Académique Documents
Professionnel Documents
Culture Documents
Issue: 07
Date: 2016-11-16
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees
or representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Reference
Start information
Operation
Installation
Page 1
Page 40 Installing Boards Precautions
Configuring
Page 41 - Requirements and
Master/Slave Preparing for
43 Page 2 Precautions for
Subracks the Installation
Operating Boards
Installing the Fiber
Page 44
Management Frame
Required Tools
Page 3
Installing the DCM and Equipment
Page 44-
45 Frame
Pages 4-
Installing the Installing Cabinets
Page 45 14 Pages 34 -
CRPC/ROP Frame Installing Boards
37
Page 46- Installing the Y- Pages 15 - OptiX OSN 9800 Installing Fan Tray
17 Appearance Page 38
47 Cable Assemblies
Page 49
Setting Board Pages 34 - Installing Boards and
Jumpers Components Open-End Corrugated
39 Page 98
—— U64 /U32/U16 Pipe Introduction
NOTE
This document provides guidelines for quick hardware installation. It describes procedures for onsite installation, but does
not describe pre-delivery assembly.
CAUTION
Safety Information
Always wear protective gloves when lifting or transporting a cabinet to prevent hand injuries or damage to the cabinet surface.
The equipment is heavy. To prevent human injuries or equipment damage, always use a lifting device to transport or position the
equipment. Use a pallet truck or heavy-duty bogie wagon to transport the equipment on even ground, and use a cargo lift to transport
the equipment between different floors. If the equipment room does not have a cargo lift, a stair-climbing truck is recommended to
transport the equipment between different floors.
CAUTION
ESD Protection
Always wear ESD gloves or an ESD wrist strap prior to contact with the equipment or before handling devices, boards, or IC chips
to prevent damage to sensitive components due to electrostatic discharge from the human body. Ensure that the ESD wrist strap is
properly grounded. The OptiX OSN 9800 is available in two variants: OptiX OSN 9800 U64 equipment (U64 equipment) and OptiX
OSN 9800 U32 (U32 subrack). The U64 equipment has two ESD jacks on each of the front and rear sides, which are designed in a
similar structure. For the positions of the ESD jacks on the front side of the U64 equipment, see the ESD jacks on the OptiX OSN
9800 U32 subrack (U32 subrack) shown below. In this document, the full and abbreviated product terms may be used
interchangeably.
CAUTION
Bundling Cables
Binding intervals between cable ties or optical fiber binding straps inside the cabinet cannot exceed 250 mm. (Binding intervals
cannot exceed 200 mm for user cables.)
Binding intervals between cable ties for all cables and corrugated pipes outside the cabinet are determined based on the distance
between the two horizontal beams. If the cable trough does not contain any beams, the binding intervals between cable ties cannot
exceed 250 mm.
CAUTION
Pre-Installation Check
Ensure that the equipment room, cabinets, power supplies, ground cables, optical cables, and associated devices are ready for
installation. Start the installation according to the engineering design documents after confirming that all conditions are met.
1
Requirements and Precautions for Operating Boards
CAUTION
Always wear ESD gloves or an ESD wrist strap prior to operating a board to prevent damage to sensitive
components.
Wearing ESD gloves Wearing an ESD wrist strap Operating a board without ESD
protection
CAUTION
Hold the front panel of a board with both hands.
CAUTION
Any vacant slot must be covered by a filler panel to prevent foreign objects from entering the subrack or system
ventilation ducts. Foreign objects may cause an NE failure.
Boards are fragile and vulnerable. When transporting or placing a board, exercise caution and ensure that the
board is packed in a dedicated box to protect the board against damage.
Boards must be packed with original packaging materials during transportation. If the original packaging
materials are lost, contact Huawei.
2
Required Tools and Equipment
Heat gun Segmented blade utility knife COAX crimping tool Wire clippers
3
Installing U64 Equipment on a Concrete Floor
NOTE
For information about how to install an N63B cabinet, see the N63B Cabinet Installation Guide. For information about
how to install an N66B cabinet, see the N66B Cabinet Installation Guide. The following describes how to install the
OptiX OSN 9800 U64 equipment (U64 equipment) on a concrete floor.
CAUTION
H
1. Always wear protective gloves when
lifting or transporting the U64
equipment.
2. Human safety is paramount. Protect
yourself at all times, especially during
transportation.
D W
Unit: mm
Installation
hole
Front
NOTE
The preceding method used to determine the installation
position of the U64 equipment is provided for your
reference only. In practice, determine the installation
position based on the engineering diagram.
4
3 Determining the Installation Holes
Position the marking-off templates on the predefined installation position. Ensure that the
distance between the central lines of two adjacent marking-off templates is 600 mm.
NOTE
The recessed semicircles of the
marking-off templates indicate the
orientation of the U64 equipment. After
marking the installation holes, calibrate
their positions if needed.
Insert the expansion bolt into the hole. Knock the expansion
bolt into the hole with a claw hammer.
Unit: mm
5
5 Installing the U64 Equipment
Take the four leveling bolts, each contained in a Use a level and plumb line to check whether
plastic bag at the bottom of the U64 equipment the U64 equipment cabinet is level and
cabinet, and insert them into corresponding vertically aligned with the cable rack.
leveling nuts.
If the U64 equipment cabinet is not level, After leveling the U64 equipment cabinet,
adjust the leveling bolts using a socket tighten the four expansion bolts to 45 N•m
wrench. using a torque wrench.
NOTE M12
M12
The leveling bolts allow for
adjustments within the range of
0 mm to 10 mm.
Leveling bolt
6
7 Performing an Insulation Test
CAUTION
1. Do not conjoin the U64 equipment cabinets
back-to-back.
2. After conjoining all the U64 equipment cabinets,
the U64 equipment cabinets must be no more
than 3 mm out-of-plumb, and gaps between
them must be no more than 3 mm.
Remove the connecting plates mounted on the front
and rear doorheads and reinstall them according to
the figure on the right.
Use a level and plumb line to check the bottom of the
U64 equipment cabinets and front sides of the
cabinet columns. If the U64 equipment cabinets are
not at the same level, adjust the leveling bolts using a
socket wrench.
M5
2# screwdriver
3.06 ± 0.30 N.M
7
9 Installing Doors/Side Panels and Equipotential Cables
NOTE
M6
1. Install the doors and side panels after installing
fibers/cables to the U64 equipment.
2. Do not install side panels if the U64 equipment is to
be conjoined.
Push the side panel into the U64 equipment cabinet. 3# screwdriver
4.90 ± 0.49 N.M
Secure the side panel with two M6 screws. Repeat
steps 1 and 2 to install the remaining three side panels.
M6 M12
M6
2# screwdriver
2.04 ± 0.20 N.M 4.90 ± 0.49 N.M
NOTE
Before installing cabinet doors,
make sure that a dustproof sponge
has been installed onto the interior
side of each door.
Align the front door with the M6
doorhead and door sill.
Place the door onto the door
sill. The hinge pin at the
bottom of the door will
automatically locate into the
installation hole on the door
sill. 2# screwdriver
Press the spring pin at the top 2.04 ± 0.20 N.M
of the door and push the upper
part of the door. The spring pin
will automatically locate into
the installation hole on the
doorhead. Check the spring
and hinge pins and ensure that
they are located in the holes.
Repeat steps 1 to 3 to install
the rear door.
Install equipotential cables
onto the front and rear doors.
8
Installing U64 Equipment on an ESD Floor
NOTE
For information about how to install an N63B cabinet, see the N63B Cabinet Installation Guide. For information about
how to install an N66B cabinet, see the N66B Cabinet Installation Guide. The following describes how to install U64
equipment on an ESD floor.
CAUTION H
1. Always wear protective gloves when lifting or
transporting the U64 equipment.
2. Human safety is paramount. Protect yourself
at all times, especially during transportation.
D W
Unit: mm
Installation
hole
Front
NOTE
The preceding method used to determine the installation
position of the U64 equipment is provided for your
reference only. In practice, determine the installation
position based on the engineering diagram.
9
3 Determining the Installation Holes
Remove the ESD floor from the predefined installation position to expose the concrete floor. Position the
marking-off templates on the installation position. Ensure that the distance between the central lines of two
adjacent marking-off templates is 600 mm.
Mark the installation holes on the floor using a
marker.
NOTE
The recessed semicircles of the
marking-off templates indicate the
orientation of the U64 equipment.
After marking the installation holes,
calibrate their positions if needed.
Screw the expansion bolt clockwise until the guide ribs properly
engage with the guide grooves.
Insert the expansion bolt into the hole. Knock the expansion bolt
into the hole with a claw hammer.
Unit: mm
10
5 Installing U64 Equipment Supports
M12
M12 Put a spring and flat washer onto each of the
anchor expansion bolts. Insert these bolts into
the installation holes on the floor and partially
tighten them.
Adjust the support location if needed, and use a Align the front sides of all supports.
level to check whether the supports are at the same Adjust the spacing between adjacent supports so that
level. the connecting braces can be connected to the
adjacent supports.
If the supports are not at the same level, add
spacers under the corresponding ground legs. Use a level to check whether the supports are at the
same level.
Tighten the expansion bolts to with a If the supports are not at the same level, add spacers
M12
M12
under the corresponding ground legs.
torque wrench.
45.0 ±4.5N.M
Central
line
11
6 Installing the U64 Equipment
Take the four leveling bolts, each contained in a Use a level and plumb line to check whether
plastic bag at the bottom of the U64 equipment the U64 equipment cabinet is level and
cabinet, and insert them into corresponding vertically aligned with the cable rack.
leveling nuts.
If the U64 equipment cabinet is not level, After leveling the U64 equipment cabinet,
adjust the leveling bolts using a socket tighten the four expansion bolts using a
wrench. torque wrench.
NOTE
The leveling bolts allow for M12
M12
adjustments within the range of
0 mm to 10 mm.
Leveling bolt
12
8 Performing the Insulation Test
CAUTION Remove the connecting plates mounted on the front and rear
1. Do not conjoin the U64 equipment cabinets back- doorheads and reinstall them according to the following figure on
to-back. the left.
2. After conjoining all the U64 equipment cabinets, Use a level and plumb line to check the bottom of the U64
ensure that the adjoining line between two equipment cabinets and front sides of the cabinet columns. If the
adjacent U64 equipment cabinets is perpendicular U64 equipment cabinets are not at the same level, adjust the
leveling bolts using a socket wrench.
to the central line on the connecting brace.
M5
2# screwdriver
3.06 ± 0.30 N.M
CAUTION
If underfloor cabling is required, route fibers and
cables prior to restoring the ESD floor.
13
11 Installing Doors/Side Panels and Equipotential Cables
NOTE M6
M6 M6
M12
2# screwdriver
2.04 ± 0.20 N.M 4.90 ± 0.49 N.M
NOTE
Before installing cabinet doors, make
sure that a dustproof sponge has been
installed onto the
interior side of each door.
14
OptiX OSN 9800 Appearance
1 Availability
Product Initial Supportive Product Version
OptiX OSN 9800 U64 subrack
OSN 9800 V100R001C00
OptiX OSN 9800 U32 subrack
OptiX OSN 9800 universal platform subrack OSN 9800 V100R001C01
OptiX OSN 9800 U16 subrack OSN 9800 V100R001C30
2 OptiX OSN 9800 U64 subrack and OptiX OSN 9800 U32 subrack
NOTE
The U64 equipment is a cabinet that integrates with an OptiX OSN 9800 U64 subrack (U64 subrack). The U64
equipment is accessible from both the front and rear. The rear is similar to the front, with the differences as follows:
1. The front has indicators at the top of the cabinet, but the rear does not.
2. The front has slots for housing the CTU and EFI boards, but the rear does not.
NOTE
A U32 subrack is only accessible from the front.
The front of a U32 subrack is similar to the front 1 Cabinet indicators 2 PIU
of a U64 subrack. A U32 subrack has no indicator.
3 EFI 4 Fan tray assemblies
Front view of the U64 5 Fiber trough 6 Service board area
equipment 1
CTU and XCS
7 8 Air deflector
2 board area
3
OptiX OSN 9800 U64 subrack OptiX OSN 9800 U32 subrack
4
5
4
15
3 OptiX OSN 9800 U16 Subrack
2 Board area
4 Air filter
5 Fiber-routing areas
5
2
16
4 OptiX OSN 9800 Universal Platform Subrack
1
2
3 1 LAMP TEST button
4
2 Indicator/Interface area
3 RESET button
5
4 Subrack ID LED
5 PIU
6
6 Board area
11
7 Fiber through
7
8 Fan tray assemblies
8
10 9 Air filter
9
10 Fiber spool
11 Mounting ear
A1 A2 A3 A4 B1 B2 B3 B4
(-) (-) (-) (-) (-) (-) (-) (-)
A1 A2 A3 A4 B1 B2 B3 B4
(+) (+) (+) (+) (+) (+) (+) (+)
17
Installing Subracks
NOTE
An OptiX OSN 9800 U64 subrack is integrated in a cabinet and does not need manual installation.
NOTE
Before installing a subrack into a cabinet, remove the front door and side panels of the cabinet. For details, see the
N63B Cabinet Installation Guide or N66B Cabinet Installation Guide. To prevent human injuries or damage to the
subrack, at least two people are required during the installation; one to hold the subrack, the other to install the
subrack.
NOTE
77
76 1. The U32 subrack can be installed inside an N63B
cabinet, which can house only one U32 subrack or four
optical subracks.
2. The U32 subrack can also be installed inside an N66B
cabinet together with optical subracks. An N66B cabinet
can house one U32 subrack and four optical subracks.
Air deflector 3, 4
OptiX OSN 9800 U32 10, 11, 32, 33, 54, 55, 76, 77
OptiX OSN
9800 U32 subrack
33
32
M6
11
10
2# screwdriver
2.04 ± 0.20 N.M
4 Air deflector
3
18
2 Installing Subracks —— Universal Platform Subrack
a Deploying the Universal Platform Subrack in an N63B Cabinet
NOTE
Before installing a subrack into a cabinet, remove the front door
and side panels of the cabinet. For details, see the N63B Cabinet
Mechanical Installation
Installation Guide or N66B Cabinet Installation Guide. To Part Position
prevent human injuries or damage to the subrack, at least two DCM 1, 2
people are required during the installation; one to hold the
subrack, the other to install the subrack. DCM 3,4
Subrack 1 7, 8, 21, 22
Subrack 2 23, 24, 37, 38
Air deflector 40, 41
83 PDU
81 Subrack 3 46, 47, 60, 61
Subrack 4
63
62
61
60 NOTE
You are advised to install the subracks from bottom to top.
Subrack 3
47
46
Place the feet of the subrack on the guide rails. The guide rails are on
41 Air deflector both columns. Fix the subrack on the cabinet columns with panel
40 导风框 screws.
38 37
Subrack 2
M6
24
22 23
21
2# screwdriver
Subrack 1 2.04 ± 0.20 N.M
8
7
4 3 DCM
DCM
2 DCM
1
19
2 Installing Subracks —— Universal Platform Subrack
b Deploying the Universal Platform Subrack in an N66B Cabinet
NOTE
Before installing a subrack into a cabinet, remove the front door and side panels of the cabinet. For details, see the
N63B Cabinet Installation Guide or N66B Cabinet Installation Guide. To prevent human injuries or damage to the
subrack, at least two people are required during the installation; one to hold the subrack, the other to install the
subrack.
83 PDU
81
77
76
Subrack 4
Mechanical Installation
Part Position
63
62 Bottom-
61
60 mounted 1
fiber spool
DCM 7, 8
Subrack 3
Subrack 1 13, 14, 27, 28
Subrack 2 29,30, 43, 44
47 Subrack 3 46, 47, 60, 61
46
4443 Subrack 4 62, 63, 76, 77
PDU 81, 83
Subrack 2
30
28 29
27
Subrack 1
M6
14
13
9
8 8 DCM
7 2# screwdriver
2.04 ± 0.20 N.M
Bottom-mounted fiber spool
1
20
3 Installing Subracks —— U16 Subrack and Universal Platform Subrack
NOTE
• Before installing a subrack into a cabinet, remove the front door and side panels of the cabinet. For details, see the
N63B Cabinet Installation Guide or N66B Cabinet Installation Guide. To prevent human injuries or damage to the
subrack, at least three people are required during the installation.
• The following describes how to install the universal platform subrack. You can install the U16 subrack in the
same way.
54
Place the feet of the subrack on the guide rails. The guide rails are on
both columns. Fix the subrack on the cabinet columns with panel
screws.
38
37
Universal Platform
Subrack
M6
24 23
22
21
8
7
4 3 DCM
2 DCM
1 DCM
21
4 Installing Subracks —— U16 Subrack or Universal Platform Subrack
a Installing a Subrack in an ETSI Cabinet with Middle Columns
NOTE
• The methods of installing a U16 subrack and a universal platform subrack are similar. The following uses U16
subrack installation as an example.
• Mounting ears of the subrack for delivery are the mounting ears for installation in the ETSI cabinet with middle
columns by default.
M4
1.22±0.12 N.M
Fix floating nuts and M6 screws in the correct Attach the subrack to the panel screws previously
holes. installed onto the cabinet, install other panel screws, and
tighten all the screws to secure the subrack to the cabinet.
M6 M6
2# screwdriver
2# screwdriver
2.04±0.20 N.M
2.04±0.20 N.M
22
4 Installing Subracks —— U16 Subrack or Universal Platform Subrack
b Installing a Subrack in an ETSI Cabinet with Front Columns (N63E)
Remove the mounting ears and fiber management trays from the left and right sides of the U16 subrack.
Remove the upper and lower cable troughs from the U16 subrack, and then remove the left and right cable
protection ears from the cable troughs.
Cable
Cable trough Position of the screw on the
protection cable protection ear
ear
23
4 Installing Subracks —— U16 Subrack or Universal Platform Subrack
b Installing a Subrack in an ETSI Cabinet with Front Columns (N63E)
Install the mounting ears of the U16 subrack and the cable troughs without cable protection ears.
M4
1.22±0.12 N.M
Fix floating nuts and M6 screws in the correct holes. Attach the subrack to the panel screws previously installed
onto the cabinet, install other panel screws, and tighten all
the screws to secure the subrack to the cabinet.
M6 M6
2# screwdriver 2# screwdriver
2.04±0.20 N.M 2.04±0.20 N.M
24
4 Installing Subracks —— U16 Subrack or Universal Platform Subrack
c Installing a Subrack in a 19-inch Cabinet with Middle Columns
Remove the mounting ears and fiber management trays from the left and right sides of the U16 subrack.
Mounting Fiber
ear management
tray Positions of the
screws on the
Positions of the Fiber
screws on the management tray
Mounting ear
Adjust the directions of the left and right mounting ears, as shown in the following figure.
25
4 Installing Subracks —— U16 Subrack or Universal Platform Subrack
c Installing a Subrack in a 19-inch Cabinet with Middle Columns
Install the mounting ears in correct directions at the original positions on the U16 subrack.
M4
1.22±0.12 N.M
M6
2# screwdriver
2.04±0.20 N.M
26
4 Installing Subracks —— U16 Subrack or Universal Platform Subrack
d Installing a Subrack in a 19-inch Cabinet with Front Columns
Remove the mounting ears and fiber management trays from the left and right sides of the U16 subrack.
Mounting Fiber
management Positions of the
ear
tray screws on the
Positions of the Fiber
screws on the management tray
Mounting ear
Remove the upper and lower cable troughs from the U16 subrack, and then remove the left and right cable
protection ears of the cable troughs.
Cable
Cable trough Position of the screw on the
protection cable protection ear
ear
27
4 Installing Subracks —— U16 Subrack or Universal Platform Subrack
d Installing a Subrack in a 19-inch Cabinet with Front Columns
Adjust the directions of the left and right mounting ears, as shown in the following figure.
Install the mounting ears of the U16 subrack and the cable troughs without cable protection ears.
M4
1.22±0.12 N.M
28
4 Installing Subracks —— U16 Subrack or Universal Platform Subrack
d Installing a Subrack in a 19-inch Cabinet with Front Columns
M6
2# screwdriver
2.04±0.20 N.M
29
5 Installing Subracks ——U32 Subrack in a Cabinet with Front Columns
Remove mounting ears from the left and right sides of the U32 subrack and cable protection ears from
the cable trough.
Cable
protection ear
Cable
trough
Positions of the screws
on the cable trough
Mounting
ear
M4
Install the mounting ears of the U32 subrack and the cable troughs without cable protection ears.
Mounting
ear
M4
1.22±0.12 N.M
30
5 Installing Subracks ——U32 Subrack in a Cabinet with Front Columns
M6
2#批头
2.04±0.20 N.M
31
6 Subrack Installation Clearance Requirements
a Clearance Requirements of Installing a U16 or Universal Platform Subrack
c a b c a b
d Middle column
d Front column
a. Distance between a mounting ear and the rear side of the cabinet.
b. Distance between a mounting ear and the inside of the front door.
c. Heat dissipation space above the subrack
d. Air intake vent below the subrack
WARNING
If other devices are present above or below the newly installed subrack, except Huawei standard multi-
subrack configurations, air blocking devices must be used to separate the air flows of heat dissipation,
avoiding mutual interference.
32
6 Subrack Installation Clearance Requirements
b Clearance Requirements of Installing a U32 Subrack
a b a b
c c
a. Distance between a mounting ear and the rear side of the cabinet
b. Distance between a mounting ear and the inside of the front door
c. Heat dissipation space above the subrack
d. Air intake vent below the subrack
WARNING
If other devices are present above or below the newly installed subrack, except Huawei standard multi-
subrack configurations, air blocking devices must be used to separate the air flows of heat dissipation,
avoiding mutual interference.
33
Installing Boards and Components —— U64/U32/U16
1 Installing Boards
EFI IU105
IU68-IU69
PIU
U16 IU80~IU81
EFI IU79
CAUTION
The board is designed for easy installation. If you feel a blockage when
inserting a board into a slot, remove the board and check whether it was
inserted correctly or whether it is of the correct type. Do not use force to
insert the board.
Installing a PIU board:
Remove the filler panel screws Push the PIU board with Tighten the screws on the front
and then withdraw the filler panel proper force until it is fully panel of the PIU board.
from the slot. seated in the slot.
M3
2# screwdriver
0.39 ~0.43N.M
Note
Installing an EFI board:
The method of installing an EFI
Push the EFI board with Tighten the screws on the front board in a U16 subrack is similar
proper force until it is fully panel of the EFI board. to that of installing a service board.
seated in the slot. For details, see the installation
procedure of service boards.
M3
2# screwdriver
0.39 ~0.43N.M
34
1 Installing Boards
b Installing CTU and XCS Boards
NOTE
CAUTION The method of installing the CTU/XCS board in a U16 subrack is
similar to that of installing a service board. For details, see the
Wear an ESD wrist strap or
installation procedure of service boards.
ESD gloves during operations.
CAUTION
The two ends of a CTU board front panel and the edges of each CTU
CTU and XCS board slots board slot are purple. The two ends of an XCS board front panel and the
edges of each XCS board slot are red. Pay attention to the color
Subrack Board Slot differences when installing CTU and XCS boards, and make sure that
CTU and XCS boards are installed in the correct slots.
CTU IU78, IU70
U64 IU71-IU77,
XCS
IU79-IU85
M4
2# screwdriver
0.71 ± 0.07N.M
35
1 Installing Boards
CAUTION
Wear an ESD wrist strap or ESD gloves during operations.
CAUTION
The board is designed for easy installation. If you feel a blockage when inserting a board into a slot, remove the
board and check whether it was inserted correctly or whether it is of the correct type. Do not use force to insert
the board.
CAUTION
Service boards or filler panels are inserted differently in the upper and
lower portions of an U64/U32 subrack. When installing service boards or
filler panels into upper-portion slots, ensure that the ejector levers are on
the left side of the front panels. When installing service boards or filler
panels into lower-portion slots, ensure that the ejector levers are on the
right side of the front panels.
36
1 Installing Boards
Remove the filler panel screws and hold the Hold the ejector levers outwards until the ejector levers
ejector levers outwards. Then withdraw the filler form a 45-degree angle to the front panel. Then, gently
panel from the slot. slide the board along the guide rails into the slot until the
board is fully seated in the slot.
Push the ejector levers inwards to secure the board Tighten the screws on the front panel of the board.
in the slot.
M4
Guide rail
2# screwdriver
0.71 ± 0.07 N.M
Remove the dust-proof plug from the CFP cage of the board.
Pull the two screw rods outwards and ensure that the rods are
free. Then, partially tighten the rod on one side.
Completely tighten the rod on the other side, and then tighten the
rod that is partially tightened.
NOTE
• If the CFP optical module is placed towards the cage but cannot be
inserted into the cage, the module insertion direction is incorrect. When CFP optical module
this occurs, rotate the module by 180° and then re-insert it.
• If insertion cannot continue after the CFP optical module is pushed into
the cage, the CFP optical module contacts well with the board connector
inside the cage.
37
2 Installing Fan Tray Assemblies
NOTE
The air flows in the upper and lower portions of a cabinet are
in opposite directions, so the fan tray assemblies at the top
and bottom of the cabinet are installed differently. Four labels
are located on the fan tray assembly: two on the top surface
and two on the bottom. One of the labels, a mounting
direction label, indicates the mounting direction of the fan
tray assembly. Another mounting direction label is present on
the air blocking panel that covers a vacant fan tray assembly
slot or inside the fan tray assembly slot. When installing a fan
tray assembly in the upper portion of a cabinet, ensure that the
mounting direction label on the right of the fan tray assembly
surface faces upward. When installing a fan tray assembly in
the lower portion of a cabinet, ensure that the mounting
direction label on the left of the fan tray assembly surface
faces upward.
The U64 subrack is used as an example to describe the
installation of a fan tray assembly.
NOTE
A yellow-green button is located on the left and right sides of a fan tray
assembly. You must press these two buttons to completely plug the fan
tray assembly into the subrack or to remove it from the slot.
Press the button on each side of the fan tray assembly and push the
assembly until it is fully seated in the slot. After releasing the buttons,
check whether they are restored to their original positions. If they are
not, withdraw the fan tray assembly, restore the buttons to their original
positions, and then install the fan tray assembly again.
Button
38
3 Checking CTU Board Battery Jumper Settings —— U64/U32
CAUTION
Before installing a CTU board, ensure that its battery jumper has been set properly. In the figure below, pins 2
and 3 are capped to enable the supply of battery power. To disable the supply of battery power, cap pins 1 and
2.
Battery jumper
Battery jumper
J14
4J1
J14
4J1
3 2
Battery
3 2
is used
1
SSD card
1
4J1
J14
Battery
3 2
is not
used
CPU
39
Installing Boards and Components —— Universal Platform Subrack
1 Installing Boards
CAUTION NOTE
Wear an ESD wrist strap or ESD Before installing or
gloves during operations. removing a board, press the
safety latch on the ejector
levers.
Installing a board
Hold the retaining clip Withdraw the filler Slide the board into the Push the ejector levers
at the top end (the one panel from the slot. slot. inwards.
with "PUSH" identified)
with two fingers.
Removing a board
Slide the bottom end (the one Slide the top end (the one with
with no "PUSH" identified) of "PUSH" identified) of the filler
the filler panel into the slot panel into the slot guide
guide groove. Ensure that the groove, and then push the
Hold the ejector levers Remove the board. retaining clip at this end retaining clip at this end until
outwards.
locates properly onto the front you hear it click into place to
edge of the subrack. secure the filler panel.
40
2 Configuring Master/Slave Subracks
CAUTION
Changing the ID of a subrack leads to service interruption.
When it is the first time that the EFI board is installed in an universal platform subrack or when the changed subrack ID
is the same as the previous subrack ID, the subrack_ID LED on the SCC and EFI boards will display the newly
specified subrack ID.
If the newly specified subrack ID differs from the previous subrack ID, the subrack_ID LED on the SCC and EFI
boards will alternately display the previous subrack ID and the EE value. When this occurs, determine whether the
newly specified subrack ID is correct. If it is correct, power-cycle all the PIU boards inside the subrack to make it take
effect. If it is incorrect, configure the DIP switches again to recover the previous subrack ID.
NOTE
•The TN18EFI board has a set of five DIP switches whose IDs are ID1-ID5 from the lower bit to the higher bit.
Each DIP switch can be used to set a binary digit, 0 or 1. When the DIP switch is toggled to “0”, the value of the
corresponding bit is set to 0.
•"00000" indicates the master subrack. The other values indicate slave subracks.
CAUTION
DIP switches must be toggled to the topmost or the bottommost. Otherwise, the subrack ID cannot be intuitively
identified.
G CAUTION 0
If the DIP switch is blocked by a network
cable, properly move the network cable
so that the DIP switch can be configured.
After the DIP switch configuration is
ACK_ID NM_ETH1ALMI1 ALMO1 ALMO2
completed, move the network cable to its NM_ETH2
original position.
ID5 ID4 ID3ID2ID1
1
41
2 Configuring Master/Slave Subracks
NOTE
•The TN18EFI board has a set of five DIP switches whose IDs are ID1-ID5 from the lower bit to the higher bit.
Each DIP switch can be used to set a binary digit, 0 or 1. When the DIP switch is toggled to “0”, the value of the
corresponding bit is set to 0.
•"00000" indicates the master subrack. The other values indicate slave subracks.
ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID
5 4 3 2 1 5 4 3 2 1 5 4 3 2 1 5 4 3 2 1
1 5 1 6 1 7 1 8
0 0 0 0
ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID
5 4 3 2 1 5 4 3 2 1 5 4 3 2 1 5 4 3 2 1
1 9 1 10 1 11 1 12
0 0 0 0
ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID
5 4 3 2 1 5 4 3 2 1 5 4 3 2 1 5 4 3 2 1
1 13 1 14 1 15 1 16
0 0 0 0
ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID
5 4 3 2 1 5 4 3 2 1 5 4 3 2 1 5 4 3 2 1
1 17 1 18 1 19 1 20
0 0 0 0
ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID
5 4 3 2 1 5 4 3 2 1 5 4 3 2 1 5 4 3 2 1
1 21 1 22 1 23 1 24
0 0 0 0
ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID
5 4 3 2 1 5 4 3 2 1 5 4 3 2 1 5 4 3 2 1
1 1 1 1
25 26 27 28
0 0 0 0
"EE" indicates
ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID that the subrack
5 4 3 2 1 5 4 3 2 1 5 4 3 2 1
ID is incorrect or
1 29 1 30 1 31 the subrack ID or
Err
0 0 0 fails to be
obtained.
42
2 Configuring Master/Slave Subracks
CAUTION
Changing the ID of a subrack leads to service interruption.
When it is the first time that the EFI board is installed in an universal platform subrack or when the changed subrack ID
is the same as the previous subrack ID, the subrack_ID LED on the SCC and EFI boards will display the newly
specified subrack ID.
If the newly specified subrack ID differs from the previous subrack ID, the subrack_ID LED on the SCC and EFI
boards will alternately display the previous subrack ID and the EE value. When this occurs, determine whether the
newly specified subrack ID is correct. If it is correct, power-cycle all the PIU boards inside the subrack to make it take
effect. If it is incorrect, configure the DIP switches again to recover the previous subrack ID.
NOTE
Among these ID values, only ID1-ID5 are valid.
The bits from high to low are ID5-ID1. The value
of the DIP switches is a binary value 0 or 1. When
the DIP switch is toggled to ON, the value is set to ON (ID8) ON (ID4)
ON (ID7) ON (ID3)
0 by default. The value 0 indicates a master ON (ID6) ON (ID2)
subrack, and other values indicate slave subracks. ON (ID5) ON (ID1)
ON (ID8) ON (ID4)
"EE" indicates that the subrack ID is incorrect or the Err
ON (ID7) ON (ID3)
31 subrack ID fails to be obtained.
ON
ON
(ID6)
(ID5)
ON
ON
(ID2)
(ID1) or
43
3 Installing the Fiber Management Frame
NOTE
• A fiber management frame is installed in the upper-most area in an N63B or N66B equipment cabinet to co-reside with
optical subracks (for example, the universal platform subracks).
•Dimensions (H x W x D): 148.0 mm (5.8 in.) x 535.1 mm (21.1 in.) x 199.7 mm (7.9 in.)
•To ensure the proper ventilation of adjacent frames, you are advised to reserve a 80 mm space above and below the fiber
management frame.
• Usually, two fiber management frames are deployed.
M6
2# screwdriver
2.04 ±0.20 N.M
Place two DCM modules into the DCM frame and secure each of them in the frame with four screws.
NOTE
If only one DCM is required, position it on the left part of the frame to facilitate the routing of DCM fibers.
DCM
DCM
frame
M3
Mounting
ear
Screw
2# screwdriver
0.56 ± 0.05 N.M
44
4 Installing the DCMComponents
Installing Frame
Ground
post
M6 M6
2# screwdriver 3# screwdriver
2.04 ±0.20 N.M 4.9 ±0.49 N.M
NOTE
Position and attach a mounting ear to the side of the
CRPC/ROP frame, securing it to the CRPC/ROP frame Reserve 2 U (89 mm) space above the CRPC/ROP
with appropriate screws. Repeat this step to attach a frame for ventilation purposes. To ensure proper
mounting ear to the other side of the CRPC/ROP frame. ventilation of the frame, do not place any device
around the air intake and exhaust vents of the
Position the CRPC/ROP frame in the cabinet and frame.
attach the mounting ears to the cabinet columns with
four panel screws, two screws on each side.
ROP frame ROP board CRPC frame CRPC board Mounting ear
M6
Panel
screws
Panel
2# screwdriver screws
2.04 ± 0.20 N.M
45
6 Installing the Y-Cable
The Y-Cable consists of six subboards, each of which can be separately installed. A filler panel needs to be
inserted in a slot that is not equipped with a subboard.
Subboard
Insert a subboard into the specified slot of the Y-Cable along the guide rail and tighten the screws on the front
panel of the Y-Cable.
M3
2# screwdriver
0.39±0.04N.M
a In a 19-Inch Cabinet
M6 M4
2# screwdriver 2# screwdriver
2.04±0.20N.M 1.43±0.14N.M
46
b In an ETSI Cabinet
Remove the mounting ears pre-assembled on the Fix the shorter sides of the removed mounting
chassis. ears in the middle positions on the chassis.
M3 M3
2# screwdriver 2# screwdriver
0.56 ± 0.05 N.M 0.56 ± 0.05 N.M
M6 M4
2# screwdriver 2# screwdriver
2.04±0.20N.M 1.43±0.14N.M
47
7 Checking SCC Board Battery Jumper Settings
CAUTION
1. Before installing an SCC board, ensure that its battery jumper has been set properly. In the figure below, pins 2
and 3 are capped to enable the supply of battery power. To disable the supply of battery power, cap pins 1 and 2.
2. If you must retain the original SCC board data (for example, the SCC board is delivered with configurations
already provisioned or the SCC board is used to replace an in-service SCC board), cap pins 2 and 3 to enable the
supply of battery power to the SCC board.
3. If the original SCC board data is not required (for example, the SCC board will not be commissioned for a long
time), cap pins 1 and 2 to disable the supply of battery power to the SCC board.
Battery Jumper
1
2
J1
1
2
10
9
J11
Battery Jumper
1
Battery Battery is
2
卡
F J1 J1
48
8 Setting Board Jumpers
a Setting CRPC Board Jumpers
The CRPC board has two jumper blocks: J3 and J4. To ensure the
normal operation of the CRPC board, adopt the following jumper
CRPC
settings:
J3 Capped J4 Capped
J4 J3
1~2 No 1~2 Yes
10
2
9
3~4 No 3~4 Yes
CPU
5~6 No 5~6 Yes
J4 J3 7~8 No
10
9
2
1
9~10 Yes
To set the slot ID of the CRPC board, cap or uncap pins 7-8 and 9-
J4 J3 10 in J4 as required. The jumper settings are as follows:
Board Board
10
2
9
J4 Capped J4 Capped
slot slot
U
7~8 No 7~8 No
IU120 IU122
9~10 No 9~10 Yes
10
9
2
The ROP board has two jumper blocks: J3 and J4. To ensure the
ROP normal operation of the ROP board, adopt the following jumper
settings:
J4
J3 J3
Capped J4 Capped
1~2 No 1~2 Yes
10
2
9
J4 J3 7~8 No
10
9
2
9~10 Yes
To set the slot ID of the ROP board, cap or uncap pins 7-8 and 9-10
J4 J3 in J4 as required. The jumper settings are as follows:
10
2
9
Board Board
J4 Capped J4 Capped
slot slot
7~8 No 7~8 No
IU124 IU126
9~10 No 9~10 Yes
10
9
2
49
Installing/Routing Cables
1 Cable Holes on Cabinets
a U64 Subrack
Cable holes at the top of the cabinet Cable holes at the bottom of the cabinet
Cable/fiber routing
Mapping between top cable holes and PIU board power cables
50
1 Cable Holes on Cabinets
M8
c N63B Cabinet
Cable holes at the top of the cabinet Cable holes at the bottom of the cabinet
51
1 Cable Holes on Cabinets
c N63B Cabinet
Cable holes at the top of the cabinet Cable holes at the bottom of the cabinet
Mapping between top cable holes and PIU board Mapping between top cable holes and PDU board
power cables power cables
52
1 Cable Holes on Cabinets
d N66B Cabinet
Cable holes at the top of the cabinet Cable holes at the bottom of the cabinet
NOTE
For the mappings between the top cable holes of the N66B cabinet and the PIU power cables, see the two
figures in the previous slide.
53
2 Routing Ground and Power Cables
a
e1 Routing Ground and Power Cables —— U64 Equipment
CAUTION
Do not install or remove power cables while the
equipment is powered on. Ensure that the power is
switched off prior to removing or installing power
cables to avoid bodily injuries.
Overhead Cabling
Ground
cable
(yellow-
green)
Underfloor Cabling
Cable-routing
area
54
2 Routing Ground and Power Cables
CAUTION
Do not install or remove power cables while the
equipment is powered on. Ensure that the
power is switched off prior to removing or
installing a power cable to avoid bodily
injuries.
Overhead Cabling
Ground
cable
Underfloor Cabling M8 bolt (yellow-
green)
Thread power and ground cables into the cabinet
through cable holes in the ESD support at the
bottom of the cabinet. For the ground cable, route it
by way of the cable-routing area, thread it through
the cable hole at the top of the cabinet, and
connect it to the ground screws. For the power
cables, route them by way of the cable-routing area
to the top of the cabinet.
Cable-routing
area
55
2 Routing Ground and Power Cables
CAUTION
Do not install or remove power cables while
the equipment is powered on. Ensure that the
power is switched off prior to removing or
installing a power cable to avoid bodily
injuries.
Overhead Cabling
Underfloor Cabling
Ground
cable
Thread power and ground cables into the cabinet
M8 bolt (yellow-
through cable holes in the ESD support at the
green)
bottom of the cabinet. For the ground cable, route it
by way of the cable-routing area, thread it through
the cable hole at the top of the cabinet, and
connect it to the ground screws. For the power
cables, route them by way of the cable-routing area
to the top of the cabinet.
Cable-routing
area
56
3 Installing Ground Cables
U64 NOTE
Two pairs of ground screws are present at the top of the
U64 equipment cabinet. You can connect a ground cable
to either pair of the ground screws. However, you are
advised to connect the ground cable to the pair of ground
screws identified with a ground label.
N63B Cabinet
NOTE
Two pairs of ground screws are present at the
N66B Cabinet top of the N66B cabinet. You can connect a
ground cable to either pair of the ground
screws. However, you are advised to connect
the ground cable to the pair of ground screws
identified with a ground label.
To the ground bar in the
equipment room
M8
57
3 Installing Ground Cables
NOTE
An OptiX OSN 9800 U64 subrack is integrated in a cabinet, so the installation of OptiX OSN 9800 U64 subrack
ground cables is not required.
Ground cable
Connect one end of the subrack ground
cable to the ground screw at the top of
the subrack, and connect the other end
to an appropriate ground screw located
on the right-side cabinet column.
M5
2# screwdriver
M6 3.0 ± 0.3 N.M
58
3 Installing Ground Cables
c Installing Subrack Ground Cable —— U16 Subrack
Ground cable
Connect one end of the subrack ground cable to the ground screw on the subrack, and connect
the other end to an appropriate ground screw located on the right-side cabinet column.
PDU
M5
2# screwdriver
3.0 ± 0.3 N.M
M6
3# screwdriver
4.90 ± 0.49 N.M
59
3 Installing Ground Cables
Connect one end of the subrack ground cable to the ground screw on the subrack and the other end of the cable to
the ground bar.
Connect the other end of the pre-connected PDU cable to the ground bar in the equipment room.
NOTE
Connect the PDU ground cable to the ground Ground cable Phillips screwdriver
screw before installing the PDU.
M6
3# screwdriver
4.90 ± 0.49 N.M
M5
2# screwdriver
3.0 ± 0.3 N.M
DPD63-8-8
M6
3# screwdriver
4.90 ± 0.49 N.M
60
4 Installing Power Cables-AC
AC power supplies
NOTE
Only the Universal Platform Subrack supports AC power supply.
~AC
61
5 Installing Power Cables-DC
U64 20 x 63 A
U32 10 x 63 A
U16 4 x 63 A
1 8 x 63 A 8 x 63 A Not required
62
5 Installing Power Cables-DC
Appearance
NOTE
The two-in-one copper fitting
(right) is installed in the power Copper fitting (middle)
Copper fittings for the input area A, and the two-in-one
service board area copper fitting is installed in the
power input area B.
(Short) (Long)
(Long)
63
5 Installing Power Cables-DC
≤20 16
120 ≤25 35
Cross-Sectional
Power Cable
Input Current Area of the Power
Length (m) Terminal Type
(A) Cable (mm²)
≤20 16
NEG(-) cable:
One end is equipped with a JG two-hole bare crimp
63 20~35 25 terminal (when a copper fitting is installed on a
PDU) or a cord end terminal (when no copper fitting
is installed on a PDU) to connect to a PDU.
The other end is equipped with a one-hole OT
35~50 35 terminal to connect to a PDF.
RTN(+) cable:
One end of the cable is equipped with a cord end
terminal to connect to a PDU.
The other end is equipped with a one-hole OT
125 ≤25 35 terminal to connect to a PDF.
64
5 Installing Power Cables-DC
b
c1 Power Cable Connections —— PIU (U64)
NOTE
The PIU boards installed back-to-
back are in mutual backup.
CAUTION
•The U64 equipment is equipped with 20 x
63 A circuit breakers to interface with 20 x
63 A power inputs.
•The U64 equipment also supports 120
A power inputs. The 120 A power
inputs require cable connections to the
specified PIUs (shown in figure 2) and
installation of copper fittings.
PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU
PIUPIU
PIUPIU
PIU PIUPIU
PIUPIU PIU
PIUPIU
PIUPIU
PIU PIU PIU PIU PIU PIU P
PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU
PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU
65
5 Installing Power Cables-DC
b
c1 Power Cable Connections —— PIU (U32)
EFI
PIU PIU PIU PIU PIU PIU PIUPIU PIU PIU
NOTE
The PIU boards on the left and right sides of
the EFI board are in mutual backup,
CAUTION
•The U32 equipment is equipped with 10 x 63 A circuit
breakers to interface with 10 x 63 A power inputs.
•The U32 equipment also supports 120 A power
inputs. The 120 A power inputs require cable
connections to the specified PIUs (shown in figure 2)
and installation of copper fittings.
63A
EFI
PIU PIU PIU PIU PIU PIU PIUPIU PIU PIU
63A 120A
EFI
PIU PIU PIU PIU PIU PIU PIUPIU PIU PIU
66
5 Installing Power Cables-DC
c
c1 Power Cable Connections —— PDU (U16/Universal Platform Subrack)
NOTE
The model of the PDU shown in the figure is DPD63-8-8 PDU. When the PDU distributes to U16/universal platform
subracks, it is equipped with 8 x 63 A circuit breakers to interface with 8 x 63 A power inputs, or to interface with 4 x 125
A (copper fittings required) power inputs.
A-RTN2(+)
B-RTN1(+)
A-RTN1(+) B-RTN2(+)
A-NEG2(-)
A-NEG1(-) B-NEG1(-)
B-NEG2(-)
-48 V -48 V
Power source in the
机房电源
equipment room
0V 0V -48 V -48 V
0V 0V
PGND
Introduction to PIUs
2# screwdriver
0.59 ± 0.06 N.M
2. The equipment is powered off only
after all power inputs to each PIU
board are disconnected.
67
5 Installing Power Cables-DC
63A
PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU
M6
3# screwdriver
5.10±0.51 N.M
CAUTION
Install the OT terminals on the power
cables according to the instructions on the
plastic cover of each PIU board. Ensure
that the terminals are installed correctly.
68
5 Installing Power Cables-DC
63A 120A
U32
PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU P
Install the copper fitting (short) (NEG–) and power cable (NEG–).
M6
Power cable
(NEG-)
Copper fitting
(short)
3# screwdriver
5.10±0.51 N.M
69
5 Installing Power Cables-DC
Install the copper fitting (long) (RTN+) and power cable (RTN+).
Copper fitting
(long)
Power cable
(RTN+)
M6
3# screwdriver
5.10±0.51N.M
CAUTION
•Install the OT terminals on the power
cables according to the instructions on the
plastic cover of each PIU board. Ensure
that the terminals are installed correctly.
•Connect the power cables to the screws
on the left legs of the copper fittings.
70
5 Installing Power Cables-DC
Install the copper fitting (short) (NEG–) and power cable (NEG–).
Copper fitting
Power cable
(short)
(NEG-)
71
5 Installing Power Cables-DC
Install the copper fitting (short) (NEG–) and power cable (NEG–).
Power cable
(NEG-)
Copper fitting
Power cable Copper fitting (short)
(short)
(NEG-)
M6
3# screwdriver
5.10±0.51 N.M
72
5 Installing Power Cables-DC
Install the copper fitting (long) (RTN+) and power cable (RTN+).
Power cable
(RTN+)
Copper
fitting (long)
Power cable
(RTN+) Power cable
Copper fitting (RTN+)
(long) Copper fitting
(long)
M6
3# screwdriver
5.10±0.51 N.M
73
5 Installing Power Cables-DC
Install the copper fitting (long) (RTN+) and power cable (RTN+).
CAUTION
•Install the OT terminals on the power
cables according to the instructions on the
plastic cover of each PIU board. Ensure
that the terminals are installed correctly.
•Connect the power cables to the screws
on the left legs of the copper fittings.
74
5 Installing Power Cables-DC
RTN(+) terminal blocks and copper fittings for the middle area of the DC PDU
CAUTION
1. There are two types of RTN(+) terminal blocks for the DPD63-8-8 PDU and correspond to two types of copper
fittings.
2. Install corresponding copper fitting in the middle area of the DPD63-8-8 PDU based on the type of the RTN(+)
block.
75
5 Installing Power Cables-DC
DANGER
Do not install any copper fitting in the power output areas of the DC PDU. If copper fittings are required, install
them only in the power input areas.
NOTE
By default, two-in-one copper fittings are not installed on NEG(-) and RTN(+) terminals of the PDU before delivery.
Based on your site survey, determine whether to install these fittings.
Install four two-in-one copper fittings on the NEG(-) input terminals. Tighten the screws on the fittings to secure them.
M5
2# screwdriver
2.04±0.20 N.M
Install four two-in-one copper fittings on the RTN(+) input terminals in the middle of the PDU.
3# screwdriver
3.06 ±0.30 N.M
76
5 Installing Power Cables-DC
3# screwdriver
3.06 ± 0.30 N.M
Connect the blue -48 V power cables to the NEG(-) input terminals and the cord end
terminals of the BGND cables to the PDU RTN(+) input terminals.
Ensure that the fluted sides of the cord end terminals face outwards. If copper fittings
have been installed in the power input areas, ensure that the protruding side of the two-
hole OT terminals on blue -48 V power cables face outwards. Then tighten the screws to
secure the cables in the input terminals.
Copper M5
fittings not
installed
2# screwdriver
2.04±0.20 N.M
-48 V power cables (blue) BGND cables (black) -48 V power cables (blue)
NEG(-) RTN(+) NEG(-)
3# screwdriver
4.9 ± 0.49 N.M
-48 V power cables (blue) BGND cables (black) -48 V power cables (blue)
NEG(-) RTN(+) NEG(-)
77
5 Installing Power Cables-DC
1 x U16 + 2 x Universal
platform subracks The DPD63-8-8 PDU can power one U16 and two universal platform subracks.
According to the installation positions, the three subracks are numbered 1 to 3.
CAUTION The table below provides the mapping between the switches on the PDU and
the subracks.
The equipment has more
than one power input. Do Power Switch No. Subrack No.
disconnect all power inputs SW1A U16:PIU(IU 68)
to power off the equipment.
SW1B U16:PIU(IU 80)
SW2A U16:PIU(IU 69)
SW2B U16:PIU(IU 81)
SW3A, SW3B Universal platform subrack 1
U16
Subrack 1
Power outputs
a2 a4 b2 b4
(+) (+) (+) (+) b1 b2 b3 b4
a1 a2 a3 a4
(-) (-) (-) (-) a1 a3 b1 b3 (-) (-) (-) (-)
(+) (+) (+) (+)
b1(-) b2(-)
b3(+) b4(+)
b1(+) b2(+)
78
5 Installing Power Cables-DC
g Subrack Power Cable Connections
The DPD63-8-8 PDU can power four universal platform subracks. According to
CAUTION
the installation positions, the four subracks are numbered 1 to 4. The table below
The equipment has more provides the mapping between the switches on the PDU and the subracks.
than one power input. Do
disconnect all power inputs
Power Switch No. Subrack No.
to power off the equipment.
SW1A, SW1B 1
SW2A, SW2B 2
SW3A, SW3B 3
SW4A, SW4B 4
Subrack 3
Power outputs
a2 a4 b2 b4
(+) (+) (+) (+) b1 b2 b3 b4
a1 a2 a3 a4
(-) (-) (-) (-) a1 a3 b1 b3 (-) (-) (-) (-)
(+) (+) (+) (+)
Subrack 2
79
5 Installing Power Cables-DC
h Installing/Routing Power Cables —— U16
WARNING
Do not install or remove power cables while the
equipment is powered on. Ensure that the power is
switched off prior to removing or installing a power
cable to avoid bodily injuries.
M3
2# screwdriver
0.39 ~0.43N.M
The protruding side of the two-hole OT terminals on power cables faces outwards. Connect the OT terminal of the -48 V
power cable (blue) to the PIU NEG(-) terminal and the RTN cable (black) to the PIU RTN(+) terminal.
Inner
side of
the PIU
M6
NEG(-)
RTN(+)
Inner
side of
the PIU 3# screwdriver
4.9 ± 0.49 N.M
80
5 Installing Power Cables-DC
h Installing/Routing Power Cables —— U16
Install the front panel of the PIU board. This completes the procedure of installing subrack power cables.
Route and secure the power cables to the cabinet according to the figure below.
81
5 Installing Power Cables-DC
i Installing/Routing Power Cables —— Universal Platform Subrack
WARNING
Do not install or remove power cables while the
equipment is powered on. Ensure that the power is
switched off prior to removing or installing a power
cable to avoid bodily injuries.
M3
2# screwdriver
0.39 ~0.43N.M
The protruding side of the two-hole OT terminals on power cables faces outwards. Connect the OT terminal of the -48 V
power cable (blue) to the PIU NEG(-) terminal and the RTN cable (black) to the PIU RTN(+) terminal.
Inner
side of
the PIU
M6
RTN(+)
NEG(-) Inner
side of
the PIU 3# screwdriver
4.9 ± 0.49 N.M
82
5 Installing Power Cables-DC
i Installing/Routing Power Cables —— Universal Platform Subrack
Install the front panel of the PIU board. This completes the procedure of installing subrack power cables.
The upper power cables connecting to the upper PIU board do not traverse the fiber trough, but the power cables
connecting to the lower PIU board must be routed through the fiber trough.
Route the power cables through the bottom of the fiber spool,
direct them through the hole on the mounting ear to the side of
the cabinet, and let them out of the cabinet through the
designated hole at the top the cabinet.
Route and secure the power cables to the cabinet according to the figure below.
83
6 Installing/Routing NM Cables
a U64 Subrack
NOTE
An OptiX OSN 9800 U64 subrack is integrated in a cabinet. U64 equipment cabinets connects to the NMS through
the NM interface to manage the entire system.
GE1 FE NM GE2
NMS
GE1 FE NM GE2
GE1 FE NM GE2
84
6 Installing/Routing NM Cables
b U32 Subrack
NOTE
U32 subracks connects to the NMS through the NM interface to manage the entire system.
GE1 FE NM GE2
NMS
GE1 FE NM GE2
GE1 FE NM GE2
85
6 Installing/Routing NM Cables
c U16 Subrack
NOTE
U16 subracks connects to the NMS through the NM
interface to manage the entire system.
NMS
ETH2
Master subrack
NM_ETH ETH1
NMS NM GE2
computer ETH2
IU78 CTU Slave
ETH1
GE1 FE subrack 1
CAUTION
ETH2
Connect the cables as shown in the figure on the NM GE2
Slave
right. IU70 CTU ETH1
subrack 2
GE1 FE
NOTE ETH2
The two CTU boards inside the U64/U32 subrack Slave
ETH1
communicate with each other through the backplane. subrack 3
86
6 Installing/Routing NM Cables
CAUTION
Connect the cables as shown in the figure on the right.
EFI
ETH2
Master subrack
NM_ETH ETH1
NMS NM NM
computer ETH2
EFI Slave
ETH1
subrack 1
U16 Universal
platform subrack
f Routing NM Cables
e
U64/U32 subrack
NOTE
1. The NM cable is routed through the fiber trough either in
overhead cabling or underfloor cabling mode.
2. Two cable saddle clamps are mounted on each side (left and
right sides) of the U64 equipment/U32 subrack for routing
CTU board fibers. The two cable saddle clamps are next to
the CTU boards. Route the NM cables through these cable
saddle clamps.
87
6 Installing/Routing NM Cables
f Routing NM Cables
U16
88
6 Installing/Routing NM Cables
g Routing NM Cables
Loosen the captive screws on the EFI board front Plug the NM cable into the required
panel and then remove the front panel. interface.
M3
2# screwdriver
0.39 ~0.43N.M
The figure below shows the NM cable connected to the EFI board.
NOTE
1. Subracks are connected through
straight-through cables. An universal
platform subrack can be connected to
the NMS computer through either a
straight-through or crossover network
cable.
2. Install the front panel of the EFI
board after installing and routing all NM
and alarm cables.
M3
Cable tie Diagonal pliers
2# screwdriver
0.39 ~0.43N.M
89
7 Installing/Routing Housekeeping Alarm Cables
NOTE
On the EFI board, the ALMO1 interface outputs
alarm signals.
To the central
alarm
management
Alarm cable
system STAT MAJ
CRIT MIN
Inputs
SubRACK
ID
NOTE
On the EFI board, the ALMO1 interface outputs alarm signals.
Inputs
90
7 Installing/Routing Housekeeping Alarm Cables
ALMO1 ALMO2
Alarm cable
PWR CRI MAJ MIN STAT PROG
Inputs
91
8 Installing/Routing Cabinet Indicator Alarm Cables
a Interface Description
A cabinet alarm indicator cable connects the LAMP interface on an EFI board to the alarm indicator interface
at the top of the cabinet.
U64/U32
STAT MAJ
CRIT MIN
SubRACK
ID
U16
92
8 Installing/Routing Cabinet Indicator Alarm Cables
Subrack 3
Subrack 4
c Cabinet Indicator Alarm Cable Connections (U32 and Universal Platform Subracks
cascaded)
NOTE
ETH1 ETH2 ETH3 LAMP1 LAMP2 NM_ETH ALMI1 ALMO1 ALMO2
cables.
STAT MAJ
CRIT MIN
SubRACK
ID
93
9 Installing and Routing Clock Cables
a Interface Description
The clock interfaces of the U64/U32 subrack are located on the EFI board.
STAT MAJ
CRIT MIN
SubRACK
ID
The clock interfaces of the U16 subrack are located on the EFI board.
TOD1 TOD2
CLK1 CLK2
TOD TOD
CLK CLK
IN IN
OUT OUT
Fan
94
9 Installing and Routing Clock Cables
NOTE
Use the clock cascading cables to connect clock and time interfaces between the master and slave subracks. Use the clock
cascading cables to connect clock interfaces between NEs and use the straight-through cables to connect time interfaces. For
the cables used to connect the subrack to other equipment, see "Clock/Time Cable" in the Hardware Description.
NOTE
1. The cables are connected in a similar way in multi-subrack configurations. The only difference lies in the
number of cascaded interfaces.
2. The cables are connected in a similar way in multi-subrack configurations. The only difference is the board
where the clock interface is located.
NOTE
The shielded cables without protection boot are used for transmitting clock signals.
Clock signal
output Clock signal
input
CLK CLK CLK CLK CLK CLK
X1 X2 Color Relationship
1 4 White/Orange
Pair
2 5 Orange
3 7 White/Green
Pair
4 1 Blue
5 2 White/Blue
Pair
6 8 Green
7 3 White/Brown
Pair
8 6 Brown
95
9 Installing and Routing Clock Cables
NOTE
U16 The following describes how to install the clock cables
onto the U16 subrack. You can install the clock cables
onto the U64/U32 subrack in the same way.
CAUTION
The CLK port and the IN/OUT port cannot be used as the input or output port at the same time. If the CLK
port is used to input or output clock signals, the IN/OUT port cannot be used to input/output clock signals. If
the IN/OUT port is used to input/output clock signals, the CLK port cannot be used to input or output clock
signals.
CLK IN/OUT
96
10 Installing and Routing Cables to the CRPC/ROP ——Universal Platform
Subrack
CRPC/ROP Power cables
SW1A SW1B
Subrack 3
Subrack 2
Backup
power
cables for
the
Main power CRPC/ROP
cables for frame
the
CRPC/ROP
frame
Subrack1
RS232-1 RS232-2
LAN
CRPC 1
MON SYS LINE
LAN
LAN
RS232-1 RS232-2
RS232-1 RS232-2
Route the main and backup power cables of the CRPC/ROP frame to the power interfaces of the frame. Route
the other end of the power cables along the cable routing area on the right side of the cabinet to the power cable
terminal block on the top of the cabinet.
Plug one end of the crossover network cable into the LAN port on the CRPC/ROP board. Plug the other end to the ETH1
or ETH3 port on the EFI board in the corresponding subrack.
97
Installing/Routing Fibers
1 Open-End Corrugated Pipe Introduction
NOTE
Do not use an open-end corrugated pipe to hold excessive fibers. It is recommended that an open-end corrugated
pipe that has a diameter of 32 mm accommodate 60 fibers at most, each with a diameter of 2 mm.
Before routing fibers out of a cabinet, ensure that they are protected in an open-end corrugated pipe and about 10
cm of the open-end corrugated pipe is inside the cabinet.
Inner
pipe
Outer
pipe
2 Precautions
No. Precautions
Avoid direct eye exposure to fiber connectors when performing operations such as installing and maintaining
1
fibers.
The bending radius of G.657B3 fibers must not be less than 8 mm, consult the Installation Reference for the
2
bending radius.
After installing fibers, insert a fiber plug into each unconnected optical port and cap the unused connector on
3
each fiber patch cord.
When routing and installing fibers onsite, you need to clean fiber end faces. For detailed operations, see the
4 multimedia at the following website:
http://support.huawei.com/carrier/docview!docview?nid=DOC1000132657
98
3 Installing/Routing External Fibers (Unequipped with Fiber Management
Frames)
a Installing/Routing External Fibers—— U64/U32 Subrack (Overhead Cabling)
NOTE
Because ESD floors are generally used in underfloor cabling
scenarios, multi-purpose fiber management cabinets are
required for routing optical fibers.
Fiber
Fiber extractor binding tape
99
3 Installing/Routing External Fibers (Unequipped with Fiber Management
Frames)
NOTE
1. When routing fibers through the side-mounted fiber spools, neatly dress the fibers and bundle them with
fiber binding tape.
2. Coil fibers around the appropriate fiber spools based on the lengths of the fibers. Wind the fibers around
the big spool first and then the smaller spool. Do not coil the fibers too tightly or too loosely.
a
d
b c
100
4 Installing/Routing External Fibers (Equipped with Fiber Management
Frames)
a Fiber Management Frame Introduction
NOTE
Two types of fiber management frames are
Dimensions (H x W x D): 2200 mm x 150 mm x 300 mm available: left-side and right-side fiber
Weight: 23 kg management frames. Each fiber management
frame has a nameplate, indicating that it is for
use on the left or right side of a cabinet.
NOTE
See the Fiber Management Frame Quick Installation Guide.
NOTE
Fiber spool units inside each fiber management frame are moveable up or down to facilitate fiber routing.
Generally, their positions do not need to be adjusted.
101
4 Installing/Routing External Fibers (Equipped with Fiber Management
Frames)
c Installing/Routing External Fibers
WARNING NOTE
Avoid direct eye exposure to fiber connectors when During capacity expansion, redundant fibers are
performing operations such as installing and routed through fiber management frames. For
maintaining fibers. underfloor cabling scenarios, redundant fibers are
also routed through fiber management frames.
NOTE
The bending radius of each fiber must not be
less than 8 mm. Fiber extractor Fiber
Fiber binding tape
NOTE
After installing fibers, insert a fiber plug into each
unconnected optical port and cap the unused connector
on each fiber patch cord.
102
5 Installing/Routing External Fibers (Equipped with Multi-purpose Fiber
Management Cabinet)
a Multi-purpose Fiber Management Cabinet Introduction
NOTE
There are two types of multifunctional
fiber management cabinets: type A and
type B. The two types of cabinets have
similar functions and appearances. The
type A cabinet is 300-mm wide, and the
type B cabinet is 150-mm wide. Type B
cannot be used in the downward
ventilation and heat dissipation scenarios.
Left-side Cabinet Right-side Cabinet The type A multifunctional fiber
management cabinet is taken as an
example to describe the appearance and
application scenarios.
NOTE
See the Multi-purpose Fiber Management Cabinet Quick Installation Guide.
103
5 Installing/Routing External Fibers (Equipped with Multi-purpose Fiber
Management Cabinet)
c Installing/Routing External Fibers
104
6 Installing/Routing Inter —— Subrack Fibers
a Fibers Between U16/Universal Platform Subracks
NOTE
1. When routing fibers through the side-mounted fiber
spools, neatly dress the fibers and bundle them with fiber
binding tape.
2. Coil fibers around the appropriate fiber spools based
on the lengths of the fibers. Wind the fibers around the
big spool first and then the smaller spool. Do not coil the
fibers too tightly or too loosely.
1 2
3 4 5
Use the tool on the board panel to Insert fibers and close the
open the cover of an interlock switch. cover.
CAUTION
1. The LINE port on the
TN12RAU1/TN12RAU2 board
has an interlock switch. You
must perform the procedure in
the figures on the right to insert
or remove fibers.
2. Fibers cannot be inserted or
removed when the cover of the
interlock switch is closed.
105
6 Installing/Routing Inter —— Subrack Fibers
b Fibers Between U32 and Optical Subracks
NOTE NOTE
When U32 and optical subracks are deployed in the The figure is used to illustrate how
same N66B cabinet, fibers can be, if required, fibers are routed. It does not show the
jumpered between the U32 subrack and the optical DCM frames installed in the cabinet.
subracks through the bottom-most hole on the air
deflector.
Caution
If fibers are routed through bottom-most holes on
the air deflector, slide up the air restrictor panels
and latch them into position. After routing fibers,
slide the air restrictor panels downwards and latch
them into position. (Ensure the air restrictor panels
are down as far as possible without compressing
the fibers.)
Air restrictor
Air deflector
panels
NOTE
If the fiber spools mounted on the subracks cannot
support all the subrack fibers, coil the excess fibers
around the fiber spools installed in the bottom-most
portion of the cabinet. Fiber spools installed in
the bottom-most portion
of the cabinet
NOTE
Connect and route fibers between U64 and optical subracks in the same way as you route external fibers.
106
7 Installing and Routing Fibers to a CRPC Frame
NOTE
Ensure that the radius of a fiber bend is 50 mm or larger. Fibers must be routed and bundled properly
but not over-tightly. After installing fibers, insert plugs in optical interfaces without fiber connections
and cap the fibers not connected to optical interfaces.
Fibers need to be installed onsite. Before installing the fibers, you must install cable clips at the
specified positions, as shown in the following figure.
When fibers splice through the E2000-E2000 connector on the ODF, purchase an E2000 ODF box for
fiber routing and installation. For details, see the E2000-ODF BOX Installation Guide.
Fiber holder
Cable clips
Cable clips
Fiber
NOTE
When you connect fibers to DCMs, make sure that the
DCMs and fibers are correctly connected in the two
directions based on the engineering documents specific Fiber holder Cable clips Fiber
to the site.
107
9 Installing and Routing Fibers of the Y-Cable
When installing or maintaining fibers, do not look into optical ports without eye protection.
• The following uses a 19-inch cabinet as an example to describe the fiber installation and routing in a cabinet.
The fiber installation and routing in an ETSI cabinet is similar.
• Bind fibers after laying out them. Ensure that fibers are not squeezed and the bend radius of fibers is 40 mm
or larger.After installing fibers, insert plugs in optical ports without fiber connections and cap fibers not
connected to opticalports.
Caution
The coiled fibers cannot exceed the fiber
management frame. Otherwise, the
excessively loose fibers may affect heat
dissipation of the lower subrack.
NOTE
1. Install the cabinet doors and side panels after routing all fibers and cables.
2. If the cabinets must be conjoined in a row, do not install the side panels. If the cabinets must be conjoined in a column, do not
install the rear doors.
3. For information about how to install the doors and side panels of the U64 equipment, see "Installing U64 Equipment on a Concrete
Floor" and "Installing U64 Equipment on an ESD Floor" in this document. For information about how to install the doors and side
panels of the U63B/N66B cabinet, see the N63B Cabinet Installation Guide and N66B Cabinet Installation Guide.
4. N63B cabinets designated to hold U32 subracks have dustproof sponges pre-installed on the interior side of their doors. Bear this in
mind when installing U32 subracks inside N63B cabinets.
108
Performing the Post-installation Check
1 Post-installation Checklist
When the installation is complete, double check that these items have been properly performed.
1 The cabinets are positioned in the places defined by the site-specific engineering design. Visual inspection
The subrack(s) and other components are properly installed and are free of damage or
2 Visual inspection
loose parts. No fingerprints, scratch marks, or other stains are present on the cabinets.
3 Cable holes at the top and bottom of the cabinets are securely sealed. Visual inspection
Cables are not damaged, broken, or spliced. The cable connectors are connected
5 Visual inspection
correctly and securely.
6 Labels at both ends of each cable and fiber are marked correctly, clearly, and neatly. Visual inspection
The fibers routed outside a cabinet are protected in a pipe or trough, and are protected
7 Visual inspection
from being pulled out or pressed against by other cables or objects.
The bending radius of fibers is not less than 8 mm. There are no sharp components
8 Visual inspection
along the routing path for the fibers.
Fibers are placed in order and are properly bound with fiber binding tape. There are no
9 Visual inspection
sharp edges.
Any vacant slots are covered with filler panels, and no devices are located in the air
11 Visual inspection
intake and exhaust areas.
The cabinet holding a U32 subrack has one dustproof sponge installed on the interior
12 Visual inspection
side of the cabinet door (either front or rear door).
109
2 Equipment Inspection Before Power-On
a Provisioning Power for the Equipment
Switch off the power sources for the equipment. Use a multimeter to measure the resistance between NEG(-),
RTN(+), and PGND terminals on the equipment.
CAUTION
After measuring the power voltages, shut down all power inputs to the PIU boards.
CAUTION
Do not power on the equipment when the power voltages are not within the specified ranges.
Measure the voltage between the NEG(-) and RTN(+) terminals on each PIU board.
U64 20 X 63 A
U32 10 X 63 A
U16 4 X 63 A
110
2 Equipment Inspection Before Power-On
WARNING
Do not insert or remove power plugs and PIU boards when they are energized.
U64/U32 Equipment
Switch on the main power for the U64/U32 subrack and check whether the subrack is powered on. If the subrack
is powered on, switch the main power off and then switch on the backup power for the subrack. If the subrack is
powered on, switch on the main power again.
Check the power indicator (green) at the top of the cabinet. The indicator should be lit.
After the subrack is powered on, test the air flows to check that the fans are working.
Check that the indicator on the fan tray assembly is steady green. If the STAT indicator is not steady green (for
example, steady yellow indicates one of the fans has failed, steady red indicates two or more fans have failed),
rectify the fan faults and then commission the equipment.
Check the connection between the core end terminal of the power cable and the corresponding output terminal of
the power distribution box. Check if all power connectors are connected tightly. If not, use the flat-head screwdriver
to tighten the captive screws on the connectors of power cables.
Check the connection of the other end (with OT naked crimping connector) of the power cable with the PIU board.
Each subrack must be provided with two lines of power supply.
Turn on the power switch of the part A on the DC power distribution box for each subrack. Check if the subrack are
powered on. If powered on, go on turning on the power switch of the part B and then turn off the power switch of
the part A. Check if the subrack are powered on. If powered on, turn on the power switch of the part A.
Check the cabinet power indicator on the top of the cabinet. The green indicator stays on.
When the subrack is powered on, the fan starts to operate. Check the air ventilation at the top and the bottom of
the subrack.
Observe the indicator on the front panel of the fan. Normally, it is always green.
If the indicator is constantly red, it indicates that two or more fans are faulty.
If the indicator is constantly yellow, it indicates that one fan is faulty.
WARNING
Do not insert or remove power plugs and the PIU when the power is on.
111
Provisioning Optical Paths
Station A Station B
West East
Fiber patch
cord
Measure the OUT port power of the FIU board at the transmit end. Record this reading as a.
Measure the fiber output power on the ODF side at the transmit end. Record this reading as b.
Measure the fiber input power on the ODF side at the receive end. Record this reading as c.
Measure the IN port power of the FIU board at the receive end. Record this reading as d.
Subtract b from a to determine the line-side fiber insertion loss for the upstream station. This insertion
loss must be less than 1 dB. If the insertion loss is greater than 1 dB, clean the fiber connectors on
section 1. If the insertion loss remains greater than 1 dB after the fiber connectors are cleaned, the
fibers on section 1 must be replaced.
Subtract d from c to determine the line-side fiber insertion loss for the downstream station. This insertion
loss must be less than 1 dB. If the insertion loss is greater than 1 dB, clean the fiber connectors on
section 2. If the insertion loss remains greater than 1 dB after the fiber connectors are cleaned, the fibers
on section 2 must be replaced.
After ensuring that the optical paths on sections 1 and 2 are functioning properly, calculate the actual line
attenuation between the two stations according to the formula Line attenuation = a - d + 2. (In the formula,
2 indicates 2 dB, which is the insertion loss of each FIU board.) The calculated line attenuation must be
equal to or less than the line attenuation specified in the design documents. If the line attenuation is not
within the specified range, the fibers on section 3 must be replaced.
Restore all fiber and cable connections after completing steps 1 to 3. This concludes the procedure for
provisioning optical paths from west to east.
Repeat the preceding steps to provision optical paths from east to west. Ensure that the optical paths
between the existing stations are functioning properly.
112
Engineering Labels
1 Affixing Labels
NOTE
Affix a label to a cable/fiber 2 cm away from its connectors.
Identification plate
To:
B03 — -48V2
B03 — -48V2 on the right side of the cable
when the cable is routed
Cable vertically.
Identification plate
Attach the identification plate on top of the
cable when the cable is routed horizontally.
Cable
Label
Fold upwards
NOTE
If a cable is routed vertically, the label must
face to the right. If a cable is routed
horizontally, the label must face
downwards.
113
2 Standard Engineering Labels
114
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Industrial Base Bantian Longgang
Shenzhen 518129
People’s Republic of China
www.huawei.com