Sr No Particular Floor Level Quantity Rate
1 Column Ground 445.06 79
2 Column 1st - 79
3 Column 2nd - 79
4 Column Service 474.24 79
5 Column 3rd 290.93 79
6 Column 4th 278.16 79
7 Column 5th 278.16 79
8 Column 6th - 79
9 Column 7th 278.16 79
10 Column 8th 278.16 79
11 Column Footing 579.12 79
12 Column B2 834.48 79
13 Column B1 - 79
Structural Steel
Sr No Particular Floor Level Quantity Rate
1 Beam 3rd
Structural Steel
Sr No Particular Floor Level Quantity Rate
1 Column Ground - 79
2 Column 1st - 79
Structural Steel
Sr No Particular Floor Level Quantity Rate
1 Column Ground - 79
2 Column 1st - 79
Structural Steel
Sr No Particular Floor Level Quantity Rate
1 Bracing Work Ground 4,183.36 79
Structural Steel
Sr No Particular Floor Level Quantity Rate
1 Beam Ground
Structural Steel
Sr No Particular Floor Level Quantity Rate
1 Column FC 3rd
2 Column FC 4th
3 Column FC 5th
4 Column FC 6th
5 Column FC 7th
6 Column FC 8th
Structural Steel
Sr No Particular Floor Level Quantity Rate
1 SW Footing
2 SW B2
3 SW B1
4 SW Ground
5 SW 1st
6 SW 2nd
7 SW Service
Itemwise Summary
Floor Level Cost
Footing 310,523.94
Beam 17,259,498.83
Slab 12,885,298.81
Column 32,123,406.59
Grand Total 62,578,728.16 1
ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
35159.424 8,985.10 81 762,953 299.78 1722.24 516290.35 2,480.00
0 7,696.07 81 623,382 264.78 1722.24 456019.36 1,999.20
0 13,164.14 81 1,066,295 373.81 1722.24 643787.09 3,600.00
37464.96 4,423.74 81 395,788 122.77 1722.24 211442.85 1,192.00
22983.312 6,308.50 81 533,972 176.95 1722.24 304749.16 1,601.60
21974.64 4,603.29 81 394,841 147.50 1722.24 254027 1,209.60
21974.64 4,608.90 81 395,296 149.33 1722.24 257178.65 1,209.60
0 4,579.20 81 370,915 147.04 1722.24 253239 1,132.80
21974.64 4,731.73 81 405,245 158.94 1722.24 273725.08 1,209.60
21974.64 4,608.90 81 395,296 150.24 1722.24 258754.5 1,171.20
45750.48 8,732.79 81 753,106 283.40 1722.24 488083.68 2,537.60
65923.92 8,021.29 81 715,648 230.15 1722.24 396378.7 2,006.40
0 5,842.05 81 473,206 160.13 1722.24 275773.68 1,536.00
ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
4,828.35 81 391,096 - - 568.00
ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
0 2,850.15 81 230,862 23.42 1722.24 40341.75 480.00
0 2,482.40 81 201,074 20.50 1722.24 35299.031 408.00
ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
0 1,068.81 81 86,573 23.42 1722.24 40341.75 480.00
0 930.90 81 75,403 20.50 1722.24 35299.031 408.00
ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
330,485 746.06 81 390,917 - 1722.24 - 4.00
ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
16,147.00 79 1,275,613 -
ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
2,088.81 81 169193.5436 650.00
1,719.59 81 139286.5095 528.00
1,733.23 81 140391.958 528.00
1,828.77 81 148130.0974 576.00
1,665.00 81 134864.7155 504.00
1,758.25 81 142418.6135 552.00
ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
3,504.24 81 283843.44 62.23 1722.24 107175 988.00
1,639.08 81 132765.48 29.89 1722.24 51477.754 456.00
1,639.08 81 132765.48 29.89 1722.24 51477.754 456.00
2,673.40 81 216545.076 47.82 1722.24 82364.406 760.00
2,328.62 81 188618.544 41.85 1722.24 72068.855 646.00
2,673.40 81 216545.076 47.82 1722.24 82364.406 760.00
1,384.74 81 112163.94 25.48 1722.24 43882.675 380.00
Rate Amount Quantity Rate Amount
15000000
Grand Total 15,000,000.00 Beam
4 Hilti Bolts - No
5 Grouting - Sqm
6 Ferrocrete - Sqm
ngsville Realty LLP, Shivaji Nagar,
Rate Amount
100 1,623,010.74
575 -
550 -
2400 -
1,623,010.74
Missing data Base plate and gusset plate details not given MS 16230.11
Bolt M10 0.00
Ferrocrete 0.00
Grouting 0.00
Beam strngthening at Typical Floors Ref Drawing : TYPICAL FLOOR BEAM STRENGTHENING_R0.dwg
Sr No Location Work Details Nos L B H Quantity Unit Constant
A 1 Third Floor Beam Strengthening ISMC -200 1 1 38.195 1 1 38.195 Rm 22.1
2 2 ISMC -200 Box 1 2 42.102 1 1 84.204 Rm 22.1
B 3 Fourth Floor Beam Strengthening ISMC -200 1 1 38.195 1 1 38.195 Rm 22.1
4 2 ISMC -200 Box 1 2 42.102 1 1 84.204 Rm 22.1
C 5 Fifth Floor Beam Strengthening ISMC -200 1 1 38.195 1 1 38.195 Rm 22.1
6 2 ISMC -200 Box 1 2 42.102 1 1 84.204 Rm 22.1
D 7 Sixth Floor Beam Strengthening ISMC -200 1 1 38.195 1 1 38.195 Rm 22.1
8 2 ISMC -200 Box 1 2 42.102 1 1 84.204 Rm 22.1
E 9 Seventh Floor Beam Strengthening ISMC -200 1 1 38.195 1 1 38.195 Rm 22.1
10 2 ISMC -200 Box 1 2 42.102 1 1 84.204 Rm 22.1
F 11 Eight Floor Beam Strengthening ISMC -200 1 1 38.195 1 1 38.195 Rm 22.1
12 2 ISMC -200 Box 1 2 42.102 1 1 84.204 Rm 22.1
Unit Total Quantity Unit
Kg/Rm 844.11 Kg ISMC -200 MS
Kg/Rm 1,860.91 Kg 2 ISMC -200 Box MS
Kg/Rm 844.11 Kg ISMC -200 MS
Kg/Rm 1,860.91 Kg 2 ISMC -200 Box MS
Kg/Rm 844.11 Kg ISMC -200 MS
Kg/Rm 1,860.91 Kg 2 ISMC -200 Box MS
Kg/Rm 844.11 Kg ISMC -200 MS
Kg/Rm 1,860.91 Kg 2 ISMC -200 Box MS
Kg/Rm 844.11 Kg ISMC -200 MS
Kg/Rm 1,860.91 Kg 2 ISMC -200 Box MS
Kg/Rm 844.11 Kg ISMC -200 MS
Kg/Rm 1,860.91 Kg 2 ISMC -200 Box MS
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of Slab strengthening
as per drawing and as instructed including contractor
consumables, cleaning concrete surface by using grander,
filing gaps between structural steel and concrete with
approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
638.19 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by Client
free of cost.
Rate Amount
100 63,819.44
575 50,600.00
550 1,151.82
2400 27,627.42
143,198.69
MS 638.19
Bolt M10 88.00
Ferrocrete 11.51
Grouting 2.09
Rate Amount
100 257,200.80
575 35,650.00
800 25,101.60
2400 16,396.80
334,349.20
Extra mezzanine beam work
Sr No Location Work Details Nos L B H Quantity Unit Constant
A 1 Ground Floor Footing and Column in MS Base Plate (400 X 350 X 12 mm) 2 1 0.4 0.35 0.012 0.00336 Cum 7850
2 Footing and Column in MS Bolts (M 12 - 11nos ) 2 11 1 1 1 22 Nos 1
3 Footing and Column in MS ISA 75 X 75 - 8mm 2 1 1.1 1 1 2.2 Rm 8.9
4 Footing and Column in MS ISMC - 200 Box 2 2 1 1 4.88 19.52 Rm 22.1
5 Footing and Column in MS Ferrocrete 2 1 0.2 0.15 4.88 6.832 Sqm 1
C 10 Mezzanine Floor Beam Strengthening Base Plate ( 225 X 235 X 10 mm) 4 1 0.225 0.235 0.01 0.002115 Cum 7850
11 Beam Strengthening Bolts (M 10mm - 4nos ) 4 4 1 1 1 16 Nos 1
12 Beam Strengthening ISA 65 X 65 - 8mm 4 1 0.175 1 1 0.7 Rm 7.7
D 13 Mezzanine Floor Beam Strengthening Base Plate ( 200 X 125 X 10 mm) 4 1 0.2 0.125 0.01 0.001 Cum 7850
E 14 Mezzanine Floor Beam Strengthening ISMC - 200 Box 2 2 1 1 15.114 60.456 Rm 22.1
15 Mezzanine Floor Beam Strengthening ISMC - 200 2 1 1 1 14.968 29.936 Rm 22.1
16 Mezzanine Floor Beam Strengthening Deck Plate - 1mm GI 1 1 31.377 1 1 31.377 Sqm 1
Unit Total Quantity Unit
Kg/Cum 26.38 Kg Base Plate (400 X 350 X 12 mm) MS
Per No 22.00 Nos Bolts (M 12 - 11nos ) Bolt M12
Kg/Rm 19.58 Kg ISA 75 X 75 - 8mm MS
Kg/Rm 431.39 Kg ISMC - 200 Box MS
Sqm 6.83 Sqm Ferrocrete Ferro
Rate Amount
100 350,645.50
60 224,326.38
6419 266,652.35
575 50,600.00
550 12,830.40
2400 99,861.12
168 88,200.00
1,093,115.74
M-
TRIUMPH
Sr No Location Work Details Nos L B H Quantity Unit Constant
A 1 B3 Footing and Column in MS Base Plate (500 X 550 X 12 mm) 4 1 0.5 0.55 0.012 0.0132 Cum 7850
2 B3 Footing and Column in MS Bolts (Tor 12mm - 12nos ) 4 12 1 1 1 48 Nos 1
3 B3 Footing and Column in MS ISA 100 X 100 - 8mm 4 1 1.5 1 1 6 Rm 12.1
Unit Total Quantity Unit
Kg/Cum 103.62 Kg Base Plate (500 X 550 X 12 mm)
Per No 48.00 Nos Bolts (Tor 12mm - 12nos )
Kg/Rm 72.60 Kg ISA 100 X 100 - 8mm
Slab Strengthening Qty M - TRIUMPH
Beam Size
Thickness
Length of Slab Beam of plate in Length of Area of Plate Wt per Sqm Area of Beam in
Sr No Beam No Floor Beam Breadth Depth depth Depth mm No of plate plate Height of plate in Sqm in Kgs Sqm Total wt in Kgs
1 Basement-2 109.69 0.15 0.2 12 84 0.31 0.36 9.37 94.20 60.33 883.07
ISMC200 2 109.69 1.00 219.38 22.10 - 4,848.25
ISA75X75X6 84 0.70 1.00 58.80 6.80 - 399.84
2 Basement-1 109.71 0.15 0.2 12 84 0.31 0.36 9.37 94.20 60.34 883.07
ISMC200 2 109.71 1.00 219.41 22.10 - 4,849.05
ISA75X75X6 84 0.70 1.00 58.80 6.80 - 399.84
3 Ground Floor 96.80 0.15 0.2 12 84 0.31 0.36 9.37 94.20 53.24 883.07
ISMC200 2 96.80 1.00 193.60 22.10 - 4,278.60
ISA75X75X6 84 0.70 1.00 58.80 6.80 - 399.84
4 First Floor 39.19 0.15 0.2 12 16 0.31 0.36 1.79 94.20 21.56 168.20
ISMC200 2 39.19 1.00 78.38 22.10 - 1,732.29
ISA75X75X6 16 0.70 1.00 11.20 6.80 - 76.16
5 Second Floor 115.10 0.15 0.2 12 33 0.31 0.36 3.68 94.20 63.31 346.92
ISMC200 2 115.10 1.00 230.20 22.10 - 5,087.46
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
6 Service Floor 115.10 0.15 0.2 12 33 0.31 0.36 3.68 94.20 63.31 346.92
ISMC200 2 115.10 1.00 230.20 22.10 - 5,087.46
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
7 Third Floor 107.36 0.15 0.2 12 33 0.31 0.36 3.68 94.20 59.05 346.92
ISMC200 2 107.36 1.00 214.73 22.10 - 4,745.49
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
8 Fourth Floor 107.36 0.15 0.2 12 33 0.31 0.36 3.68 94.20 59.05 346.92
ISMC200 2 107.36 1.00 214.73 22.10 - 4,745.49
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
9 Fifth Floor 107.36 0.15 0.2 12 33 0.31 0.36 3.68 94.20 59.05 346.92
ISMC200 2 107.36 1.00 214.73 22.10 - 4,745.49
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
10 Sixth Floor 107.36 0.15 0.2 12 33 0.31 0.36 3.68 94.20 59.05 346.92
ISMC200 2 107.36 1.00 214.73 22.10 - 4,745.49
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
11 Seventh Floor 107.36 0.15 0.2 12 33 0.31 0.36 3.68 94.20 59.05 346.92
ISMC200 2 107.36 1.00 214.73 22.10 - 4,745.49
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
11 Seventh Floor 107.36 0.15 0.2 12 33 0.31 0.36 3.68 94.20 59.05 346.92
ISMC200 2 107.36 1.00 214.73 22.10 - 4,745.49
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
1,229.78 2,891.32 676.38 62,481.14
No of Bolts
1 7.00 588.00
0 - -
1 7.00 588.00
0 - -
1 7.00 588.00
0 - -
1 7.00 112.00
0 - -
1 7.00 231.00
0 - -
1 7.00 231.00
0 - -
1 7.00 231.00
0 - -
1 7.00 231.00
0 - -
1 7.00 231.00
0 - -
1 7.00 231.00
0 - -
1 7.00 231.00
0 - -
1 7.00 231.00
0 - -
3,724.00
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of Slab strengthening
as per drawing and as instructed including contractor
consumables, cleaning concrete surface by using grander,
filing gaps between structural steel and concrete with
approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
62,481.14 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by Client
free of cost.
Rate Amount
100 6,248,114.20
1375 -
550 101,456.44
2400 1,623,303.00
575 2,141,300.00
10,114,173.64
Column Size
Slab Beam Thickness of Length of Height of Area of Plate Wt per Sqm Area of column
Sr No Column No Floor Floor Ht L B depth Depth plate in mm No of plate plate plate in Sqm in Kgs in Sqm
1 C1 Ground to 1st floor 4.88 0.375 0.9 0.15 6 1 2.55 4.73 12.06 47.10 12.44
C1 1st to 2nd floor 4.27 0.375 0.9 0.15 6 1 2.55 4.12 10.50 47.10 10.89
C1 2nd to Service 4.88 0.375 0.9 0.15 6 1 2.55 4.73 12.06 47.10 12.44
C1 Service to 3rd 2.6 0.375 0.9 0.15 6 1 2.55 2.45 6.24 47.10 6.63
C1 3rd to 4th 3.19 0.3 0.9 0.15 8 1 2.4 3.04 7.29 62.80 7.66
C1 4th to 5th 3.05 0.3 0.9 0.15 6 1 2.4 2.90 6.95 47.10 7.32
C1 5th to 6th 3.05 0.3 0.6 0.15 6 1 1.8 2.90 5.22 47.10 5.49
C1 6th to 7th 3.05 0.3 0.6 0.15 6 1 1.8 2.90 5.22 47.10 5.49
C1 7th to 8th 3.05 0.3 0.6 0.15 8 1 1.8 2.90 5.22 62.80 5.49
C1 8th to 9th 3.05 0.3 0.6 0.15 8 1 1.8 2.90 5.22 62.80 5.49
2 C2 Ground to 1st floor - - - -
C2 1st to 2nd floor - - - -
C2 2nd to Service 4.88 0.525 1.35 0.15 6 2 0.45 4.73 4.25 47.10 18.30
C2 Service to 3rd - - - -
C2 3rd to 4th - - - -
C2 4th to 5th - - - -
C2 5th to 6th - - - -
C2 6th to 7th 3.05 0.375 1.05 0.15 6 2 0.45 2.90 2.61 47.10 8.69
C2 7th to 8th 3.05 0.375 0.9 0.15 6 2 0.45 2.90 2.61 47.10 7.78
C2 8th to 9th - - - -
3 C3 Ground to 1st floor - - - -
C3 1st to 2nd floor - - - -
C3 2nd to Service - - - -
C3 Service to 3rd - - - -
C3 3rd to 4th - - - -
C3 4th to 5th - - - -
C3 5th to 6th - - - -
C3 6th to 7th - - - -
C3 7th to 8th 3.05 0.3 0.9 0.15 6 2 0.45 2.90 2.61 47.10 7.32
C3 8th to 9th 3.05 0.3 0.75 0.15 6 2 0.45 2.90 2.61 47.10 6.41
4 C10 Ground to 1st floor - - - -
C10 1st to 2nd floor - - - -
C10 2nd to Service 4.88 0.525 1.35 0.15 6 1 3.75 4.73 17.73 47.10 18.30
C10 Service to 3rd - - - -
C10 3rd to 4th - - - -
C10 4th to 5th - - - -
C10 5th to 6th - - - -
C10 6th to 7th - - - -
C10 7th to 8th - - - -
C10 8th to 9th - - - -
5 C22 Footing to B2 6.35 0.6 1.2 0.15 6 2 0.9 6.20 11.16 47.10 22.86
C22 B2 to B1 3.05 0.6 1.2 0.15 6 2 0.9 2.90 5.22 47.10 10.98
C22 B1 to Ground 3.05 0.6 1.2 0.15 6 2 1.1 2.90 6.37 47.10 10.98
C22 Ground to 1st floor 4.88 0.6 1.2 0.15 6 1 3.6 4.73 17.02 47.10 17.57
C22 1st to 2nd floor 4.27 0.6 1.2 0.15 6 1 3.6 4.12 14.82 47.10 15.37
C22 2nd to Service 4.88 0.6 1.2 0.15 6 2 0.9 4.73 8.51 47.10 17.57
C22 Service to 3rd - - - -
C22 3rd to 4th - - - -
C22 4th to 5th - - - -
C22 5th to 6th - - - -
C22 6th to 7th - - - -
C22 7th to 8th - - - -
C22 8th to 9th - - - -
6 C29 Footing to B2 6.35 0.6 1.2 0.15 10 1 3.6 6.20 22.31 78.50 22.86
C29 B2 to B1 3.05 0.6 1.2 0.15 10 1 3.6 2.90 10.43 78.50 10.98
C29 B1 to Ground 3.05 0.6 1.2 0.15 8 1 3.6 2.90 10.43 62.80 10.98
C29 Ground to 1st floor 4.88 0.6 1.2 0.15 8 1 3.6 4.73 17.02 62.80 17.57
C29 1st to 2nd floor 4.27 0.6 1.2 0.15 8 1 3.6 4.12 14.82 62.80 15.37
C29 2nd to Service 4.88 0.6 1.2 0.15 6 1 3.6 4.73 17.02 47.10 17.57
C29 Service to 3rd - - - -
C29 3rd to 4th - - - -
C29 4th to 5th - - - -
C29 5th to 6th - - - -
C29 6th to 7th - - - -
C29 7th to 8th - - - -
C29 8th to 9th - - - -
7 C31 Footing to B2 6.35 0.9 0.9 0.15 6 2 0.6 6.20 7.44 47.10 22.86
C31 B2 to B1 3.05 0.9 0.9 0.15 6 2 0.6 2.90 3.48 47.10 10.98
C31 B1 to Ground - - - -
C31 Ground to 1st floor - - - -
C31 1st to 2nd floor - - - -
C31 2nd to Service - - - -
C31 Service to 3rd - - - -
C31 3rd to 4th - - - -
C31 4th to 5th - - - -
C31 5th to 6th - - - -
C31 6th to 7th - - - -
C31 7th to 8th - - - -
C31 8th to 9th - - - -
8 C32 Footing to B2 - - - -
C32 B2 to B1 - - - -
C32 B1 to Ground - - - -
C32 Ground to 1st floor - - - -
C32 1st to 2nd floor - - - -
C32 2nd to Service - - - -
C32 Service to 3rd - - - -
C32 3rd to 4th 3.19 0.75 0.75 0.15 6 2 0.45 3.04 2.73 47.10 9.57
C32 4th to 5th - - - -
C32 5th to 6th - - - -
C32 6th to 7th - - - -
C32 7th to 8th - - - -
C32 8th to 9th - - - -
9 C36 Footing to B2 6.35 0.45 1.2 0.15 6 2 0.6 6.20 7.44 47.10 20.96
C36 B2 to B1 3.05 0.45 1.2 0.15 6 2 0.45 2.90 2.61 47.10 10.07
C36 B1 to Ground 3.05 0.45 1.2 0.15 6 2 0.45 2.90 2.61 47.10 10.07
C36 Ground to 1st floor 4.88 0.45 1.2 0.15 6 2 0.9 4.73 8.51 47.10 16.10
C36 1st to 2nd floor 4.27 0.45 1.2 0.15 6 2 0.9 4.12 7.41 47.10 14.09
C36 2nd to Service 4.88 0.45 1.2 0.15 6 2 0.9 4.73 8.51 47.10 16.10
C36 Service to 3rd - - - -
C36 3rd to 4th - - - -
C36 4th to 5th - - - -
C36 5th to 6th - - - -
C36 6th to 7th - - - -
C36 7th to 8th - - - -
C36 8th to 9th - - - -
10 C101 Footing to B2 - - - -
C101 B2 to B1 3.05 0.23 0.75 0.15 6 2 0.6 2.90 3.48 47.10 5.98
C101 B1 to Ground 3.05 0.23 0.75 0.15 6 2 0.6 2.90 3.48 47.10 5.98
C101 Ground to 1st floor 4.88 0.23 0.75 0.15 10 2 0.6 4.73 5.67 78.50 9.56
C101 1st to 2nd floor 4.27 0.23 0.75 0.15 10 2 0.6 4.12 4.94 78.50 8.37
C101 2nd to Service 4.88 0.23 0.75 0.15 12 2 0.6 4.73 5.67 94.20 9.56
C101 Service to 3rd 2.6 0.23 0.75 0.15 10 2 0.6 2.45 2.94 78.50 5.10
C101 3rd to 4th 3.19 0.23 0.75 0.15 6 2 0.6 3.04 3.65 47.10 6.25
C101 4th to 5th 3.05 0.23 0.75 0.15 6 2 0.6 2.90 3.48 47.10 5.98
C101 5th to 6th 3.05 0.23 0.75 0.15 6 2 0.6 2.90 3.48 47.10 5.98
C101 6th to 7th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C101 7th to 8th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C101 8th to 9th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
11 C102 Footing to B2 - - - -
C102 B2 to B1 3.05 0.23 0.75 0.15 6 1 1.96 2.90 5.68 47.10 5.98
C102 B1 to Ground 3.05 0.23 0.75 0.15 6 1 1.96 2.90 5.68 47.10 5.98
C102 Ground to 1st floor 4.88 0.23 0.75 0.15 8 1 1.96 4.73 9.27 62.80 9.56
C102 1st to 2nd floor 4.27 0.23 0.75 0.15 6 1 1.96 4.12 8.07 47.10 8.37
C102 2nd to Service 4.88 0.23 0.75 0.15 6 2 0.7 4.73 6.62 47.10 9.56
C102 Service to 3rd 2.6 0.23 0.75 0.15 6 2 0.6 2.45 2.94 47.10 5.10
C102 3rd to 4th 3.19 0.23 0.75 0.15 6 2 0.6 3.04 3.65 47.10 6.25
C102 4th to 5th 3.05 0.23 0.75 0.15 6 2 0.6 2.90 3.48 47.10 5.98
C102 5th to 6th 3.05 0.23 0.75 0.15 6 2 0.6 2.90 3.48 47.10 5.98
C102 6th to 7th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C102 7th to 8th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C102 8th to 9th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
12 C103 Footing to B2 - - - -
C103 B2 to B1 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C103 B1 to Ground 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C103 Ground to 1st floor 4.88 0.23 0.75 0.15 6 2 0.45 4.73 4.25 47.10 9.56
C103 1st to 2nd floor 4.27 0.23 0.75 0.15 6 2 0.45 4.12 3.71 47.10 8.37
C103 2nd to Service 4.88 0.23 0.75 0.15 6 2 0.45 4.73 4.25 47.10 9.56
C103 Service to 3rd 2.6 0.23 0.75 0.15 6
C103 Service to 3rd 2.6 0.23 0.75 0.15 10 16 0.45 0.15 1.08 78.50 5.10
C103 Service to 3rd 2.6 0.23 0.75 0.15 6 4 2.6 ISA 150x150x10 22.80
C103 3rd to 4th 3.19 0.23 0.75 0.15 6 2 0.45 3.04 2.73 47.10 6.25
C103 4th to 5th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C103 5th to 6th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C103 6th to 7th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C103 7th to 8th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C103 8th to 9th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
13 C117 Footing to B2 6.35 0.45 0.75 0.15 10 42 0.15 0.15 0.95 78.50 15.24
C117 Footing to B2 6.35 0.45 0.75 0.15 10 42 0.45 0.15 2.84 78.50 15.24
C117 Footing to B2 6.35 0.45 0.75 0.15 6 4 6.35 ISA 150x150x10 22.80
14 C104 Footing to B2 - - - -
C104 B2 to B1 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C104 B1 to Ground 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C104 Ground to 1st floor 4.88 0.23 0.75 0.15 6 2 0.45 4.73 4.25 47.10 9.56
C104 1st to 2nd floor 4.27 0.23 0.75 0.15 6 2 0.45 4.12 3.71 47.10 8.37
C104 2nd to Service 4.88 0.23 0.75 0.15 6 2 0.45 4.73 4.25 47.10 9.56
C104 Service to 3rd 2.6 0.23 0.75 0.15
C104 Service to 3rd 2.6 0.23 0.75 0.15 10 16 0.45 0.15 1.08 78.50 5.10
C104 Service to 3rd 2.6 0.23 0.75 0.15 6 4 2.6 ISA 150x150x10 22.80
C104 3rd to 4th 3.19 0.23 0.75 0.15 6 2 0.45 3.04 2.73 47.10 6.25
C104 4th to 5th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C104 5th to 6th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C104 6th to 7th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C104 7th to 8th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C104 8th to 9th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
15 C106 Footing to B2 6.35 0.45 0.75 0.15 6 2 0.7 6.20 8.68 47.10 15.24
C106 B2 to B1 3.05 0.45 0.75 0.15 6 2 0.6 2.90 3.48 47.10 7.32
C106 B1 to Ground 3.05 0.45 0.75 0.15 6 2 0.6 2.90 3.48 47.10 7.32
C106 Ground to 1st floor 4.88 0.45 0.75 0.15 6 2 0.6 4.73 5.67 47.10 11.71
C106 1st to 2nd floor 4.27 0.45 0.75 0.15 6 2 0.45 4.12 3.71 47.10 10.25
C106 2nd to Service - - - -
C106 Service to 3rd - -
C106 3rd to 4th 3.19 0.45 0.6 0.15 10 20 0.15 0.15 0.45 78.50 6.70
C106 3rd to 4th 3.19 0.45 0.6 0.15 10 20 0.3 0.15 0.90 78.50 6.70
C106 3rd to 4th 3.19 0.45 0.6 0.15 6 4 3.19 ISA 150x150x10 22.80
C106 4th to 5th 3.05 0.45 0.6 0.15 10 20 0.15 0.15 0.45 78.50 6.41
C106 4th to 5th 3.05 0.45 0.6 0.15 10 20 0.3 0.15 0.90 78.50 6.41
C106 4th to 5th 3.05 0.45 0.6 0.15 6 4 3.05 ISA 150x150x10 22.80
C106 5th to 6th 3.05 0.3 0.6 0.15 6 2 0.45 2.90 2.61 47.10 5.49
C106 6th to 7th 3.05 0.3 0.6 0.15 6 2 0.45 2.90 2.61 47.10 5.49
C106 7th to 8th 3.05 0.3 0.6 0.15 10 20 0 - - 78.50 5.49
C106 7th to 8th 3.05 0.3 0.6 0.15 10 20 0.3 0.15 0.90 78.50 5.49
C106 7th to 8th 3.05 0.3 0.6 0.15 6 4 3.05 ISA 150x150x10 22.80
C106 8th to 9th 3.05 0.3 0.6 0.15 10 20 0 - - 78.50 5.49
C106 8th to 9th 3.05 0.3 0.6 0.15 10 20 0.3 0.15 0.90 78.50 5.49
C106 8th to 9th 3.05 0.3 0.6 0.15 6 4 3.05 ISA 150x150x10 22.80
16 C107 Footing to B2 6.35 0.45 0.75 0.15 6 2 0.45 6.20 5.58 47.10 15.24
C107 B2 to B1 3.05 0.45 0.75 0.15 10 20 0.15 0.15 0.45 78.50 7.32
C107 B2 to B1 3.05 0.45 0.75 0.15 10 20 0.45 0.15 1.35 78.50 7.32
C107 B2 to B1 3.05 0.45 0.75 0.15 6 4 3.05 ISA 150x150x10 22.80
C107 B1 to Ground - - -
C107 Ground to 1st floor - - -
C107 1st to 2nd floor - - -
C107 2nd to Service - - - -
C107 Service to 3rd - - -
C107 3rd to 4th - - -
C107 4th to 5th - - -
C107 5th to 6th 3.05 0.3 0.6 0.15 10 20 0 - - 78.50 5.49
C107 5th to 6th 3.05 0.3 0.6 0.15 10 20 0.3 0.15 0.90 78.50 5.49
C107 5th to 6th 3.05 0.3 0.6 0.15 6 4 3.05 ISA 150x150x10 22.80
C107 6th to 7th - - -
C107 7th to 8th - -
C107 8th to 9th - -
17 C109 Footing to B2 6.35 0.6 0.6 0.15 6 2 0.45 6.20 5.58 47.10 15.24
C109 B2 to B1 3.05 0.6 0.6 0.15 6 2 0.45 2.90 47.10 7.32
C109 B1 to Ground - - -
C109 Ground to 1st floor 4.88 0.6 0.6 0.15 10 32 0.3 0.15 1.44 78.50 11.71
C109 Ground to 1st floor 4.88 0.6 0.6 0.15 10 32 0.3 0.15 1.44 78.50 11.71
C109 Ground to 1st floor 4.88 0.6 0.6 0.15 6 4 4.88 ISA 150x150x10 22.80
C109 1st to 2nd floor - - -
C109 2nd to Service - - - -
C109 Service to 3rd - - -
C109 3rd to 4th - - -
C109 4th to 5th - - -
C109 5th to 6th - - -
C109 6th to 7th - - -
C109 7th to 8th - -
C109 8th to 9th - -
18 C110 3rd to 4th 3.19 0.9 0.9 0.15 6 2 0.45 3.04 2.73 47.10 11.48
19 C111 Footing to B2 6.35 0.6 0.6 0.15 6 1 2.4 6.20 14.87 47.10 15.24
C111 B2 to B1 3.05 0.6 0.6 0.15 6 1 2.4 2.90 6.95 47.10 7.32
C111 B1 to Ground 3.05 0.6 0.6 0.15 6 1 2.4 2.90 6.95 47.10 7.32
C111 Ground to 1st floor 4.88 0.6 0.6 0.15 8 2 0.6 4.73 5.67 62.80 11.71
C111 1st to 2nd floor 4.27 0.6 0.6 0.15 6 2 0.45 4.12 3.71 47.10 10.25
C111 2nd to Service 4.88 0.6 0.6 0.15 6 2 0.45 4.73 4.25 47.10 11.71
C111 Service to 3rd - - -
C111 3rd to 4th 3.19 0.6 0.6 0.15 10 2 0.45 3.04 2.73 78.50 7.66
C111 4th to 5th - - -
C111 5th to 6th - - -
C111 6th to 7th - - -
C111 7th to 8th - -
C111 8th to 9th - -
20 C112 Footing to B2 6.35 0.6 0.6 0.15 6 4 0.45 6.20 11.16 47.10 15.24
C112 B2 to B1 3.05 0.6 0.6 0.15 10 20 0.3 0.15 0.90 78.50 7.32
C112 B2 to B1 3.05 0.6 0.6 0.15 10 20 0.3 0.15 0.90 78.50 7.32
C112 B2 to B1 3.05 0.6 0.6 0.15 6 4 3.05 ISA 150x150x10 22.80
C112 B1 to Ground - - - -
C112 Ground to 1st floor - - - -
C112 1st to 2nd floor - - - -
C112 2nd to Service - - - -
C112 Service to 3rd - - - -
C112 3rd to 4th - - - -
C112 4th to 5th - - - -
C112 5th to 6th - - - -
C112 6th to 7th - - - -
C112 7th to 8th - - - -
C112 8th to 9th - - - -
21 C113 Footing to B2 6.35 0.9 0.9 0.15 6 4 0.7 6.20 17.35 47.10 22.86
C113 B2 to B1 3.05 0.9 0.9 0.15 10 20 0.6 0.15 1.80 78.50 10.98
C113 B2 to B1 3.05 0.9 0.9 0.15 10 20 0.6 0.15 1.80 78.50 10.98
C113 B2 to B1 3.05 0.9 0.9 0.15 6 4 3.05 ISA 150x150x10 22.80
C113 B1 to Ground - - - -
C113 Ground to 1st floor - - - -
C113 1st to 2nd floor - - - -
C113 2nd to Service - - - -
C113 Service to 3rd - - - -
C113 3rd to 4th 3.19 0.9 0.9 0.15 12 1 3.6 3.04 10.94 94.20 11.48
C113 4th to 5th - - - -
C113 5th to 6th - - - -
C113 6th to 7th - - - -
C113 7th to 8th - - - -
C113 8th to 9th - - - -
22 C114 Footing to B2 6.35 0.6 0.6 0.15 10 1 2.4 6.20 14.87 78.50 15.24
C114 B2 to B1 3.05 0.6 0.6 0.15 8 1 2.4 2.90 6.95 62.80 7.32
C114 B1 to Ground 3.05 0.6 0.6 0.15 6 1 2.4 2.90 6.95 47.10 7.32
C114 Ground to 1st floor 4.88 0.6 0.6 0.15 6 1 2.4 4.73 11.35 47.10 11.71
C114 1st to 2nd floor 4.27 0.6 0.6 0.15 6 1 2.4 4.12 9.88 47.10 10.25
C114 2nd to Service 4.88 0.6 0.6 0.15 6 1 2.4 4.73 11.35 47.10 11.71
C114 3rd to 4th - - -
C114 4th to 5th - - -
C114 5th to 6th - - -
C114 6th to 7th - - -
C114 7th to 8th - - -
C114 8th to 9th - - -
1 693.40 1,251.10
No of Bolts
3 Material Requirement:
Hilti/fishers Bolts 22,885.60 No
Rate Amount
81 6,990,761.16
79 295,180.66
1375 -
550 808,620.62
1722.24 4,589,449.09
474 10,847,774.40
23,531,785.93
31,503,678.75
Column Size
Beam
Sr No Column No Floor Floor Ht L B Slab depth Depth
Sub structure
FE350 9,081.74 kg
Super structure
FE350 39,817.60 kg
Bolts
Ground to 1st floor 3334.084 139.2752 860 50.96
1st to 2nd floor 3291.759 144.8384 799 49.33
4th to 5th 3596.574 103.456 1008 58.36
5th to 6th 3596.574 103.456 1008 58.36
6th to 7th 3596.574 103.456 1008 58.36
7th to 8th 3596.574 103.456 1008 58.36
8th to 9th 3596.574 103.456 1008 58.36
Footing to B2 1313.573 49.0855 468 22.31
2nd to Service 7975.972 211.8408 2380 136.72
Service to 3rd 3591.322 95.758 1070 55.82
3rd to 4th 3641.586 90.6917 1040 58.44
B2 to B1 4500.04 82.716 1092 62.01
B1 to Ground 3268.124 82.228 864 49.43
48899.33
Thickness
of plate in Area of Plate Wt per Sqm in Area of column
mm No of plate Length of plate Height of plate in Sqm Kgs in Sqm
776.81 1,413.71
No of Bolts
Total No of Cotractor
Total wt in Kgs Horizontal Vertical Bolts name
Thickness
Length of Slab Beam of plate in Length of Area of Plate Wt per Sqm Area of Beam in
Sr No Beam No Floor Beam Breadth Depth depth Depth mm No of plate plate Height of plate in Sqm in Kgs Sqm Total wt in Kgs
1 B19 3rd floor 12.80 0.9 1.5 0.13 12 2 0.6 12.67 15.21 94.20 61.44 1,432.66
2 B21 3rd floor 11.17 0.9 1.5 0.13 12 2 0.6 11.04 13.25 94.20 53.62 1,248.30
3 B11 3rd floor 4.29 0.3 0.6 0.15 2 4.29 ISMC 250 30.40 7.72 260.83
4 B16 3rd floor 4.95 0.45 0.6 0.15 2 4.95 ISMC 400 49.40 10.40 489.06
Plate column face 12 1 0.45 0.80 0.36 94.20 - 33.91
beam face 12 1 0.45 0.80 0.36 94.20 - 33.91
support plate 12 2 0.19 94.20 - 36.17
4 B18 3rd floor 11.17 0.9 0.6 0.15 2 11.17 ISMC 400 49.40 33.51 1,103.60
Plate column face 12 1 0.9 0.80 0.72 94.20 - 67.82
beam face 12 1 0.9 0.80 0.72 94.20 - 67.82
support plate 12 3 0.19 94.20 - 54.26
-
-
31.00 166.69 4,828.35
No of Bolts
2 28.00 112.00
2 25.00 100.00
2 17.00 68.00
2 19.00 76.00
3 4.00 12.00
3 2.00 6.00
2 44.00 176.00
3 4.00 12.00
3 2.00 6.00
568.00
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
4,828.35 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by Client
free of cost.
Rate Amount
81 391,096.47
1375 -
455 258,440.00
649,536.47
M-TRIUMPH
Column Strengtheing Work Col 106 & 107
Column Size No of Bolts
Slab Beam Thickness of Length of Height of Area of Plate Wt per Sqm Area of column
Sr No Column No Floor Floor Ht L B depth Depth plate in mm No of plate plate plate in Sqm in Kgs in Sqm Total wt in Kgs Horizontal
C106 Ground to 1st floor 4.88 0.45 0.75 0.15 16 1 2.4 4.73 11.35 125.60 11.71 1,425.08 12
C106 1st to 2nd floor 4.27 0.45 0.75 0.15 16 1 2.4 4.12 9.88 125.60 10.25 1,241.20 12
C107 Ground to 1st floor 4.88 0.45 0.75 0.15 16 1 2.4 4.73 11.35 125.60 11.71 1,425.08 12
C107 1st to 2nd floor 4.27 0.45 0.75 0.15 16 1 2.4 4.12 9.88 125.60 10.25 1,241.20 12
42.46 43.92 5,332.55
No of Bolts
20.00 240.00
17.00 204.00
20.00 240.00
17.00 204.00
888.00
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
5,332.55 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
Kgs
Guniting by dry mix process as per IS 9012 (1978) to
concrete surface in C.M. 1:3, 25mm. thick under pressure of
2 2.1 kg to 2.8 kg per sq.cm. including forms, scaffolding,
floating the surface, curing for 14 days etc. complete.
(Excluding reinforcement) - Sqm
3 Grouting 42.46 Sqm
4 Ferrocrete work 43.92 Sqm
3 Material Requirement:
Hilti/fishers Bolts 888.00 No
Rate Amount
81 431,936.32
79 -
1375 -
550 23,351.12
1722.24 75,640.78
474 420,912.00
951,840.22
Column Size
Slab Beam Thickness of Length of Height of Area of Plate Wt per Sqm Area of column
Sr No Column No Floor Floor Ht L B depth Depth plate in mm No of plate plate plate in Sqm in Kgs in Sqm Total wt in Kgs
1 108 Ground to 1st floor 4.88 0.6 0.6 0.15 6 1 2.4 4.73 11.35 47.10 11.71 534.40
108 1st to 2nd floor 4.27 0.6 0.6 0.15 6 1 2.4 4.12 9.88 47.10 10.25 465.45
2 109 Ground to 1st floor 4.88 0.6 0.6 0.15 6 1 2.4 4.73 11.35 47.10 11.71 534.40
109 1st to 2nd floor 4.27 0.6 0.6 0.15 6 1 2.4 4.12 9.88 47.10 10.25 465.45
12 20.00 240.00
12 17.00 204.00
12 20.00 240.00
12 17.00 204.00
0 -
888.00
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
1,999.71 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
- Kgs
Guniting by dry mix process as per IS 9012 (1978) to
concrete surface in C.M. 1:3, 25mm. thick under pressure of
2 2.1 kg to 2.8 kg per sq.cm. including forms, scaffolding,
floating the surface, curing for 14 days etc. complete.
(Excluding reinforcement) - Sqm
3 Grouting 42.46 Sqm
4 Ferrocrete work 43.92 Sqm
3 Material Requirement:
Hilti/fishers Bolts 888.00 No
Rate Amount
81 161,976.12
79 -
-
550 23,351.12
1722.24 75,640.78
474 420,912.00
681,880.02
M-TRIUMPH Cross Bracing work at Ground Floor
SI. No. Description Nos Length Breadth Depth Qty Unit wt Total Weight
16 to 106 4 2.297 9.19 22.1 203.05
R1 2 ISMC 4 3 12.00 22.1 265.20
4 3.78 15.11 22.1 334.01
106 to 107 4 4.767 19.07 22.1 421.40
R1 2 ISMC 4 3 12.00 22.1 265.20
4 5.63 22.53 22.1 497.91
107 to 108 4 4.916 19.66 22.1 434.57
R1 2 ISMC 4 3 12.00 22.1 265.20
4 5.76 23.04 22.1 509.10
107 to lift wall 4 3.536 14.14 22.1 312.58
R1 2 ISMC 4 3 12.00 22.1 265.20
4 4.64 18.55 22.1 409.93
12mm plate to
column at B 2 1.1 0.4 0.88 94.2 82.90
10mm plate to
column at B 2 0.528 1.06 78.5 82.90
10mm plate to
column at N 14 0.528 7.39 78.5 580.27
Summary
ISMC 200 4183.36 Kg
12 mm thick plate 82.90 Kg
10mm thick Plate 663.17 Kg
Bolts 4
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
746.06 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
4,183.36 Kgs
Guniting by dry mix process as per IS 9012 (1978) to
concrete surface in C.M. 1:3, 25mm. thick under pressure of
2 2.1 kg to 2.8 kg per sq.cm. including forms, scaffolding,
floating the surface, curing for 14 days etc. complete.
(Excluding reinforcement) - Sqm
3 Grouting - Sqm
4 Ferrocrete work - Sqm
3 Material Requirement:
Bolts 4.00 No
Rate Amount
81 60,431.18
79 330,485.38
-
550 -
1722.24 -
474 1,896.00
392,812.56
M-TRIUMPH Beam Strengthening at Ground Floor
SI. No. Description Nos Length Breadth Depth Qty Unit wt Total Weight
GF
1 ISMC 400 18 12.761 229.70 49.4 11347.08
ISM 300
C38 to C31, C40 to
C32 4 6.705 26.82 35.8 960.16
C31 to C24, C32 to
C25 4 6.705 26.82 35.8 960.16
C24 to C15 4 6.705 26.82 35.8 960.16
2880.47
FF
C33 to C31 4 6.699 26.80 35.8 959.30
C31 to C24 4 6.705 26.82 35.8 960.16
1919.45
Summary
GF ISMC 400 11347.08 Kg
GF ISMC 300 2880.47 Kg
FF ISMC 300 1919.45 Kg
16147.00 Kg
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of Beam
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
1
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
Note : Required HILTI/Fisher make anchors will be supplied
by Client free of cost.
RO Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
Note : Required HILTI/Fisher make anchors will be supplied
by Client free of cost.
16,147.00 Kgs
2
3 Material Requirement:
fixing Anchor fastener make HILTI/Fisher or equivalent of
specified size with necessary fittings chemicals if any
required as per manufactuere standard including drilling
holes in masonry work /CC/ R.C.C. and making good etc.
complete as directed by Engineer incharge. RO No
16:0013-113-3 Dated 24.01.2018
ngsville Realty LLP, Shivaji Nagar,
Rate Amount
79 1,275,613.16
1,275,613.16
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
10,793.65 Kgs
3 Material Requirement:
Hilti/fishers Bolts 3,338.00 No
Drg Ref:
16:0013-113-CS-O dated 03.02.18
ngsville Realty LLP, Shivaji Nagar,
Rate Amount
81 874,285.44
-
550 88,380.04
474 1,582,212.00
2,544,877.47
Beam
Sr No Column No Floor Floor Ht L B Slab depth Depth
Total No of
Total wt in Kgs Horizontal Vertical Bolts
3 Material Requirement:
Hilti/fishers Bolts 4,446.00 No
Rate Amount
81 1,283,247.04
79
1375 -
550 138,748.50
1722.24 490,810.84
474 2,107,404.00
4,020,210.38
Column Size
Beam
Sr No Column No Floor Floor Ht L B Slab depth Depth
252.27 284.98
No of Bolts
Total No of Cotractor
Total wt in Kgs Horizontal Vertical Bolts name