger,Nerolac 0.000 0.00
or equivalent and of required shade on all internal wall surface to 0.000 0.00
give an even shade including a priming coat with alkali resistant 0.00
primer and two coats of putty after thoroughly brushing the 0.000 0.00
surface free from mortar dropping and other foreign matter and 0.000 0.00
also including preparing the surface even and sand papered 0.000 0.00
smooth etc. all materials and labour complete. Sqm. 580.000 865.000 2675.000 1650.000 750.000 380.000 1450.000 570.000 220.000 61.000 600.000 9801.00
0.000 0.00
0.000 0.00
3 J3 Ceiling Painting 0.000 0.00
Providing and applying two coats of Plastic emulsion over one coat of 0.000 0.00
primer with brush to get an even and uniform shade and thickness 0.000 0.00
on all ceiling surface at all heights and levels and curing with 0.00
water after application, all works including labour, material and 0.000 0.00
scaffolding complete. Sqm. 305.000 475.000 2154.000 1436.000 - 300.000 600.000 70.000 191.000 45.000 450.000 6026.00
0.000 0.00
0.000 0.00
K FLOORING 0.000 0.00
0.000 0.00
1 K1 Kota stone slab 0.000 0.00
Providing and laying 25mm thk. Kota stone slab flooring of 0.000 0.00
pg 18 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
approved quality, colour and required size as specified selected 0.000 0.00
and sorted for uniformity in colour free from cracks, fissures & 0.00
flakes with straight edges & perfect corners laid at right angles as 0.000 0.00
per pattern over a bedding of cement mortar 20mm thk. average in 0.000 0.00
C.M.1:4 (1 cement : 4 coarse sand) pointed neatly with white 0.000 0.00
cement mixed with colouring pigment to match colour of tile and 0.000 0.00
three or more coats of polishing (with oxalic acid) upto mirror 0.000 0.00
finished and all material and labour complete Sqm. 160.000 40.000 200.00
0.000 0.00
0.00
2 K2 Granolithic Flooring 0.000 0.00
Providing and laying 40mm thick. Granolithic flooring (as per IS: 0.000 0.00
2571) in entry ramps with cement concrete1:1:2 with 12.5mm 0.000 0.00
and down stone aggregates laid in alternate panels of sizes not 0.000 0.00
more than2M x 2M area, finished smooth by using cement@ 0.000 0.00
2kg/sqm including rounding off corners and applying a coat of 0.000 0.00
cement slurry over base concrete after chipping and cleaning of 0.000 0.00
surface etc., properly cured and finished in all respects, all 0.000 0.00
materials, lead, lift, descent and labour complete at all levels. Sqm. 0.000 150.000 150.00
0.000 0.00
0.000 0.00
0.000 0.00
3 K3 Ceramic Tile flooring (Basic Price - Rs.-30/-) 0.000 0.00
Providing and laying of 300 mm x 300 mm size Anti skid 0.00
ceramic tiles in toilets of approved quality, brand and uniform 0.000 0.00
colour, free from cracks, fissures and flakes with straight edges 0.000 0.00
and perfect corners laid at right angles as per approved pattern 0.000 0.00
over a bedding of cement mortar 20 mm thk average in CM 0.000 0.00
1:4 (1part of cement and 4 part of sand) pointed neatly with white 0.000 0.00
cement mixed with colouring pigment to match colour of tile and 0.000 0.00
Providing
finished inand laying 600mm
all respects X 600mm
all materials andsize Vitrified
labour tiles (conforming to
complete. Sqm. - 145.000 85.000 25.000 30.000 70.000 355.00
EN 176water absorbtion less than 0.05%) of approved make, in
approved colour and design, flooring laid in pattern as detailed in 0.000 0.00
4 K4 drawing or as directed by the EIC. Tile to be laid over Sqm. 315.000 510.000 2148.000 1432.000 - 170.000 650.000 530.000 198.000 48.000 418.000 6419.00
0.000 0.00
pg 19 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
pg 20 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
pg 21 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
The outer frame and the shutter are made 0.000 0.00
out of section no. 9222, 9223, 9202, 9203, 9201, 9200, 9219, 0.00
5140 with 5mm thick plain glass at the top and 9mm thick 0.000 0.00
laminated novapan board at the bottom upto a height of 900mm 0.000 0.00
with push plate handle across the door and with all necessary 0.000 0.00
fittings accessories. 0.000 0.00
900mm x 2100mm ( D1 ) Nos. 10.000 - 2.000 1.000 4.000 17.00
750mm x 2100mm ( D2 ) 30.000 16.000 4.000 2.000 6.000 1.000 59.00
3 Q3 Providing and fixing of brown anodised aluminium 6 shutter 0.000 0.00
sliding window for an opening size of 1500mm x 1200mm. 0.000 0.00
The outer frame made out of III track heavy duty sections with 0.000 0.00
gutter head bottom with standard window style using section 0.000 0.00
nos. 8689, 8685, 1819, 1822, 1823 and with all necessary 0.00
fittings and accessories and with 4mm plain glass (W) Nos. 88.000 68.000 33.000 8.000 5.000 7.000 3.000 32.000 244.00
0.00
4 Q4 Same as item no. Q4 but for an opening size of 0.000 0.00
6 ' 0'' x 6' 0'' and with shutters ( W1 ) Nos. 0.000 0.00
0.000 0.00
Same as item no. Q4 but for an opening size of 0.000 0.00
3 ' 0'' x 4' 6'' and with shutters ( W1 ) Nos. 0.000 0.00
0.000 0.00
5 Q5 Same as item no. Q4 but for an opening size of 0.000 0.00
9' 0'' x 6' 0'' and with shutters (W) Nos. 0.000 0.00
0.00
0.000 0.00
6 Q6 Providing and fixing of brown anodised aluminium fixed 0.000 0.00
ventilators for an opening size of 600mm x 600mm , the unit is 0.000 0.00
divided into 6 equal panels. The outer frame is made out of 2" x 1" 0.000 0.00
hollow box section tube with suitable louver blades and 5mm pin 0.000 0.00
headed glass. Nos. 31.000 18.000 8.000 2.000 4.000 63.00
R WOODEN JOINERY 0.00
0.00
1 Q1 Providing and fixing Treated hard wood framed with 32mm 0.00
thick both sides commercial with plastic coating flush door 0.000 0.00
3' 0'' x 7' 0'' ( D1 ) Nos. 0.000 0.00
2' 6'' x 7' 0'' ( D2 ) Nos. 0.00
pg 22 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
0.000 0.00
Note:
pg 23 of 24
L&T-RAMBØLL CONSULTING ENGINEERS LIMITED
BILL OF QUANTITIES-PRELIMINARY
JOB No. SHEET
Proposed Land side facilities-BUILDINGS AND
PROJECT
BOUNDARY -Kattupalli Port C1091102
DATE
Doc. No. BQ-0001 0 07-02-10 Security
33kV Fire water Raw water Fuel station
CHECKE Reefer Operation Admin Workshop cum Quay BOUNDAR Control
PARTICU - BOQ for Civil and Structural works CALCULATED SSReceivi Fire station pump pump and storage Total
D substation building building building document- substation Y WALL tower
-LARS Sheena/Arun JTP ng yard house house yard
ation office
Sl. Item
Description of Work Unit
No. No.
pg 24 of 24