Académique Documents
Professionnel Documents
Culture Documents
Executive Engineer,
Drainage Division, Chirala.
Executive Engineer,
Drainage Division, Chirala.
Required Certificates
1) Certified that the bill was not drawn and paid previously
2) Certified that all recoveries are effected as per G.Os.
Executive Engineer,
Drainage Division, Chirala.
Executive Engineer,
Drainage Division, Chirala.
Non govt.recovery
Class IV New GPF
Spl. Pay
AG NET
Net Pay
Name ,
APGLI
Scale
Sl.No
G.P.F
Total
Months
CPS
Pay
D.A
P.P
PT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
25.676% 10%
SARVA SRI/SMT. 24.104%
AD 21820 0 0 5259
Diff 0 344 12 4128
Period from: 01.10.2017 to 30.09.2018 (12M)
SEL FOR 15 DAYS 01-02-2018 172
TOTAL 5302 0 513 0 513 4789 0 4789
AD 21230 0 0 5117
Diff 0 334 10 3340
Period from: 01.12.2017 to 30.09.2018 (10M)
SEL FOR 15 DAYS 01-02-2018 167
. 5132 0 497 497 4635 0 4635