MURO SUPERIOR LONGITUD ANCHO ALTO

ZAPATAS 27.1 3.5 0.6


CUERPO 27.1 2.7 5.4
ZAPATAS 7.6 3.5 0.6
CUERPO 7.6 2.5 4.9
BLOQUES DE CONCRETO EN DESNIVEL
12.85 2.6 0.7
6.78 2.6 0.65
MURO SUPERIOR T.I Y LS LONGITUD ANCHO ALTO
ZAPATAS 8.75 3.5 0.6
CUERPO 8.75 3.3 6.5

MURO CENTRAL + LATERALES LONGITUD ANCHO ALTO

MURO CENTRAL 1
ZAPATAS 38.95 3.5 0.6
CUERPO 38.95 2.7 5.4
MURO LATERAL I
ZAPATAS 10.1 3.5 0.6
CUERPO 10.1 2.7 5.4
MURO LATERAL D
ZAPATAS 10.4 3.5 0.6
CUERPO 10.4 2.7 5.4
MURO INFERIOR + LATERALES LONGITUD ANCHO ALTO
ZAPATAS 42.7 3.5 0.6
CUERPO 42.7 2.7 5.4
MURO INFERIO PARTE FALTANTE LONGITUD ANCHO ALTO
ZAPATAS 5.9 3.5 0.6
CUERPO 5.9 1.5 3
MURO LATERAL I
ZAPATAS 25.32 3.5 0.6
CUERPO 25.32 2.7 5.4
MURO LATERAL D
ZAPATAS 6.5 3.5 0.6
CUERPO 6.5 1.5 3
CONCRETO TOTAL

03.8.01.06 ENCOFRADO Y DESENCOFRADO

ALTO LARGO
CARA EXTERIOR 5.4 34.7
MURO SUPERIOR
CARA INTERIOR 1 2.7
CARA EXTERIOR 6.5 8.75
MURO SUPERIOR T.I Y LS
CARA INTERIOR 1 3.244
CARA EXTERIOR 5.4 38.95
MURO CENTRAL 1
CARA INTERIOR 1 2.7
CARA EXTERIOR 5.4 10.1
MURO LATERAL I
CARA INTERIOR 1 2.7
CARA EXTERIOR 4.9 10.4
MURO LATERAL D
CARA INTERIOR 1 2.7
CARA EXTERIOR 5.4 42.7
MURO INFERIOR + LATERALES
CARA INTERIOR 1 2.7
CARA EXTERIOR 3 5.9
MURO INFERIO PARTE FALTANTE
CARA INTERIOR 1 1.5
CARA EXTERIOR 5.4 25.32
MURO LATERAL I
CARA INTERIOR 1 3.5
CARA EXTERIOR 3 6.5
MURO LATERAL D
CARA INTERIOR 1 1.5
AREA TOTAL (m2) =

1.3.8.1.8 JUNTA ASFALTICA

03.8.01.09 CURADO DE CONCRETO 2612.398


1970.778
AREA ZAPATAS 641.62

1.3.8.1.12 GRAVA DE 1/2" m3


LARGO ANCHO ALTURA
MUROS 27.1 0.5 5.4
MUROS 7.6 0.5 4.9
MUROS 8.75 0.5 6.5
MUROS 59.45 0.5 5.4
MUROS 42.7 0.5 5.4
MUROS 5.9 0.5 3

1.3.8.1.11 TUBERIA DE DREN PERFORADO D= 4" 183.32

1.3.8.1.10 TUBERIA DREN D=4"

116.75
58.375 175.70875
VOLUMEN
56.91
73.441
15.96
18.62

23.387
11.4582
VOLUMEN
18.375
28.4375

VOLUMEN

81.795
105.5545

21.21
27.371

21.84
28.184
VOLUMEN
89.67
115.717
VOLUMEN
12.39
8.8972

53.172
68.6172

13.65
9.802
904.4586

O Y DESENCOFRADO 1970.778 m2

VECES AREA
2 374.76
2 5.4
2 113.75
2 6.488
2 420.66
2 5.42
2 109.08
2 5.42
2 101.92
2 5.42
2 461.16
2 5.42
2 35.4
2 3.016
2 273.456
1 3.5
2 39
1 1.508
1970.778

404.8825

73.17
18.62
28.4375
160.515
115.29
8.85
404.8825
03.8.01.07 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
MURO INFERIOR + LATERALES
DATOS
ZAPATA r 0.075
ANCHO 3.5 rmuros 0.05
ALTO 0.6
L 183.32

VECES Q´ LONG. DIAM. 1/2''


DESCRIPCION
INTERV. m. m
Acero Transversal 1(Z1) 917 3.8 1/2" 3484.6
Acero Transversal 2(Z2) 917 1.4 1/2" 1283.8
Acero Transversal 3(Z3) 917 3.8 1/2" 3484.6
Acero Transersal 4(Z4) 917 2 1/2" 1834
Acero Longitudinal (At1)
∅1/2":1@.05, R@.20 1 0.05
R 0.2
17
#VARILLAS 18 183.17 1/2" 3297.06
Acero Longitudinal (At2) 18 183.17 1/2" 3297.06
SUBTOTAL DE ACERO (ml) 16681.12
PESO DEL ACERO (kg/m.) 1.02
TOTAL DE ACERO (kg.) 17014.7424

MURO INFERIOR + LATERALES

MURO 6
DESCRIPCION VECES Q´ LONG. Nº DE DIAM. 3/8''
INTERV. m. ELEMENTOS m
ACERO VERTICAL(M2) 227 6.40 2.00 3/4''
ACERO VERTICAL(M1) 454 3.45 2.00 3/4''
ACERTO LONGITU (Mt1)
∅3/8":1@.05, 2@.10, 12@.20, R@.25cm
1 0.05 0.05
2 0.1 0.2
12 0.2 2.4
R 0.25
13
#VARILLAS 28 67.92 2 3/8'' 3803.52
SUBTOTAL DE ACERO (ml) 3803.52
PESO DEL ACERO (kg/m.) 0.56
TOTAL DE ACERO (kg.) 2129.97
MURO CENTRAL + LATERALES

MURO 6
DESCRIPCION VECES Q´ LONG. Nº DE DIAM. 3/8''
INTERV. m. ELEMENTOS m
ACERO VERTICAL(M2) 199 6.40 2.00 3/4''
ACERO VERTICAL(M1) 398 3.45 2.00 3/4''
ACERTO LONGITU (Mt1)
∅3/8":1@.05, 2@.10, 12@.20, R@.25cm
1 0.05 0.05
2 0.1 0.2
12 0.2 2.4
R 0.25
13
#VARILLAS 28 59.35 2 3/8'' 3323.6
SUBTOTAL DE ACERO (ml) 3323.60
PESO DEL ACERO (kg/m.) 0.56
TOTAL DE ACERO (kg.) 1861.22

MURO SUPERIOR T.I Y LS

MURO 6.5
DESCRIPCION VECES Q´ LONG. Nº DE DIAM. 3/8''
INTERV. m. ELEMENTOS m
ACERO VERTICAL(M2) 30 6.40 2.00 3/4''
ACERO VERTICAL(M1) 60 3.45 2.00 3/4''
ACERTO LONGITU (Mt1)
∅3/8":1@.05, 2@.10, 12@.20, R@.25cm
1 0.05 0.05
2 0.1 0.2
12 0.2 2.4
R 0.25
17
#VARILLAS 32 8.65 2 3/8'' 553.6
SUBTOTAL DE ACERO (ml) 553.60
PESO DEL ACERO (kg/m.) 0.56
TOTAL DE ACERO (kg.) 310.02
27.1
MURO SUPERIOR
7.6
MURO 6
DESCRIPCION VECES Q´ LONG. Nº DE DIAM. 3/8''
INTERV. m. ELEMENTOS m
ACERO VERTICAL(M2) 91 6.40 2.00 3/4''
ACERO VERTICAL(M1) 182 3.45 2.00 3/4''
ACERTO LONGITU (Mt1)
∅3/8":1@.05, 2@.10, 12@.20, R@.25cm
1 0.05 0.05
2 0.1 0.2
12 0.2 2.4
R 0.25
13
#VARILLAS 28 34.6 2 3/8'' 1937.6
SUBTOTAL DE ACERO (ml) 1937.60
PESO DEL ACERO (kg/m.) 0.56
TOTAL DE ACERO (kg.) 1085.06

MURO 5.5
DESCRIPCION VECES Q´ LONG. Nº DE DIAM. 3/8''
INTERV. m. ELEMENTOS m
ACERO VERTICAL(M2) 26 5.90 2.00 3/4''
ACERO VERTICAL(M1) 52 3.20 2.00 3/4''
ACERTO LONGITU (Mt1)
∅3/8":1@.05, 2@.10, 12@.20, R@.25cm
1 0.05 0.05
2 0.1 0.2
12 0.2 2.4
R 0.25
13
#VARILLAS 28 7.5 2 3/8'' 420
SUBTOTAL DE ACERO (ml) 420.00
PESO DEL ACERO (kg/m.) 0.56
TOTAL DE ACERO (kg.) 235.20

MURO INFERIO PARTE FALTANTE

MURO 3.6
DESCRIPCION VECES Q´ LONG. Nº DE DIAM. 3/8''
INTERV. m. ELEMENTOS m
ACERO VERTICAL(M2) 42 4.00 2.00 3/4''
ACERO VERTICAL(M1) 83 2.30 2.00 3/4''
ACERTO LONGITU (Mt1)
∅3/8":1@.05, 2@.10, 12@.20, R@.25cm
1 0.05 0.05
2 0.1 0.2
9 0.2 1.8
R 0.25 0.25
6
#VARILLAS 18 12.3 2 3/8'' 442.8
SUBTOTAL DE ACERO (ml) 442.80
PESO DEL ACERO (kg/m.) 0.56
TOTAL DE ACERO (kg.) 247.97
56,849.29 kg

MURODE 6.00 Metros

3/4''
m
2905.60
3132.60

6038.20
2.24
13525.57
3/4''
m
2547.20
2746.20

5293.40
2.24
11857.22

3/4''
m
384.00
414.00

798.00
2.24
1787.52

3/4''
m
1164.80
1255.80

2420.60
2.24
5422.14

3/4''
m
306.80
332.80

639.60
2.24
1432.70

3/4''
m
336.00
381.80
717.80
2.24
1607.87
1.3.8 MUROS DE CONTENCION EN PLANTAS DE TRATAMIENTO 0.00
1.3.8.1 MURO DE CONCRETO ARMADO 0.00
1.3.8.1.1 TRAZO Y REPLANTEO m2 1,960.91 1,642.41
1.3.8.1.2 EXCAVACION DE TERRENO C/MAQ. m3 13,170.65 10,931.64
1.3.8.1.3 RELLENO Y CON MATERIAL PROPIO: MANUAL m3 4,347.76 2,173.88
1.3.8.1.4 CONFORMACION BASE GRANULAR (E=0.10M) m2 1,960.91 674.10
1.3.8.1.5 CONCRETO F'C=175 KG/CM2; MUROS m3 2,592.88 887.17
ENCOFRADO Y DESENCOFRADO m2 6,162.86
1.3.8.1.6 1,965.94
1.3.8.1.7 ACERO CORRUGADO F´Y=4200 KG/CM2 GRADO 60 kg 86,055.41 51,249.52
1.3.8.1.8 JUNTA ASFALTICA m 500.55 0.00
1.3.8.1.9 CURADO DE CONCRETO m2 6162.86 4,060.43
1.3.8.1.10 TUBERIA DREN D=4" m 584.00 221.70
1.3.8.1.11 TUBERIA DREN PERFORADO D=4" m 560.26 220.85
1.3.8.1.12 GRAVA DE 1/2" m3 735.34 372.17
1.3.8.2 MURO DE CONCRETO CICLOPEO 0.00
1.3.8.2.1 TRAZO Y REPLANTEO m2 48.28 0.00