SrNo Floor Level Cost SrNo


1 Footing 3728444 1
2 B2 3650341 2
3 B1 3052277 3
4 Ground 7947025 4
5 1st 4095320 Grand Total
6 2nd 5085106
7 Service 2412488
8 3rd 3875542
9 4th 2748808
10 5th 2753273
11 6th 2719500
12 7th 2761909
13 8th 2748695
Grand Total 62,578,728.16 1

Sr No Particular Floor Level


1 Beam Strengthening Assumed
by carbon wrapping

Sr No Particular Floor Level


1 Slab-new 3rd
4th
5th
6th
7th
8th

Sr No Particular Floor Level


1 MS STP Slab strengthening Ground

Sr No Particular Floor Level


1 Footing Strengthening Footing

Sr No Particular Floor Level


1 BeamExtraMezz301-302 1st

Sr No Particular Floor Level


1 Slab-new-Ramp Location Ground

Sr No Particular Floor Level


1 Slab-new B2
B1
Ground
1st
2nd
Service
3rd
Assumed 4th
Assumed 5th
Assumed 6th
Assumed 7th
Assumed 8th

Structural Steel
Sr No Particular Floor Level Quantity Rate
1 Column Ground 445.06 79
2 Column 1st - 79
3 Column 2nd - 79
4 Column Service 474.24 79
5 Column 3rd 290.93 79
6 Column 4th 278.16 79
7 Column 5th 278.16 79
8 Column 6th - 79
9 Column 7th 278.16 79
10 Column 8th 278.16 79
11 Column Footing 579.12 79
12 Column B2 834.48 79
13 Column B1 - 79

Structural Steel
Sr No Particular Floor Level Quantity Rate
1 Beam 3rd

Structural Steel
Sr No Particular Floor Level Quantity Rate
1 Column Ground - 79
2 Column 1st - 79

Structural Steel
Sr No Particular Floor Level Quantity Rate
1 Column Ground - 79
2 Column 1st - 79

Structural Steel
Sr No Particular Floor Level Quantity Rate
1 Bracing Work Ground 4,183.36 79

Structural Steel
Sr No Particular Floor Level Quantity Rate
1 Beam Ground

Structural Steel
Sr No Particular Floor Level Quantity Rate
1 Column FC 3rd
2 Column FC 4th
3 Column FC 5th
4 Column FC 6th
5 Column FC 7th
6 Column FC 8th

Structural Steel
Sr No Particular Floor Level Quantity Rate
1 SW Footing
2 SW B2
3 SW B1
4 SW Ground
5 SW 1st
6 SW 2nd
7 SW Service
Itemwise Summary
Floor Level Cost
Footing 310,523.94
Beam 17,259,498.83
Slab 12,885,298.81
Column 32,123,406.59
Grand Total 62,578,728.16 1

Quantity Rate Amount Quantity Rate Amount Quantity


15,000,000 1 15000000

Quantity Rate Amount Quantity Rate Amount Quantity


2,705.02 100 270501.79 2400 0
2,705.02 100 270501.79 2400 0
2,705.02 100 270501.79 2400 0
2,705.02 100 270501.79 2400 0
2,705.02 100 270501.79 2400 0
2,705.02 100 270501.79 2400 0

Structural Steel Ferrocrete Work Costing Bolting Work Costing


Quantity Rate Amount Quantity Rate Amount Quantity
638.19 100 63819.4425 11.51 2400 27627.42 88.00

Structural Steel Ferrocrete Work Costing Bolting Work Costing


Quantity Rate Amount Quantity Rate Amount Quantity

Structural Steel Ferrocrete Work Costing Bolting Work Costing


Quantity Rate Amount Quantity Rate Amount Quantity
2,572.01 100 257200.795 6.83 2400 16396.8 62.00

Structural Steel Ferrocrete Work Costing Bolting Work Costing


Quantity Rate Amount Quantity Rate Amount Quantity
3,506.46 100 350645.5 41.61 2400 99861.12 88.00

Quantity Rate Amount Quantity Rate Amount Quantity


6,131.16 100 613116.228 60.33 2400 144789.48 588.00
6,131.96 100 613195.788 60.34 2400 144813.24 588.00
5,561.51 100 556151.268 53.24 2400 127777.32 588.00
1,976.65 100 197664.992 21.56 2400 51733.44 112.00
5,591.46 100 559146.396 63.31 2400 151933.32 231.00
5,591.46 100 559146.396 63.31 2400 151933.32 231.00
5,249.49 100 524948.856 59.05 2400 141720.48 231.00
5,249.49 100 524948.856 59.05 2400 141720.48 231.00
5,249.49 100 524948.856 59.05 2400 141720.48 231.00
5,249.49 100 524948.856 59.05 2400 141720.48 231.00
5,249.49 100 524948.856 59.05 2400 141720.48 231.00
5,249.49 100 524948.856 59.05 2400 141720.48 231.00

ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
35159.424 8,985.10 81 762,953 299.78 1722.24 516290.35 2,480.00
0 7,696.07 81 623,382 264.78 1722.24 456019.36 1,999.20
0 13,164.14 81 1,066,295 373.81 1722.24 643787.09 3,600.00
37464.96 4,423.74 81 395,788 122.77 1722.24 211442.85 1,192.00
22983.312 6,308.50 81 533,972 176.95 1722.24 304749.16 1,601.60
21974.64 4,603.29 81 394,841 147.50 1722.24 254027 1,209.60
21974.64 4,608.90 81 395,296 149.33 1722.24 257178.65 1,209.60
0 4,579.20 81 370,915 147.04 1722.24 253239 1,132.80
21974.64 4,731.73 81 405,245 158.94 1722.24 273725.08 1,209.60
21974.64 4,608.90 81 395,296 150.24 1722.24 258754.5 1,171.20
45750.48 8,732.79 81 753,106 283.40 1722.24 488083.68 2,537.60
65923.92 8,021.29 81 715,648 230.15 1722.24 396378.7 2,006.40
0 5,842.05 81 473,206 160.13 1722.24 275773.68 1,536.00

ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
4,828.35 81 391,096 - - 568.00

ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
0 2,850.15 81 230,862 23.42 1722.24 40341.75 480.00
0 2,482.40 81 201,074 20.50 1722.24 35299.031 408.00

ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
0 1,068.81 81 86,573 23.42 1722.24 40341.75 480.00
0 930.90 81 75,403 20.50 1722.24 35299.031 408.00

ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
330,485 746.06 81 390,917 - 1722.24 - 4.00

ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
16,147.00 79 1,275,613 -

ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
2,088.81 81 169193.5436 650.00
1,719.59 81 139286.5095 528.00
1,733.23 81 140391.958 528.00
1,828.77 81 148130.0974 576.00
1,665.00 81 134864.7155 504.00
1,758.25 81 142418.6135 552.00

ctural Steel Structural Steel Ferrocrete Work Costing Bolting Work Costing
Amount Quantity Rate Amount Quantity Rate Amount Quantity
3,504.24 81 283843.44 62.23 1722.24 107175 988.00
1,639.08 81 132765.48 29.89 1722.24 51477.754 456.00
1,639.08 81 132765.48 29.89 1722.24 51477.754 456.00
2,673.40 81 216545.076 47.82 1722.24 82364.406 760.00
2,328.62 81 188618.544 41.85 1722.24 72068.855 646.00
2,673.40 81 216545.076 47.82 1722.24 82364.406 760.00
1,384.74 81 112163.94 25.48 1722.24 43882.675 380.00
Rate Amount Quantity Rate Amount
15000000
Grand Total 15,000,000.00 Beam

Rate Amount Quantity Rate Amount


575 0 550 0 270501.79
575 0 550 0 270501.79
575 0 550 0 270501.79
575 0 550 0 270501.79
575 0 550 0 270501.79
575 0 550 0 270501.79
Grand Total 1,623,010.74 Slab

Bolting Work Costing Grouting Work Costing Total Cost


Rate Amount Quantity Rate Amount
575 50600 2.09 550 1151.8238 143198.68625
Grand Total 143198.68625 Slab
Bolting Work Costing Grouting Work Costing Total Cost
Rate Amount Quantity Rate Amount
310523.9359161
Grand Total 310523.9359161 Footing
Bolting Work Costing Grouting Work Costing Total Cost
Rate Amount Quantity Rate Amount
575 35650 334349.195
Grand Total 334349.195 Beam
Bolting Work Costing Grouting Work Costing Total Cost
Rate Amount Quantity Rate Amount
575 50600 23.33 550 12830.4 1004915.743994
Grand Total 1004915.743994 Slab
Rate Amount Quantity Rate Amount
575 338100 16.45 550 9049.3425 1105055.0505
575 338100 16.46 550 9050.8275 1105159.8555
575 338100 14.52 550 7986.0825 1030014.6705
575 64400 5.88 550 3233.34 317031.772
575 132825 17.27 550 9495.8325 853400.5485
575 132825 17.27 550 9495.8325 853400.5485
575 132825 16.10 550 8857.53 808351.866
575 132825 16.10 550 8857.53 808351.866
575 132825 16.10 550 8857.53 808351.866
575 132825 16.10 550 8857.53 808351.866
575 132825 16.10 550 8857.53 808351.866
575 132825 16.10 550 8857.53 808351.866
Grand Total 10114173.6415 Slab
Bolting Work Costing Grouting Work Costing Total Cost
Rate Amount Quantity Rate Amount
474 1175520 154.59 550 85023.087 2539786.099985
474 947620.8 134.60 550 74031.688 2101053.632753
474 1706400 241.20 550 132660.09 3549142.467407
474 565008 70.10 550 38554.399 1210793.338276
474 759158.4 98.98 550 54437.465 1652316.704824
474 573350.4 78.83 550 43356.929 1265575.024803
474 573350.4 79.25 550 43587.527 1269412.342027
474 536947.2 79.22 550 43570.624 1204671.671052
474 573350.4 80.12 550 44065.624 1296385.896779
474 555148.8 77.51 550 42631.332 1251830.396505
474 1202822.4 152.52 550 83886.805 2527899.191974
474 951033.6 122.70 550 67483.229 2130544.009159
474 728064 100.60 550 55331.824 1532375.153737
Grand Total 23531785.92928 Column
Bolting Work Costing Grouting Work Costing Total Cost
Rate Amount Quantity Rate Amount
455 258,440 - - 649536.4745066
Grand Total 649536.4745066 Beam
Bolting Work Costing Grouting Work Costing Total Cost
Rate Amount Quantity Rate Amount
474 227520 22.69 550 12480.761 511204.8195746
474 193392 19.76 550 10870.361 440635.4000546
Grand Total 951840.2196293 Column
Bolting Work Costing Grouting Work Costing Total Cost
Rate Amount Quantity Rate Amount
474 227520 22.69 550 12480.761 366915.8765502
474 193392 19.76 550 10870.361 314964.1450302
Grand Total 681880.0215805 Column
Bolting Work Costing Grouting Work Costing Total Cost
Rate Amount Quantity Rate Amount
474 1,896 - 550 - 392812.5636443
Grand Total 392812.5636443 Column
Bolting Work Costing Grouting Work Costing Total Cost
Rate Amount Quantity Rate Amount
- - 550 - 1275613.158
Grand Total 1275613.158 Beam
Bolting Work Costing Grouting Work Costing Total Cost
Rate Amount Quantity Rate Amount
474 308100 31.89 550 17541.915 494835.4582537
474 250272 26.95 550 14821.024 404379.5338537
474 250272 26.08 550 14342.927 405006.8847805
474 273024 26.95 550 14821.024 435975.1217561
474 238896 23.47 550 12908.634 386669.3496585
474 261648 25.35 550 13944.512 418011.1257073
Grand Total 2544877.47401 Column
Bolting Work Costing Grouting Work Costing Total Cost
Rate Amount Quantity Rate Amount
474 468312 55.80 550 30690 890020.4352
474 216144 26.10 550 14355 414742.2336
474 216144 26.10 550 14355 414742.2336
474 360240 42.57 550 23413.5 682562.98176
474 306204 37.08 550 20394 587285.39904
474 360240 42.57 550 23413.5 682562.98176
474 180120 22.05 550 12127.5 348294.1152
Grand Total 4020210.38016 Column
62,578,728.16
LEVELS B3 91.83 3.05
B2 94.88 3.06
B1 97.94 3.01
GRND 100.95

Sr No Location Work Details Nos L B H Quantity Unit Constant


Unit Total Quantity Unit
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of Slab strengthening
as per drawing and as instructed including contractor
consumables, cleaning concrete surface by using grander,
filing gaps between structural steel and concrete with
approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
16,230.11 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by Client
free of cost.

4 Hilti Bolts - No
5 Grouting - Sqm
6 Ferrocrete - Sqm
ngsville Realty LLP, Shivaji Nagar,

Rate Amount

100 1,623,010.74

575 -
550 -
2400 -
1,623,010.74
Missing data Base plate and gusset plate details not given MS 16230.11
Bolt M10 0.00
Ferrocrete 0.00
Grouting 0.00

Beam strngthening at Typical Floors Ref Drawing : TYPICAL FLOOR BEAM STRENGTHENING_R0.dwg
Sr No Location Work Details Nos L B H Quantity Unit Constant
A 1 Third Floor Beam Strengthening ISMC -200 1 1 38.195 1 1 38.195 Rm 22.1
2 2 ISMC -200 Box 1 2 42.102 1 1 84.204 Rm 22.1
B 3 Fourth Floor Beam Strengthening ISMC -200 1 1 38.195 1 1 38.195 Rm 22.1
4 2 ISMC -200 Box 1 2 42.102 1 1 84.204 Rm 22.1
C 5 Fifth Floor Beam Strengthening ISMC -200 1 1 38.195 1 1 38.195 Rm 22.1
6 2 ISMC -200 Box 1 2 42.102 1 1 84.204 Rm 22.1
D 7 Sixth Floor Beam Strengthening ISMC -200 1 1 38.195 1 1 38.195 Rm 22.1
8 2 ISMC -200 Box 1 2 42.102 1 1 84.204 Rm 22.1
E 9 Seventh Floor Beam Strengthening ISMC -200 1 1 38.195 1 1 38.195 Rm 22.1
10 2 ISMC -200 Box 1 2 42.102 1 1 84.204 Rm 22.1
F 11 Eight Floor Beam Strengthening ISMC -200 1 1 38.195 1 1 38.195 Rm 22.1
12 2 ISMC -200 Box 1 2 42.102 1 1 84.204 Rm 22.1
Unit Total Quantity Unit
Kg/Rm 844.11 Kg ISMC -200 MS
Kg/Rm 1,860.91 Kg 2 ISMC -200 Box MS
Kg/Rm 844.11 Kg ISMC -200 MS
Kg/Rm 1,860.91 Kg 2 ISMC -200 Box MS
Kg/Rm 844.11 Kg ISMC -200 MS
Kg/Rm 1,860.91 Kg 2 ISMC -200 Box MS
Kg/Rm 844.11 Kg ISMC -200 MS
Kg/Rm 1,860.91 Kg 2 ISMC -200 Box MS
Kg/Rm 844.11 Kg ISMC -200 MS
Kg/Rm 1,860.91 Kg 2 ISMC -200 Box MS
Kg/Rm 844.11 Kg ISMC -200 MS
Kg/Rm 1,860.91 Kg 2 ISMC -200 Box MS
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of Slab strengthening
as per drawing and as instructed including contractor
consumables, cleaning concrete surface by using grander,
filing gaps between structural steel and concrete with
approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
638.19 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by Client
free of cost.

4 Hilti Bolts 88.00 No


5 Grouting 2.09 Sqm
6 Ferrocrete 11.51 Sqm
ngsville Realty LLP, Shivaji Nagar,

Rate Amount

100 63,819.44

575 50,600.00
550 1,151.82
2400 27,627.42
143,198.69
MS 638.19
Bolt M10 88.00
Ferrocrete 11.51
Grouting 2.09

Beam strengthening at STB top slab


Sr No Location Work Details Nos L B H Quantity Unit Constant
A for ISMC 150 and 200
1 B1 to Ground Beam Strengthening Base Plate ( 225 X 235 X 10 mm) 11 2 0.225 0.235 0.01 0.0116325 Cum 7850
2 B1 to Ground Beam Strengthening Bolts (M 10mm - 4nos ) 11 2 4 1 1 88 Nos 1
3 B1 to Ground Beam Strengthening ISA 65 X 65 - 8mm 11 2 0.175 1 1 3.85 Rm 7.7
5 B1 to Ground Beam Strengthening ISMC - 200 1 1 10.403 1 1 10.403 Rm 22.1
6 B1 to Ground Beam Strengthening ISMC - 150 1 1 17.52 1 1 17.52 Rm 16.4
7 B1 to Ground Beam Strengthening Ferrocrete 1 1 10.403 1 0.475 4.94 Sqm 1
Unit Total Quantity Unit

Kg/Cum 91.32 Kg Base Plate ( 225 X 235 X 10 mm) MS


Per No 88.00 Nos Bolts (M 10mm - 4nos ) Bolt M10
Kg/Rm 29.65 Kg ISA 65 X 65 - 8mm MS
Kg/Rm 229.91 Kg ISMC - 200 MS
Kg/Rm 287.33 Kg ISMC - 150 MS
Sqm/Sqm 4.94 Sqm Ferrocrete Ferrocrete
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of Beam
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
2,572.01 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by Client
free of cost.

4 Hilti Bolts 62.00 No


5 Deck Plate 31.38 Sqm
6 Ferrocrete 6.83 Sqm
ngsville Realty LLP, Shivaji Nagar,

Rate Amount

100 257,200.80

575 35,650.00
800 25,101.60
2400 16,396.80
334,349.20
Extra mezzanine beam work
Sr No Location Work Details Nos L B H Quantity Unit Constant
A 1 Ground Floor Footing and Column in MS Base Plate (400 X 350 X 12 mm) 2 1 0.4 0.35 0.012 0.00336 Cum 7850
2 Footing and Column in MS Bolts (M 12 - 11nos ) 2 11 1 1 1 22 Nos 1
3 Footing and Column in MS ISA 75 X 75 - 8mm 2 1 1.1 1 1 2.2 Rm 8.9
4 Footing and Column in MS ISMC - 200 Box 2 2 1 1 4.88 19.52 Rm 22.1
5 Footing and Column in MS Ferrocrete 2 1 0.2 0.15 4.88 6.832 Sqm 1

B 6 Mezzanine Floor Beam Strengthening ISA 75 X 75 - 8mm Connections 5 1 0.2 1 1 1 Rm 8.9


7 Beam Strengthening Base Plate (400 X 350 X 12 mm) 3 1 0.4 0.35 0.012 0.00504 Cum 7850
8 Beam Strengthening Bolts (M12 - 8 nos ) 3 8 1 1 1 24 Nos 1
9 Beam Strengthening ISA 75 X 75 - 8mm 3 1 0.7 1 1 2.1 Rm 8.9

C 10 Mezzanine Floor Beam Strengthening Base Plate ( 225 X 235 X 10 mm) 4 1 0.225 0.235 0.01 0.002115 Cum 7850
11 Beam Strengthening Bolts (M 10mm - 4nos ) 4 4 1 1 1 16 Nos 1
12 Beam Strengthening ISA 65 X 65 - 8mm 4 1 0.175 1 1 0.7 Rm 7.7

D 13 Mezzanine Floor Beam Strengthening Base Plate ( 200 X 125 X 10 mm) 4 1 0.2 0.125 0.01 0.001 Cum 7850

E 14 Mezzanine Floor Beam Strengthening ISMC - 200 Box 2 2 1 1 15.114 60.456 Rm 22.1
15 Mezzanine Floor Beam Strengthening ISMC - 200 2 1 1 1 14.968 29.936 Rm 22.1
16 Mezzanine Floor Beam Strengthening Deck Plate - 1mm GI 1 1 31.377 1 1 31.377 Sqm 1
Unit Total Quantity Unit
Kg/Cum 26.38 Kg Base Plate (400 X 350 X 12 mm) MS
Per No 22.00 Nos Bolts (M 12 - 11nos ) Bolt M12
Kg/Rm 19.58 Kg ISA 75 X 75 - 8mm MS
Kg/Rm 431.39 Kg ISMC - 200 Box MS
Sqm 6.83 Sqm Ferrocrete Ferro

Kg/Rm 8.90 Kg ISA 75 X 75 - 8mm Connections MS


Kg/Cum 39.56 Kg Base Plate (400 X 350 X 12 mm) MS
Per No 24.00 Nos Bolts (M12 - 8 nos ) Bolt M12
Kg/Rm 18.69 Kg ISA 75 X 75 - 8mm MS

Kg/Cum 16.60 Kg Base Plate ( 225 X 235 X 10 mm) MS


Per No 16.00 Nos Bolts (M 10mm - 4nos ) Bolt M10
Kg/Rm 5.39 Kg ISA 65 X 65 - 8mm MS

Kg/Cum 7.85 Kg Base Plate ( 200 X 125 X 10 mm) MS

Kg/Rm 1,336.08 Kg ISMC - 200 Box MS


Kg/Rm 661.59 Kg ISMC - 200 MS
Sqm 31.38 Sqm Deck Plate - 1mm GI Deck
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of Slab strengthening
as per drawing and as instructed including contractor
consumables, cleaning concrete surface by using grander,
filing gaps between structural steel and concrete with
approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
3,506.46 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by Client
free of cost.

2 Reinforcement Steel (L+M) 3,738.77 Kgs


3 Concrete for Slab (L+M) Grade-M30 41.54 Cum
4 Hilti Bolts 88.00 No
5 Grouting 23.33 Sqm
6 Ferrocrete 41.61 Sqm
7 Rebarring 525 Nos
ngsville Realty LLP, Shivaji Nagar,

Rate Amount

100 350,645.50

60 224,326.38
6419 266,652.35
575 50,600.00
550 12,830.40
2400 99,861.12
168 88,200.00
1,093,115.74
M-
TRIUMPH
Sr No Location Work Details Nos L B H Quantity Unit Constant
A 1 B3 Footing and Column in MS Base Plate (500 X 550 X 12 mm) 4 1 0.5 0.55 0.012 0.0132 Cum 7850
2 B3 Footing and Column in MS Bolts (Tor 12mm - 12nos ) 4 12 1 1 1 48 Nos 1
3 B3 Footing and Column in MS ISA 100 X 100 - 8mm 4 1 1.5 1 1 6 Rm 12.1
Unit Total Quantity Unit
Kg/Cum 103.62 Kg Base Plate (500 X 550 X 12 mm)
Per No 48.00 Nos Bolts (Tor 12mm - 12nos )
Kg/Rm 72.60 Kg ISA 100 X 100 - 8mm
Slab Strengthening Qty M - TRIUMPH
Beam Size

Thickness
Length of Slab Beam of plate in Length of Area of Plate Wt per Sqm Area of Beam in
Sr No Beam No Floor Beam Breadth Depth depth Depth mm No of plate plate Height of plate in Sqm in Kgs Sqm Total wt in Kgs

1 Basement-2 109.69 0.15 0.2 12 84 0.31 0.36 9.37 94.20 60.33 883.07
ISMC200 2 109.69 1.00 219.38 22.10 - 4,848.25
ISA75X75X6 84 0.70 1.00 58.80 6.80 - 399.84
2 Basement-1 109.71 0.15 0.2 12 84 0.31 0.36 9.37 94.20 60.34 883.07
ISMC200 2 109.71 1.00 219.41 22.10 - 4,849.05
ISA75X75X6 84 0.70 1.00 58.80 6.80 - 399.84
3 Ground Floor 96.80 0.15 0.2 12 84 0.31 0.36 9.37 94.20 53.24 883.07
ISMC200 2 96.80 1.00 193.60 22.10 - 4,278.60
ISA75X75X6 84 0.70 1.00 58.80 6.80 - 399.84
4 First Floor 39.19 0.15 0.2 12 16 0.31 0.36 1.79 94.20 21.56 168.20
ISMC200 2 39.19 1.00 78.38 22.10 - 1,732.29
ISA75X75X6 16 0.70 1.00 11.20 6.80 - 76.16
5 Second Floor 115.10 0.15 0.2 12 33 0.31 0.36 3.68 94.20 63.31 346.92
ISMC200 2 115.10 1.00 230.20 22.10 - 5,087.46
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
6 Service Floor 115.10 0.15 0.2 12 33 0.31 0.36 3.68 94.20 63.31 346.92
ISMC200 2 115.10 1.00 230.20 22.10 - 5,087.46
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
7 Third Floor 107.36 0.15 0.2 12 33 0.31 0.36 3.68 94.20 59.05 346.92
ISMC200 2 107.36 1.00 214.73 22.10 - 4,745.49
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
8 Fourth Floor 107.36 0.15 0.2 12 33 0.31 0.36 3.68 94.20 59.05 346.92
ISMC200 2 107.36 1.00 214.73 22.10 - 4,745.49
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
9 Fifth Floor 107.36 0.15 0.2 12 33 0.31 0.36 3.68 94.20 59.05 346.92
ISMC200 2 107.36 1.00 214.73 22.10 - 4,745.49
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
10 Sixth Floor 107.36 0.15 0.2 12 33 0.31 0.36 3.68 94.20 59.05 346.92
ISMC200 2 107.36 1.00 214.73 22.10 - 4,745.49
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
11 Seventh Floor 107.36 0.15 0.2 12 33 0.31 0.36 3.68 94.20 59.05 346.92
ISMC200 2 107.36 1.00 214.73 22.10 - 4,745.49
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
11 Seventh Floor 107.36 0.15 0.2 12 33 0.31 0.36 3.68 94.20 59.05 346.92
ISMC200 2 107.36 1.00 214.73 22.10 - 4,745.49
ISA75X75X6 33 0.70 1.00 23.10 6.80 - 157.08
1,229.78 2,891.32 676.38 62,481.14
No of Bolts

Vertical Horizontal Total No of Bolts

1 7.00 588.00
0 - -

1 7.00 588.00
0 - -

1 7.00 588.00
0 - -

1 7.00 112.00
0 - -

1 7.00 231.00
0 - -

1 7.00 231.00
0 - -

1 7.00 231.00
0 - -

1 7.00 231.00
0 - -

1 7.00 231.00
0 - -

1 7.00 231.00
0 - -

1 7.00 231.00
0 - -

1 7.00 231.00
0 - -

3,724.00
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of Slab strengthening
as per drawing and as instructed including contractor
consumables, cleaning concrete surface by using grander,
filing gaps between structural steel and concrete with
approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
62,481.14 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by Client
free of cost.

Guniting by dry mix process as per IS 9012 (1978) to


concrete surface in C.M. 1:3, 25mm. thick under pressure of
2 2.1 kg to 2.8 kg per sq.cm. including forms, scaffolding,
floating the surface, curing for 14 days etc. complete.
(Excluding reinforcement) including weld mesh - Sqm
3 Grouting 184.47 Sqm
4 Ferrocrete work 676.38 Sqm
Hilti Bolts 3,724.00 No
ngsville Realty LLP, Shivaji Nagar,

Rate Amount

100 6,248,114.20

1375 -
550 101,456.44
2400 1,623,303.00
575 2,141,300.00
10,114,173.64
Column Size

Slab Beam Thickness of Length of Height of Area of Plate Wt per Sqm Area of column
Sr No Column No Floor Floor Ht L B depth Depth plate in mm No of plate plate plate in Sqm in Kgs in Sqm
1 C1 Ground to 1st floor 4.88 0.375 0.9 0.15 6 1 2.55 4.73 12.06 47.10 12.44
C1 1st to 2nd floor 4.27 0.375 0.9 0.15 6 1 2.55 4.12 10.50 47.10 10.89
C1 2nd to Service 4.88 0.375 0.9 0.15 6 1 2.55 4.73 12.06 47.10 12.44
C1 Service to 3rd 2.6 0.375 0.9 0.15 6 1 2.55 2.45 6.24 47.10 6.63
C1 3rd to 4th 3.19 0.3 0.9 0.15 8 1 2.4 3.04 7.29 62.80 7.66
C1 4th to 5th 3.05 0.3 0.9 0.15 6 1 2.4 2.90 6.95 47.10 7.32
C1 5th to 6th 3.05 0.3 0.6 0.15 6 1 1.8 2.90 5.22 47.10 5.49
C1 6th to 7th 3.05 0.3 0.6 0.15 6 1 1.8 2.90 5.22 47.10 5.49
C1 7th to 8th 3.05 0.3 0.6 0.15 8 1 1.8 2.90 5.22 62.80 5.49
C1 8th to 9th 3.05 0.3 0.6 0.15 8 1 1.8 2.90 5.22 62.80 5.49
2 C2 Ground to 1st floor - - - -
C2 1st to 2nd floor - - - -
C2 2nd to Service 4.88 0.525 1.35 0.15 6 2 0.45 4.73 4.25 47.10 18.30
C2 Service to 3rd - - - -
C2 3rd to 4th - - - -
C2 4th to 5th - - - -
C2 5th to 6th - - - -
C2 6th to 7th 3.05 0.375 1.05 0.15 6 2 0.45 2.90 2.61 47.10 8.69
C2 7th to 8th 3.05 0.375 0.9 0.15 6 2 0.45 2.90 2.61 47.10 7.78
C2 8th to 9th - - - -
3 C3 Ground to 1st floor - - - -
C3 1st to 2nd floor - - - -
C3 2nd to Service - - - -
C3 Service to 3rd - - - -
C3 3rd to 4th - - - -
C3 4th to 5th - - - -
C3 5th to 6th - - - -
C3 6th to 7th - - - -
C3 7th to 8th 3.05 0.3 0.9 0.15 6 2 0.45 2.90 2.61 47.10 7.32
C3 8th to 9th 3.05 0.3 0.75 0.15 6 2 0.45 2.90 2.61 47.10 6.41
4 C10 Ground to 1st floor - - - -
C10 1st to 2nd floor - - - -
C10 2nd to Service 4.88 0.525 1.35 0.15 6 1 3.75 4.73 17.73 47.10 18.30
C10 Service to 3rd - - - -
C10 3rd to 4th - - - -
C10 4th to 5th - - - -
C10 5th to 6th - - - -
C10 6th to 7th - - - -
C10 7th to 8th - - - -
C10 8th to 9th - - - -
5 C22 Footing to B2 6.35 0.6 1.2 0.15 6 2 0.9 6.20 11.16 47.10 22.86
C22 B2 to B1 3.05 0.6 1.2 0.15 6 2 0.9 2.90 5.22 47.10 10.98
C22 B1 to Ground 3.05 0.6 1.2 0.15 6 2 1.1 2.90 6.37 47.10 10.98
C22 Ground to 1st floor 4.88 0.6 1.2 0.15 6 1 3.6 4.73 17.02 47.10 17.57
C22 1st to 2nd floor 4.27 0.6 1.2 0.15 6 1 3.6 4.12 14.82 47.10 15.37
C22 2nd to Service 4.88 0.6 1.2 0.15 6 2 0.9 4.73 8.51 47.10 17.57
C22 Service to 3rd - - - -
C22 3rd to 4th - - - -
C22 4th to 5th - - - -
C22 5th to 6th - - - -
C22 6th to 7th - - - -
C22 7th to 8th - - - -
C22 8th to 9th - - - -
6 C29 Footing to B2 6.35 0.6 1.2 0.15 10 1 3.6 6.20 22.31 78.50 22.86
C29 B2 to B1 3.05 0.6 1.2 0.15 10 1 3.6 2.90 10.43 78.50 10.98
C29 B1 to Ground 3.05 0.6 1.2 0.15 8 1 3.6 2.90 10.43 62.80 10.98
C29 Ground to 1st floor 4.88 0.6 1.2 0.15 8 1 3.6 4.73 17.02 62.80 17.57
C29 1st to 2nd floor 4.27 0.6 1.2 0.15 8 1 3.6 4.12 14.82 62.80 15.37
C29 2nd to Service 4.88 0.6 1.2 0.15 6 1 3.6 4.73 17.02 47.10 17.57
C29 Service to 3rd - - - -
C29 3rd to 4th - - - -
C29 4th to 5th - - - -
C29 5th to 6th - - - -
C29 6th to 7th - - - -
C29 7th to 8th - - - -
C29 8th to 9th - - - -
7 C31 Footing to B2 6.35 0.9 0.9 0.15 6 2 0.6 6.20 7.44 47.10 22.86
C31 B2 to B1 3.05 0.9 0.9 0.15 6 2 0.6 2.90 3.48 47.10 10.98
C31 B1 to Ground - - - -
C31 Ground to 1st floor - - - -
C31 1st to 2nd floor - - - -
C31 2nd to Service - - - -
C31 Service to 3rd - - - -
C31 3rd to 4th - - - -
C31 4th to 5th - - - -
C31 5th to 6th - - - -
C31 6th to 7th - - - -
C31 7th to 8th - - - -
C31 8th to 9th - - - -
8 C32 Footing to B2 - - - -
C32 B2 to B1 - - - -
C32 B1 to Ground - - - -
C32 Ground to 1st floor - - - -
C32 1st to 2nd floor - - - -
C32 2nd to Service - - - -
C32 Service to 3rd - - - -
C32 3rd to 4th 3.19 0.75 0.75 0.15 6 2 0.45 3.04 2.73 47.10 9.57
C32 4th to 5th - - - -
C32 5th to 6th - - - -
C32 6th to 7th - - - -
C32 7th to 8th - - - -
C32 8th to 9th - - - -
9 C36 Footing to B2 6.35 0.45 1.2 0.15 6 2 0.6 6.20 7.44 47.10 20.96
C36 B2 to B1 3.05 0.45 1.2 0.15 6 2 0.45 2.90 2.61 47.10 10.07
C36 B1 to Ground 3.05 0.45 1.2 0.15 6 2 0.45 2.90 2.61 47.10 10.07
C36 Ground to 1st floor 4.88 0.45 1.2 0.15 6 2 0.9 4.73 8.51 47.10 16.10
C36 1st to 2nd floor 4.27 0.45 1.2 0.15 6 2 0.9 4.12 7.41 47.10 14.09
C36 2nd to Service 4.88 0.45 1.2 0.15 6 2 0.9 4.73 8.51 47.10 16.10
C36 Service to 3rd - - - -
C36 3rd to 4th - - - -
C36 4th to 5th - - - -
C36 5th to 6th - - - -
C36 6th to 7th - - - -
C36 7th to 8th - - - -
C36 8th to 9th - - - -
10 C101 Footing to B2 - - - -
C101 B2 to B1 3.05 0.23 0.75 0.15 6 2 0.6 2.90 3.48 47.10 5.98
C101 B1 to Ground 3.05 0.23 0.75 0.15 6 2 0.6 2.90 3.48 47.10 5.98
C101 Ground to 1st floor 4.88 0.23 0.75 0.15 10 2 0.6 4.73 5.67 78.50 9.56
C101 1st to 2nd floor 4.27 0.23 0.75 0.15 10 2 0.6 4.12 4.94 78.50 8.37
C101 2nd to Service 4.88 0.23 0.75 0.15 12 2 0.6 4.73 5.67 94.20 9.56
C101 Service to 3rd 2.6 0.23 0.75 0.15 10 2 0.6 2.45 2.94 78.50 5.10
C101 3rd to 4th 3.19 0.23 0.75 0.15 6 2 0.6 3.04 3.65 47.10 6.25
C101 4th to 5th 3.05 0.23 0.75 0.15 6 2 0.6 2.90 3.48 47.10 5.98
C101 5th to 6th 3.05 0.23 0.75 0.15 6 2 0.6 2.90 3.48 47.10 5.98
C101 6th to 7th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C101 7th to 8th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C101 8th to 9th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
11 C102 Footing to B2 - - - -
C102 B2 to B1 3.05 0.23 0.75 0.15 6 1 1.96 2.90 5.68 47.10 5.98
C102 B1 to Ground 3.05 0.23 0.75 0.15 6 1 1.96 2.90 5.68 47.10 5.98
C102 Ground to 1st floor 4.88 0.23 0.75 0.15 8 1 1.96 4.73 9.27 62.80 9.56
C102 1st to 2nd floor 4.27 0.23 0.75 0.15 6 1 1.96 4.12 8.07 47.10 8.37
C102 2nd to Service 4.88 0.23 0.75 0.15 6 2 0.7 4.73 6.62 47.10 9.56
C102 Service to 3rd 2.6 0.23 0.75 0.15 6 2 0.6 2.45 2.94 47.10 5.10
C102 3rd to 4th 3.19 0.23 0.75 0.15 6 2 0.6 3.04 3.65 47.10 6.25
C102 4th to 5th 3.05 0.23 0.75 0.15 6 2 0.6 2.90 3.48 47.10 5.98
C102 5th to 6th 3.05 0.23 0.75 0.15 6 2 0.6 2.90 3.48 47.10 5.98
C102 6th to 7th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C102 7th to 8th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C102 8th to 9th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
12 C103 Footing to B2 - - - -
C103 B2 to B1 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C103 B1 to Ground 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C103 Ground to 1st floor 4.88 0.23 0.75 0.15 6 2 0.45 4.73 4.25 47.10 9.56
C103 1st to 2nd floor 4.27 0.23 0.75 0.15 6 2 0.45 4.12 3.71 47.10 8.37
C103 2nd to Service 4.88 0.23 0.75 0.15 6 2 0.45 4.73 4.25 47.10 9.56
C103 Service to 3rd 2.6 0.23 0.75 0.15 6
C103 Service to 3rd 2.6 0.23 0.75 0.15 10 16 0.45 0.15 1.08 78.50 5.10
C103 Service to 3rd 2.6 0.23 0.75 0.15 6 4 2.6 ISA 150x150x10 22.80
C103 3rd to 4th 3.19 0.23 0.75 0.15 6 2 0.45 3.04 2.73 47.10 6.25
C103 4th to 5th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C103 5th to 6th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C103 6th to 7th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C103 7th to 8th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C103 8th to 9th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
13 C117 Footing to B2 6.35 0.45 0.75 0.15 10 42 0.15 0.15 0.95 78.50 15.24
C117 Footing to B2 6.35 0.45 0.75 0.15 10 42 0.45 0.15 2.84 78.50 15.24
C117 Footing to B2 6.35 0.45 0.75 0.15 6 4 6.35 ISA 150x150x10 22.80
14 C104 Footing to B2 - - - -
C104 B2 to B1 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C104 B1 to Ground 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C104 Ground to 1st floor 4.88 0.23 0.75 0.15 6 2 0.45 4.73 4.25 47.10 9.56
C104 1st to 2nd floor 4.27 0.23 0.75 0.15 6 2 0.45 4.12 3.71 47.10 8.37
C104 2nd to Service 4.88 0.23 0.75 0.15 6 2 0.45 4.73 4.25 47.10 9.56
C104 Service to 3rd 2.6 0.23 0.75 0.15
C104 Service to 3rd 2.6 0.23 0.75 0.15 10 16 0.45 0.15 1.08 78.50 5.10
C104 Service to 3rd 2.6 0.23 0.75 0.15 6 4 2.6 ISA 150x150x10 22.80
C104 3rd to 4th 3.19 0.23 0.75 0.15 6 2 0.45 3.04 2.73 47.10 6.25
C104 4th to 5th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C104 5th to 6th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C104 6th to 7th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C104 7th to 8th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
C104 8th to 9th 3.05 0.23 0.75 0.15 6 2 0.45 2.90 2.61 47.10 5.98
15 C106 Footing to B2 6.35 0.45 0.75 0.15 6 2 0.7 6.20 8.68 47.10 15.24
C106 B2 to B1 3.05 0.45 0.75 0.15 6 2 0.6 2.90 3.48 47.10 7.32
C106 B1 to Ground 3.05 0.45 0.75 0.15 6 2 0.6 2.90 3.48 47.10 7.32
C106 Ground to 1st floor 4.88 0.45 0.75 0.15 6 2 0.6 4.73 5.67 47.10 11.71
C106 1st to 2nd floor 4.27 0.45 0.75 0.15 6 2 0.45 4.12 3.71 47.10 10.25
C106 2nd to Service - - - -
C106 Service to 3rd - -
C106 3rd to 4th 3.19 0.45 0.6 0.15 10 20 0.15 0.15 0.45 78.50 6.70
C106 3rd to 4th 3.19 0.45 0.6 0.15 10 20 0.3 0.15 0.90 78.50 6.70
C106 3rd to 4th 3.19 0.45 0.6 0.15 6 4 3.19 ISA 150x150x10 22.80
C106 4th to 5th 3.05 0.45 0.6 0.15 10 20 0.15 0.15 0.45 78.50 6.41
C106 4th to 5th 3.05 0.45 0.6 0.15 10 20 0.3 0.15 0.90 78.50 6.41
C106 4th to 5th 3.05 0.45 0.6 0.15 6 4 3.05 ISA 150x150x10 22.80
C106 5th to 6th 3.05 0.3 0.6 0.15 6 2 0.45 2.90 2.61 47.10 5.49
C106 6th to 7th 3.05 0.3 0.6 0.15 6 2 0.45 2.90 2.61 47.10 5.49
C106 7th to 8th 3.05 0.3 0.6 0.15 10 20 0 - - 78.50 5.49
C106 7th to 8th 3.05 0.3 0.6 0.15 10 20 0.3 0.15 0.90 78.50 5.49
C106 7th to 8th 3.05 0.3 0.6 0.15 6 4 3.05 ISA 150x150x10 22.80
C106 8th to 9th 3.05 0.3 0.6 0.15 10 20 0 - - 78.50 5.49
C106 8th to 9th 3.05 0.3 0.6 0.15 10 20 0.3 0.15 0.90 78.50 5.49
C106 8th to 9th 3.05 0.3 0.6 0.15 6 4 3.05 ISA 150x150x10 22.80
16 C107 Footing to B2 6.35 0.45 0.75 0.15 6 2 0.45 6.20 5.58 47.10 15.24
C107 B2 to B1 3.05 0.45 0.75 0.15 10 20 0.15 0.15 0.45 78.50 7.32
C107 B2 to B1 3.05 0.45 0.75 0.15 10 20 0.45 0.15 1.35 78.50 7.32
C107 B2 to B1 3.05 0.45 0.75 0.15 6 4 3.05 ISA 150x150x10 22.80
C107 B1 to Ground - - -
C107 Ground to 1st floor - - -
C107 1st to 2nd floor - - -
C107 2nd to Service - - - -
C107 Service to 3rd - - -
C107 3rd to 4th - - -
C107 4th to 5th - - -
C107 5th to 6th 3.05 0.3 0.6 0.15 10 20 0 - - 78.50 5.49
C107 5th to 6th 3.05 0.3 0.6 0.15 10 20 0.3 0.15 0.90 78.50 5.49
C107 5th to 6th 3.05 0.3 0.6 0.15 6 4 3.05 ISA 150x150x10 22.80
C107 6th to 7th - - -
C107 7th to 8th - -
C107 8th to 9th - -
17 C109 Footing to B2 6.35 0.6 0.6 0.15 6 2 0.45 6.20 5.58 47.10 15.24
C109 B2 to B1 3.05 0.6 0.6 0.15 6 2 0.45 2.90 47.10 7.32
C109 B1 to Ground - - -
C109 Ground to 1st floor 4.88 0.6 0.6 0.15 10 32 0.3 0.15 1.44 78.50 11.71
C109 Ground to 1st floor 4.88 0.6 0.6 0.15 10 32 0.3 0.15 1.44 78.50 11.71
C109 Ground to 1st floor 4.88 0.6 0.6 0.15 6 4 4.88 ISA 150x150x10 22.80
C109 1st to 2nd floor - - -
C109 2nd to Service - - - -
C109 Service to 3rd - - -
C109 3rd to 4th - - -
C109 4th to 5th - - -
C109 5th to 6th - - -
C109 6th to 7th - - -
C109 7th to 8th - -
C109 8th to 9th - -
18 C110 3rd to 4th 3.19 0.9 0.9 0.15 6 2 0.45 3.04 2.73 47.10 11.48
19 C111 Footing to B2 6.35 0.6 0.6 0.15 6 1 2.4 6.20 14.87 47.10 15.24
C111 B2 to B1 3.05 0.6 0.6 0.15 6 1 2.4 2.90 6.95 47.10 7.32
C111 B1 to Ground 3.05 0.6 0.6 0.15 6 1 2.4 2.90 6.95 47.10 7.32
C111 Ground to 1st floor 4.88 0.6 0.6 0.15 8 2 0.6 4.73 5.67 62.80 11.71
C111 1st to 2nd floor 4.27 0.6 0.6 0.15 6 2 0.45 4.12 3.71 47.10 10.25
C111 2nd to Service 4.88 0.6 0.6 0.15 6 2 0.45 4.73 4.25 47.10 11.71
C111 Service to 3rd - - -
C111 3rd to 4th 3.19 0.6 0.6 0.15 10 2 0.45 3.04 2.73 78.50 7.66
C111 4th to 5th - - -
C111 5th to 6th - - -
C111 6th to 7th - - -
C111 7th to 8th - -
C111 8th to 9th - -
20 C112 Footing to B2 6.35 0.6 0.6 0.15 6 4 0.45 6.20 11.16 47.10 15.24
C112 B2 to B1 3.05 0.6 0.6 0.15 10 20 0.3 0.15 0.90 78.50 7.32
C112 B2 to B1 3.05 0.6 0.6 0.15 10 20 0.3 0.15 0.90 78.50 7.32
C112 B2 to B1 3.05 0.6 0.6 0.15 6 4 3.05 ISA 150x150x10 22.80
C112 B1 to Ground - - - -
C112 Ground to 1st floor - - - -
C112 1st to 2nd floor - - - -
C112 2nd to Service - - - -
C112 Service to 3rd - - - -
C112 3rd to 4th - - - -
C112 4th to 5th - - - -
C112 5th to 6th - - - -
C112 6th to 7th - - - -
C112 7th to 8th - - - -
C112 8th to 9th - - - -
21 C113 Footing to B2 6.35 0.9 0.9 0.15 6 4 0.7 6.20 17.35 47.10 22.86
C113 B2 to B1 3.05 0.9 0.9 0.15 10 20 0.6 0.15 1.80 78.50 10.98
C113 B2 to B1 3.05 0.9 0.9 0.15 10 20 0.6 0.15 1.80 78.50 10.98
C113 B2 to B1 3.05 0.9 0.9 0.15 6 4 3.05 ISA 150x150x10 22.80
C113 B1 to Ground - - - -
C113 Ground to 1st floor - - - -
C113 1st to 2nd floor - - - -
C113 2nd to Service - - - -
C113 Service to 3rd - - - -
C113 3rd to 4th 3.19 0.9 0.9 0.15 12 1 3.6 3.04 10.94 94.20 11.48
C113 4th to 5th - - - -
C113 5th to 6th - - - -
C113 6th to 7th - - - -
C113 7th to 8th - - - -
C113 8th to 9th - - - -
22 C114 Footing to B2 6.35 0.6 0.6 0.15 10 1 2.4 6.20 14.87 78.50 15.24
C114 B2 to B1 3.05 0.6 0.6 0.15 8 1 2.4 2.90 6.95 62.80 7.32
C114 B1 to Ground 3.05 0.6 0.6 0.15 6 1 2.4 2.90 6.95 47.10 7.32
C114 Ground to 1st floor 4.88 0.6 0.6 0.15 6 1 2.4 4.73 11.35 47.10 11.71
C114 1st to 2nd floor 4.27 0.6 0.6 0.15 6 1 2.4 4.12 9.88 47.10 10.25
C114 2nd to Service 4.88 0.6 0.6 0.15 6 1 2.4 4.73 11.35 47.10 11.71
C114 3rd to 4th - - -
C114 4th to 5th - - -
C114 5th to 6th - - -
C114 6th to 7th - - -
C114 7th to 8th - - -
C114 8th to 9th - - -

1 693.40 1,251.10
No of Bolts

Total wt in Kgs Horizontal Vertical Total No of Bolts


567.80 14 20.00 280.00
494.54 14 17.00 238.00
567.80 14 20.00 280.00
293.96 14 10.00 140.00
457.82 14 13.00 182.00
327.54 14 12.00 168.00
245.66 10 12.00 120.00
245.66 10 12.00 120.00
327.54 10 12.00 120.00
327.54 10 12.00 120.00
- 0 - -
- 0 - -
200.40 2 20.00 80.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
122.83 2 12.00 48.00
122.83 2 12.00 48.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
122.83 2 12.00 48.00
122.83 2 12.00 48.00
- 0 - -
- 0 - -
835.01 16 20.00 320.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
525.43 5 26.00 260.00
245.66 5 12.00 120.00
300.25 7 12.00 168.00
801.61 16 20.00 320.00
698.17 16 17.00 272.00
400.80 5 20.00 200.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
1,751.43 16 26.00 416.00
818.85 16 12.00 192.00
655.08 16 12.00 192.00
1,068.81 16 20.00 320.00
930.90 16 17.00 272.00
801.61 16 20.00 320.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
350.29 3 26.00 156.00
163.77 3 12.00 72.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
128.76 2 13.00 52.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
350.29 3 26.00 156.00
122.83 2 12.00 48.00
122.83 2 12.00 48.00
400.80 5 20.00 200.00
349.09 5 17.00 170.00
400.80 5 20.00 200.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
163.77 3 12.00 72.00
163.77 3 12.00 72.00
445.34 3 20.00 120.00
387.87 3 17.00 102.00
534.40 3 20.00 120.00
230.56 3 10.00 60.00
171.68 3 13.00 78.00
163.77 3 12.00 72.00
163.77 3 12.00 72.00
122.83 2 12.00 48.00
122.83 2 12.00 48.00
122.83 2 12.00 48.00
- 0 - -
267.49 10 12.00 120.00
267.49 10 12.00 120.00
581.91 10 20.00 200.00
380.12 10 17.00 170.00
311.74 3 20.00 120.00
138.34 3 10.00 60.00
171.68 3 13.00 78.00
163.77 3 12.00 72.00
163.77 3 12.00 72.00
122.83 2 12.00 48.00
122.83 2 12.00 48.00
122.83 2 12.00 48.00
- 0 - -
122.83 2 12.00 48.00
122.83 2 12.00 48.00
200.40 2 20.00 80.00
174.54 2 17.00 68.00
200.40 2 20.00 80.00
-
84.78 -
237.12 2 10.00 80.00
128.76 2 13.00 52.00
122.83 2 12.00 48.00
122.83 2 12.00 48.00
122.83 2 12.00 48.00
122.83 2 12.00 48.00
122.83 2 12.00 48.00
74.18 -
222.55 -
579.12 2 26.00 208.00
- 0 - -
122.83 2 12.00 48.00
122.83 2 12.00 48.00
200.40 2 20.00 80.00
174.54 2 17.00 68.00
200.40 2 20.00 80.00
0 - -
84.78
237.12 2 10.00 80.00
128.76 2 13.00 52.00
122.83 2 12.00 48.00
122.83 2 12.00 48.00
122.83 2 12.00 48.00
122.83 2 12.00 48.00
122.83 2 12.00 48.00
408.67 3 26.00 156.00
163.77 3 12.00 72.00
163.77 3 12.00 72.00
267.20 3 20.00 120.00
174.54 2 17.00 68.00
- 0 - -
- 0 - -
35.33 0 - -
70.65
290.93 2 13.00 104.00
35.33 0 - -
70.65
278.16 2 12.00 96.00
122.83 2 12.00 48.00
122.83 2 12.00 48.00
- 0 - -
70.65
278.16 2 12.00 96.00
- 0 - -
70.65
278.16 2 12.00 96.00
262.71 2 26.00 104.00
35.33 0 - -
105.98
278.16 2 12.00 96.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
70.65
278.16 2 12.00 96.00
- 0 - -
- 0 - -
- 0 - -
262.71 2 26.00 104.00
- 2 12.00 48.00
- 0 - -
113.04 0 - -
113.04
445.06 2 20.00 160.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
128.76 2 13.00 52.00
700.57 12 26.00 312.00
327.54 12 12.00 144.00
327.54 12 12.00 144.00
356.27 3 20.00 120.00
174.54 2 17.00 68.00
200.40 2 20.00 80.00
- 0 - -
214.60 2 13.00 52.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
525.43 2 26.00 208.00
70.65 0 - -
70.65
278.16 2 12.00 96.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
817.33 3 26.00 312.00
141.30 - -
141.30
278.16 2 12.00 96.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
1,030.10 20 13.00 260.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
1,167.62 12 26.00 312.00
436.72 12 12.00 144.00
327.54 12 12.00 144.00
534.40 12 20.00 240.00
465.45 12 17.00 204.00
534.40 12 20.00 240.00
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
- 0 - -
0 -
0 -
41,142.83 14,994.00
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
86,305.69 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
3,736.46 Kgs
Guniting by dry mix process as per IS 9012 (1978) to
concrete surface in C.M. 1:3, 25mm. thick under pressure of
2 2.1 kg to 2.8 kg per sq.cm. including forms, scaffolding,
floating the surface, curing for 14 days etc. complete.
(Excluding reinforcement) - Sqm
3 Grouting 1,470.22 Sqm
4 Ferrocrete work 2,664.81 Sqm

3 Material Requirement:
Hilti/fishers Bolts 22,885.60 No

Dwg. ref. 160013-113-R0


Dwg. ref. 160013-112-CS1.

Dwg. ref. 160013-112-CS1_27.07.2017

Dwg. ref. 160013-112-CS1_27.07.2017 (12th sept 2017)


ngsville Realty LLP, Shivaji Nagar,

Rate Amount

81 6,990,761.16

79 295,180.66

1375 -
550 808,620.62
1722.24 4,589,449.09
474 10,847,774.40
23,531,785.93
31,503,678.75
Column Size

Beam
Sr No Column No Floor Floor Ht L B Slab depth Depth

1 LC2A Ground to 1st floor 4.88 0.23 2.515 0.15


LC2A 1st to 2nd floor 4.27 0.23 2.515 0.15
LC2A 4th to 5th 3.05 0.23 2.515 0.15
LC2A 5th to 6th 3.05 0.23 2.515 0.15
LC2A 6th to 7th 3.05 0.23 2.515 0.15
LC2A 7th to 8th 3.05 0.23 2.515 0.15
LC2A 8th to 9th 3.05 0.23 2.515 0.15
2 LC2B Footing to B2 6.35 0.23 2.285 0.15
3 LC2C Ground to 1st floor 4.88 0.23 2.515 0.15
LC2C 1st to 2nd floor 4.27 0.23 2.515 0.15
LC2C 2nd to Service 4.88 0.23 2.515 0.15
LC2C Service to 3rd 2.6 0.23 2.515 0.15
LC2C 3rd to 4th 3.19 0.23 2.515 0.15
LC2C 4th to 5th 3.05 0.23 2.515 0.15
LC2C 5th to 6th 3.05 0.23 2.515 0.15
LC2C 6th to 7th 3.05 0.23 2.515 0.15
LC2C 7th to 8th 3.05 0.23 2.515 0.15
LC2C 8th to 9th 3.05 0.23 2.515 0.15
4 LC2 B2 to B1 3.05 0.23 5.23 0.15
LC2 2nd to Service 4.88 0.23 5.23 0.15
5 LC49 B2 to B1 3.05 0.23 2.46 0.15
LC49 B1 to Ground 3.05 0.23 2.46 0.15
LC49 Ground to 1st floor 4.88 0.23 2.46 0.15
LC49 1st to 2nd floor 4.27 0.23 2.46 0.15
LC49 2nd to Service 4.88 0.23 2.46 0.15
LC49 Service to 3rd 2.6 0.23 2.46 0.15
LC49 3rd to 4th 3.19 0.23 2.46 0.15
LC49 4th to 5th 3.05 0.23 2.46 0.15
LC49 5th to 6th 3.05 0.23 2.46 0.15
LC49 6th to 7th 3.05 0.23 2.46 0.15
LC49 7th to 8th 3.05 0.23 2.46 0.15
LC49 8th to 9th 3.05 0.23 2.46 0.15
6 LC4B B1 to Ground 3.05 0.23 2.46 0.15
7 LC4C B1 to Ground 3.05 0.23 2.46 0.15
8 LC4D 1st to 2nd floor 4.27 0.23 2.46 0.15
LC4D 2nd to Service 4.88 0.23 2.46 0.15
LC4D Service to 3rd 2.6 0.23 2.46 0.15
LC4D 3rd to 4th 3.19 0.23 2.46 0.15
LC4D 4th to 5th 3.05 0.23 2.46 0.15
LC4D 5th to 6th 3.05 0.23 2.46 0.15
LC4D 6th to 7th 3.05 0.23 2.46 0.15
LC4D 7th to 8th 3.05 0.23 2.46 0.15
LC4D 8th to 9th 3.05 0.23 2.46 0.15
9 LC41 B2 to B1 3.05 0.23 1.8 0.15
LC41 B1 to Ground 3.05 0.23 1.8 0.15
LC41 Ground to 1st floor 4.88 0.23 1.8 0.15
LC41 1st to 2nd floor 4.27 0.23 1.8 0.15
LC41 2nd to Service 4.88 0.23 1.8 0.15
10 LC42 Footing to B2
LC42 2nd to Service 4.88 0.23 1.8 0.15
LC42 Service to 3rd 2.6 0.23 1.8 0.15
LC42 3rd to 4th 3.19 0.23 1.8 0.15
LC42 4th to 5th 3.05 0.23 1.8 0.15
LC42 5th to 6th 3.05 0.23 1.8 0.15
LC42 6th to 7th 3.05 0.23 1.8 0.15
LC42 7th to 8th 3.05 0.23 1.8 0.15
LC42 8th to 9th 3.05 0.23 1.8 0.15
11 LC43 Footing to B2
LC43 B2 to B1 3.05 0.23 1.8 0.15
LC43 B1 to Ground 3.05 0.23 1.8 0.15
LC43 Ground to 1st floor 4.88 0.23 1.8 0.15
LC43 1st to 2nd floor 4.27 0.23 1.8 0.15
LC43 2nd to Service 4.88 0.23 1.8 0.15
LC43 Service to 3rd 2.6 0.23 1.8 0.15
LC43 3rd to 4th 3.19 0.23 1.8 0.15
LC43 4th to 5th 3.05 0.23 1.8 0.15
LC43 5th to 6th 3.05 0.23 1.8 0.15
LC43 6th to 7th 3.05 0.23 1.8 0.15
LC43 7th to 8th 3.05 0.23 1.8 0.15
LC43 8th to 9th 3.05 0.23 1.8 0.15
12 LC44 Footing to B2
LC44 B2 to B1
LC44 B1 to Ground
LC44 Ground to 1st floor 4.88 0.23 1.8 0.15
LC44 1st to 2nd floor 4.27 0.23 1.8 0.15
LC44 2nd to Service 4.88 0.23 1.8 0.15
LC44 Service to 3rd 2.6 0.23 1.8 0.15
LC44 3rd to 4th 3.19 0.23 1.8 0.15
LC44 4th to 5th 3.05 0.23 1.8 0.15
LC44 5th to 6th 3.05 0.23 1.8 0.15
LC44 6th to 7th 3.05 0.23 1.8 0.15
LC44 7th to 8th 3.05 0.23 1.8 0.15
LC44 8th to 9th 3.05 0.23 1.8 0.15
13 C1 Footing to B2 6.35 0.45 0.9 0.15
C1 B2 to B1 3.05 0.45 0.9 0.15
C1 B1 to Ground 3.05 0.45 0.9 0.15
14 C111 Service to 3rd 2.6 0.6 0.6 0.15
15 C113 Service to 3rd 2.6 0.9 0.9 0.15
16 C114 Service to 3rd 2.6 0.6 0.6 0.15

Sub structure
FE350 9,081.74 kg
Super structure
FE350 39,817.60 kg

Bolts
Ground to 1st floor 3334.084 139.2752 860 50.96
1st to 2nd floor 3291.759 144.8384 799 49.33
4th to 5th 3596.574 103.456 1008 58.36
5th to 6th 3596.574 103.456 1008 58.36
6th to 7th 3596.574 103.456 1008 58.36
7th to 8th 3596.574 103.456 1008 58.36
8th to 9th 3596.574 103.456 1008 58.36
Footing to B2 1313.573 49.0855 468 22.31
2nd to Service 7975.972 211.8408 2380 136.72
Service to 3rd 3591.322 95.758 1070 55.82
3rd to 4th 3641.586 90.6917 1040 58.44
B2 to B1 4500.04 82.716 1092 62.01
B1 to Ground 3268.124 82.228 864 49.43
48899.33
Thickness
of plate in Area of Plate Wt per Sqm in Area of column
mm No of plate Length of plate Height of plate in Sqm Kgs in Sqm

6 2 0.45 4.73 4.25 47.10 26.79


6 2 0.45 4.12 3.71 47.10 23.44
6 2 0.45 2.90 2.61 47.10 16.74
6 2 0.45 2.90 2.61 47.10 16.74
6 2 0.45 2.90 2.61 47.10 16.74
6 2 0.45 2.90 2.61 47.10 16.74
6 2 0.45 2.90 2.61 47.10 16.74
6 2 0.45 6.20 5.58 47.10 31.94
6 2 0.45 4.73 4.25 47.10 26.79
6 2 0.45 4.12 3.71 47.10 23.44
6 2 0.45 4.73 4.25 47.10 26.79
6 2 0.45 2.45 2.20 47.10 14.27
6 2 0.45 3.04 2.73 47.10 17.51
6 2 0.45 2.90 2.61 47.10 16.74
6 2 0.45 2.90 2.61 47.10 16.74
6 2 0.45 2.90 2.61 47.10 16.74
6 2 0.45 2.90 2.61 47.10 16.74
6 2 0.45 2.90 2.61 47.10 16.74
10 1 10.92 2.90 31.64 78.50 33.31
6 1 10.92 4.73 51.62 47.10 53.29
8 1 5.38 2.90 15.59 62.80 16.41
8 1 5.38 2.90 15.59 62.80 16.41
8 1 5.38 4.73 25.43 62.80 26.25
8 1 5.38 4.12 22.15 62.80 22.97
8 1 5.38 4.73 25.43 62.80 26.25
6 2 0.45 2.45 2.20 47.10 13.99
6 2 0.45 3.04 2.73 47.10 17.16
6 2 0.45 2.90 2.61 47.10 16.41
6 2 0.45 2.90 2.61 47.10 16.41
6 2 0.45 2.90 2.61 47.10 16.41
6 2 0.45 2.90 2.61 47.10 16.41
6 2 0.45 2.90 2.61 47.10 16.41
8 1 5.38 2.90 15.59 62.80 16.41
10 2 0.6 2.90 3.48 78.50 16.41
10 2 0.6 4.12 4.94 78.50 22.97
10 2 0.6 4.73 5.67 78.50 26.25
10 2 0.6 2.45 2.94 78.50 13.99
10 2 0.6 3.04 3.65 78.50 17.16
10 2 0.6 2.90 3.48 78.50 16.41
10 2 0.6 2.90 3.48 78.50 16.41
10 2 0.6 2.90 3.48 78.50 16.41
10 2 0.6 2.90 3.48 78.50 16.41
10 2 0.6 2.90 3.48 78.50 16.41
10 2 0.6 2.90 3.48 78.50 12.38
10 2 0.6 2.90 3.48 78.50 12.38
10 2 0.6 4.73 5.67 78.50 19.81
10 2 0.6 4.12 4.94 78.50 17.34
10 2 0.6 4.73 5.67 78.50 19.81
- - - -
8 1 4.06 4.73 19.19 62.80 19.81
8 1 4.06 2.45 9.94 62.80 10.56
8 1 4.06 3.04 12.33 62.80 12.95
8 1 4.06 2.90 11.76 62.80 12.38
8 1 4.06 2.90 11.76 62.80 12.38
8 1 4.06 2.90 11.76 62.80 12.38
8 1 4.06 2.90 11.76 62.80 12.38
8 1 4.06 2.90 11.76 62.80 12.38
- - - -
10 2 0.6 2.90 3.48 78.50 12.38
10 2 0.6 2.90 3.48 78.50 12.38
10 2 0.6 4.73 5.67 78.50 19.81
10 2 0.6 4.12 4.94 78.50 17.34
8 1 4.06 4.73 19.19 62.80 19.81
8 1 4.06 2.45 9.94 62.80 10.56
8 1 4.06 3.04 12.33 62.80 12.95
8 1 4.06 2.90 11.76 62.80 12.38
8 1 4.06 2.90 11.76 62.80 12.38
8 1 4.06 2.90 11.76 62.80 12.38
8 1 4.06 2.90 11.76 62.80 12.38
8 1 4.06 2.90 11.76 62.80 12.38
- - - -
- - - -
- - - -
10 2 0.6 4.73 5.67 78.50 19.81
10 2 0.6 4.12 4.94 78.50 17.34
10 2 0.6 4.73 5.67 78.50 19.81
8 1 4.06 2.45 9.94 62.80 10.56
8 2 4.06 3.04 24.66 62.80 12.95
8 2 4.06 2.90 23.53 62.80 12.38
8 2 4.06 2.90 23.53 62.80 12.38
8 2 4.06 2.90 23.53 62.80 12.38
8 2 4.06 2.90 23.53 62.80 12.38
8 2 4.06 2.90 23.53 62.80 12.38
8 1 2.7 6.20 16.73 62.80 17.15
8 1 2.7 2.90 7.82 62.80 8.24
8 1 2.7 2.90 7.82 62.80 8.24
8 1 2.4 2.45 5.87 62.80 6.24
10 1 3.6 2.45 6.92 78.50 9.36
8 1 2.4 2.45 5.87 62.80 6.24

776.81 1,413.71
No of Bolts

Total No of Cotractor
Total wt in Kgs Horizontal Vertical Bolts name

200.40 2 20.00 80.00 Trimurti


174.54 2 17.00 68.00 SFI
122.83 2 12.00 48.00 SFI
122.83 2 12.00 48.00 Trimurti
122.83 2 12.00 48.00 SFI
122.83 2 12.00 48.00 Trimurti
122.83 2 12.00 48.00 SFI
262.71 2 26.00 104.00 Trimurti
200.40 2 20.00 80.00 Trimurti
174.54 2 17.00 68.00 SFI
200.40 2 20.00 80.00 Trimurti
103.75 2 10.00 40.00 SFI
128.76 2 13.00 52.00 Trimurti
122.83 2 12.00 48.00 SFI
122.83 2 12.00 48.00 Trimurti
122.83 2 12.00 48.00 SFI
122.83 2 12.00 48.00 Trimurti
122.83 2 12.00 48.00 SFI
2,483.85 46 12.00 552.00
2,431.54 46 20.00 920.00 Trimurti
978.98 23 12.00 276.00
978.98 23 12.00 276.00 SFI
1,597.27 23 20.00 460.00 Trimurti
1,391.18 23 17.00 391.00 SFI
1,597.27 23 20.00 460.00 Trimurti
103.75 2 10.00 40.00 SFI
128.76 2 13.00 52.00 Trimurti
122.83 2 12.00 48.00 SFI
122.83 2 12.00 48.00 Trimurti
122.83 2 12.00 48.00 SFI
122.83 2 12.00 48.00 Trimurti
122.83 2 12.00 48.00 SFI
978.98 23 12.00 276.00 SFI
272.95 2 12.00 48.00 SFI
387.87 2 17.00 68.00 SFI
445.34 2 20.00 80.00 Trimurti
230.56 2 10.00 40.00 SFI
286.14 2 13.00 52.00 Trimurti
272.95 2 12.00 48.00 SFI
272.95 2 12.00 48.00 Trimurti
272.95 2 12.00 48.00 SFI
272.95 2 12.00 48.00 Trimurti
272.95 2 12.00 48.00 SFI
272.95 2 12.00 48.00
272.95 2 12.00 48.00 SFI
445.34 2 20.00 80.00 Trimurti
387.87 2 17.00 68.00 SFI
445.34 2 20.00 80.00 Trimurti
- 0 - -
1,205.38 17 20.00 340.00 Trimurti
624.05 17 10.00 170.00 SFI
774.48 17 13.00 221.00 Trimurti
738.79 17 12.00 204.00 SFI
738.79 17 12.00 204.00 Trimurti
738.79 17 12.00 204.00 SFI
738.79 17 12.00 204.00 Trimurti
738.79 17 12.00 204.00 SFI
- 0 - -
272.95 2 12.00 48.00
272.95 2 12.00 48.00 SFI
445.34 2 20.00 80.00 Trimurti
387.87 2 17.00 68.00 SFI
1,205.38 17 20.00 340.00 Trimurti
624.05 17 10.00 170.00 SFI
774.48 17 13.00 221.00 Trimurti
738.79 17 12.00 204.00 SFI
738.79 17 12.00 204.00 Trimurti
738.79 17 12.00 204.00 SFI
738.79 17 12.00 204.00 Trimurti
738.79 17 12.00 204.00 SFI
- 0 - -
- 0 - -
- 0 - - SFI
445.34 2 20.00 80.00 Trimurti
387.87 2 17.00 68.00 SFI
445.34 2 20.00 80.00 Trimurti
624.05 17 10.00 170.00 SFI
1,548.96 17 13.00 442.00
1,477.57 17 12.00 408.00 SFI
1,477.57 17 12.00 408.00 Trimurti
1,477.57 17 12.00 408.00 SFI
1,477.57 17 12.00 408.00 Trimurti
1,477.57 17 12.00 408.00 SFI
1,050.86 14 26.00 364.00 Trimurti
491.31 14 12.00 168.00 SFI
491.31 14 12.00 168.00 SFI
368.90 12 10.00 120.00 SFI
543.32 20 10.00 200.00 SFI
368.90 12 10.00 120.00 SFI
0 -
-
48,899.33 13,613.00
Beam Strengthening Qty M - TRIUMPH
Beam Size

Thickness
Length of Slab Beam of plate in Length of Area of Plate Wt per Sqm Area of Beam in
Sr No Beam No Floor Beam Breadth Depth depth Depth mm No of plate plate Height of plate in Sqm in Kgs Sqm Total wt in Kgs

1 B19 3rd floor 12.80 0.9 1.5 0.13 12 2 0.6 12.67 15.21 94.20 61.44 1,432.66
2 B21 3rd floor 11.17 0.9 1.5 0.13 12 2 0.6 11.04 13.25 94.20 53.62 1,248.30
3 B11 3rd floor 4.29 0.3 0.6 0.15 2 4.29 ISMC 250 30.40 7.72 260.83
4 B16 3rd floor 4.95 0.45 0.6 0.15 2 4.95 ISMC 400 49.40 10.40 489.06
Plate column face 12 1 0.45 0.80 0.36 94.20 - 33.91
beam face 12 1 0.45 0.80 0.36 94.20 - 33.91
support plate 12 2 0.19 94.20 - 36.17
4 B18 3rd floor 11.17 0.9 0.6 0.15 2 11.17 ISMC 400 49.40 33.51 1,103.60
Plate column face 12 1 0.9 0.80 0.72 94.20 - 67.82
beam face 12 1 0.9 0.80 0.72 94.20 - 67.82
support plate 12 3 0.19 94.20 - 54.26
-
-
31.00 166.69 4,828.35
No of Bolts

Vertical Horizontal Total No of Bolts

2 28.00 112.00
2 25.00 100.00
2 17.00 68.00
2 19.00 76.00
3 4.00 12.00
3 2.00 6.00

2 44.00 176.00
3 4.00 12.00
3 2.00 6.00

568.00
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
4,828.35 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by Client
free of cost.

Guniting by dry mix process as per IS 9012 (1978) to


concrete surface in C.M. 1:3, 25mm. thick under pressure of
2 2.1 kg to 2.8 kg per sq.cm. including forms, scaffolding,
floating the surface, curing for 14 days etc. complete.
(Excluding reinforcement) including weld mesh - Sqm
Hilti Bolts 568.00 No
ngsville Realty LLP, Shivaji Nagar,

Rate Amount

81 391,096.47

1375 -
455 258,440.00
649,536.47
M-TRIUMPH
Column Strengtheing Work Col 106 & 107
Column Size No of Bolts

Slab Beam Thickness of Length of Height of Area of Plate Wt per Sqm Area of column
Sr No Column No Floor Floor Ht L B depth Depth plate in mm No of plate plate plate in Sqm in Kgs in Sqm Total wt in Kgs Horizontal

C106 Ground to 1st floor 4.88 0.45 0.75 0.15 16 1 2.4 4.73 11.35 125.60 11.71 1,425.08 12
C106 1st to 2nd floor 4.27 0.45 0.75 0.15 16 1 2.4 4.12 9.88 125.60 10.25 1,241.20 12
C107 Ground to 1st floor 4.88 0.45 0.75 0.15 16 1 2.4 4.73 11.35 125.60 11.71 1,425.08 12
C107 1st to 2nd floor 4.27 0.45 0.75 0.15 16 1 2.4 4.12 9.88 125.60 10.25 1,241.20 12
42.46 43.92 5,332.55
No of Bolts

Vertical Total No of Bolts

20.00 240.00
17.00 204.00
20.00 240.00
17.00 204.00
888.00
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
5,332.55 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
Kgs
Guniting by dry mix process as per IS 9012 (1978) to
concrete surface in C.M. 1:3, 25mm. thick under pressure of
2 2.1 kg to 2.8 kg per sq.cm. including forms, scaffolding,
floating the surface, curing for 14 days etc. complete.
(Excluding reinforcement) - Sqm
3 Grouting 42.46 Sqm
4 Ferrocrete work 43.92 Sqm

3 Material Requirement:
Hilti/fishers Bolts 888.00 No

Dwg. ref. 16:0013-113-2 dated 05.01.2018


ngsville Realty LLP, Shivaji Nagar,

Rate Amount

81 431,936.32

79 -

1375 -
550 23,351.12
1722.24 75,640.78
474 420,912.00
951,840.22
Column Size

Slab Beam Thickness of Length of Height of Area of Plate Wt per Sqm Area of column
Sr No Column No Floor Floor Ht L B depth Depth plate in mm No of plate plate plate in Sqm in Kgs in Sqm Total wt in Kgs

1 108 Ground to 1st floor 4.88 0.6 0.6 0.15 6 1 2.4 4.73 11.35 47.10 11.71 534.40
108 1st to 2nd floor 4.27 0.6 0.6 0.15 6 1 2.4 4.12 9.88 47.10 10.25 465.45
2 109 Ground to 1st floor 4.88 0.6 0.6 0.15 6 1 2.4 4.73 11.35 47.10 11.71 534.40
109 1st to 2nd floor 4.27 0.6 0.6 0.15 6 1 2.4 4.12 9.88 47.10 10.25 465.45

42.46 43.92 1,999.71


No of Bolts

Horizontal Vertical Total No of Bolts

12 20.00 240.00
12 17.00 204.00
12 20.00 240.00
12 17.00 204.00
0 -
888.00
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
1,999.71 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
- Kgs
Guniting by dry mix process as per IS 9012 (1978) to
concrete surface in C.M. 1:3, 25mm. thick under pressure of
2 2.1 kg to 2.8 kg per sq.cm. including forms, scaffolding,
floating the surface, curing for 14 days etc. complete.
(Excluding reinforcement) - Sqm
3 Grouting 42.46 Sqm
4 Ferrocrete work 43.92 Sqm

3 Material Requirement:
Hilti/fishers Bolts 888.00 No

16:0013-113-3 Dated 24.01.2018


ngsville Realty LLP, Shivaji Nagar,

Rate Amount

81 161,976.12

79 -

-
550 23,351.12
1722.24 75,640.78
474 420,912.00
681,880.02
M-TRIUMPH Cross Bracing work at Ground Floor
SI. No. Description Nos Length Breadth Depth Qty Unit wt Total Weight
16 to 106 4 2.297 9.19 22.1 203.05
R1 2 ISMC 4 3 12.00 22.1 265.20
4 3.78 15.11 22.1 334.01
106 to 107 4 4.767 19.07 22.1 421.40
R1 2 ISMC 4 3 12.00 22.1 265.20
4 5.63 22.53 22.1 497.91
107 to 108 4 4.916 19.66 22.1 434.57
R1 2 ISMC 4 3 12.00 22.1 265.20
4 5.76 23.04 22.1 509.10
107 to lift wall 4 3.536 14.14 22.1 312.58
R1 2 ISMC 4 3 12.00 22.1 265.20
4 4.64 18.55 22.1 409.93
12mm plate to
column at B 2 1.1 0.4 0.88 94.2 82.90
10mm plate to
column at B 2 0.528 1.06 78.5 82.90
10mm plate to
column at N 14 0.528 7.39 78.5 580.27

bolts for circular


Bolts column 4 4

Summary
ISMC 200 4183.36 Kg
12 mm thick plate 82.90 Kg
10mm thick Plate 663.17 Kg
Bolts 4
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
746.06 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
4,183.36 Kgs
Guniting by dry mix process as per IS 9012 (1978) to
concrete surface in C.M. 1:3, 25mm. thick under pressure of
2 2.1 kg to 2.8 kg per sq.cm. including forms, scaffolding,
floating the surface, curing for 14 days etc. complete.
(Excluding reinforcement) - Sqm
3 Grouting - Sqm
4 Ferrocrete work - Sqm

3 Material Requirement:
Bolts 4.00 No

16:0013-113-3 Dated 24.01.2018


ngsville Realty LLP, Shivaji Nagar,

Rate Amount

81 60,431.18

79 330,485.38

-
550 -
1722.24 -
474 1,896.00
392,812.56
M-TRIUMPH Beam Strengthening at Ground Floor
SI. No. Description Nos Length Breadth Depth Qty Unit wt Total Weight
GF
1 ISMC 400 18 12.761 229.70 49.4 11347.08

ISM 300
C38 to C31, C40 to
C32 4 6.705 26.82 35.8 960.16
C31 to C24, C32 to
C25 4 6.705 26.82 35.8 960.16
C24 to C15 4 6.705 26.82 35.8 960.16
2880.47
FF
C33 to C31 4 6.699 26.80 35.8 959.30
C31 to C24 4 6.705 26.82 35.8 960.16
1919.45

Summary
GF ISMC 400 11347.08 Kg
GF ISMC 300 2880.47 Kg
FF ISMC 300 1919.45 Kg
16147.00 Kg
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of Beam
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
1
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
Note : Required HILTI/Fisher make anchors will be supplied
by Client free of cost.
RO Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
Note : Required HILTI/Fisher make anchors will be supplied
by Client free of cost.
16,147.00 Kgs
2
3 Material Requirement:
fixing Anchor fastener make HILTI/Fisher or equivalent of
specified size with necessary fittings chemicals if any
required as per manufactuere standard including drilling
holes in masonry work /CC/ R.C.C. and making good etc.
complete as directed by Engineer incharge. RO No
16:0013-113-3 Dated 24.01.2018
ngsville Realty LLP, Shivaji Nagar,

Rate Amount

79 1,275,613.16

1,275,613.16
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
10,793.65 Kgs

Providing and applying Grouting between the gap of


concrete column and m.s.plate we are closing sides of
M.S.Plate by FOSROC RAINROCK PLUG, after that using
2
pressure grout of admixture which is cement slurry and
FOSROC COMP. CEBEX 100. including scaffolding, all leads
and lifts, curing, equipment's, material, labour etc. complete. 160.69 Sqm

3 Material Requirement:
Hilti/fishers Bolts 3,338.00 No

Drg Ref:
16:0013-113-CS-O dated 03.02.18
ngsville Realty LLP, Shivaji Nagar,

Rate Amount

81 874,285.44
-

550 88,380.04

474 1,582,212.00
2,544,877.47

3-CS-O dated 03.02.18


Column Size

Beam
Sr No Column No Floor Floor Ht L B Slab depth Depth

FC5 3rd to 4th 3.19 0.3 0.6 0.15


FC5 4th to 5th 3.05 0.3 0.6 0.15
FC5 5th to 6th 3.05 0.3 0.6 0.15
FC5 6th to 7th 3.05 0.3 0.6 0.15
FC5 7th to 8th 3.05 0.3 0.6 0.15
FC5 8th to 9th 3.05 0.3 0.6 0.15
FC6 3rd to 4th 3.19 0.3 0.6 0.15
FC6 4th to 5th 3.05 0.3 0.6 0.15
FC6 5th to 6th 3.05 0.3 0.6 0.15
FC6 6th to 7th 3.05 0.3 0.6 0.15
FC6 7th to 8th 3.05 0.3 0.6 0.15
FC6 8th to 9th 3.05 0.3 0.6 0.15
FC7 3rd to 4th 3.19 0.45 0.45 0.15
FC7 4th to 5th 3.05 0.45 0.45 0.15
FC7 5th to 6th 3.05 0.45 0.45 0.15
FC7 6th to 7th 3.05 0.3 0.45 0.15
FC7 7th to 8th 3.05 0.3 0.45 0.15
FC7 8th to 9th 3.05 0.3 0.475 0.15
FC8 3rd to 4th 3.19 0.45 0.45 0.15
FC8 4th to 5th 3.05 0.45 0.45 0.15
FC8 5th to 6th 3.05 0.3 0.45 0.15
FC8 6th to 7th 3.05 0.3 0.45 0.15
FC8 7th to 8th 3.05 0.3 0.45 0.15
FC8 8th to 9th 3.05 0.3 0.45 0.15
FC9 3rd to 4th 3.19 0.6 0.6 0.15
FC9 4th to 5th 3.05 0.6 0.6 0.15
FC9 5th to 6th 3.05 0.45 0.6 0.15
FC9 6th to 7th 3.05 0.45 0.6 0.15
FC10 3rd to 4th 3.19 0.45 0.6 0.15
FC10 4th to 5th 3.05 0.45 0.6 0.15
FC10 5th to 6th 3.05 0.45 0.6 0.15
FC10 6th to 7th 3.05 0.45 0.6 0.15
FC10 7th to 8th 3.05 0.45 0.6 0.15
FC10 8th to 9th 3.05 0.45 0.6 0.15
Drg Ref:
16:0013-113-CS-O dated 03.02.18

Struct Ferro Bolts Grouting


3rd to 4th 2088.809 650 31.89
4th to 5th 1719.587 528 26.95
5th to 6th 1733.234 528 26.08
6th to 7th 1828.767 576 26.95
7th to 8th 1664.996 504 23.47
8th to 9th 1758.254 552 25.35
10793.65 0 3338 160.69
Thickness
of plate in Area of Plate Wt per Sqm in Area of column
mm No of plate Length of plate Height of plate in Sqm Kgs in Sqm

6 2 0.6 3.04 3.65 47.10 5.74


6 2 0.6 2.90 3.48 47.10 5.49
6 2 0.6 2.90 3.48 47.10 5.49
6 2 0.6 2.90 3.48 47.10 5.49
6 2 0.6 2.90 3.48 47.10 5.49
6 1 1.8 2.90 5.22 47.10 5.49
6 2 0.6 3.04 3.65 47.10 5.74
6 2 0.6 2.90 3.48 47.10 5.49
6 2 0.6 2.90 3.48 47.10 5.49
6 1 1.8 2.90 5.22 47.10 5.49
6 1 1.8 2.90 5.22 47.10 5.49
6 1 1.8 2.90 5.22 47.10 5.49
8 1 1.8 3.04 5.47 62.80 5.74
8 1 1.8 2.90 5.22 62.80 5.49
8 1 1.8 2.90 5.22 62.80 5.49
10 1 1.5 2.90 4.35 78.50 4.58
10 1 1.5 2.90 4.35 78.50 4.58
10 1 1.55 2.90 4.49 78.50 4.73
8 1 1.8 3.04 5.47 62.80 5.74
8 1 1.8 2.90 5.22 62.80 5.49
10 1 1.5 2.90 4.35 78.50 4.58
10 1 1.5 2.90 4.35 78.50 4.58
10 1 1.5 2.90 4.35 78.50 4.58
10 1 1.5 2.90 4.35 78.50 4.58
8 1 2.4 3.04 7.29 62.80 7.66
6 2 0.6 2.90 3.48 47.10 7.32
6 2 0.6 2.90 3.48 47.10 6.41
6 2 0.6 2.90 3.48 47.10 6.41
12 1 2.1 3.04 6.38 94.20 6.70
12 1 2.1 2.90 6.08 94.20 6.41
12 1 2.1 2.90 6.08 94.20 6.41
12 1 2.1 2.90 6.08 94.20 6.41
12 1 2.1 2.90 6.08 94.20 6.41
12 1 2.1 2.90 6.08 94.20 6.41
160.69 193.03
No of Bolts

Total No of
Total wt in Kgs Horizontal Vertical Bolts

171.68 3 13.00 78.00


163.77 3 12.00 72.00
163.77 3 12.00 72.00
163.77 3 12.00 72.00
163.77 3 12.00 72.00
245.66 10 12.00 120.00
171.68 3 13.00 78.00
163.77 3 12.00 72.00
163.77 3 12.00 72.00
245.66 10 12.00 120.00
245.66 10 12.00 120.00
245.66 10 12.00 120.00
343.37 8 13.00 104.00
327.54 8 12.00 96.00
327.54 8 12.00 96.00
341.19 8 12.00 96.00
341.19 8 12.00 96.00
352.56 8 12.00 96.00
343.37 8 13.00 104.00
327.54 8 12.00 96.00
341.19 8 12.00 96.00
341.19 8 12.00 96.00
341.19 8 12.00 96.00
341.19 8 12.00 96.00
457.82 12 13.00 156.00
163.77 3 12.00 72.00
163.77 3 12.00 72.00 0
163.77 3 12.00 72.00
600.89 10 13.00 130.00
573.20 10 12.00 120.00
573.20 10 12.00 120.00
573.20 10 12.00 120.00
573.20 10 12.00 120.00
573.20 10 12.00 120.00
10,793.65 3,338.00
RCC structure strengthening Sample work at M - TRIUMPH, Kingsville Realty LLP, Shivaji
Pune
Sr. NO. Item desertion Qty. Unit
Providing, Fabricating & erecting of various sections of Fe
350 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
1
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
15,842.56 Kgs
Providing, Fabricating & erecting of various sections of Fe
250 structural steel for different types of column
strengthening as per drawing and as instructed including
contractor consumables, cleaning concrete surface by using
grander, filing gaps between structural steel and concrete
with approved non-shrink grout, H-frame scaffolding...... etc
complete along with all lead and lifts fixing the same at
required positions to proper line, level and plumb at all
levels and repair of the unsatisfactory work etc complete
and as directed by the engineer in charge.
(Beam offset between Slab bottom & beam bottoms not to
be deducted if area is less than 0.3 sqm)
Note : Required HILTI make anchors will be supplied by
Client free of cost.
RO Kgs
Guniting by dry mix process as per IS 9012 (1978) to
concrete surface in C.M. 1:3, 25mm. thick under pressure of
2 2.1 kg to 2.8 kg per sq.cm. including forms, scaffolding,
floating the surface, curing for 14 days etc. complete.
(Excluding reinforcement) - Sqm
3 Grouting 252.27 Sqm
4 Ferrocrete work 284.98 Sqm

3 Material Requirement:
Hilti/fishers Bolts 4,446.00 No

Dwg. ref. 160013-113-CS-O R0 dated 03.02.18


ngsville Realty LLP, Shivaji Nagar,

Rate Amount

81 1,283,247.04

79

1375 -
550 138,748.50
1722.24 490,810.84
474 2,107,404.00
4,020,210.38
Column Size

Beam
Sr No Column No Floor Floor Ht L B Slab depth Depth

1 SW1 Footing to B2 6.35 0.23 4.67 0.15


2 SW1 B2 to B1 3.05 0.23 4.67 0.15
3 SW1 B1 to Ground 3.05 0.23 4.67 0.15
4 SW1 Ground to 1st floor 4.88 0.23 4.67 0.15
5 SW1 1st to 2nd floor 4.27 0.23 4.67 0.15
6 SW1 2nd to Service 4.88 0.23 4.67 0.15
7 SW1 Service to 3rd 2.6 0.23 4.67 0.15
Thickness
of plate in Area of Plate Wt per Sqm in Area of column
mm No of plate Length of plate Height of plate in Sqm Kgs in Sqm

8 2 4.5 6.20 55.80 62.80 62.23


8 2 4.5 2.90 26.10 62.80 29.89
8 2 4.5 2.90 26.10 62.80 29.89
8 2 4.5 4.73 42.57 62.80 47.82
8 2 4.5 4.12 37.08 62.80 41.85
8 2 4.5 4.73 42.57 62.80 47.82
8 2 4.5 2.45 22.05 62.80 25.48

252.27 284.98
No of Bolts

Total No of Cotractor
Total wt in Kgs Horizontal Vertical Bolts name

3,504.24 19 26.00 988.00 Trimurti


1,639.08 19 12.00 456.00 SFI
1,639.08 19 12.00 456.00 SFI
2,673.40 19 20.00 760.00 Trimurti
2,328.62 19 17.00 646.00 SFI
2,673.40 19 20.00 760.00 Trimurti
1,384.74 19 10.00 380.00 SFI
-
15,842.56 4,446.00