Académique Documents
Professionnel Documents
Culture Documents
USER NAME :
***********************************************************************************
***************************
!VALVE! DEPTH !VRT.DEP|TEMP.| Pso(psi)! Pvo(psi)! Pto(psi)! Pvc(psi)! Pd(psi) !
Ptro(psi)| PORT !Ap/Ab| SPG. |
! NO. ! (m) ! (m) |Deg.C| | | | |@ Lab tmp!@
Lab tmp|1/64 in| | FACT |
!--------------------------------------------------------------------------------
----------------------------!
! 1 ! 850.0 ! 850.0 | 42.0| 668. | 721. ! 225. ! 650. | 607. |
712. ! 24.|0.143 | 0.040|
! 2 !1186.5 !1186.5 | 47.5| 643. | 713. ! 269. ! 650. | 596. |
698. ! 24.|0.143 | 0.040|
! 3 !1484.8 !1484.8 | 52.4| 618. | 702. ! 309. ! 646. | 582. |
682. ! 24.|0.143 | 0.040|
! 4 !1746.0 !1746.0 | 56.7| 593. | 687. ! 343. ! 638. | 567. |
664. ! 24.|0.143 | 0.040|
! 5 !1971.5 !1971.5 | 60.5| 568. | 670. ! 373. ! 627. | 550. |
645. ! 24.|0.143 | 0.040|
! 6 !2162.4 !2162.4 | 63.6| 543. | 649. ! 398. ! 613. | 532. |
624. ! 24.|0.143 | 0.040|
! 7 !2320.3 !2320.3 | 66.2| 518. | 627. ! 418. ! 597. | 513. |
601. ! 24.|0.143 | 0.040|
! 8 !2446.8 !2446.8 | 68.3| 493. | 602. ! 435. ! 578. | 493. |
578. ! 24.|0.143 | 0.040|
! 9 !2543.3 !2543.3 | 69.9| 468. | 575. ! 448. ! 557. | 473. |
554. ! 24.|0.143 | 0.040|
! 10 !2611.7 !2611.7 | 71.0| 443. | 547. ! 457. ! 534. | 452. |
530. ! 24.|0.143 | 0.040|
!--------------------------------------------------------------------------------
----------------------------!
! LAST VALVE IS AT DEPTH (m) : 2611.7
|
***********************************************************************************
***************************
-----------------------------------------------------------------------------------
-----
| DESIGN OF INTERMITTENT LIFT CYCLE FREQUENCY
|
-----------------------------------------------------------------------------------
-----
| STANDING VALVE NOT INSTALLED
|
-----------------------------------------------------------------------------------
-----
! VALVE NO. 7 VALVE DEPTH (m) : 2320.33
!
| TUBING LOAD 65.0 % OF CASING LOAD
|
-----------------------------------------------------------------------------------
-----
| SLUG LIFTING TIME (min) : 11.
|
| PR. FALL OFF TIME (min) : 4.
|
| PR. BUILD UP TIME (min) : 69.
|
| TOTAL CYCLE TIME (min) : 85.
|
| TOTAL NO. OF CYCLE/D : 17
|
| INJ. GAS REQD/CYC. (m3) : 218.3
|
| INJ. GAS STORED IN THE ANNULUS/CYC (m3) : 32.3
|
| EXPECTED PRODUCTION (m3/D) : 4.9
|
| INJECTION GAS REQD. (m3/D) : 3711.
|
| INJECTION GLR (V/V) : 750.
|
-----------------------------------------------------------------------------------
-----
| Static Fluid Level (m) : 1340.99
|
| Depth of Operating Valve (m) 2320.33
|
| Inj. Gas Pr. at Valve Depth (kg/cm2) : 45.09
|
| Tubing Load at Valve Depth (kg/cm2) : 29.31
|
| Pr. Due to Gas Column in Tubing (kg/cm2) : 10.58
|
| Starting Slug Height (m) : 205.44
|
| Staring Slug Volume (m3) : 0.6203
|
-----------------------------------------------------------------------------------
-----
| Slug Lifting Time (min) : 11.419
|
| Total Vol. Feed in From Formation (m3) : 0.0303
|
| Total Pr. Feed in During Lifting (kg/cm2) : 0.916
|
-----------------------------------------------------------------------------------
-----
| Pressure Fall Off Time (min) : 3.81
|
| Percent Recovery of Slug : 46.7
|
| Total Fall Back Height (m) : 109.476
|
| Total Minm. Pr. Without Feed From Formn.(kg/cm2) : 20.56
|
| Volume Feed From Formation (m3) : 0.0135
|
| Pr. Feed in From Formation (kg/cm2) : 0.408
|
| Total Minimum Pressure (kg/cm2) : 21.88
|
-----------------------------------------------------------------------------------
-----
| Time For Pressure Build Up (min) : 69.31
|
| Total Cycle Time in min : 84.5
|
| (Time for Lifting + Fall Off + Build UP)
|
| Total No. of Cycles/Day : 17
|
| Weighted Average BHP (kg/cm2) : 28.226
|
| Expected Production (m3/D) : 4.95
|
+| Expected Production (m3/D) : 4.95
|
-----------------------------------------------------------------------------------
-----
| Injection Gas Required During Each Cycle (m3) : 218.
|
| Inj. Gas Stored in Annulus in Each Cyc. (m3) : 32.
|
| Injection Gas Requirement per Day (m3) : 3711.
|
-----------------------------------------------------------------------------------
-----
-----------------------------------------------------------------------------------
-----
| DESIGN OF INTERMITTENT LIFT CYCLE FREQUENCY
|
-----------------------------------------------------------------------------------
-----
| STANDING VALVE NOT INSTALLED
|
-----------------------------------------------------------------------------------
-----
! VALVE NO. 8 VALVE DEPTH (m) : 2446.76
!
| TUBING LOAD 65.0 % OF CASING LOAD
|
-----------------------------------------------------------------------------------
-----
| SLUG LIFTING TIME (min) : 12.
|
| PR. FALL OFF TIME (min) : 4.
|
| PR. BUILD UP TIME (min) : 49.
|
| TOTAL CYCLE TIME (min) : 65.
|
| TOTAL NO. OF CYCLE/D : 21
|
| INJ. GAS REQD/CYC. (m3) : 223.3
|
| INJ. GAS STORED IN THE ANNULUS/CYC (m3) : 27.0
|
| EXPECTED PRODUCTION (m3/D) : 5.6
|
| INJECTION GAS REQD. (m3/D) : 4689.
|
| INJECTION GLR (V/V) : 838.
|
-----------------------------------------------------------------------------------
-----
-----------------------------------------------------------------------------------
-----
| DESIGN OF INTERMITTENT LIFT CYCLE FREQUENCY
|
-----------------------------------------------------------------------------------
-----
| STANDING VALVE NOT INSTALLED
|
-----------------------------------------------------------------------------------
-----
! VALVE NO. 9 VALVE DEPTH (m) : 2543.32
!
| TUBING LOAD 65.0 % OF CASING LOAD
|
-----------------------------------------------------------------------------------
-----
| SLUG LIFTING TIME (min) : 13.
|
| PR. FALL OFF TIME (min) : 4.
|
| PR. BUILD UP TIME (min) : 37.
|
| TOTAL CYCLE TIME (min) : 53.
|
| TOTAL NO. OF CYCLE/D : 27
|
| INJ. GAS REQD/CYC. (m3) : 223.8
|
| INJ. GAS STORED IN THE ANNULUS/CYC (m3) : 21.3
|
| EXPECTED PRODUCTION (m3/D) : 6.0
|
| INJECTION GAS REQD. (m3/D) : 6044.
|
| INJECTION GLR (V/V) : 1000.
|
-----------------------------------------------------------------------------------
-----
-----------------------------------------------------------------------------------
-----
| DESIGN OF INTERMITTENT LIFT CYCLE FREQUENCY
|
-----------------------------------------------------------------------------------
-----
| STANDING VALVE NOT INSTALLED
|
-----------------------------------------------------------------------------------
-----
! VALVE NO. 10 VALVE DEPTH (m) : 2611.65
!
| TUBING LOAD 65.0 % OF CASING LOAD
|
-----------------------------------------------------------------------------------
-----
| SLUG LIFTING TIME (min) : 13.
|
| PR. FALL OFF TIME (min) : 4.
|
| PR. BUILD UP TIME (min) : 28.
|
| TOTAL CYCLE TIME (min) : 45.
|
| TOTAL NO. OF CYCLE/D : 32
|
| INJ. GAS REQD/CYC. (m3) : 220.5
|
| INJ. GAS STORED IN THE ANNULUS/CYC (m3) : 15.4
|
| EXPECTED PRODUCTION (m3/D) : 6.3
|
| INJECTION GAS REQD. (m3/D) : 7057.
|
| INJECTION GLR (V/V) : 1112.
|
-----------------------------------------------------------------------------------
-----