PROJECT 1 STIX3913 A181

S
CONFIDENTIAL

TIX 3913 PROJECT 1

Project Proposal Form

Fill in by : PROJECT 1 GROUP A

Submitted To : Prof. Madya Dr. Azizah Bt Haji Ahmad

Name :
Matric No : 237408
Year/Session : 2018/A181

Supervisor Name : Dr. Mazni Omar


PROJECT 1 STIX3913 A181

PROJECT TITLE

Vehicle Routing System

ABSTRACT

Vehicle Routing system is a project to create a mobile application relating to essential


activity such as logistics, navigation, and emergency services specifically in supply chain
management industry. In supply chain management, distribution and transport processes are
concerned about specific routes that the transport units need to follow and to distribute materials
and products between different points, it is very common to drivers getting into problem such as
delayed delivery, inefficient fuel-burn rate, stuck in high traffic area and what’s worse is the
safety risk of the drivers and the logistic they transport.

This system is intended to reduce the possibility of risks that might occur in the supply
distribution area, especially during the delivery of goods. The Vehicle routing system will help
drivers who is having trouble finding the most effective way for them to the destination. This
application will look all possible risks that can occur and provides calculation in each street
based on possibilities obtained.

PROJECT BACKGROUND

In the supply chain management area, the delivery and distribution process focuses on
the specific route that the unit must follow from the starting to the destination point. The
determination of these routes followed by the goods delivery unit is the central part of
operationalise decision making in logistics management for many businesses. Generally, many
of decided route is inefficient when it has been implemented. The issues are lack of the
knowledge fo the route condition when deciding it. this requires a tool that can help route
selection for the distribution of goods and help take into account all possible risks that will be
encountered on each path.
PROJECT 1 STIX3913 A181

PROBLEM STATEMENT

Due to high trafic area and or some drivers do not know where is the best road to go
through from point A to point B (departure-destination). The app is able to give some option to
the driver based on risk in each route. The risk are distance, time, road surface, trafic, money,
etc. It’s not necessary that the shortest route is the better option. There would be some
calculation to determine the risk.

The problem may focus on truck or vehicle that is transporting any material, the problem
can be high trafic, driver’s behaviour or high demand from customer (material suply).

PROJECT SIGNIFICANCE

It is hoped that the proposed integrated system model will be able to determine the best
choice for route planning activities in the industrial supply chain and measure the right risk
elements. By having this model, the industry route manager will be able to plan, monitor and
make strategic decisions regarding route planning for the delivery of goods until the destination
arrives fastly, safely and smoothly. In addition, organizations can make better information about
the status of the resources invested by them. At a broader level, the proposed approach can
help enable transportation ecosystems to successfully implement transportation and
urbanization initiatives.

PROJECT OBJECTIVE

Below is a list of objectives that will be achieved during this project :

 To determine the requirements needed for the system.


 To develop the system prototype.
 To develop the complete system in Project II course.
 To test the system in each function.
PROJECT 1 STIX3913 A181

PROJECT SCOPE

Project Title Vehicle Routing System

Project Supervisor Dr. Mazni Omar

IN SCOPE :

Scope Description  A system to find risk posibelities in travel route.


 Risk calculation in each route.
 Measure route distance and travelling time.
 Search for driving-related services.

OUT OF SCOPE :

 Service for other different destination.

Project Deliverable Material supply driver navigation application.

The project will be accepted when it is agreed by the supervisor


Acceptance Criteria
that the system scope, deliverable and objectives meet the needs
as expected.

 Skill level.
Constraint
 Resources.
 Scope.
 Budget.

Assumption All resource required available for building this application project.
PROJECT 1 STIX3913 A181

PROJECT METHODOLOGY

The methodology consist of six stages that are used to establish this project.

1. Analysis

There are some tasks are being completed in this step such as information
gathering related to the project, identify system description and the purpose of the
project, time schedulling when building the project, identify all the possible risk that can
occur during the development and requirement analysis.

2. Defining Requirement

After the requirement analysis is done the next step is to clearly define and
document the system requirements and get it approved from the supervisor.

3. Design

All type of system designing are happen in this step including interface design,
database design and software design based on requirement specified in Software
Requirement Specification. when designs has been completed, they must be recorded
and documented for future use.

4. Development
This is the step when actual building the application occur. Programmer is
developing the system by taking it appart, building one by one module and integrate the
components into one complete system.

Whet it is has been completed for the first time, initial testing must be performed
before the actual testing to make sure it ready for fully tested.

5. Testing
Testing is performed in this step after the development is completed and before
the system is implemented. To make sure there is no possible errors, tester must work
hard finding possible error and documenting all the issues. When all found bugs has
been corrected, the system is ready for use.
6. Deployment

When the building has completed, tested and corrected. It is time to deploy the
system to the system is ready to be used by the intended user.
PROJECT 1 STIX3913 A181

GANTT CHART
PROJECT 1 STIX3913 A181

___________________________

(Signature)

Date : ______________________

For Approval Use

Supervisor:

Pass

Fail

Pass with

condition

Remark:

Supervisor’s Signature &


Stamp