Ref.

Pak PWD
S. No. Description 2004 Sch. Page Unit
No./ Item No.
CIVIL WORKS
A SCHEDULED ITEMS
1 Clearing Jungle (dense) by cutting, 14/2 100 Sft
removing all Shrubs, trees upto 6 inches
(152 mm) girth etc and taking out their
entire roots and filling the hollows with
earth concrete with dressing,consolidating
and watering the filling including stacking
the serviceable materials and disposal of
useless materials and directed lead upto
10 chains (305Rm) cost of earth included.

2 Felling trees of any height girth exceeding 14/3 Each


6" to one foot (152mm), cutting into
portable pieces, taking out their entire roots
and filling the hollow with earth complete
with dressing, consolidating and watering
the filled including stacking the serviceable
material and disposal of useless materials
as directed lead upto 10 chains(305Rm)
cost of earth included

3 Felling trees of any height girth exceeding 14/4 Footgirth


6" to one foot (505mm), cutting into
portable pieces, taking out their entire roots
and filling the hollow with earth complete
with dressing, consolidating and watering
the filled including stacking the serviceable
material and disposal of useless materials
as directed lead upto 10 chains(305Rm)
cost of earth included
4 a. Excavation for raft foundations, 23/10 100 Cft
underground tanks and septic tank
(rectangular or square) in all kind of soil
(except gravelly and murum soil wet silt,
clay or mud, conglomeration of gravel and
boulders, soil, sandy or disintegrated and
hard rock.) and back filling the excavated
material all round the trenches including
breaking clods, watering, consolidation by
ramming in layers not exceeding 9 inches
(229mm) in depth to full compaction,
dressing and disposal of surplus excavated
stuff as directed, lead up to one chain (30.5
Rm) and lift upto 5 feet (1.52m)

5 Providing and laying 1:6:12 cement 37/20, 38/51 100 Cft


concrete using jhama brick ballast in
foundation including levelling, compacting
and curing etc. complete.
6 Providing and laying reinforced cement 167/2 100 Cft
concrete using local sand & crushed stone 189/134
3/4 inch (19 mm) and down gauge having 189/137
a minimum works cubes crushing strength
of 3750 lbs per sq. inch (23.24 N/mm2) at
28 days with a mix not leaner than 1:1.5:3
in raft or strip foundation with columns and
pillars of any shape including formwork and
its removal, compacting, levelling and
curing etc complete but excluding the cost
of reinforcement in foundation basement
and plinth

7 Providing and laying reinforced cement 167/3, 100 Cft


concrete using local sand & crushed stone 189/134,
3/4 inch (19 mm) and down gauge having 189/137
a minimum works cubes crushing strength
of 3750 lbs per sq. inch (23.24 N/mm2) at
28 days with a mix not leaner than 1:1.5:3
in columns of T,L, angular or cross shape
of regular section including formwork and
its removal, compacting, levelling and
curing etc complete but excluding the cost
of reinforcement in foundation basement
and plinth
8 Providing and laying RCC using local sand 168/8, 100 Cft
& crushed stone 3/4 inch (19mm) and 189/134,
down gauge having a minimum works cube 189/137
crushing strength of 3750lbs per sq inch
(23.24N/mm2) at 28 days with a mix not
leaner than 1:1.5:3 in plinth beams of
required shape and design including form
work and its removal, compacting and
curing etc. but exceeding the cost of
reinforcement, in foundation basement and
plinth.

9 Providing and laying first class solid brunt 124/2 100 Cft
brick masonry set in cement mortar 1:6 in
straight or curved walls 9" to 13 1/2" (228
mm to 343 mm) thick including scaffolding,
racking out joints and curing etc complete
in foundation, basement and plinth
(foundation and basement masonry upto 5
feet (1.52 R.m) depth and plinth upto 4 feet
(1.2Ru.m) height from ground level)

10 Providing and laying 1.5" (38 mm) thick 69/8 100 Sq.ft.
DPC with cement concrete 1:2:4 cast in
situ using graded screened bajri of 3/4 inch
(19mm) and down gauge including
compacting, curing, form work and its
removal etc. complete with applying a coat
of hot bitumen ( max asphalt 80/100 or
equivalent) using 35 lbs. per hundred
square feet (1.7Kg/sm) on DPC after
complete drying and cleaning the surface
with double layer of polythene sheet of 500
gauge.

11 a. Providing DPC on vertical surface with 70/11 100 sq. ft


3/4 inch (19mm) thick cement plaster 1:4
mixed with any approved water proofing
agent including curing etc complete but
excluding the cost of water proofing agent.

b. Providing a coat of bitumen emulsion at 70/12 100 Sq. ft.


10 lbs per % sft (0.49 Kg/sm) on walls and
floor in ground floor.
12 Supplying stacking and filling sand of 31/9 100 Cft
approved quality from outside sources in
foundation, trenches, plinth or under floor
etc including dressing, watering and
consolidating by ramming in layers not
exceeding 9 inches (229mm) in depth to
compaction and lift upto 5 feet (1.52 m)
13 170/23, 100 Cft
189/134,
189/137
a. First Floor 182/92 100 Cft
b. Second Floor 183/93 100 Cft
C. Third Floor 183/93 100 Cft
Rate
Amount
Qty (Rs.)
(Rs.)

113,490 35.83 40663

240 82.4 19776

384 107.88 41425.92


114,371 144.89 165,711

18,493 3,588.01 663531

45,435 8720.02 3,961,906

4,739 10,265.26 486,419


4,789 9,819.73 470,292

35,867 6,264.47 2,246,893

4,832 1,978.96 95,613

9,540 1,026.18 97897.57

9,540 182.77 1743625.8

86,567 638.5 552730.3


7,655 11,754.55 899,752